MAHARASTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED



Similar documents
Company Profile. Introduction

Power distribution reforms in Maharashtra

National Electricity Policy 03-Feb-2005

Empowering Rural India: Expanding Electricity Access by Mobilizing Local Resources

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI

CHAMUNDESHWARI ELECTRICITY SUPPLY CORPORATION LIMITED (CESC) Mysore (Karnataka)

Press Release on Tariff Orders FY for PSPCL & PSTCL

ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1 st April, 2015

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

& benefits. Indian context

ELECTRICITY CONSUMER'S - RIGHTS STATEMENT

STRATEGIC ISSUES OF THE ELECTRICITY COMPANY OF GHANA PRESENTATION BY MR. WILLIAM HUTTON-MENSAH (AG. MANAGING DIRECTOR) ELECTRICITY COMPANY OF GHANA

KERALA STATE ELECTRICITY REGULATORY COMMISSION

Tamil Nadu WiNd ENErgy ProfilE

Reforms in Vulnerable Power Distribution Sector in Odisha BOT Model

To whom application is to be filed

Wind Power Programme in India

Volume 12 Issue 3 Version 1.0 Fabruary 2012 Type: Double Blind Peer Reviewed International Research Journal Publisher: Global Journals Inc.

Electricity Generation from Renewable Energy in Sri Lanka: Future Directions

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015

RAPDRP GSP - Challenges & Key Learnings

Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme

Outsourcing of Metering and Billing. 14 th September 2015

Reduction of AT&C Losses. Praveer Sinha CEO & ED, TPDDL

EESL Business Model to Scale up Energy Efficiency Implementation in India

RAJASTHAN ELECTRICITY REGULATORY COMMISSION, JAIPUR Petition No. RERC 456/14, 457/14, 458/14, 442/14, 444/14 & 447/14

INDEX S. No. PARTICULARS Note:

Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014

A. 5MWp SPV Plant at Khimsar, Rajasthan. B. 5MWp SPV Plant Installed Technologies. D. 5MWp SPV Plant Challenges. E. 5MWp SPV Plant - Performance

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR *****************

Energy Efficiency Standards and Labeling in India

a) Whether there is a need to revisit the existing approach for debt: equity ratio or to continue with the existing composition?

Conservation Voltage Reduction (CVR)

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR

Maharashtra Budget Analysis

WATER / WASTEWATER & POWER PROJECTS LAST 5 YEARS. No of Staff Provided by BCE. Overall Project Value (SR)

Detailed Vetting Report

Smart Metering Initiative ADWEA Program

Strategy for Providing 24x7 Power Supply. Forum of Regulators

may be prescribed by the Government, under the provisions of the sub section (1) of section 127 of the Act;

Mobile Workforce Management (MWM) By Samant Nagpaul

AFRICAN UTILITY WEEK March 2011 Challenges with electricity supply: The role of the City of Cape Town

Opportunities in Electricity Distribution Franchisee in India

Methodology for Solar Power Projects

POWER BUDGET

ELECTRICITY SUPPLY- MEASURE OF LIVING AND DEVELOPMENT

Analysis of state-wise RPO Regulation across India

FIXED CHARGE: This is a cost that goes towards making the service available, including

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

Electricity market drivers

Smart Metering for Automatic Demand Response

MANUAL FOR FISCAL INCENTIVES FOR IT UNITS

KERALA STATE ELECTRICITY REGULATORY COMMISSION

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO , SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.

6545(Print), ISSN (Online) Volume 4, Issue 2, March April (2013), IAEME & TECHNOLOGY (IJEET)

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

Electric Power Distribution

ACCELERATING GREEN ENERGY TOWARDS The Danish Energy Agreement of March 2012

Electricity Governance in India: Regulatory Governance of Maharashtra Power Sector

Karnataka Electricity Regulatory Commission. Discussion note on

e-public Distribution Monitoring System e-pdms

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR ***************** Secy/Tariff/ Date..03.

China Solar Market Analysis

XLPE PRODUCTION PLANT FOR THIRUVALLA UNIT OF TRACO CABLE LTD

Draft Solar Energy Purchase Agreement (EPA) subject to approval by TNERC

TRANSMISSION SERVICE RATE SCHEDULE Effective from 1 April 2015

WATER RESOURCES OF MAHARASHTRA STATE The geographical area of the state is 30.7Mha. Cultivable area is 22.5 Mha.(73%GA). Out of this 40% area is

Rural Electrification Workshop February 23-25, 2005 Bangkok

2.2 Quality Standards and Compliances The BIS has specified quality standards vide IS 1011:1992. Compliance with PFA Act is necessary.

Company Policy MANAGEMENT OF OVERHEAD PRIVATE AND SHARED MAINS. Page 1 of 11

ENERGY COST SAVINGS IN MUNICIPAL WATER PUMPING SYSTEMS-NEED FOR WEB INTERACTIVE TOOL

Trends in Private and Public Investments in Agricultural Marketing Infrastructure in India

Indian Electricity Sector

Case Study 5 Use of Wind Turbine Technology

G.O.MS.No. 8 Dated Read the following:-

all that you want to know About Rajasthan Solar Energy

Technologies Supporting Smart Meter Networks

Initiatives to promote clean energy in Maharashtra, India Dr. Pramod Deo, Chairman, MERC

FACT SHEET. BSES, Delhi - Distribution Network. Power Systems Consultancy from ABB

Networks. ESB Networks Ltd Basis of Charges for Connection to the Distribution System. Commercial and Customer Asset Management ESB Networks Ltd.

DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT)

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background

Study Report on Metering, Billing and Collection in the Electrical Distribution System in Karnataka

Naperville Smart Grid Initiative

Executive summary 2. 1 Introduction 4

CUSTOMER SERVICE AND BILLING PROGRAMS in CESC Limited, Kolkata

Electricity Terminology. Simplifying energy management

Renewable Energy Certificate Mechanism

International Journal of Advancements in Research & Technology, Volume 3, Issue 5, May ISSN THROUGH MOBILE

Review relating to Statutory Corporation

DANISH DISTRICT ENERGY PLANNING EXPERIENCE

PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE

Sustainable Energy for India s Rural Development (A keynote given at International Energy Conference in Beijing. November 2007)

S. No. Year Obligation expressed as percentage of energy consumption (%)

Solar Purchase Obligation

Estimation of electrical losses in Network Rail Electrification Systems

PRESS NOTE REVISION OF ELECTRICITY TARIFF FOR

AN OVERVIEW OF INDIA S ENERGY SECTOR

Delhi Electricity Regulatory Commission Viniyamak Bhawan, C Block, Shivalik, Malviya Nagar, New Delhi 17

Transcription:

First Prize Electricity Distribution Companies (DISCOMs) DISCOM Profile MAHARASTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED Mumbai (Maharashtra) MSEDCL provides electricity throughout the state of Maharashtra except Mumbai city. MSEDCL is one of the largest power distribution companies in the country in terms of number of consumers and electricity supplied. It serves more than 2.2 crore consumers spread over 3.07 lakh sq. km covering 41015 villages and 457 towns. Total no. of registered consumers with MSEDCL, as on 31st March 2014, are 2,71,53,963. This is the maximum number of consumers amongst any distribution licensees in India. Over the years, out of these consumers total 49,41,549 consumers are permanently disconnected. Therefore, balance consumers of MSEDCL as on March 2014 are 2,22,12,414. Bifurcation of these consumers amongst various categories is as follows. Category HT LT Total % Residential 347 1,63,86,981 1,63,87,328 74% Commercial 2,911 15,71,966 15,74,877 7% Industrial 12,766 3,83,515 3,96,281 2% Agricultural 1,292 36,67,450 36,68,742 17% Others 1,993 1,83,193 1,85,186 1% Total 19,309 2,21,93,105 2,22,12,414 100% 99

Operational Performance MSEDCL presently has around 3.3 Lakh Ckt km of HT lines and around 5.93 lakh Ckt km of LT lines, with around 2700 substations. MSEDCL has added around 10 lakh agricultural connections in last five years. The demand for FY 2013-14 of MSEDCL is of around 14,506 MW, with a supply of around 13,830 MW leaving a deficit of 4 %. MAJOR ACHIEVEMENT OF MSEDCL MSEDCL has reduced distribution loss from whopping 31% (FY 2005-06) to 14% (FY 2013-14) The collection efficiency increased to 96% in FY 2013-14 from 82.96% (FY 2005-06). Transformer Failure Rate has been reduced to 7% in FY 2012-13 as compared to 16% in FY 2005-06. Bhiwandi Circle with 44% distribution losses and 68% collection efficiency has been franchised out to M/S Torrent Power on 26th Jan 2007 for ten years. It has reduced losses to ~17.3%, improved collection efficiency to 99 %. MSEDCL has implemented feeder wise DCL (Distribution Commercial Loss) concept which envisages higher load shedding in areas where recovery is low and distribution losses are high. This has yielded very good results in bringing community pressure to reduce the losses. The community now jointly endeavors to reduce losses so that they can have uninterrupted electricity. With such joint efforts, about 85% of MSEDCL area is load shedding free and collection efficiency is about 96%-98%. 13 state-of-the-art Consumer Facilitation Canters (CFCs) have been opened at Major Urban Centers. In addition 31 small CFCs have also been established at Sub Divisions. 24 x 7 online operating Centralized Customer Care Centre has been commissioned at Bhandup and Pune for redressal of complaints of consumers. Online bill payment facility has been made available for all consumers. 100

MSEDCL has implemented innovative technologies such as Pre-paid meter, automatic meter reading through infra-red (I.R.) and Radio Frequency (R.F.) technology. SCADA and ERP are under implementation by MSEDCL. Maharashtra has been adding capacities in generation and also strengthening its infrastructure in Transmission as well as for Distribution of electricity in the State. These activities for the last 4 5 years have started yielding results and Maharashtra is moving towards load shedding free regime. A short term measure of Single Phasing Scheme was also implemented, whereby 15482 villages get 18-24 hours of single phase and 8-10 hours of 3 phase supply. Gaothan Feeder Separation Scheme implemented for 18095 villages, this scheme separates 11/22 kv feeders assuring evening supply for lighting in villages. 16000 14000 12000 10000 8000 6000 4000 2000 0 Demand Supply Position 26% 25% 23% 12404 9212 12797 9638 13137 10130 12507 10203 18% 12624 10921 13% 13157 11917 14043 12841 14032 13309 14406 13830 9% 9% 5% 4% FY 06 FY 07 FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 30% 25% 20% 15% 10% 5% 0% Demand (MW) Supply (MW) % Def icit There are about 41,000 villages in the State, out of which 31,000 are AG dominated load. Single phasing scheme is implemented on 1900 feeders and about 14900 villages are benefited. AG feeder separation scheme implemented on 3500 feeders and about 17000 villages are benefited. Through these schemes expected results of reduction of peak demand by about 2500 to 3000 MW is achieved so that the problems during evening peak are solved and load curve is almost flattened. 1. AG. DSM PROJECT In order to accelerate Demand Side Management (DSM) measures in agriculture sector, Government of India approved a scheme on Agricultural Demand Side Management (Ag DSM) to be implemented by Bureau of Energy Efficiency (BEE), Ministry of Power. The objective of the scheme is to create appropriate framework for market based interventions in agriculture pumping sector by facilitating conducive policy environment to promote Public Private Partnership (PPP) to implement projects. As a part of national Ag DSM scheme, first pilot Ag DSM project 101

was launched at Mangalwadha subdivision of Solapur Circle. This first pilot Ag DSM project covers 2209 agricultural pumps connected on four feeders (Bramhapuri, Nandeshewar, Borale and Bhose) in Mangalwedha subdivision of Solapur Circle, Maharashtra. The overall consumption of existing pump sets is work out to be 15.6 Million Units (MU), whereas with energy efficient pump sets, the consumption will go down to 9.4 MU for annual average operating hours of 1642. This will lead to the energy savings of 6.1 MU. The project is completed in year 2012 and energy saving achieved in the year 2013-14. 2. LT FIXED CAPACITOR SCHEME Agricultural load is one of major category in agricultural predominant district. Currently operating power factor of Distribution Transformer supplying predominantly agricultural load is in range of 0.7 to 0.75. The Capacitor can be installed on secondary side of Distribution Transformers to improve operating power factor to 0.95. Improvement in power factor will lead to subsequent reduction in line losses and relieve Distribution System to the extent of reduction in kva, thus resulting reduction in line & equipment loading and hence reduction in failure rate and improvement in voltage profile. Up to date progress of Scheme is as below: Scheme Name Installation of LT fixed capacitors Contract Value (in Cr. Rs.) 25 kvar 30 kvar Total Capacitors Target Achieved Target Achieved Target Achieved 46.98 23073 23153 22285 22161 45358 45314 The works of LT Fixed Capacitor phase I as above are completed in the year of 2012-13. Realization of the benefits is in the year of 2013-14. 3. GAOTHAN FEEDER SEPARATION SCHEME (GFSS) Gaothan feeder separation scheme (GFSS) involves segregation of agricultural load and other category load respectively on separate feeders. The immediate measure for load management can only be achieved by flattening of the load curve and shifting of the peak load to other off-peak periods and thus minimize the large-scale unrest among rural consumers arising out of load shedding. Such measure shall also help MSEDCL to eliminate the feeling of discrimination felt by the rural consumers vis-à-vis urban consumers. 102

Progress of GFSS as on October 2014: Name of the Scheme Cost of the Scheme (in Cr.) Scope Feeders Achieved Scope Villages Achieved Load Management Scope (MW) Achieved (MW) Expend. (in Cr.) GFSS-I 895 1498 1498 6932 6932 1905 1905 816 GFSS-II 1006 895 892 7005 6775 1088 995 950 GFSS-III 231 - - 381 328 - - 212 GFSS Leftout GFSS- Shrirampur GFSS Total 721 1008 1075 3601 2856 628 362 658 87 81 70 176 132 161 72 40 2940 3482 3535 18095 17023 3782 3334 2676 4. SINGLE PHASING SCHEME Single Phasing of the selected rural mixed load feeders is carried out by use of changeover switches at substation. The scheme envisages supplying Single Phase rural lighting load through three nos. of single phase transformers. During the normal operation, the agricultural load continues to be supplied from the three phase transformers. On operation of the changeover switch, there will be no supply to the 3-phase load on the 11 kv distribution network whereas single phase supply is available to the lighting and fan load. On revising changeover switch, normal 3- phase supply shall be restored. Progress of Single Phasing Scheme as on October 2014: Name of the Scheme Single Phasing-I Single Phasing- II Single Phasing- III Single Phasing Left-out Single Phasing Total Cost of the Scheme (in Cr.) Scope Feeders Achieved Scope Villages Achieved Load Management Scope (MW) Achieved (MW) Expend. (in Cr.) 235 1186 1186 8085 8085 1153 1153 213 221 768 768 3877 3877 722 722 214 205 - - 2325 1880 - - 178 268 - - 1195 1105 - - 237 929 1954 1954 15482 14947 1875 1875 842 103

First Prize Electricity Distribution Companies (DISCOMs) KERALA STATE ELECTRICITY BOARD LTD. Pattom, Thiruvananthapuram (Kerala) DISCOM Profile Kerala State Electricity Board Ltd. is functioning as a company, incorporated under the Companies Act, 1956, fully owned by the Govt. of Kerala. It generates, Transmits and distributes electricity in the Kerala state and comes under the authority of the Department of Power. Its Mission is to provide quality power at affordable cost, on demand, to the consumers of the state and to act as the catalyst for total development of the state. KSEBL provides supply to more than 1.12 Crores (approx.) consumers of the state and has been performing the planning and development of the power system. As a fully owned Government public utility, KSEB has been implementing all the policy directions of the State Government, such as providing free electricity to consumers below poverty line, Giving priorities for service connections to weaker sections in the society, subsidy to Agricultural consumers, orphanages and similar other eligible consumers. It has been implementing various schemes, formulated by Central Government such as R-APDRP (Restructured Accelerated Power Development and Reforms Programme), RGGVY (Rajeev Gandhi Grammeen Vidyuthikaran Yojana). It has been implementing DSM activities and has 213 nos. DSM cells, as on 31-12- 2013 104

Energy Consumption Year(FY) Per capita consumption(kwh) 2008-09 375 2009-10 420 2010-11 436 2011-12 478 2012-13 501 2013-14 516 Net energy saving for the year 2013-14 Expenditure incurred for this savings : 81.66 MU : 238.86 Crores Energy Conservation Measures Taken KSEB has consistently been reducing the Transmission and Distribution (T&D) losses, since 2001-02. The details are given below:- Year T&D Loss within KSEB system (%) Extent of reduction (%) Yearly Cumulative Total Energy sales within the State (MU) Savings in Generation & Power Purchase (MU) Savings in Power purchase cost)* (Rs. Cr) 2010-11 16.09 1.62 14.67 14547.90 3673.33 1285.66 2011-12 15.65 0.44 15.11 15980.53 4134.41 1447.04 2012-13 15.30 0.35 15.46 16838.24 4438.80 1553.58 2013-14 14.96 0.34 15.8 17454.04 4683.52 1639.233 105

Other DSM Activities 1. DSM activity in Ice plants (during 2014-15) Energy saving activities in various Ice plants of Kerala (Trivandrum, Ernakulam & Kannur districts ) are carried out and found that an energy saving of about 300 to 400 units per day has been achieved. 2. DSM activity named Labhaprabha is in progress, to reduce domestic energy consumption. 3. Energy Conservation awareness classes were conducted among the students of Barton Hill Engg. College, Trivandrum, Kariavattom university college of Engg, Trivandrum, school students and also, among the employees of KSEB. 106

Certificate of Merit Electricity Distribution Companies (DISCOMs) DAKSHIN GUJARAT VIJ COMPANY LIMITED Surat (Gujarat) Discom Profile As a part of efforts towards restructuring of Power Sector in the State of Gujarat the Government of Gujarat reorganized erstwhile Gujarat Electricity Board functionally into a Generation Company, a Transmission Company and four Distribution Companies. Of the four Distribution companies, Dakshin Gujarat Vij Company Ltd. was incorporated on 15-Septmber-2003 and obtained Certificate for Commencement of Business on 15-Oct-2003. The Company commenced the commercial operations with effect from 1st April 2005 and has been entrusted with the responsibility of the distribution of electricity in the Southern districts of Gujarat state. The brief profile of the company is tabulated below Area in sq. kms 23,307 Districts covered 7 Talukas covered 37 Towns covered 28 No. of Villages 3,518 Circles Division Offices Sub Division Offices Sub stations Transformer centers 4 Nos. 19 Nos. 112 Nos. 186 Nos. 83096 Nos. 11 KV and 22 KV Feeders 1572 Nos. H.T Line L.T Line 39260 KMs 45485 KMs LT : HT line Ratio 1.158 Daily Energy catered Connected Load Revenue Consumers 55 MUs 6348 MW Rs. 8,461Crores 25.86 Lakh (2968 nos. HT Consumers & rest LT Consumers) Employees 6211 107

Energy Consumption Particulars YEAR 2012-13 2013-14 Input energy into the system in MUs (A) 12807 16835 Units billed in MUs (Sold out) (B) 11283 15162 Billing Efficiency (C=B/A) 88.10% 90.05% Distribution losses in MUs (D=A-B) 1524 1673 Distribution losses in %age 11.90% 9.94% Collection Efficiency in %age (E) 100% 100% %AT&C Losses {(1-Billing Efficiency(C) x Collection Efficiency(E)} x 100 Energy Conservation Projects 1. AT&C (Distribution losses) LOSSES REDUCTION 11.90% 9.94% Most important efficiency parameter of a Distribution Licensee is the success in reducing the AT&C losses especially in relation to the regulatory targets that have been set up. Hence, since the commencement of commercial operations of the company in 2005, reduction of AT&C losses has been one of our crucial activities. Thus in a span of 8 years, since the formation of the Company, the % reduction achieved in the AT&C losses is to the tune of 6.60 %. During the year the DISCOM has achieved the actual Distribution losses of 9.94%. % AT & C (Distribution Loss) Losses 20 18 16 14 12 10 8 6 4 2 0 18.5 16.11 15.84 15.04 14.53 12.99 13.16 11.9 9.94 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 % AT & C Loosses The Distribution loss, which is a combination of Technical and Commercial losses, has been brought down to the present levels through a number of rectification activities as enumerated below. 108

Reduction of Technical Losses i. Bifurcation of lengthy/overloaded feeders either from the Existing S/S or by erecting new feeders from the newly commissioned S/S in co ordination with the State Transmission Utility (GETCO). The total no of feeders bifurcated and New S/S commissioned in the last few recent few years are as under. PARTICULARS 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 No. of feeders bifurcated No. of New S/S Commissioned. 14 18 33 49 68 57 5 7 10 19 16 18 ii. iii. Replacement of Conventional CRGO transformers by Amorphous Core transformers to achieve a reduction the Core losses by 40 to 45%. (No load losses of transformer). In fact, in the last four financial years a total of 6040 nos. CRGO transformers were replaced by Amorphous Core transformers. Adoption of HVDS system to minimize the LT line losses, if not to eliminate which not only improves the HT/LT ratio in addition to curbing the power theft through hooking by unscrupulous consumers. The progresses of the HVDS system of the last 4 years are 1401 nos. Reduction of Commercial Losses The commercial losses mainly contributed by the poor and inefficient metering accounted for almost 64% (10.21% of the total of 16.11%) of the total Distribution losses in the year of commencement of operations of the Company. However, through a series of continuing rectification activities the Company has been able to reduce the Commercial losses and as on today it accounts for only 40% % of the total Distribution losses (4.23 % of total of 10.21%). The steps taken by the company in the reduction of commercial losses are as under:- i. Replacement of old/sluggish meters by new quality/static meters along with providing New Metal Meter Boxes (MMB), and sealing of the installations to make them foolproof. ii. Particulars 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 Replacement of old/faulty meters. 120962 82103 47991 171145 124225 136264 Replacement of Bare LT conductors with LT Aerial Bunched Cables (ABC) in addition to the practice of erecting LT lines in theft prone areas by using A B Cables only. Particulars 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 Providing L T A B Cables in KMS. 24 419 714 1814 2345 1916 109

iii. Vigorous installation checking programs conducted by the Vigilance wing of the company as well as by the (O&M) squads. Particulars 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 %age installations checked to the total no. of installations. 11.14% 8.82% 9.9% 8.46% 10.21% 7.35% iv. Adoption of the facility of Automatic Meter Reading in case of HT/EHT consumers to avoid the manual intervention in addition to cross verification of the meter readings taken by meter readers in case of LT consumers, analysis of consumption category wise, verification of the zero/low consumption cases as well as the non-billing cases. Furthermore RAPDRP scheme covering part A and Part B was introduced to bring down the losses. 2. Increase in collection efficiency As a part of increasing the consumer s satisfaction in addition to the increased collection efficiency, DGVCL has taken a number of steps to facilitate the consumers in payment of their energy bills. 3. Fulfilment of RPO obligations Renewable Purchase Obligations as stipulated by regulator GERC are complied in letter and spirit by the company. As against the RPO of 7% for 2013-14, the actual consumption from renewable sources from wind, solar and biomass was 7.07%. Other Initiatives i. DGVCLAapneDware DGVCL has introduced the unique concept of DGVCL AapneDware consumer centric program by arranging program at pre-determined places convenient to consumer mass and dates. A total 51 Nos. of such programs were arranged in one month covering 112 nos. of sub divisions by giving wide publicity through press well in advance to resolve the grievances of the consumer on the spot. In addition to this, LokDarbars are arranged at Taluka headquarters for on the spot redressal of consumer complaints and also collection of customer feedback. In the last year alone, 10 such LokDarbars were arranged. ii. Lighting Day DGVCL has celebrated LIGHTING DAY on 16-17th October 2013, just before Dipawali Festival- The festival of Lights. *Total 5539 nos. of connections were released in two days. 110

iii. iv. *It has enhanced the trust bonding and consumer s satisfaction towards the company s customer friendly policies. Consumer Redressal Committees: As per notification no: 4 of 2004 of GERC DGVCL has formed 3 Tier style Complaint Redressal Committees at division offices and circle offices and consumer grievances Redressal forum at corporate office. Creating Brand Image Of Company Distribution of energy conservation pamphlets among common people and displaying hoardings at public places and major division and circle office buildings. Adoption of technological solutions Adoption of Web-based RAPDRP GIS in 33 Sub Divisions covering 8.54 Lacs consumers which facilitate the DISCOM for better Complaints resolution, maintenance, inventory of Assets etc. Spot Billing through Hand Held Equipments (HHE) introduced in town areas of four Circles as a part of enhancing customer satisfaction by prompt issue of bills, and elimination of human errors and delay in rectification of the same. GPRS based spot billing of LT consumers is started from April 2012. Monitoring of the HT Consumers through Automatic Meter Reading (AMR) devices. To provide conventional electricity to the tribal residents of Shurpaneshvar Wild life Sanctuary of NARMADA District above 135 Km underground cable is laid and villages are electrified In the year 1029 transformers are replaced during the year 2013-14 for reliable power supply. Aerial Bunched Cables are provided in Chemical polluted and costal area. The DISCOM has achieved approximately 100% Rev Collection efficiency since year 2006-2007. Hi-Tech Meter testing laboratory is provided. 111