1 COMPANY PROFILE
1.1. FIELDS OF ACTIVITIES Construction of: Piled jetties (suspended deck structures supported on piles) Breasting and mooring dolphin systems with single or multiple piles Roll-on/Roll-off (Ro-Ro) terminal ramps Ferry terminals Steel sheet-piled walls Bored cast-in-place concrete piles (drilled shafts, drilled piers) Secant and contiguous pile walls Driven precast concrete piles Steel bearing piles (tubular steel piles and H-piles) Ground anchors Prefabricated drains (wick drains), sand drains Stone columns Jet grouted columns Micro piles Shoring systems for deep excavations Rehabilitation, refurbishment and repair of marine structures Testing of Deep and Shallow Foundations: Static axial compressive load testing of deep foundations (ASTM D1143) Static axial tensile load testing of individual piles (ASTM D3689) Static lateral load testing of individual piles and pile groups (ASTM D3966) Instrumented pile load tests 1 High-strain dynamic testing of piles (ASTM D4945) 1 Low-strain impact integrity testing of deep foundations (ASTM D4945) 1 Ultrasonic cross-hole integrity testing of concrete deep foundations (ASTM D6760) 1 Zone load testing (ICE Specification for Ground Treatment, 1987) 1 Outsourced to specialist subcontractors (3 rd party)
Engineering and Construction Management Works for: Marine structures (jetties, dolphins, quay walls) Bored cast-in-place concrete pile systems (bearing piles, secant & contiguous pile walls) Driven piles (steel sheet piles, tubular steel piles, steel H-piles, precast concrete piles) Embedded retaining walls (anchored and cantilever walls) Ground anchors (soil and rock anchors) Ground improvement (stone columns, jet grouting, dynamic compaction) Provision of experienced staff to carry out deep foundation works WPS, Static calculations Core Engineering Disciplines: Civil Engineering Structural Engineering Geotechnical Engineering, Foundation Engineering Marine Structural Engineering Project Management, Planning, Scheduling, Budgeting, Cost Estimation Engineering Management and Consultancy Welding Engineering
1.2. OFFICE ADDRESS & CONTACT DETAILS Deep Foundation Systems Engineering & Construction Ltd (Derin Temel Sistemleri İnşaat Mühendislik Sanayi ve Dış Ticaret Ltd Şti) HEAD OFFICE: Yenişehir Mah. Şefika Sok. No:10 Dumankaya Flex B Blok Kat 5 Daire 134 Kurtköy, Pendik, İstanbul, 34912, Türkiye Telephone: +90 (216) 510 64 17 Facsimile: +90 (216) 510 64 17 E-mails: Web page: celalo@dtsinsaat.com nod118727@gmail.com aynuroncu@hotmail.com www.derintemelsistemleri.com
2 MAJOR PROJECTS COMPLETED BY FOUNDERS
DEEP FOUNDATION SYSTEMS ENGINEERING & CONSTRUCTION LTD (DERİN TEMEL SİSTEMLERİ İNŞAAT MÜHENDİSLİK SANAYİ ve DIŞ TİCARET LİMİTED ŞİRKETİ) 2. MAJOR PROJECTS COMPLETED BY FOUNDERS No. Project Name Location, Country Owner / Employer Contract Date of Value (USD) Contract Completion 1 Construction of 1500 Villas Ubari, Libya Municipality of Ubari 75.000.000 1980 1984 2 Construction of 550 residential units Kosuyolu, İstanbul, Türkiye Murat Cooperative Society 25.000.000 1984 1987 3 Second Bosphorous Bridge Asian Side Drainage Works TEM 0-62 km, İstanbul, Türkiye 4 Construction of İzmir Karşıyaka Jetty Karşıyaka, İzmir, Türkiye 5 Construction of Kanlıca Jetty Kanlıca, İstanbul, Türkiye 6 Construction of Çengelköy Jetty 7 8 Construction of Kınalıada & Burgazada Jetties Haydarpaşa Container Teminal, Construction of Crane Rail Beams on Piles Çengelköy, İstanbul, Türkiye Kınalıada & Burgazada, İstanbul, Türkiye Haydarpaşa, İstanbul, Türkiye General Directorate of Highways [KGM] 12.000.000 1987 1988 General Directorate of Railways, Harbors & Airports Construction [TDI] General Directorate of Railways, Harbors & Airports Construction [TDI] General Directorate of Railways, Harbors & Airports Construction [TDI] General Directorate of Railways, Harbors & Airports Construction [TDI] General Directorate of Railways, Harbors & Airports Construction [TDI] 1.320.000 1988 1989 225.000 1989 1990 610.000 1989 1990 1.460.000 1990 1991 825.000 1991 1992 9 Construction of Mudanya Jetty Mudanya, Bursa, Türkiye Municipality of Mudanya 1.290.000 1992 1993 10 11 Construction of Fuel Loading/Unloading Jetty (NATO) Construction of Piers & Wharves for Frigates (NATO) Eastern Breakwater, Mersin, Türkiye Ministry of Defence, NATO Infrastructure 6.620.000 1993 1995 Gölcük, Kocaeli, Türkiye Ministry of Defence, NATO Infrastructure 12.800.000 1994 1996
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Reconstruction of Berths 5 to 10 at East Wharves Construction of Yenikapı Jetty and Terminal Building Construction of Fuel Loading/Unloading Jetty (NATO) Construction of "The Grand Mosque for H. H. Sheikh Zayed Bin Sultan The Second" Project, Bored Piling Works Reconstruction & Rehabilitation of Naval Piers & Wharves Damaged After the 1999 Kocaeli Earthquake Turkmenbashi Port Development Project, Construction Works Contract Installation of open-ended tubular steel piles for the Presidential Villa at Awaza Urea Production Plant - Construction of stone columns Urea Production Plant - Construction of bored piles Urea Production Plant - Construction of railway tracks Türkmenbaşy Şäheri Ruhiýet Merkezi - Construction of bored piles Türkmenbaşy Şäheri Ruhiýet Merkezi - Construction of finger pier Mary Diagnostic Center - Construction of jet grout columns Dashoguz Diagnostic Center - Construction of jet grout columns Yaslik Paper Factory - Construction of jet grout columns Karachi Port, Karachi, Pakistan Yenikapı, İstanbul, Türkiye Karachi Port Trust 47.998.000 1995 1999 Istanbul Seabuses and Fast Ferries Inc. [IDO] 1.970.000 1996 1997 Gölcük, Kocaeli, Türkiye Ministry of Defence, NATO Infrastructure 4.530.000 1997 1998 Abu Dhabi, UAE Municipality of Abu Dhabi 6.081.000 1998 1999 Gölcük, Kocaeli, Türkiye Turkmenbashi, Turkmenistan Awaza, Turkmenbashi, Turkmenistan Ministry of Defence & Turkish Naval Forces Turkmen Maritime & River Lines [Funded by European Bank for Reconstruction & Development (EBRD)] TürkmenNebitGazGurluşyk (State Concern Turkmen Oil and Gas Construction) 8.775.000 1999 2000 27.400.000 2000 2003 527.000 2002 2002 Tejen, Turkmenistan GAP Construction Co. 546.000 2002 2003 Tejen, Turkmenistan GAP Construction Co. 590.000 2002 2003 Tejen, Turkmenistan GAP Construction Co. 990.000 2002 2003 Turkmenbashi, Turkmenistan Turkmenbashi, Turkmenistan Asist Construction Co. 167.000 2002 2003 Asist Construction Co. 100.000 2003 2003 Mary, Turkmenistan GAP Construction Co. 105.000 2003 2003 Dashoguz, Turkmenistan GAP Construction Co. 85.000 2003 2003 Yaslik, Turkmenistan GAP Construction Co. 521.000 2002 2003
27 28 29 Petronas Supply Base - Quay wall repair works Jumeirah Beach Residence Project, Sectors 4 & 6 - Piling Works Contract (pile design, pile axial compression load testing and interpretation) Kharg Island Project, Eastern & Western Jetties, Pile Driving Works Turkmenbashi, Turkmenistan Dubai, UAE Kharg Island, Iran Petronas 97.000 2003 2003 Dubai Technology Commerce and Media Free Zone (TECOM) & Mace International Ltd Taisei Corporation & Rinkai Construction (Japan) 16.870.000 2003 2004 390.000 2004 2004 30 Construction of Kuşadası Jetty Kuşadası, Aydın, Türkiye Ege Port 318.652 2004 2005 31 32 33 34 35 36 Piling Works to Rades - La Goulette Bridge (bored piles, driven precast concrete piles, prefabricated vertical drains, sheet piles) Marmaray Project, Construction of Two Temporary Dry Docks in Offshore Element Fabrication Site in Tuzla Construction of Bulk Liquid Berth C1 for the New Port and Fishery Harbour at Wilayat Sohar Sohar Aluminium Smelter Project - Supply, Installation and Testing of Bored Cast-In-Place Concrete Piles Construction of Liquid Cargo Terminal at Port Muhammad Bin Qasim Bored Cast-In-Place Concrete Piling Works in Berths 9 to 14 and Fishery Harbour Quay Wall Tunis, Tunisia Taisei Corporation (Japan) 5.180.000 2005 2006 Tuzla, İstanbul, Türkiye Taisei Corporation (Japan) 5.750.000 2005 2006 Sohar Industrial Port, Sultanate of Oman Sohar Industrial Port, Sultanate of Oman Ministry of Transport and Communications 20.488.500 2005 2006 Bechtel & Sohar Aluminium Company 9.810.000 2006 2007 Karachi, Pakistan FWQ Enterprise Pvt Ltd 10.500.000 2006 2007 Sohar Industrial Port, Sultanate of Oman Ministry of Transport and Communications & Six Construct - Interbeton J.V. 4.410.000 2006 2007
3 CV s OF PERSONNEL
PERSONAL DETAILS: Family Name: First Name: Öncü Mahmut Celal Date of Birth: 23 March 1957 Place of Birth: Nationality: Civil Status: Beykoz, İstanbul, Turkey Turkish Married (father of one child) EDUCATION: IDMMA Galatasaray Engineering Faculty, 1980 Ferit İnal High School, 1975 Beykoz Junior High School, 1972 Language Skills: Turkish (native), English Membership of professional bodies: Union of Chambers of Engineers and Architects of Turkey, Chamber of Civil Engineers PRESENT POSITION: Partner and Director KEY QUALIFICATIONS: Civil engineering. Construction of residential buildings.
Construction of storm water drainage systems. Management and execution of earthworks. Construction of marine structures, jetties, dolphins, sheet pile walls. Construction of bored cast-in-place concrete piles, secant and contiguous pile walls. Construction of ferry terminals and ramps. Installation of driven precast concrete piles and steel bearing piles. Construction of shore protection/revetment systems. Installation of wick drains and sand drains. Construction of jet grout columns and stone columns. Execution of full-scale static pile load testing, instrumented pile load testing. Construction of soil and rock anchors. Rehabilitation, refurbishment and repair of marine structures Construction of shoring systems for deep excavations Management and execution of dredging works. Project Management, construction management, site supervision and management. Construction planning and scheduling. Cost estimation, master planning, budgeting. Determination of construction methods and project resources based on local conditions. Selection and scheduling of manpower and machinery, equipment & plant. Management of project finances and cash flow. Progress reporting. PROFESSIONAL EXPERIENCE: Ayson Geotknik Marine Construction Co, İstanbul,Turkey General Menager (2007/07 2013/12) STFA Marine Construction Co, Istanbul, Turkey Project Coordinator (2006/10 2007/07) Al Habtoor STFA Soil Group LLC, Abu Dhabi, UAE
Operations Manager (2006/03 2006/10) STFA Temel Pile Construction Co, Istanbul, Turkey Assistant General Manager, Operations (2005 2006/03) Project Manager, Kharg Island Jetty Project, Piling Works, Iran (2004) Project Manager, Turkmenbashi Port Development Project, Turkmenistan (2000 2003) Project Manager, Reconstruction of Gölcük Jetties, Turkey (1999) Project Manager, Abu Dhabi Grand Mosque Project Piling Works (1998-1999) Project Manager, Gölcük Fuel Ships Jetty Construction, Turkey (1997 1998) Project Manager, Yenikapı Seabus Jetty and Terminal Building Construction, Turkey (1997) Project Manager, Gölcük Frigate Piers Construction, Turkey (1995 1996) Project Manager, Mersin Fuel Facilities Jetty Construction, Turkey (1993 1995) Site Manager, Mudanya Jetty Construction, Turkey (1992) Site Manager, Kınalı & Burgaz Jetties Construction, Istanbul, Turkey (1991) Site Manager, Haydarpaşa Container Crane Foundation Construction, Istanbul, Turkey (1991) Site Manager, Çengelköy Jetty Construction, Istanbul, Turkey (1989 1990) Site Manager, Karşıyaka Jetty Extension & Repair, İzmir, Turkey (1988 1989) Sezin Construction Co. Site Manager, Second Bosporus Bridge, Construction of Drainage System & Auxiliary Structures, Istanbul, Turkey (1988 1987) Murat Construction Cooperative Site Manager, Construction of 550 Houses, Istanbul, Turkey (1984 1987) Libaş Construction Co, Ubari, Libya Area Representative, Construction of 1500 Houses, Ubari, Libya (1980 1984) Date: 08 August 2007
Curriculum Vitae Personal information First name(s) / Surname(s) Fatih Öncü Address(es) Koşuyolu Barboros mah. Veysipaşa sokak 100. Yıl sitesi E/Blok Daire/7 Üsküdar Telephone(s) (216) 474 79 63 Mobile: (536) 863 27 10 E-mail fca1187 @hotmail.com Nationality T.C. Date of birth 27.10.1985 Gender Occupational field Male Metallurji and Material Engineer /Quality Management
Persona skills and competences Mother tongue(s) Other language(s) Turkish English school English Education İstek Belde High English Course Education Professional Trainings Seven Years English education St. Giles English curse finishing at Upper-lntermediate level Istanbul University Metallurgy and Material engineer ODTU International Welding Engineer TMMOB Çevre Mühendisleri Odası İstanbul Şubesi 19-21 November.2009 ISO 9001:2008 KALİTE YÖNETİM SİSTEMİ BİLİNÇLENDİRME VE İÇ DENETÇİ EĞİTİMİ 24-26 December.2009 OHSAS 18001:2007 İŞ SAĞLIĞI VE İŞ GÜVENLİĞİ YÖNETİM SİSTEMİ BİLİNÇLENDİRME VE İÇ TETKİKÇİ Istanbul Teknik University 02/2010 KALİTE YÖNETİCİLİĞİ SERTİFİCA PROGRAMI
İSO 14001 ÇEVRE YÖNETİM SİSTEMİ İÇ TETKİKÇİLİK SERTİFİKASI ISO 9001 KALİTE YÖNEYİM SİSTEMİ VE OHSAS 18001-2007 İSİG İÇ TETKİKÇİLİK SERTİFİKASI Work experience Dates Occupation or position held Name and address of employer Work experience Dates Occupation or position held Name and address of employer Work experience Dates Occupation or position held Name and address of employer 1 03.2011 08.2012 Responsible of Quality Doğuş Group- Ayson Geo-technic and Marine Construction C.O/kavacık 2 01.2013 07.2013 Responsible of Quality Group- Ayson Geo-technic and Marine Construction C.O. Üsküdar Ümraniye - Çekmeköy Metro Projesi 3 07.2013 01.2014 Project Managment Systems Group- Ayson Geo-technic and Marine Construction C.O İzmit Körfez Geçiş Köprüsü IKG Projesi References Mahmut Celal Öncü Levent Tek Ayson - General Manager 0532 247 25 63 Ayson - Project Manager 0532 406 29 31
Curriculum Vitae Personal information First name(s) / Surname(s) Aynur Öncü Address(es) Koşuyolu Barboros mah. Veysipaşa sokak 100. Yıl sitesi E/Blok Daire/7 Üsküdar Telephone(s) (216) 474 79 63 Mobile: (533) 368 91 03 E-mail aynuroncu@hotmail.com Nationality T.C. Date of birth 23.07.1960 Gender Occupational field Male Chemical and Matallurji Engineer
Persona skills and Competences Mother tongue(s) Other language(s) Education Work experience Dates Occupation or position held Name and address of employer Turkish English Istanbul Tecnical University Metallurgy and Chemical engineer 1 1984 1993 Responsible of Quality Deva İLAÇ Work experience Dates Occupation or position held Name and address of employer 2 1997 2002 Mesur Müdür Medifarma İlaç
4 PHOTOGRAPHS OF TYPICAL PROJECTS COMPLETED BY FOUNDERS
Installation of steel pipe piles for New Quay 13, Turkmenbashi, Turkmenistan, 2001
New Quay 13 in operation, Turkmenbashi Port, Turkmenistan, 2001
New Quays 13 & 14 in operation, Turkmenbashi Port, Turkmenistan, 2002
Installation of steel pile piles for Ferry Terminal, Turkmenbashi, Turkmenistan, 2002
Construction of New Ferry Terminal, Turkmenbashi Port, Turkmenistan, 2002
Construction of New Ferry Terminal, Turkmenbashi Port, Turkmenistan, 2002
New Ferry Terminal in operation, Turkmenbashi Port, Turkmenistan, 2003
New Ferry Terminal in operation, Turkmenbashi Port, Turkmenistan, 2003
Rehabilitation of Ferry Terminal Right Ramp, Turkmenbashi Port, Turkmenistan, 2003
Rehabilitation of Ferry Terminal Right Ramp, Turkmenbashi Port, Turkmenistan, 2003
Frigate Piers, Gölcük, Turkey, 1996
Construction of Kuşadası Jetty, Aydın, Türkiye, 2005
Construction of Kuşadası Jetty, Aydın, Türkiye, 2005
Construction of finger pier, Turkmenbashi, Turkmenistan, 2003
Construction of Bulk Liquid Berth C1, Sohar Industrial Port, Oman, 2005
Installation of sheet piles, Piling Works to Rades - La Goulette Bridge, Tunisia, 2005
Reconstruction of Berths 5 to 10 at East Wharves, Karachi Port, Pakistan, 1999
Construction of Fuel Loading/Unloading Jetty (NATO), Mersin, Türkiye, 1995
Kharg Island Project, Eastern & Western Jetties, Pile Driving Works, Iran, 2004
Kharg Island Project, Eastern & Western Jetties, Pile Driving Works, Iran, 2004
Construction of Two Temporary Dry Docks, Tuzla, İstanbul, Türkiye, 2005
Construction of Two Temporary Dry Docks, Tuzla, İstanbul, Türkiye, 2005
Osterberg-Cell Load Testing of Bored Piles, Abu Dhabi, UAE, 2006
Construction of New Port Office Building, Turkmenbashi Port, Turkmenistan, 2002