first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel



Similar documents
GigaCrete Specification PlasterMax

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Built to Last. Built for Beauty. Good. Solid. Logix. TM

INSTALLATION OF A BAY WINDOW

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

Additions and Alterations

Electrical Wiring Technical Bulletin

PANELIZED HOME INSTALLATION GUIDELINE

Insulation R-Value Comparisons

PANEL CONCEPTS LLLP.

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

Mark Cramer Inspection Services, Inc.

How to Install GoBoard:

The minimum reinforcement for the stem wall is the placement of:

InsulView Window Installation Instructions

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010

ADDENDUM # 1 To: RFP for: Various Construction Maintenance & Repair Services

BOQ SPECIFICATIONS. The Blind system consist of a coated aluminium tube of 38 mm diameter with provision of fabric clamping.

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

2.18 INTERIOR & EXTERIOR FINISHES VAPOR & AIR BARRIERS

Building Condition Assessment Report

March 14, Installation of Bay, Bow and Garden Windows

Best Barns USA Assembly Book

Holz Choices & Specifications

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

Mike and Jen Sample 111 Main St. Tabb, VA SPECIFICATION LIST

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Chapter 36 - STRAW BALE CONSTRUCTION SECTION PURPOSE. SECTION SCOPE. SECTION DEFINITIONS.

technology UICK progressive sustainable any design, any shape, any colour, anywhere you like!

LAYING BLOCK AND BRICK

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

Superform Products Ltd.

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN Phone (260) Sales Fax (260)

COMMERCIAL BUILDING APPLICATIONS

Estimating Database Checklist

Window Installation Instructions

Designing With. Designing With Structural Insulated Panels Advanced. Credit for this course is 1 AIA HSW CE Hour. Course Sponsor

H-Stud Area Separation Wall System

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra Includes:

R-Value and Densities Chart

Foundation. Foundation

ModuSec. Secure and efficient IT room solutions. Turnkey Modular Construction Fast clean build to any size or shape

Mobile Home Pre-Inspection Checklist

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

PART 1 GENERAL 1.1 SECTION INCLUDES

Estimator: Miami Estimates Business: (305) Date Entered: 04/30/2008

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

How to build a Pizza Oven in 4 days

DENVER MODEL 30 X 30 SPECIFICATIONS

INNOVATIVE. ADAPTABLE. ENERGY EFFICIENT.

Asbestos Management Program

Renovating Your Basement

GENERAL PROVISIONS

AUTHORIZATION TO MARK

Premier & Deluxe 3-Season Room Sliding Glass Door

TechPractices: Home Front Homes:

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

Irvinton Village Apartments 2901 Fulton Houston, Texas Houston Housing Authority J. Allen Management Managing Agent

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

Adding value to the finest homes in Virginia for 52 years! years

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

IF YOU NEED A POLE BARN OR DIY KIT CALL NOW AND LETS MAKE A DEAL

ICC-ES Evaluation Report Reissued September, 2010 This report is subject to re-examination in one year.

IMPROVEMENT COST ESTIMATE powered by HomeFixers

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

The Case for Cross Laminated Timber: Part 2

Crawford Inspection Services C.C.B. #

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

RACQUETBALL, HANDBALL OR SQUASH COURTS AND GYMNASIUM WALL SURFACES

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

12.1 Schlüter -KERDI-BOARD

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Zen House. A Case Study on Design, Construction and Cost/benefit Analysis of a High Performance Home. Presentation for Net Zero Networking & Exchange

Elevating Your House. Introduction CHAPTER 5

Texas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG)

Triarch Products Over Various Interior Substrates

Models A spe n, Econoline C o l o n i al. and Savoy. Installation Instructions. Contractors Wardrobe

research highlight Highly Energy Efficient Building Envelope Retrofits for Houses

ULTIMATE GUIDE BE PREPARED FOR YOUR UPCOMING PROJECT

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

Sun Windows General Information Sun New Construction Window Installation Instructions

ORAY PREFABRICATED GSM SHELTER CONTAINERS TECHNICAL SPECIFICATIONS

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

Heavy Glass Frameless Shower Door With Return Panel

Transcription:

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

What is GigaCrete GigaCrete is a family of products based on low carbon footprint Green ceramic binders significantly outperforming Portland cement: We do not use PORTLAND CEMENT which is a high CO2 producer StuccoMax, a waterproof exterior coating that is non-combustible PlasterMax, a fire rated abuse resistant coating over foam replacing gypsum board All GigaCrete coatings bond permanently to EPS and PU insulation foam, concrete products, bricks and plasters. All are one coat applications and fast to apply All are abuse resistant, non combustible, no VOC s, no off-gassing utilizing only safe and healthy materials that will not support the growth of mold or mildew.

What is GigaCrete s unique GigaHouse GigaPanel is not what you think. It is not a SIP s panelized building system at all. It is a patented steel framed insulation system! The building components are structural steel stud construction, proven for decades, signed off by a local structural engineer who only has to agree with the calculations of leading structural engineering already completed. We reversed the building process Typically building with studs comes first, then fiberglass insulation is added in between the studs, this creates thermal leaks and sound transmission through the studs into the home. Neither fast nor ideal. GigaPanel Systems starts with the insulation first utilizing variable density high R-Value rigid EPS foam insulation panels with computerized insert channels cut into the foam. Structural engineering dictates where the steel studs and connectors fit to meet code compliance for a steel framed structure! The structural components are then slipped into place and securely attached with self drilling, self tapping screw. Exactly the same as steel framed construction only this can be done by unskilled labor, purposely made to be very simple, guaranteed square and right the first time, no measuring, no room for errors.

Overview of installation methodology 1. Layout steel track on slab and permanently attach 2. Locate wall insulation panels into track 3. Slide down connectors and screw to tracks top and bottom 4. Cut electrical outlets and link to conduits and secure with insulating foam (same as ICF construction) 5. Coat exterior with 3,500 psi StuccoMax (same day as roof is installed) 6. Coat roof with GigaRoof (StuccoMax) 7. Coat interior with fire rated, 8500+psi PlasterMax

Tools needed to build a house 2.5 to 3 meter Step Ladder Screw Gun Ramset Gun Tape Measure Metal Shears Pry bar

6 to 12 thickness EPS GigaPanel components, (variable densities)

GigaPanel is designed for rapid assembly by unskilled labor Large interior wall insulation panels can be lifted with one hand

16 linear feet of wall GigaPanel is easily carried into position No heavy machinery needed

Step 1: Lay out the bottom tracks according to plans and include water resistant gaskets between the bottom track and the slab.

Step 2: Attach bottom track to the slab with Ramset pins or screws

Step 3: Locate panels next to where they are needed

Step 4: Insert pre-cut foam panel into steel stud bottom track Tools needed: tape measure, ramset gun, pins and load. Track positioned over moisture gasket and shot into slab

Panels are laid in place in minutes not days CNC cuts are guaranteed to be square with studs located exactly where needed as per structural needs no measuring no room for errors NO SPECIAL SKILLS NEEDED

Step 5: Insert studs Double stud connector equals a 4 x4 every 4 with additional stud @ 24 O/C Tools needed: Step Ladder Screw gun, pry bar. Patented connectors based on steel framing construction methods Slide down engineered grooves in panels forming panel to panel connections and the structural members both at the same time. Note: the GigaPanel designs determine where the structural studs and connectors are placed

Finished top track Top track inserted into EPS panel and screwed to vertical studs

Exploded view of connections

Section through a typical interior panel shows double studs connecting panel to panel and 24 on center steel studs for all walls. Exterior walls and roofs may have studs offset within thicker foam wall insulation panels to minimize thermal bridging.

Pre-cut T sections

Pre-cut corner sections

Column made from 4 pre-cut corners Columns are used for additional Structural support, HVAC (heating ventilation air conditioning systems) Plumbing and venting chases. Typically used in corners

90 Corner and T connected together

Foundation to wall connection Hurricane anchors solid steel connection from the roof to the foundation

Step 6: Laser level and brace walls before adding roof trusses

Step 7: Roof trusses added to walls a few hours after building walls

Compression ring holds 200 mph roof trusses securely together

Step 8: Install doors and windows and screw into steel studs

Window and Door framing

Step 9: Roof panels are laid onto trusses and studs slid into location holes cut into foam panels

Step 10: Roof studs are screwed to trusses with steel brackets

Roof panels from inside the house Showing stud perlins prior to be covered with additional EPS panels

Step 11. Install electrical conduits and wires for outlets and switches. Conduits are pre cut into panels ready to pull wiring.

Conduit or plumbing passing through walls Must meet local electrical codes Electrical wiring inside chase

Retrofit electrical after house is completed PlasterMax Mesh Cut flush ----- Foam not yet cut ----- Note the conduit and box is Foam glued into place and excess foam shaved flat, ready to be coated with PlasterMax Walls are rasped where needed to make flat

Step12: StuccoMax is direct applied over the foam insulation panels

Window and Door trims cut from EPS foam are covered with StuccoMax

Step 13: Colored GigaRoof spray applied directly over the EPS foam (non USA projects) GigaRoof is now approximately R-45

Insulated Spanish Tile GigaRoof

Step 14. PlasterMax over interior walls GigaCrete coatings are added directly to the EPS foam, note the imbedded mesh

Note: Gutter system integrated into molding for rain collection Doors (by others) added

Step 15. Add insulation sheets on underside of roof and over trusses Foam shapes are pre cut and fitted over trusses

PlasterMax applied directly over EPS foam panels. All panel seam lines are covered over to create a seamless and durable ceramic finish.

Ceiling underside of roof panels and beams covering structural roof trusses Fire rated PlasterMax applied over the EPS foam Foam sheets are screwed into the steel studs

Finished PlasterMax over the foam interior wall panels Note optional storage area above bedroom and bathroom

Optional Magnesium board ceilings (no gypsum board) With PlasterMax roller texture knockdown finish

Step16: Window trims are added, screwed into steel studs, patched and ready for paint.

Step17: StuccoMax is washed to remove dust particles, primed and painted.

Simonton vinyl windows (no wood) come in all standard sizes

End result is a very energy efficient and virtually maintenance free living environment

StuccoMax (exterior) is sprayed or troweled over foam 3/16 thick StuccoMax is tough enough to drive on!

SUSTAINABLE GigaPanel build strong, build safe, build fast 1. Completed rapidly with supervised local labor 2. Simplicity = speed = reduced cycle time 3. High R values means less operating costs to heat or cool 4. Only healthy materials are used 5. No Portland cement used in the house structure 6. Exterior StuccoMax is WATERPROOF 7. Interior PlasterMax is the Worlds only fire rated, 8,500+ psi abuse resistant plaster designed specifically for applications over insulation foam