Gas Meter Clearances and Service Installation Requirements



Similar documents
Gas Meter Clearances and Service Installation Requirements

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

SECTION 5 DRAFTING STANDARDS

PART 6: VENTING, COMBUSTION AIR & CONDENSATE REMOVAL

MOBILE HOME SERVICE REQUIREMENTS GAS

ELECTRIC SERVICE GUIDELINES (For Indiana)

Mobile Home Pre-Inspection Checklist

Underground Service Requirements and Instructions

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

Electric Service Conversion Overhead-to-Underground. Minnesota

Beacon Hill Sewer District Standard Specifications

General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.

Residential Decks. Planning and Development Services Department

Building Permit Application

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

COMMONLY USED RESIDENTIAL BUILDING CODES

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE

Please check with your local inspection authority for any additional requirements before installation.

Fiberstars Mini Lighted Laminar Flow Fountains

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

Installation of Underground LP-Gas Systems

Section 2 Gas Service

Electrical Service Guidelines

Underground Commercial Electric Service

BUILDING PERMIT SPECIFICATIONS

SECTION EARTH MOVING

COMMERCIAL CONDUIT RULES AND REGULATION

Specifications for Residential Property Owners Connection to New Public Sewer

ETL listed for installations within 5 ft. (1.5M) of outer edge of water Rev E Page 1 of 10

Development Services City of Lawrence, KS

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

March 2015 GAS SERVICE HANDBOOK. Commercial/Industrial & Multifamily Developments. Form No (Rev. 15)

NEW SERVICE INSTALLATION STEPS. Common Slow Downs. Other Necessary Steps

SHALLOW UTILITIES JOINT PROVISIONING GUIDELINES SCOPE

TABLE OF CONTENTS. PUD SERVICE TERRITORY & CONTACTS... Page 1. NEW SERVICE QUESTIONNAIRE... Page 2. GENERAL... Page 3

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

HAZARDS AND THREATS WILDFIRES HOMEOWNERS CHECKLIST INSIDE THE HOME

Builder/developer gas service application

2010 Residential Water Heater Replacement Check List

SECTION SELECTIVE DEMOLITION

Number of Sides Required to Have a Handrail

The City of Basehor, Kansas

Fiberstars Lighted Laminar Flow Fountain Installation Manual

Ontario Electrical Safety Code - Info Sheet

Note: All dimensions are nominal. All weights are for shipping purposes only. Availability is subject to change.

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

June 2014 Electric Service Handbook

Contents General Requirements Location Size Inlet and Outlet Piping Protection Security Electrical Automatic Meter Reading (AMR)

IRRIGATION PUMPING Table of Contents - Section 900

ASX7-4-IOM-7 J

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

It was my assignment to physically inspect the 8 trees on site near the proposed construction,

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

Section TREE AND PLANT PROTECTION

Town House Center Highway North Huntingdon, PA 15642

Guidelines for Earthquake Bracing of Residential Water Heaters

G SPECIFICATION: GAS METER AND REGULATOR INSTALLATION REQUIREMENTS. 3 and Gas Yellow Book. REVISIONS: (See ) 1/15/14 5 Years

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

Does Wall Township require an inspection by the building department on resale of a home?

new construction departments...

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

DESCRIPTION OF WORK:

Arapahoe County Residential Water Heater Installation and Inspection Guide

Guidelines for Earthquake Bracing Residential Water Heaters

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)


Eric Six Heath Consultants Incorporated

FY08 SEWER POINT REPAIRS BID TABULATION

Hydraulic Excavators

GENERAL WIRING RULES FOR HOUSES

GENERAL ELECTRICAL REQUIREMENTS

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

Trenching and Excavation Safety

SECTION SIGNAL WIRE AND CABLE

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13R

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Propane Gas Underground Systems: Residential Infrastructure Requirements and Energy Benefits

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

June 2014 Electric Service Handbook

Gas Appliances and Gas Piping

LIFE SCIENCE. Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House BRINGING TO YOUR HOME ECONOMICS COLLEGE OF AGRICULTURE AND

Residential Foundations and Basements

Chapter 7 Plumbing Connections

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

New Commercial Service Application

Vision Home Inspection

October 5, 2015 Dear Client,

OPTIONAL INFORMATION GUARDING FLOORS, STAIRS, AND OTHER OPENINGS SELF INSPECTION CHECKLIST

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

I N T E R N A T I O N A L R E S I D E N T I A L CO D E

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

Transcription:

March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction for more information. The clearances in this handout also apply to features on buildings adjacent to the building where the gas meter is located. Final grade of the service line route must be in place before the service line can be installed. If you are unable to meet the meter location requirements in this handout, contact PSE for further assistance. Puget Sound Energy reserves the right to designate gas meter locations so that they comply with PSE standards. For gas meter installations in Cle Elum and west of Cle Elum within Upper Kittitas County, see the Gas Meter Protection from Snow and Ice in Snow Country handout (Form 3736). Gas Meter Locations Locate gas meter on the front wall, or within the front 1/3 of the side wall, observing the corner clearance requirements detailed below. The area 3 feet in front of and 2 feet to either side of the meter set assembly must be free of any landscaping (bushes, fences, etc.) and other structures that restrict access to the meter set assembly. Gas Meter Clearances to Finish Grade (250 Meter Shown) Regulator A Fuel Line Location (Typical) Typical Regulator Relief Vent B Front 1/3 of Side Wall É É É Front Wall Walkway Driveway Front 1/3 of Side Wall Finish Grade 8 Min 6 Min Ú Meter Type A Meter Width (Typical) B Fuel Line Height (Typical) Meter Outlet Diameter 250 16 32 to 36 1 Typical Public Access 425 24 42 to 46 1 1/4 630 30 42 to 46 1 1/4 1000 32 46 1 1/4 Measuring Around a Building Corner Outside Corners The regulator relief vent (see diagram above) should be at least 12 from any outside corner. If the regulator relief vent is at least 12 from any outside corner, then there are no minimum clearances to features around the corner. If the regulator relief vent is less than 12 from any outside corner, then the minimum clearances specified in this handout must be maintained. Measure as if using a string. Ç House/Building Ç+++++++++ Building Ç+++++++++ Ç Ç Property 12 Plan View Meter Elevation View Inside Corners Clearance distances from the regulator relief vent or meter set assembly to the feature must be maintained in accordance with this handout. Measure as if using a string. House/Building Building Meter Property Plan View +++++++++ +++++++++ +++++++++ Elevation View Page 1 of 6

Property Line Work Pit for Customer Provided Trench and Backfill Work Pit Dimensions Trench to Building Gas Service Line Conduit 24 Customer provides and (Approx) plugs conduit end. 48 (Approx) Gas Stub Marker Utility Provided 3333 12 Dig to 12 from the Gas Stub Marker Ú 3333333 Customer shall not expose the stub. If accidentally exposed, cover gas stub with 12 of sand. Gas Stubout 3333333 20 to 24 Deep 3333333 Work Pit Cross Section ÚÚ 24 48 ÚÚ Final Grade Gas ÚÚ Stubout Ú When digging work ÚÚ pit, leave 12 of dirt Ú over gas stub end. ÚÚ Ú Ú Gas Stubout ÚÚ ÚÚ Service Line in Conduit Installations ÚÚ Gas Stub Marker 1/2 Yard Bedding and Shading Sand Sand shall be provided on site by the customer and placed within hand shoveling distance to the work pit for bedding and shading of direct buried facilities. A larger work pit may require more sand (see backfill requirements in this handout). Sand shall be washed, clean, and free of debris or rocks larger than 1/4 inch. Gas Service Line in Conduit Installation Final Grade 12 Typical (4 Min *) 24 Min (To Excavated Dirt Pile) For Minimum Gas Service Backfill for Line Depth See Table Conduit See at Right. Requirements 36 Max Cover * TRENCH WIDTH EXCEPTION: When converting existing construction the Gas Service Line minimum trench width acceptable is 4. in Conduit For separation requirements to other Utilities see Page 2 of the Gas and Electric Underground Service Installation Requirements handout (Form 3061) Service Line Direct Buried Installations Backfill Requirements for Conduit Installations Backfill for Conduit: Soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 10 in diameter. Shading: None required above conduit. Bedding: None required below conduit. Gas Service Line Depth Table for Conduit and Direct Buried Installations Gas Service Type Gas Service Pipe Size Minimum Depth of Cover over Gas Residential Any Size 18 Commercial/Industrial 1 1/4 + 24 Any Service in Snow Country (See Form 3736) Any Size 24 Gas Service Line Direct Buried Installation Final Grade For Minimum Final Gas Service Backfill for Line Depth Direct Bury See Table See Requirements Above. 36 Max Cover Gas Service Line Direct Buried Page 2 of 6 12 Typical 24 Min (To Excavated Dirt Pile) 6 Sand Shading 4 Sand Bedding For separation requirements to other Utilities see Page 2 of the Gas and Electric Underground Service Installation Requirements handout (Form 3061) Backfill Requirements for Direct Buried Installations Final Backfill For Direct Bury: The backfill layer above the sand shading shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8 in diameter. If the final layer contains rocks larger than 8 in diameter, then 12 of shading shall be placed over the gas service. Rocks larger than 10 in diameter are not permitted in the final backfill. Sand Bedding: The customer shall provide and install clean sand to a depth of 4 inches prior to gas service pipe installation. See diagram at left. Sand Shading: The customer shall provide additional clean sand in piles that are readily accessible near the trench. This shading sand is to be installed by the PSE crew after direct buried gas line installation. Enough sand shall be provided so that the installation can be covered to a depth of 6 inches. See diagram at left. If customer owned facilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.

Meter and Service Connections Work Pit Work Pit 48 to 60 from Fuel Line Stub Shutoff Valve 4 to 5 Fuel Line Stub Typically Protrudes 4 to 5 Customer Provided Gas Meter Utility Provided 6 Minimum clearance should be maintained from gas service line. ÚÚÚ 333333333333 20 to 24 Deep ÚÚÚ 333333333333 ÚÚÚ 333333333333 ÚÚÚ 333333333333 ÚÚÚ 333333333333 ÚÚÚ 333333333333 Gas Service Line Conduit Customer provides and plugs conduit end. 3/8 Pull Rope If Conduit is over 100 ft Finish grade shall be clearly marked at fuel line stubout. Service Riser Drainage Pipe Fuel Line Stub 48 to 60 (Approx) 1/2 Yard Bedding and Shading Sand Sand shall be provided on site by the customer and placed within hand shoveling distance to the work pit for bedding and shading of direct buried facilities. A larger work pit may require more sand (see backfill requirements in this handout). Sand shall be washed, clean, and free of debris or rocks larger than 1/4 inch. FINISHED WALL Gas Meter Gas Service Line Conduit Work Pit Dimensions 36 TYP (Approx) 12 GAS 24 Typical TV & TEL 12 POWER Conduit Requirements for Gas Service PSE recommends the use of conduit for all gas service installations. Conduit Installation Requirements Gas conduit runs over 100 feet long must have a 3/8 inch minimum diameter pull rope installed. Conduit bends shall be one long radius, single piece sweeps (see table below). Fittings and elbows shall not be used because the joints prohibit service insertion. The sum total of the degrees of bends in the conduit run cannot exceed 180. Conduit shall not cross in the trench. Yellow or white Schedule 40 PVC conduit used for gas service lines shall not be marked water, or any other utility. Service Line Typical Residential < 185 Typical Residential Services >185 and < 1000 Typical Residential > 1000 Typical Large Multi Family & Commercial Services Conduit Size, Type, & Color 2 (minimum) Schedule 40 Yellow or White PVC (minimum) Schedule 40 Yellow or White PVC 4 (minimum) Schedule 40 Yellow or White PVC 4 (minimum) Schedule 40 Yellow or White PVC Min. Bend Radius 36 48 60 60 Minimum Conduit Bend Radius Preferred Trench Location When the Trench Must Pass Near Trees The preferred position for customer provided trenching is as far as possible outside of the dripline of trees. If this is not possible, contact PSE's Customer Construction Services at 1 888 321 7779 for trench location and depth requirements. Page 3 of 6

Regulator Relief Vent Clearances from Building s Window Attic Vent Crawl Space or Garage Vent Soffit Vent 1 from Windows, Building Vents, and Fireplace Cleanouts Wall Switch Power Disconnect Electric Outlet from Electrical Components 1 Doors Garage Doors from Doors and Garage Doors Mechanical Air Intake s at Clearance Distance A (10 feet) Window/ Wall Mounted Fan Wall Mounted Air Conditioner Page 4 of 6 Window Mounted Air Conditioner Mechanical Air Intake É A É É É 10 B 10 É É É É 10 10 É É É É É Appliance Intake and Exhaust s at Clearance Distance B (3 feet) Bathroom Fan Vents Furnace Air Intake/Exhaust s from Wall Mounted Fans and Air Conditioners, and Appliance Vents and Intakes Fireplace Cleanout Dryer Intake/Exhaust Fireplace Air Intake/Exhaust

GROUND LEVEL Air Conditioner or Heat Pump Gas Meter Clearances from Building s * * Generator or Open Flame or Transformer Permanent BBQ Clearances from Padmounted Air Conditioners, Heat Pumps, Generators, or Transformers Incinerator from Incinerators or Open Flame Devices Water Spigot Preferred 2 2 Preferred from Water Spigots, and from Communications and Cable Boxes Communications Box Roofline NOTE: A clearance of É 36 inches is required in front of the electric meter face. NOTE: Clearly mark buried ground rod. 18 1 Grounding GROUND LEVEL Rod Ú Ú from Overhead or Underground Fed PSE Electric Meters Gas Meter Clearances Under Porches, Decks, and Balconies Minimum Clearance from Grade Below Meter to Deck Bottom 6 Ú Ú Under Decks and Porches (meter must not be located under stairs or anywhere between doors and stairs) É Minimum Clearance from Grade Below Meter to Deck Bottom É É 6 É É É É É Under Balconies (no stairs to ground level) Page 5 of 6

Guard Post Installation (PSE's Responsibility) To protect meter set assembly from vehicle damage, PSE will install guard posts when required. To avoid the need for PSE to install guard posts, choose a meter location that is away from driveways or other areas where vehicles travel. Guard post requirements are based on the following factors: Existing barriers (curbs, guard rails, steep increases in grade, ditches, rockeries, trees, shrubs, chimneys, recessed walls, etc.), which will provide adequate protection; Proximity of the facility to the edge of the travel lanes; The expected speeds in the travel lanes; The width of the travel lane; The volume of vehicle traffic; Existing nearby building damage or other indicators of vehicle damage that may have already occurred; and, The type of customer (i.e., single family residential versus commercial/industrial or multifamily). In cases where a meter set assembly will be installed behind a curb, observe the following: If the curb will be a rolled curb, and if there is less than 10 feet of space between the curb and the meter, guard posts will be installed; and, If the curb will have a vertical face, and if there will be less than 5 1/2 feet between the curb and the meter, guard posts will be installed. Guard posts will be painted caution yellow, especially those located in commercial or industrial locations, street rights of way, and alleyways. Typical Single Family Guard Post Installation Ú Ú 42 Ú Min above Ú grade Ú Driveway or parking area Ú Ú Î Ú Î Ú 24 Î 30 Î Underground concrete base Î Î Î Î Guard Post 1 Concrete Base 3 Minimum Clearance between Meter Set Assembly & Guard Post 5 Page 6 of 6 2 1/2 Dia steel pipes filled with concrete Single Family Residence 2016 Puget Sound Energy 3885 03/16 Gas Meter Assembly Building Wall Edge of MSA 8 8 8 Edge of MSA Edge of MSA Do not install centerline of guard posts in shaded area. TOP VIEW EXAMPLE OF GUARD POST LOCATIONS THAT PROVIDE PROTECTION FROM ALL POSSIBLE DIRECTIONS OF VEHICULAR TRAVEL Commercial/Industrial or Multi Family Legal Speed Limit Greater than 35 MPH 2 1/2 Dia. 4 Dia. 6 Dia. 2 8 Dia. x 30 High 15 Dia. x 30 High 30 Dia. x 42 High 4 8 12 12 Guard posts shall be made from steel pipe, 6 feet long, filled with wet concrete and domed on top. In this installation, the guard post can be solid concrete 9 inches in diameter. At least 24 inches of the guard post shall be embedded in the base, with at least 42 inches of the post above final grade. In this installation, at least 26 inches of the guard post shall be embedded in the base, with at least 42 inches of the post above final grade. Additional guard posts are required if the centerline spacing between guard posts exceeds 36 inches. The additional guard posts are typically evenly spaced between the outer two posts.