Volt/VAR Control at Progress Energy Carolinas Past, Present and Future

Similar documents
ADMS(Advanced Distribution Management System ) in Smart Grid

DMS - Breakthrough Technology for the Smart Grid

Substation Automation and Smart Grid

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE

Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables. Bob Yinger Southern California Edison April 15, 2014

PA PUC AERS & Metropolitan Edison Company Site Visit

GENe Software Suite. GENe-at-a-glance. GE Energy Digital Energy

Distributed Generation: Feeder Hosting Capacity. Dean E. Philips, P.E. FirstEnergy Service Corp Manager, Distribution Planning & Protection

The Future of Grid Control: Smart Grid and Beyond John D. McDonald, P.E. Director Technical Strategy & Policy Development

SCADA Controlled Multi-Step Automatic Controlled Capacitor Banks & Filter Banks

Il Progetto INTEGRIS. Risultati e nuove prospettive per lo sviluppo delle Smart Grid October 2nd 2013 Brescia

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

Step Voltage Regulators

Distributed Generation and the Impact on a Distribution System. Brian Lassiter Technical Sales Engineer

Distribution System Automation

Impact of electric vehicles on the IEEE 34 node distribution infrastructure

Case Study Improving System Performance Using Distribution Network Automation

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Basics in Energy Information (& Communication) Systems Summary Substation Automation

Grid Edge Control Extracting Value from the Distribution System

Distribution Automation / Smart Grid. Kevin Whitten

Venteea A Smart Grid demonstrator for the DRES integration on the MV distribution networks.

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman.

AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation

For Utility Operations

Advanced Distribution Grid Management for Smart Cities

Best Practices for Creating Your Smart Grid Network Model. By John Dirkman, P.E.

Big Data: Using Smart Grid to Improve Operations and Reliability. LaMargo Sweezer-Fischer Power Delivery Grid Automation Manager FPL July 2014

Preparing for Distributed Energy Resources

What Matters for Successful Integration of Distributed Generation

Monitoring Underground Power Networks

White Paper. Convergence of Information and Operation Technologies (IT & OT) to Build a Successful Smart Grid

COMMENTS OF THE SOLAR ALLIANCE NEW JERSEY INTERCONNECTION RULES APRIL 29 TH, 2011

Utilities the way we see it

Pennsylvania Summer Reliability

The State of the Electrical Grid in Washington State. Michael Pesin, PMP, P.E. Seattle City Light

Smart Grid Enabling a Sustainable Energy Future

Rule Fast Track Analysis for National Life Insurance Co.

Future of Electric Distribution Dialogue

TERMS AND CONDITIONS

A Changing Map. Four Decades of Service Restoration at Alabama Power. By G. Larry Clark

Executive Summary... ii. 1. Introduction Purpose and Scope Background about VVO Organization of this Report...

Utilization of Automatic Meter Management in Smart Grid Development

General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System

Next Generation Distribution Management Systems (DMS) and Distributed Energy Resource Management Systems (DERMS)

Totally Integrated Power SIESTORAGE. The modular energy storage system for a reliable power supply.

INTELLIGENT DISTRIBUTION NETWORK ANALYSIS AND INFORMATION ARCHITECTURE DESIGN

FACT SHEET. BSES, Delhi - Distribution Network. Power Systems Consultancy from ABB

Executive summary 2. 1 Introduction 4

CenterPoint Energy Robert B. Frazier Director of Electric Technology

Strategic Microgrid Development for Maximum Value. Allen Freifeld SVP, Law & Public Policy Viridity Energy

ARRA Grant Case Studies SMUD s Smart Grid Program

Context: significant penetration of DG = increased risks for system security

Federal Wage System Job Grading Standards for Electric Power Controlling, Table of Contents

Guideline for Energy Efficient Electrical systems for building. Presentation by TERI

Modeling of PV Based Distributed Generator Systems with Diverse Load Patterns

How the National Grid System Operates. Chris Gorman Lead Account Executive Syracuse

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

Enterprise Approach to OSIsoft PI System

FIXED CHARGE: This is a cost that goes towards making the service available, including

Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach

Renewable and Alternative Energy Outlook

Minimizing Impact of Electric Utility Outages with Backup Generation

Smart Storage and Control Electric Water Heaters. Greg Flege, Supervisor, Load Management Midwest Rural Energy Conference March 3, 2011

Volt-VAr Management Software (V VMS) for smart grid distribution automation applications

Smart Inverters Smart Grid Information Sharing Webcast

Typical Data Requirements Data Required for Power System Evaluation

SCE Experience with PV Integration

Investor day. November 17, Energy business Michel Crochon Executive Vice President

Conservation Voltage Reduction (CVR)

Future Role of Distribution Companies Deployment of Smart Systems. Dr. Sam Amadi Chairman/CEO

ABB smart grid Intelligent business

Balancing and Reserve Power by PV Plants. Ken Christensen MSEE, BSEE Global Product Manager, SMA Utility-Scale and Hybrid Solutions

Energy Storage Market Overview MADRI 3/3/2015 John Fernandes Policy & Market Development Manager

Implementing Low-Cost Distribution Automation Programs

Big Data in Smart Grid. Guangyi Liu China Electric Power Research Institute

Engineering innovation

Monitoring & Control of Small-scale Renewable Energy Sources

Power System review W I L L I A M V. T O R R E A P R I L 1 0,

Solar Power Plant Design and Interconnection

Overview brochure. Energy Storage Keeping smart grids in balance

DTE Energy: an Enterprise PI approach

Jim Sheppard, Director of Business Processes CenterPoint Energy, Texas, USA

Grid Modernization Distribution System Concept of Operations. Version 1.0

Hyperlinks are Inactive

Data center power dynamics within the settings of regional power grid

Overcurrent Protection for the IEEE 34 Node Radial Test Feeder

Guidelines for Large Photovoltaic System Integration

INTRODUCTION TO SYSTEM PROTECTION. Hands-On Relay School 2012

A Tariff for Reactive Power Christopher Tufon, Alan Isemonger, Brendan Kirby, Senior Member, John Kueck, Senior Member, and Fangxing Li, Senior Member

ComEd Grid Renewal Terence R. Donnelly

Topic 2: Introduction to Smart Grid

Smart Grids. MIECF Conference April 2011

Bill is the author of 15 papers and lectures on transmission lines and other power system topics.

On the Road to. Duke takes the road less traveled and arrives at a new level of distribution automation.

Transcription:

Volt/VAR Control at Progress Energy Carolinas Past, Present and Future IEEE PES General Meeting Minneapolis, Minn. July 27, 2010 Glenn Lampley, P.E. Project Manager, Smart Grid-DSDR Raleigh, North Carolina

Progress Energy Carolinas 33,000 Square Miles 1.4 million customers 47,000 miles of distribution primary 380+ T/D substations & 1,190+ distribution feeders 72% distribution feeders served overhead 19% at 12kV and 81% at 23kV 1,200 customers per feeder 41 miles average primary feeder length 9% of feeders > 100 miles long 2

Early Volt/VAR Management Transmission Planning & Distribution Planning performed complete system volt/var studies in accordance with annual planning calendar Transmission System required VAR support and voltage support during peak load periods and during certain contingency situations During light load times, capacitive VARs need to be removed from the system to avoid stability problems at major base load nuclear generating plants Standard model for a regulated T/D substation was a 5400 kvar capacitor bank for each 25 MVA of capacity. A fully loaded 25 MVA transformer has 3000 to 3600 kvar in losses 3

Early Volt/VAR Management Transmission Planning to maintain voltage on transmission side of T/D substation between 90-105% of nominal during normal and contingency conditions with fluctuations during contingency to no more than 8% from pre-contingency voltage level VARs are needed on the distribution system to support end-of-line voltage and meet distribution VAR requirements during peak load periods Planning guidelines called for capacitors to be installed on the distribution system to maintain 95% PF on feeders During light load periods, distribution line capacitors and substation capacitors will be controlled such that the power factor on the high side of the T/D substation bus will not go leading except during emergency conditions 4

Distribution Feeder Control Application Static (no control) provide best loss savings at minimum load. Also installed on taps serving large industrial or commercial load if customer runs three shifts. Volt/Time/Temp (VTT) Apply near the end of the line for the 1 st bank to be switched. Time setting best applied for daily load patterns and temp settings for seasonal load patterns. Current Apply on the tap serving large industrial/commercial load or instead of a VAR control for the bank nearest the sub VAR Apply on the bank nearest the substation Power Factor Reserved for special applications requiring sequencing of multiple banks at a single location 5

Typical Distribution Application Shopping Mall FDR OCB Bank Size 600/1200 kvar 600/1200 kvar 600/1200 kvar 600/1200 kvar Typical Control VAR/Current VTT (Time) Static VTT (Temp) Load Type Peak Daily Minimum Seasonal 6

T/D Substation Control Application Size capacitor bank to maximize investment 2700 kvar initial size for 12.5 MVA bank 5400 kvar initial size for 25 MVA bank 7200 kvar maximum size for contingency voltage support Utilize zero-closing breaker where possible to limit power quality problems to large industrial or commercial customers utilizing sophisticated solid-state controls Apply VAR controls with voltage override capability in all substations to protect distribution system against high or low voltage extremes 7

Volt/VAR Management With Distribution Automation Progress Energy implemented the Energy Delivery Strategic Initiative (EDSI) during the 1996-1999 time period Installed RTU in all 380 T/D subs Now monitoring voltage, current, KW, KVAR, PF, and harmonics on all 1190 distribution feeders Captured voltage, current, and fault events on all substation bus and distribution feeders using a Feeder Monitoring Systems (FMS) Ability to see cap bank switching by monitoring VAR flow Substation capacitor controlled by program resident inside of RTU Capacitor application now revised to provide a 99% PF on the high side of the T/D transformer bank 8

Volt/VAR Management With Distribution Automation Radio Controlled Capacitor System (RCCS) installed to utilize a central computer providing automated control of distribution feeder capacitor banks RCCS utilized a one-way paging system to control cap banks Switching order determined by Planning Engineer Utilized the monitoring capability of FMS to determine if feeder cap bank switched when called upon by RCCS Trouble tickets associated with switching failures identified by FMS would be electronically generated and sent to repair crews Analysis of power factor before and after implementation of EDSI Project revealed a reduction in distribution losses of 2.8% 9

Volt/VAR Management With Distribution Automation Prior to EDSI PF determined by installing temporary metering Distribution line capacitors controlled via time clocks with voltage override, current, straight voltage and some VAR Cap bank operation checked manually to determine if they were operating properly Maintenance of cap banks was performed three times a year to check switch operation and identify blown fuses 10

Volt/VAR Management With Distribution Automation After EDSI Project RTU installed in all substations to monitor voltage, current, KW, KVAR, PF, and harmonics Through implementation of the Radio Controlled Capacitor System (RCCS) able to control line cap banks to maintain 99% PF on high side of T/D transformer Using RCCS and FMS, cap bank operation can be checked remotely and repair tickets issued electronically Eliminated need to visit and maintenance cap banks three times per year Failed cap banks are expected to be back in service within 2-3 weeks of notification of failure vs. the possible 12 weeks lag prior to EDSI 11

Volt/VAR Management With Smart Grid Implemented Distribution System Demand Response (DSDR) Program in 2007 Feeder Conditioning to achieve a 2 volt profile on all feeders Upgraded DSCADA system to handle more control points Developing a Distribution Management System to perform demand reduction at peak and maintain loss optimization the remainder of the time Expanding Voltage Reduction Program to achieve consistent demand reduction over a sustained six hour peak period Installing a two-way communication system to all distribution controlled devices; regulators, capacitors, reclosers, and switches 12

Feeder Voltage Changing Voltage Profile by Feeder Conditioning Upper Regulatory Limit Flattened profile allows greater Voltage Reduction Lower Regulatory Limit 13 Feeder Length Existing Lower Voltage to Reduce MWs Flattened Profile after feeder conditioning

Distribution Feeder Conditioning DSCADA SUB Tap Lines AMI Regulator Capacitor Phase Additions Balance Load Re-tap ~5,000 transformers and line taps Capacitors Add ~400 new line capacitors ~2,500 existing today Regulators Add ~2,000 line regulators ~600 existing today New Phase Additions Add ~300 miles of new phase wire Flatten Voltage Profile 14

Secondary Optimization Primary Secondary Distribution Transformer Secondary Conductor SUB Point of Delivery 15

Distribution Feeder Control Sensors DSCADA SUB Tap Lines AMI Regulator Capacitor Phase Additions DMS Distribution Management System Obtain Data Real-time Analysis Execute Commands 16

Controlled Feeder Equipment Two-Way Communications Feeder Voltage Regulator Feeder Capacitor 17

Medium Voltage Sensors Line Voltage/Current Sensor 18

Low Voltage Sensors Voltage Sensor at Residence AMI Metering w/voltage sensing Metering Socket w/radio or modem Metering Adapter 19

Functionality of the DMS DSCADA (includes historical data) Feeder & Substation Devices 1. Data Collection 2. User Views 3. Command Execution These are required to deliver MWs Core/Base/Required DMS Modules Unbalanced Three Phase Load Flow @ Every Node State Estimator Load Forecast Study/Training/Simulation Mode Dashboard/Integrated User Interface Real Time Planning Functionality Asset Management Voltage Reduction (2.5%) Ancillary DMS Modules Switching Analysis Fault Location Basic VVO (RCCS) Disaster Recovery Online Access Load Shedding These are not required to deliver MWs Optimization Engine Loss Optimization @ Feeder Level DSDR Mode Other future modes 20

DSDR: An Integrated Grid; New Capability DSDR Substation (~315) Transformer Voltage Regulator S Feeder Breaker Distribution Feeder (~13K devices) S VR VRC SEL Cap Bank Gateway PQ Meter Cap Bank (Controllers ) Recloser (may be sensors) Sensor Regulator (Controllers) Telecom Switch Cabinet Router PGN Wireless Commercial Wireless PGN/Carrier Edge Data Network Communications PGN: Fiber, Wireless Commercial: Data Service PGN Core Data Network Communications Carrier Edge Data Network Communications EMS DSCADA VMS FMS DSM/AMI Engineering DMS DCC 21

Future of Volt/VAR Management Penetration level of Distributed Generation (DG) before voltage stability is impacted Islanding and the impacts on customer voltage Impact on voltage as PV and wind generators fluctuate on and off line Impact of DG on transmission voltage and generator VAR requirements Smart Grid will result in more monitoring and control Communications infrastructure becomes even more critical 22

Volt/VAR Control at Progress Energy Carolinas Questions? 23