1 Construction Technology 3 Assignment 2: Basement Construction Dr. Patrick Tang, School of Architecture and the Built Environment Michael Dernee C
2 Abstract: In the brief for the basement, there is the potential for rapid expansion. The Amazon highway is very close and noise pollution could affect the building s potential. Therefore the basement will be as low as possible allowing noise pollution to travel over the proposed building. Techniques will ensure that the least amount of energy will be needed to create the building and that the materials used will be long lasting to create not only an environmentally sustainable building but a physically sustainable building that will stand for many years.
3 Appendix: Title Page... i Abstract... ii Appendix... iii Physical... 1 Use... 1 Location... 1 Volume (horizontal)... 1 Clear site... 1 Volume (vertical)... 1 Type of soil... 2 Water table... 2 Disposal... 2 Mechanical... 3 Fixed... 3 Moving... 3 Transport system... 4 Excavation lateral support system... 5 Ground water control... 6 Foundation... 7 Shallow foundation... 7 Deep footings... 7 Basement method... 8 Slab... 8 Waterproof membrane... 9 Drainage Columns Suspended slab Cost analysis Pictorial explanation Conclusion Bibliography... 18
4 Physical: Use Basement allocation: the use of the basement will be for car parking, to help shoppers of the centre above (assignment two) for maximum shoppers. Location Streetscape: the streetscape of the building will be on Davidson Road, Hill Street and Amazon Highway, where the ground level will be two metres below Amazon Highway to remove some of the sound of the highway, whilst still advertising that there are shops there. Entrance: the location of the entrance will be on Davidson Road (shown in site plan). The reason for this is it is a more open location where an entrance would be. Exit: the location of the exit will be on Olive Street (shown in site plan). The reason for this is a quiet street for easy exiting to the road. Basement location: the basement will take up the whole area to allow for the highest amount of parking spaces; there will be a two metre inwards perimeter of the site, so that in the pathway can still be used. Clear site Clearing vegetation: 9 trees, 3 trees under 500mm, 6 trees 500/1000mm. Removal of trees: cost estimates, 500mm less $162 each, $162 each. Therefore total cost would accumulate to $1488. Volume (horizontal) Basement size: 2,900,000mm 2 Building floor area: 2,900,000mm 2 Volume (vertical) Depth: the depth of the basement will not go further than +56m from sea level (5 metres in depth) Amount of excavation: 14,911m 3 Cost of excavation: the cost of excavation of soft rock is $65.40m 3 Type of soil Reactive ability: there will be a combination of Made Ground : Very stiff (compacted) ashy sandy clay with brick and tile rubble and fine to coarse gravel, Medium dense becoming dense grey fine to coarse angular to sub rounded flint gravel with cobbles, and a trace of sand.
5 Compressive strength: the soils are closely dense, such that a foundation will need to be reinforced but will only have to be a shallow one. Water table Height: The water table does not go higher than +45m from sea level (16m in depth) and therefore there is no need to worry about the water level and the use of a water pump, yet still a need for waterproofing. Disposal Type: as there is no known location of the site or local disposal areas, this cannot be answered, but as shown in the mechanical disposal section (page) many different combinations can occur. It can be used as infill for another site. Distance: it is unknown.
6 Mechanical: Fixed: Name Picture Volume (V) Load (L)/ V x L / H Suited conditions Price hour (H) Shovel face farm4.static.flickr.com 0.3 6m m 3 Soil below or level and forwards N/A (was not in the Rawlinsons handbook 2010) Backhoe excavators101.com m m 3 Soil above dug down and backwards N/A (was not in the Rawlinsons handbook 2010) Clamshell, grab Dragline kensdiecastmodels.com m m 3 Soil deep below (even vertical) picked up N/A (was not in the Rawlinsons handbook 2010) 0.3-3m m 3 Coal Mines N/A (was not in the Rawlinsons handbook 2010) Summary: For the site and its contours as the basement will be dug from the east to the west the best fixed excavator would be the shovel face. Moving: Bulldozer Picture Depth Distance Action Price 400mm 100m Moving top soil and spreading the N/A (was not in the earth, flattening the land Rawlinsons handbook 2010) Loader classroomclipart.com 1000mm 200m Shallow excavation, slope excavation, loading material to transport system N/A (was not in the Rawlinsons handbook 2010) Scrapers coalcliff.com mm 3000m Collecting material, hauling it and discharging it, usually used in road. N/A (was not in the Rawlinsons handbook 2010) fhwa.dot.gov Summary: as the site is not very big the scraper is not useful, a combination of the loader and bulldozer would be the best was to move the material and load it onto the transport system.
7 Transport System: Transport Systems Dump trucks Conveyor Rail Picture Distance Suited Conditions Price elph.com.au motorsandbearingsconcept.com 0.8km 10km 1km 5km 5km 100km Close proximity removal, small to medium sized jobs Medium proximity removal, large sized jobs high longevity Far proximity removal, huge sized jobs, higher longevity N/A (was not in the Rawlinsons handbook 2010) N/A (was not in the Rawlinsons handbook 2010) N/A (was not in the Rawlinsons handbook 2010) northernrockiesrisingtide.files.wordpress.com/ Summary: as the location is unknown, there is no way to find out where the closest place is to relocate the soil, but just from the site plan the location is built up so the use of a conveyor belt is not the way to go. A combination of a dump truck and rail may need to be used if the relocating area is far away. But if close the use of only a dump truck would be a better option.
8 Excavation lateral support system: Method Picture Description Advantage Disadvantage Suitability Price Sheet pile: $54,750 permanent Sheet pile: Temporary Soldier pile Bored pile: continuous Bored pile: tangent Bored Pile: interlocking Bored pile: secant Diaphragm geelongadvertiser.com.au merelaconsultants.com sbe.napier.ac.uk Interlocking prefabricated steel piles that form a wall that is continuous and permanent Interlocking prefabricated steel piles that form a temporary wall Vertical steel H sections with horizontal timber lagging that sit in-between or behind Soldier piles that are repeated to create a wall Continuous bore piles that meet at their tangential axis Continuous bore piles that have in their gap secondary piles that are unreinforced weak concrete mix Continuous bore piles where the primary piles are the unreinforced piles and the secondary piles are reinforced A trench that is filled with slurry to prevent a collapse when reaching its depth reinforcement is lowered and the concrete displaces the slurry Light weight, adaptable, high resistance to tensile stresses Can be reused, adaptable Low cost, fast and easy to construct Stiff walls, good in confined site space, minimal vibration, low noise, flexible plan, avoids excessive excavation, can be used as footings Impermeable, can be used as the facade, flexible, little noise, deep work, lack of joints, can be used as footings Boulder obstruction, vibration, noise pollution, water seepage, cost, professional needed. Susceptible to the movement of ground. Slow, vertical joinery is difficult, low reinforcement Expensive, large area needed Harbour quays, restriction of water acting as a cofferdam Temporary restriction of water (cofferdam) to allow a basement, piers and houses that have a high water table Most suitable when the wall is above the water table, with free draining soils. Soldier piles are used mainly as they are cheap and don t disturb the surroundings as much as other walls Good for water tight needing areas, top down, used in very unstable soils $41,000 N/A (was not in the Rawlinsons handbook 2010) $8,200 $14,300 $21,000 $23,700 $69,000 Soil Nailing itm-ltd.com coastalcaisson.com Inserting near horizontal steel bars into ground and grouting over to stabilise the soil Cheap, light machinery, little noise, less rigid layout needed Soil loss, only for shallow depths Stabilize slopes or excavations. N/A (was not in the Rawlinsons handbook 2010)
9 Summary of Excavation lateral support systems: Permanent structural concrete wall formed in one operation ahead of excavation Substantially watertight wall preventing draw down to groundwater Ability to deal with obstructions economically Vertically better than 1:200 with little overbreak Lack of vibration/noise Temporary gaps left in wall to allow service diversions Vertical loads can be permanently carried Sheet pile: permanent x Sheet pile: temporary Soldier Bored pile: Bored pile: Bored Pile: Bored pile: Diaphragm pile contiguous tangent interlocking secant x x x x x x x x x x x x x x x x x x x x x x x x x x x Soil Nailing x x Summary: Due to the soil, the usefulness of how close it can get to the boundary and the use of it as a wall after excavation the diaphragm wall will be used. The diaphragm wall is also long lasting and therefore sustainable compared to the other methods that have to be replaced and fixed Ground Water Control: As the basement will not go deeper than 12.3 m there is no need to use any water pump during excavation. Summary: There is no need for ground water control during the excavation due to the depth of the building not exceeding the water table.
10 Foundation Construction method: Shallow foundation Method Picture Description Advantage Disadvantage Application price Pad A footing remote to broaden Hard soils, inert a load. soils Strip Raft 2.bp.blogspot.com lh5.ggpht.com moladi.com A footing that goes around the perimeter of the ground in a longitudinal direction where the load is. A single slab is poured with the reinforcement and footings all ready. Cheap, easy, simple, little materials used Strongest shallow foundation, can be changed for the different soils Lightweight, both slab and foundation created at once making it very strong Not good in weak soils. Or reactive soils Not good on highly reactive soils, more complicated than the pad footing Complicated compared to the pad footing, a lot of time in preparation has to take place Medium soils to hard soils Medium to hard soils Summary: Strip footings will be used as they are the strongest shallow footings, with the depth of the footings calculated by the engineer. As they are the strongest they will not need to be fixed or replaced and because of that it is quite sustainable. They will also be reinforced. N/A (was not in the Rawlinsons handbook 2010) (un reinforced) 248 cum (reinforced) 251cum 240 cum Deep footings Method Picture Description Advantage Disadvantage Application Piled (bedrock) The pile reaches Most solid Sometimes may Soft, reactive clays solid bedrock and foundation possible need to go very and soils can put all the deep to uncover weight on the bedrock bedrock. Piled (Friction) The pile does not reach any ground and has to use the friction around to allow the building to stand. Strongest foundation in locations without bedrock Complicated, many calculations need to be done and a lot of testing on the soil needed to ensure the footings will hold Soft, reactive clays and soils with no bedrock Caissons boredpiles.com Hollowed hole where concrete can be poured into More quiet than the other two deep footings. Time taken to make Soft, reactive clays and soils, where heavy machinery cannot be used kshitija.files.wordpress.com Summary: There is no need for deep footing as the soil below is quite stable.
11 Basement method: Method Open-cut Vertical cut Top-down Picture brhgarver.com simplex-foundations.co.uk personal.cityu.edu.hk/~bswmwong/pl.html Size of site Very large open site Small sized open site Large sized site Site environment Unobstructed Adaptable to most environments Adaptable to most complex environments Protection Simplest protection Complex lateral support required Limited shoring support where required Special provision Not much Not much Temporary vertical Soil removal Using ramp Staged platform or ramp Vertical shaft bucket or bucket Summary: Due to the use of the diaphragm wall, there are two choices, the vertical cut or the top down. The vertical cut is more suited for the site and will therefore be used as it is not a big site. Slab Type Picture Description Strength Price Concrete (in situ) 150mm thick, poured sqm concrete into a mould Precast Concrete underground.ie 150mm thick, concrete that is set off site and relocated to site. The strength can change with the additives used and the reinforcement used. For such a site no real additives need to be used as there are no large stresses upon the slab. But normal additives like super plasticizers to allow for higher workability concrete and pozzolans that increase the strength of the concrete will be used to help with strength and curing time sqm Summary: Both ways of creating a slab are strong, but because there are retaining walls that the slab has to fit into, in situ concrete will be used as it can chemically bond to the diaphragm wall making everything increasingly stronger.
12 Waterproofing Type Picture Description Advantage Disadvantage Price Liquid membrane A polymer liquid Good for complex Cannot be used 38m 2 that is painted on to structures under the slab form an impermeable barrier Bituminous paint img.alibaba.com A liquid that is painted on to form an impermeable barrier Good for complex structures Cannot be used under the slab 12.4m 2 Styrofoam A solid polymer that is solid and rigid that forms an impermeable barrier Can be used under the slab Not as useful as the other waterproof membranes in complex situations 22.4m 2 Polymer membrane A polymer that is solid but not rigid that forms an impermeable barrier Can be used for complex structures. Can be used under the slab. Time taken to set up can take some time. 28.2m 2 imghost1.indiamart.com Summary: As the slab is in situ the use of a polymer membrane or a Styrofoam membrane is the most useful as it can cover under the concrete. The polymer membrane will be used as it is better in difficult situations. It also doesn t have to be replaced unlike the bituminous paint so it will last a long time making it more sustainable.
13 Drainage Type Picture Description Advantage Disadvantage Price Tanking Creating an Water table can be Needs a pump, 12-38m 2 impermeable above the makes noise barrier that doesn t basement floor allow water in but if water does come in it gets pumped out Cavity drainage Exterior foundation drain oxfordbasements.co.uk Drainage that allows a gap in the membrane to a drainage channel. Drainage that uses an exterior system to drain away Un noticeable gaps Water table has to be below basement Has to have a flooring unit above the concrete, where the car park won t need it Most effective way of draining, that is quick Water table has to be below basement N/A (was not in the Rawlinsons handbook 2010) N/A (was not in the Rawlinsons handbook 2010) Summary: The use of the exterior foundation drain will be installed as the water table is 11m lower than the lowest point of the basement. The exterior foundation drain is also the quickest diffuse way of relocating water.
14 Columns Type Picture Description Strength Price Reinforced Concrete 200mm in diameter, with rebar Very strong sqm (in situ) reinforcement. Reinforced Precast Concrete 300X300 cast off site and delivered ready to lock into place Very strong sqm Steel 150X150 cast offsite, lightweight yet has no great compressive strength Medium sqm Timber Oregon wood 100X100. Not long lasting compared to the concrete Weak sqm Brickwork thepostandbeam.files.wordpress.com 350X230 although a strong column it takes a long time to make. Strong sqm img.archiexpo.com Summary: Concrete will be used as columns in this building being long lasting, as the timber and steel do corrode over time and the brickwork takes too long to make. The reason for in situ concrete is it can chemically join to the base plate making it a stronger bond
15 Suspended slab Type Picture Description Strength Price Concrete (in situ) 150mm thick, poured sqm concrete into a mould Precast Concrete underground.ie 150mm thick, concrete that is set off site and relocated to site. The strength can change with the additives used and the reinforcement used. For such a site no real additives need to be used as there are no large stresses upon the slab. But normal additives like super plasticizers to allow for higher workability concrete and pozzolans that increase the strength of the concrete will be used to help with strength and curing time. Summary: Precast concrete will be used as it will be easier to install and it is a lot easier for the precast concrete to be designed to create a waffle design making the slab lighter sqm
16 Cost Analysis: Area of cost Product Unit Price per unit Amount of products Price Cumulative price Earth moving: Tree >500mm Per tree $162 3 $496 $496 clearing the Tree Per tree $162 6 $992 $1488 site 1000>500mm Retaining wall Diaphragm wall Per m 2 $ m 2 $69000 $70488 Soil Excavation of soil Per m 2 $ ,911m 3 $975,179 $1,045,667 excavation for basement Footing Strip footings Per m 2 $ m 2 $141,360 $1,187,027 Waterproofing Polymer Per m 2 $28.2 2,900 m 2 $81,780 $1,268,807 membrane Drainage Exterior N/A N/A N/A N/A Foundation Drain Slab In situ Reinforced Per m 2 $161 2,900m 2 $466,900 $1,735,707 concrete Columns Reinforced in situ Per m 2 $201 2,900m 2 $609,000 $2,344,707 concrete Suspended Slab Precast reinforced waffle designed slab Per m 2 $120 2,900m 2 $348,000 $2,692,707
17 Pictorial Explanation: Process Description Perspective Plan 1. Analysis Entrance, exit, site size, orientation 2. Retaining wall Install guide wall, excavate trench, install rebar, check verticality, pour concrete 3. Excavation Vertically cutting the soil to open up the site
18 4. Set up Set up and install footings, install waterproof membrane, drainage installed and rebar 5. Ground Slab Pouring the slab onto set up 6. Columns Set up and pouring columns into place
19 7. Suspended Slab Crane suspended precast slabs onto the allocated points.
20 Conclusion: A diaphragm wall will be set up and the site will be open cut by shovel faces and backhoes then bulldozers will flatten it out. It is still unknown how or where the soil will be transported but will most likely be done by a dump truck. There is no need for ground water control due to the low water table and the footings will be strip due to their strength and ability to work around the site. The slab will be in situ concrete with additives like pozzolans and super plasticizers to increase strength and for higher workability. To waterproof the basement a polymer membrane will be below the slab, with the retaining wall also being impermeable. Yet if any water does come in exterior fountain drains will allow the water to go into the ground as the water table is quite low. In situ concrete columns will hold up the precast concrete slabs that are suspended and will be the base of the ground floor that is two metres below the highway to diffuse the sound.
21 Bibliography: Book: Rawlinson's handbook, Perth, W.A. 2010: House Publishing Frederick S. Merritt, Jonathan T. Ricketts Building design and handbook, USA, 1994: McGraw-Hill Professional Publi R.A. Johnson Water-resisting basement - A Guide: Safeguarding New And Existing Basements Against Water And Dampness, Great Brittan, 1995: Construction Industry Research and Information Association Barry, R. (2001) The Construction of Buildings (Vol 4), 5th Edition, Blackwell Scientific Publications. Internet: Lectures: Dr. Patrick Tang Lecture 1: Introduction to the course 9/3/10 Dr. Patrick Tang Lecture 2: Basement Construction 16/3/10 Dr. Patrick Tang Lecture 3: Foundation Construction 23/3/10 Dr. Patrick Tang Lecture 4: Specification and Cost Estimation 30/3/10 Dr. Patrick Tang Lecture 5: Concrete Technology 1 6/4/10
ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill
ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION
Geotechnical Building Works (GBW) Submission Requirements
Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.
Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations
Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet
BUTE Department of Construction Management and Technology
BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):
-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION
-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -Unit number- 4420798 -Unit title- CONSTRUCTION TECHNOLOGY 2: SUBSTRUCTURE AND REMEDIAL WORKS -Superclass category-
Soils, Foundations & Moisture Control
Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations
Simplifying design and construction. Alan Tovey, Director The Basement Information Centre
Simplifying design and construction Alan Tovey, Director The Basement Information Centre Simplifying design and construction Grades of construction Construction options Design and waterproofing issues
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
Types of Retaining Walls - Gravity walls - Pre-cast crib walls - Gabion walls - Reinforced concrete walls - Sheet pile walls - MS walls (mechanically
Foundation Engineering Lecture #23 Types of Retaining Walls - Gravity walls - Pre-cast crib walls - Gabion walls - Reinforced concrete walls - Sheet pile walls - MS walls (mechanically stabilized) - Slurry
Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:
How to build raised beds page
This leaflet has information to help you if you want to build a raised bed yourself or if you need information to give to a professional contractor. This information should be read in conjunction with
ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE
ENGINEERED FOUNDATIONS Department of Public Works Jeff Hill, PE What is an engineered foundation. A Foundation Design Developed by a Trained Professional (Engineer) Types of Foundations (All of which can
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors
Improving the flood resistance of your home Advice sheet 6: Flood-resilient This sheet provides guidance on identifying different types of floor, assessing the routes floodwater may enter, and describes
Guide to working on Public Sewers
Guide to working on Public Sewers affected by Building Works Introduction Severn Trent Water Ltd requires the work to be done in order to protect the public sewer and minimise the risk of us having to
Designed and Engineered to Perform
History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the
Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete
Tremie Concrete Underwater concrete plays an important role in the construction of offshore structures. It may be used to tie together various elements in composite action (i.e., to tie piling to the footing).
COPYRIGHT. Dincel Construction System Pty Ltd
BASEMENT CONSTRUCTION Dincel Construction System Pty Ltd 101 Quarry Road ERSKINE PARK NSW 2759 PO Box 104, ST CLAIR NSW 2759 Phone: (612) 9670 1633 Fax: (612) 9670 6744 Email: [email protected]
Siting and settlement: The most important way to protect shelter from floods is to build in a place that is unlikely to be flooded.
Siting and settlement: The most important way to protect shelter from floods is to build in a place that is unlikely to be flooded. Key Messages Shelters and settlements should be sited above the highest
Types of Mining - Expert Table
See page 6 Minerals Downunder Teacher Guide (2002) - Activity 4a Types of Mining - Expert Table How to Jigsaw Information 1. Divide the class into Home Groups of five for the five different types of mining
EXCAVATION and BASEMENT CONSTRUCTION. Introduction
EXCAVATION and BASEMENT CONSTRUCTION Introduction In general, excavation means to loosen and.take out materials leaving space above or below ground. Sometimes in civil engineering term earthwork is used
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
The Stabilizer TM. Benefits. www.griptite.com. Supplemental support system for sagging beams and floor joists within a crawl space
The Stabilizer TM Supplemental support system for sagging beams and floor joists within a crawl space Pre-drilled holes in steel plate allow for connection to beam or floor joists. Benefits Levels and
Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions
Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions Peyman Amini Motlagh, Ali Pak Abstract Seismic retrofitting of important structures is essential in seismological
Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.
Section 5.0 Basements Wall insulated externally Product: Polyfoam ECO Ba01 Wall insulated internally Product: Polyfoam ECO Ba02 Basements Basements Basement design Waterproofing BS 8102: 2009 Code of practice
CHAPTER 2 QUANTITY TAKE-OFF
CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR
TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR If you listen to the hype, it sounds like there must be 20 or 30 different types of piers out there. Company A says they have an
EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS
NMP 1.4 EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Index Purpose... 2 Application... 2 Referral Agency... 2 Associated Requirements... 2 Referenced Standards...2 Definitions...
The minimum reinforcement for the stem wall is the placement of:
PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20
Milan M5 metro extension the construction of Lotto station
Milan M5 metro extension the construction of Lotto station Giuseppe LUNARDI, Rocksoil S.p.A., Italy [email protected] Luca MANCINELLI, Rocksoil S.p.A., Italy, [email protected] Massimiliano
King Post Wall Information
King Post Wall Information DAWSON-WAM specialise in the installation of piled retaining wall systems including steel sheet piling, concrete piled walls and king post walls. This document is our guide to
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located
RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS
RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS Johnson County Building Officials Association January 2008 Residential Foundation Guideline Foundation designs for one-and two-family dwellings may use
Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps
Foundations on Expansive Clay Soil Part 3 - Investigation of Failed Foundations Presented by: Eric Green, P.E. Structural Engineer Slide 1 Copyright Eric Green 2005 Investigation of Foundation Failure
Lowering Basement Floors (Underpinning, Benching)
Copyright K.H. Davis Engineering Consultants 2011. All rights reserved Page 1 Lowering Basement Floors (Underpinning, Benching) One way of obtaining additional living space in a home is to renovate a basement
Hunter College school of Social Work Thesis Proposal
Fall 2009 Hunter College school of Social Work Thesis Proposal To analyze how energy efficiency can be implemented using facade and green roof redesign. It ties structural engineering concepts with existing
Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole
An Interdisciplinary Response to Mine Water Challenges - Sui, Sun & Wang (eds) 2014 China University of Mining and Technology Press, Xuzhou, ISBN 978-7-5646-2437-8 Treatment Practice for Controlling Water
September 2007. September 2013. Consulting Structural and Civil Engineers. 100 St John Street London EC1M 4EH. info @ akt-uk.com www.akt-uk.
Consulting Structural and Civil Engineers 100 St John Street London EC1M 4EH T +44 (0) 20 7250 7777 F +44 (0) 20 7250 7555 info @ akt-uk.com www.akt-uk.com 3290 A031234 The 196-222 Joseph Kings Bloggs
How to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No. 0113013. May 15, 2013
How to Estimate the Cost of Support of Excavation for Foundation Installation CPE Candidate No. 0113013 May 15, 2013 1 How to Estimate the Cost of Support of Excavation for Foundation Installation Table
Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file
Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file Notation B1 = lowest level of basement slab c = cohesion E = drained Young s Modulus Eu = undrained Young s Modulus
Product Systems AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING. Waterproofing Specification
AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING Typical s Table of Contents: No. 4 5 6 7 8 9 0 External waterproofing of below ground concrete wall & slab Internal waterproofing of foundation
Elevating Your House. Introduction CHAPTER 5
CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,
HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS
BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side
Foundations and Substructures
Ground workers handbook Foundations and Substructures Introduction The Ground Workers Handbook gives guidance to site managers and site staff on any particular issues on your site for traditional forms
Technical Notes 3B - Brick Masonry Section Properties May 1993
Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications
Stormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
LAYING BLOCK AND BRICK
LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct
Construction sites are dewatered for the following purposes:
9. DEWATERING CONTROL OF GROUNDWATER Construction of buildings, powerhouses, dams, locks and many other structures requires excavation below the water table into water-bearing soils. Such excavations require
Page & Turnbull imagining change in historic environments through design, research, and technology
DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED
Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything
High Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
Hanson Building Products. precast basement solutions
Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete
FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS
FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form
Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples
Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: [email protected]
90 Brighton Road, Surbiton, Surrey
90 Brighton Road, Surbiton, Surrey Civil and Structural Engineering Basement Feasibility Report Mixed Use Scheme 108802-REP-002 March 2015 Contents 1. Executive Summary... 3 2. Site Description and Constraints...
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
symptoms of a faulty foundation
symptoms of a faulty foundation How does drought impact your home's foundation? For many Texas families, their home becomes the single largest investment and also the family fortune. The home's foundation
DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H
DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H Soil Drainage Mat with Built-In Protection Layer POLYGUARD DRAINAGE MATS are three-part prefabricated geocomposite drain consisting of a
A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.
BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming
DESIGNING STRUCTURES IN EXPANSIVE CLAY
DESIGNING STRUCTURES IN EXPANSIVE CLAY A GUIDE FOR A RCHITECTS AND E NGINEERS Table of Contents 1. Introduction Page 1 2. Common Foundation Systems Page 2 3. Drilled Piers Page 3 a. Skin Friction Piers
Interior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM
P r o d u c t a p p l i c a t i o n s a n d t e c h n i c a l i n f o r m a t i o n 2 below and above ground V OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM V The flexible, fast and cost-effective answer
THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS
Chapter 11 Slope Stabiliza bilization and Stability of Cuts and Fills THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS are 1) to create space for the road template and driving surface; 2) to balance material
constructive solutions Fosroc total waterproofing protection of below-ground structures
constructive solutions Fosroc total waterproofing protection of below-ground structures Our profile Since the company s beginnings over 50 years ago, Fosroc has developed into an International leader in
Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
Watershed Works Manual
National Rural Employment Guarantee Act Watershed Works Manual DRAINAGE LINE TREATMENT: GABION STRUCTURE Baba Amte Centre for People s Empowerment Samaj Pragati Sahayog September 2006 Drainage Line Treatment:
Trenching and Excavation Safety
1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking
INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.
INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS Multi-Layer Technology provides increased strength. Specifically designed for interior applications. Compatible with most internal
SE-10 STORM DRAIN INLET PROTECTION. Objectives
STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -
How To Retaining Wall Guide
How To Retaining Wall Guide Before you start: Consents and Engineering Building Consent Retaining walls over 1.5m high will require a building consent from the Local Body Council. Walls that carry extra
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
Basement construction and waterproofing: Construction, safety, insulation and services. good building guide
Basement construction and waterproofing: Construction, safety, insulation and services GBG 72 Part 2 good building guide Peter Trotman The requirement for building on sloping sites or increasing the area
Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio
Seven Easy Steps to Installing Your Own Walkway, Driveway and Patio Without Mortar or Concrete Brick is one of the world s oldest and most enduring building materials. Those same qualities also make it
9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems
9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES Hunter Underground Systems 9.01 General 9.02 Surface water Drainage 9.03 Groundwater Drainage 9.04 Dispersal of Septic Tank Effluent 9.01 The use of
16. Storm water drainage
16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils
Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore
EXAMPLE 1 DESIGN OF CANTILEVERED WALL, GRANULAR SOIL
EXAMPLE DESIGN OF CANTILEVERED WALL, GRANULAR SOIL A sheet pile wall is required to support a 2 excavation. The soil is uniform as shown in the figure. To take into account the friction between the wall
New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations
from New construction foundations don t have to be a headache. The CHANCE Helical Pier Foundation System gives you the performance of concrete without the drawbacks and liabilities of driven piles and
PROTECT YOUR HOME WITH SANDBAGS DURING FLOODS By Giuseppe Bolzoni
TRAINING FOR TRAINERS COURSE PROTECT YOUR HOME WITH SANDBAGS DURING FLOODS By Giuseppe Bolzoni SAFETY FIRST!!! Never swim, play or drive in floodwater Floodwater is generally considered as polluted, so
Basement Moisture Problems
Foundations Foundation Purpose The purpose of a foundation is to distribute the weight of a structure securely into the ground. Engineering data regarding soil, rock and water conditions are used to design
Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits
Attachment G-1: Pit Latrine Diagram Fig E.1a: Pit Latrine Fig E.1b: Plan View of Twin Pits Fig E.1c: Section of a water-sealed pan Fig E.1d: 3D view of Overflow Pipe Fig E.1e: 2D view of Overflow Pipe
Module 3 : Sewer Material. Lecture 3 : Sewer Material
1 P age Module 3 : Sewer Material Lecture 3 : Sewer Material 2 P age 3.1 Important Factors Considered for Selecting Material for Sewer Following factors should be considered before selecting material for
Module 3: Sewer Material Lecture 3: Sewer Material
Module 3: Sewer Material Lecture 3: Sewer Material [NPTEL, IIT Kharagpur, Prof. M.M.Ghangrekar, Department of Civil Engineering Page 1 3.0 SEWER MATERIAL 3.1 Important Factors Considered for Selecting
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard
Built to Last. Built for Beauty. Good. Solid. Logix. TM
Built to Last. Built for Beauty. Good. Solid. Logix. TM Quality, Value and Service Introducing LOGIX Insulated Concrete Forms. Based on the simple concept of interlocking blocks, LOGIX ICF gives you a
Protect Your Home From Flooding. A guide for Lethbridge Residents
Protect Your Home From Flooding A guide for Lethbridge Residents Every year, millions of litres of water flow into the City of Lethbridge s stormwater and wastewater collection systems from residential
Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.
CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,
SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
GOWANUS EXPRESSWAY TUNNEL PRIMER
GOWANUS EXPRESSWAY TUNNEL PRIMER T he New York State Department of Transportation is currently studying the replacement of the Gowanus Expressway with a tunnel. This investigation involves looking at a
Uniclass L31:N14:P7111 C1/SfB (16.9) Rn7 (J4) February 2008. Foundation Heave Protection
Uniclass L31:N14:P7111 C1/SfB (16.9) Rn7 (J4) February 2008 Foundation Heave Protection The safe, sure way to provide foundation protection Clayshield is the proven solution to protecting foundations against
BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY
MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
Design and Construction of Auger Cast Piles
Design and Construction of Auger Cast Piles 101 th Annual Road School 2015 3/11/2015 Malek Smadi, Ph.D., P.E. Principal Engineer - GEOTILL - Fishers, IN [email protected] - www.geotill.com CONTENTS 1.
6 RETROFITTING POST & PIER HOUSES
Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This
The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
3.1 Functional requirements
3 Groundwork and Foundations The foundation of a building is that part of walls, piers and columns in direct contact with, and transmitting loads to, the ground. The building foundation is sometimes referred