Lake Charles Ward 3 Recreation Improvements To University Park

Similar documents
Lincoln Public Schools. 15 Attachments (separately bound) Schematic Design Schematic Design Project Manual

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room.

Seattle Public Schools Building Excellence IV Projects Under Construction

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION

Design Development Quality Management Phase Checklist Project Phase Checklist Series

Facility Assessment for East Main Street, Huntley, IL

Description Quantity Cost Total Cost

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

KIEWIT CM/GC Enabling/Utilities

Special Use Commercial Properties

WELDING LAB FSCJ DOWNTOWN CAMPUS - BUILDING B

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

A0 SHEET 1 OF LOCUST STREET FRANKFORT, KANSAS FRANKFORT, KANSAS ROOF REPAIR OF THE 400 LOCUST STREET

Architectural Inspection Site Structures

NAHB PRODUCT DEFINITION

Construction Technologies Career Field Pathways and Course Structure

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

How To Plan A Building

NOTICE TO CONTRACTORS

SWAN POINT YACHT & COUNTRY CLUB

Important Information for Owners of Buildings in Flood Zones

CHARLOTTE COUNTY Community Development Department

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

T170 Interior Design Technology MTCU Code Program Learning Outcomes

CERVANTES COMMUNITY CENTER RE-ROOFING NEW MEXICO STATE UNIVERSITY

The work has continued on final Phase 4 and is nearing completion.

October 30, Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

Point Auditorium Design Narrative PROJECT NAME: Point Auditorium DATE: 06/25/15 TO: Lance Francis FROM: Leslie Ellsworth

REQUEST FOR QUALIFICATIONS FROM FOUNDATION REPAIR CONTRACTORS BROOMFIELD DEPOT FOUNDATION REHABILITATION PROJECT

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

EAST LYME HIGH SCHOOL

BUNKER HILL ELEMENTARY SCHOOL

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

Pumphouse Museum at the Historic Ottawa Beach Parks Park Township

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

BILL OF QUANTITIES Part No.: Part Description

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

City and County of San Francisco Department of Public Works TABULATION OF BIDS

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

Interior Design IV Gary Leivers AIA, RIBA, LEED AP

Design of a Concrete Masonry House: NCMA Foundation Partners with NC State University School of Architecture

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

Saint Cloud Business Center

PRESERVATION PLANNING ASSOCIATES 519 Fig Avenue, Santa Barbara, CA Telephone (805)

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address

Residential Building Permits

Outline. Owner Perspective CM Definition Working Relationships Why CM? Project Approach Pre-construction Construction. Iowa League of Cities // 2011

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Yale Arts Complex. The design results from the integration of programmatic, structural and mechanical needs. It includes

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

SECTION 3 ONM & J STRUCTURAL ANALYSIS

Exterior Elevated Elements Inspection Guidelines

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

VILLAS OF TRADITIONS AT GREY OAKS

Building Description Project Description Estimated Cost Notes Total Deferred

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Sample Drawing Package for One and Two Family Dwelling Applications

Commercial Building Valuation Report

St. Louis County Department of Public Works Division of Code Enforcement. When is a Building Permit required for Residential Projects?

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

BUILDING PERMIT SPECIFICATIONS

HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL

PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.)

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

PROJECT COST ESTIMATES & FEASIBILITIES

A Guide To The New Termite Standards (revised 09/02/2001)

MIAMI BLUFFS COMMUNITY ASSOCIATION LINE ITEM BUDGET (9058)

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

PELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT. November 2007

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Cost Estimating Simplified

Commercial Building Valuation Report

Additions and Alterations

How To Build A Luxury Apartment Complex In London

VJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC TEL: (202) INITIAL PROJECT COST ANALYSIS

Saxe Middle School Auditorium Renovation February 4, 2015

Transcription:

DATE APRIL 2015 Drawing Index A0.0 Cover Survey A1.0 Site Plan & Details A2.0 Pool Area Site Plan & Demo Plan A2.1 Pool Area Building Improvements A2.2 Pool Area Elevations & Wall Section A3.0 Basketball Court Covering A4.0 Baseball Field Improvements A5.0 Restroom Building Foundation/Structural Plan & Details A5.1 Restroom Building Floor Plan, Sections, & Elevations M2.0 HVAC Plans E1.0 Electrical Site Plan E2.0 Basketball Court & Restroom Electrical Plans E3.0 Electrical Details, Risers, & Light Fixture Schedules P1.0 Plumbing Site Plan P2.0 Restroom Plumbing Plan P2.1 Pool Area Building Plumbing Plans P3.0 Plumbing Schedules & Details Kip Texada: Executive Director * 1 Vicinity To Interstate 2-10 Scale: N.T.S. NC. MOSS ARCHITECTS, I DAVID M. MOSS, AIA, ARCHITECT 3221 RYAN ST., SUITE B RICHARD A. STEEN, AIA, ARCHITECT LAKE CHARLES, LA 70601 D. RAVELLE REED II, ASSOC. AIA 337.433.8166 (P) 337.433.8167(F) Kyle W. Bennett, Assoc. AIA WWW.MOSSARCHITECTS.COM 2 Vicinity Map Scale: N.T.S. A 0.0

DATE APRIL 2015 VAN ACCESSIBLE 2 New Striping Detal SCALE: 1/8" = 1' 3 Parking Signage Detail SCALE: 1/2" = 1' NC. MOSS ARCHITECTS, I DAVID M. MOSS, AIA, ARCHITECT 3221 RYAN ST., SUITE B RICHARD A. STEEN, AIA, ARCHITECT LAKE CHARLES, LA 70601 D. RAVELLE REED II, ASSOC. AIA 337.433.8166 (P) 337.433.8167(F) Kyle W. Bennett, Assoc. AIA WWW.MOSSARCHITECTS.COM 1 Site Plan 1" = 50' 6 Typ. Paving Construction Joint SCALE: 1"=1' 4 Picnic Table Area, Typ. SCALE: 1/4" = 1' 5 7 Bike Rack Detail SCALE: 3/8" = 1' Typ. Paving Edge Detail SCALE: 1"=1' 8 Typ. Expansion Joint SCALE: 1" = 1' 9 Gravel Path Detail SCALE: 1" = 1' A 1.0

DATE APRIL 2015 2 Enlarged Plan 1/8" = 1' NC. MOSS ARCHITECTS, I DAVID M. MOSS, AIA, ARCHITECT 3221 RYAN ST., SUITE B RICHARD A. STEEN, AIA, ARCHITECT LAKE CHARLES, LA 70601 D. RAVELLE REED II, ASSOC. AIA 337.433.8166 (P) 337.433.8167(F) Kyle W. Bennett, Assoc. AIA WWW.MOSSARCHITECTS.COM Symbols Legend 1 Site Plan 1" = 20' 3 Cantilever Shade Structure 1/8" = 1' Key Plan 4 Demolition Plan 1/4" = 1' A 2.0

Symbols Legend DATE APRIL 2015 Finish Symbol & Schedule NC. MOSS ARCHITECTS, I DAVID M. MOSS, AIA, ARCHITECT 3221 RYAN ST., SUITE B RICHARD A. STEEN, AIA, ARCHITECT LAKE CHARLES, LA 70601 D. RAVELLE REED II, ASSOC. AIA 337.433.8166 (P) 337.433.8167(F) Kyle W. Bennett, Assoc. AIA WWW.MOSSARCHITECTS.COM 1 New Floor Plan 1/4" = 1' Key Plan 2 Interior Elevation 1/4" = 1' 3 Interior Elevation 1/4" = 1' 4 Opening Schedule 1/4" = 1' 5 Door Jamb Detail (Head Similar) Scale: 1 1/2" = 1' 6 Plan Detail Scale: 1 1/2" = 1' 7 Partition Schedule Scale: 1 1/2" = 1' 8 Shelving Detail Scale: 3/8" = 1' A 2.1

DATE APRIL 2015 1 West Elevation 1/4" = 1' NC. MOSS ARCHITECTS, I DAVID M. MOSS, AIA, ARCHITECT 3221 RYAN ST., SUITE B RICHARD A. STEEN, AIA, ARCHITECT LAKE CHARLES, LA 70601 D. RAVELLE REED II, ASSOC. AIA 337.433.8166 (P) 337.433.8167(F) Kyle W. Bennett, Assoc. AIA WWW.MOSSARCHITECTS.COM 5 Wall Section 3/4" = 1' 2 East Elevation 1/4" = 1' 3 South Elevation 1/4" = 1' 4 North Elevation 1/4" = 1' A 2.2

DATE APRIL 2015 4 East Elevation 1/8" = 1' NC. MOSS ARCHITECTS, I DAVID M. MOSS, AIA, ARCHITECT 3221 RYAN ST., SUITE B RICHARD A. STEEN, AIA, ARCHITECT LAKE CHARLES, LA 70601 D. RAVELLE REED II, ASSOC. AIA 337.433.8166 (P) 337.433.8167(F) Kyle W. Bennett, Assoc. AIA WWW.MOSSARCHITECTS.COM 1 Site Plan 1/8" = 1' 5 West Elevation 1/8" = 1' Key Plan 2 South Elevation (North Elevation Similar) 1/8" = 1' 3 Building Section 1/8" = 1' 6 Column Details 3/4" = 1' A 3.0

DATE APRIL 2015 2 Baseball Fence Details 1/4" = 1' NC. MOSS ARCHITECTS, I DAVID M. MOSS, AIA, ARCHITECT 3221 RYAN ST., SUITE B RICHARD A. STEEN, AIA, ARCHITECT LAKE CHARLES, LA 70601 D. RAVELLE REED II, ASSOC. AIA 337.433.8166 (P) 337.433.8167(F) Kyle W. Bennett, Assoc. AIA WWW.MOSSARCHITECTS.COM Key Plan 1 Site Plan 1" = 20' 3 Dugout Plan (ALT. BID #1) 1/4" = 1' 4 Dugout Section (ALT.BID#1) 1/4" = 1' 5 Batting Cage (ALT. BID #1) 1/8" = 1' A 4.0

DATE APRIL 2015 General Notes EXCAVATION 1 Foundation Plan 1/4" = 1' 3 CMU Bond Beam 3/4" = 1' 6 7 CMU Wall Control Joint 3/4" = 1' Exterior Grade Beam 3/4" = 1' SUBGRADES PREP & STRUCTURAL FILL FORMWORK NC. MOSS ARCHITECTS, I DAVID M. MOSS, AIA, ARCHITECT 3221 RYAN ST., SUITE B RICHARD A. STEEN, AIA, ARCHITECT LAKE CHARLES, LA 70601 D. RAVELLE REED II, ASSOC. AIA 337.433.8166 (P) 337.433.8167(F) Kyle W. Bennett, Assoc. AIA WWW.MOSSARCHITECTS.COM 4 CMU Wall Intersections 3/4" = 1' 2 CMU Bond Beam 3/4" = 1' Key Plan 8 Interior Grade Beam 3/4" = 1' REINFORCING STEEL CONCRETE 5 Framing Plan 1/4" = 1' A 5.0

DATE APRIL 2015 MOSS ARCHITECTS, I NC. DAVID M. MOSS, AIA, ARCHITECT 3221 RYAN ST., SUITE B RICHARD A. STEEN, AIA, ARCHITECT LAKE CHARLES, LA 70601 D. RAVELLE REED II, ASSOC. AIA 337.433.8166 (P) 337.433.8167(F) Kyle W. Bennett, Assoc. AIA WWW.MOSSARCHITECTS.COM 3 Building Section 1/4" = 1' 1 Floor Plan 1/4" = 1' Key Plan 4 Northeast Elevation 1/4" = 1' 2 Wall Section 3/4" = 1' 5 Southeast Elevation 1/4" = 1' A 5.1