Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme
|
|
|
- Gwen Hensley
- 10 years ago
- Views:
Transcription
1 Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme This agreement made at on this day of two thousand between M/s. (Renewable Energy Generator name and address) hereinafter called the Renewable Energy Generator (REG) which expression shall wherever the context so permits, mean and include the successors in interests, executors, administrators and assigns, represented by Thiru. as party of the First part and M/s..(Name of the Distribution Licensee/ State Transmission Utility). and having its office at hereinafter called the Distribution Licensee / State Transmission Utility, which expression shall wherever the context so permits, mean and include the successors in interest, administrators and assigns, represented by the.. (Designation of the Distribution Licensee s officer) as party of the Second part; WHEREAS the REG has sent to the Distribution Licensee / State Transmission Utility, his proposal to wheel the renewable energy generated from his Renewable Energy Generator No. with No. of Generators of make having capacity of KW each installed at SF.No. of village taluk in district / commissioned on through the Distribution Licensee / State Transmission Utility s transmission and / distribution network for third party sale / Captive use bearing LT / HT service Numbers (LT/HT Tariff. ) of Electricity Distribution Circle and to sell surplus energy available after captive use / third party sale to the Distribution Licensee under Tamil Nadu Electricity Regulatory Commission 1/12
2 (Renewable Energy Purchase Obligation) Regulations, 2010 and the amendments issued from time to time; WHEREAS the REG has paid the open access registration fee and agreement fee as notified / ordered by the Commission; AND WHEREAS the STU / Distribution Licensee has accepted the proposal of the REG for wheeling of energy from their Generators to third party / captive use through Distribution Licensee / State Transmission Utility s transmission / distribution networks as per Lr.No. on the terms and conditions hereinafter mentioned; NOW THESE PRESENTS WITNESSETH AND THE PARTIES HEREBY AGREE AS FOLLOWS: 1. Definitions. - In this Agreement, unless the context otherwise requires - (1) Commission means the Tamil Nadu Electricity Regulatory Commission (2) Force Majeure means any event which is beyond the control of the parties to this agreement which they could not foresee or with a reasonable amount of diligence could not have foreseen or which could not be prevented and which substantially affect the performance by either party such as but not limited to. (a) natural disasters (earthquakes, hurricane, floods); (b) wars, riots or Civil Commotions and other upheavals; and (c) grid / distribution system s failure not attributable to parties hereto. 2/12
3 (3) Interface line means the electric line between the interconnection point and the nearest point at which the electric line could technically be connected to the existing grid or distribution system. (4) Inter connection point means the interface point of renewable energy generating facility with the transmission system or distribution system, as the case may be: (a) in relation to wind energy projects and solar photovoltaic projects, inter connection point shall be line isolator on outgoing feeder on HV side of the pooling sub station; (b) in relation to small hydro power, biomass power and non fossil fuel based cogeneration power projects and Solar Thermal Power Projects, the inter connection point shall be line isolator on outgoing feeder on HV side of generator transformer; (5) Meter means a Meter as defined in the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended from time to time. 2. Interfacing and evacuation facilities. (1) The REG agrees to interface his Generators with the Distribution Licensee / State Transmission Utility s grid through lines and shall bear the entire cost of switch yard, Pooling Sub-Station, interface line, switch gear, metering, protection and other electrical equipments/lines required from the point of generation up to the nearest point at which the interface line could technically be connected to the existing grid or distribution system; (2) The REG and the Distribution Licensee / State Transmission Utility shall comply with the provisions contained in Central Electricity Authority (Technical Standards for Interconnecting to the Grid) Regulations, 2007 which includes the following, namely - (a) Connection Agreement; 3/12
4 (b) Site responsibility schedule; (c) Access at Connection site; (d) Site Common Drawings; (e) Safety; (f) Protection System and Co-ordination; (g) Inspection, Test, Calibration and Maintenance prior to Connection. (3) The REG agrees to comply with the safety measures contained in Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2010; (4) Both the parties shall comply with the provisions contained in the Commission s Renewable Energy Purchase Obligation Regulations, 2010, Indian Electricity Grid Code, Tamil Nadu Electricity Grid Code, the Electricity Act, 2003, other Codes and Regulations issued by the Commission / Central Electricity Authority (CEA) / Central Electricity Regulatory Commission (CERC) and amendments issued thereon from time to time; 3. Operation and Maintenance. (1) The REG agrees that the starting current of the Generators shall not exceed the full load current of the machine and to provide the necessary current limiting devices like thyristor during starting. (2) The REG agrees to minimize drawal of reactive power from the Distribution Licensee / State Transmission Utility s grid at an interchange point when the voltage at that point is below 95% of rated voltage and shall not inject reactive power supply when the voltage is above 105% rated voltage subject to payment of required charges as per the order in force. (3) The REG agrees to provide suitable automatic safety devices so that the Generator shall isolate automatically when the grid supply fails. 4/12
5 (4) The REG agrees to maintain the Generator and the equipments including the transformer, switch gear and protection equipments and other allied equipments at his cost to the satisfaction of the authorized officer of the Distribution Licensee / State Transmission Utility. (5) The changing of the rupturing capacity of the switch gear and settings of the relays, if any, shall be subject to the approval of the authorized officer of the Distribution Licensee / State Transmission Utility. (6) There shall be no fluctuations or disturbances to the grid or other consumers supplied by the grid due to paralleling of the Generators. The REG shall provide at his cost adequate protection as required by the Distribution Licensee / State Transmission Utility to facilitate safe parallel operation of the Generators with grid and to prevent disturbances to the grid. (7) The REG agrees that the Distribution Licensee / State Transmission Utility shall not be responsible for any damage to his Generator resulting from parallel operation with the grid and that the Distribution Licensee / State Transmission Utility shall not be liable to pay any compensation for any such damage. (8) The generators shall be maintained effectively and operated by competent and qualified personnel. (9) In case of unsymmetrical fault on HV Bus, the REG shall share the fault current according to impedance of the circuit. To meet such contingency and for safe operation of the Generators, the REG shall provide the following scheme of protection, namely:- (a) Separate overload relays on each phase and earth fault relays shall be installed by the REG. Under no circumstances, these relays shall be by passed; (b) With suitable current transformer and relay connections, the load sharing by the REG and Distribution Licensee / State Transmission Utility shall be limited to their rated capacity; 5/12
6 (c) Adequate indication and control metering for proper paralleling of the generators on the HV bus shall be made available; (d) Protection co-ordination shall be done by the Distribution Licensee / State Transmission Utility in consultation with Regional Power Committee and relays and the protection system shall be maintained as per site responsibility schedule. (10) Grid availability shall be subject to the restriction and control as per the orders of the State Load Dispatch Centre and as per Tamil Nadu Electricity Grid Code; (11) The Captive / third party user who is not having independent feeder can avail power from the REG subject to the Restriction and Control measures imposed / approved by the Commission from time to time. 4. Metering Arrangements. - (1) The metering arrangements with facilities to record export and import of energy shall be provided in accordance with the Central Electricity Authority (Installation and Operation of Meters) Regulations, Commission s Intra State Open Access Regulations, Tamil Nadu Electricity Distribution Code and Tamil Nadu Grid Code which are in force and in consultation with Distribution Licensee / State Transmission Utility. The periodicity of testing, checking, calibration etc., will be governed by the Regulations issued by the Central Electricity Authority / Commission in this regard; (2) Main and Check Meters shall have facility to communicate its reading to State Load Dispatch Centre on real time basis or otherwise as may be specified by the Commission. Meter reading shall be taken as per the procedure devised by the Distribution Licensee / State Transmission Utility; (3) The State Transmission Utility / Distribution Licensee may provide Check Meters of the same specification as Main Meters; 6/12
7 (4) The REG can have a standby meter of the same specification tested and sealed by the State Transmission Utility / Distribution Licensee; (5) The Main and Check Meters shall be tested for accuracy as per the Central Electricity Authority (Installation and Operation of Meters) Regulations, The meters may be tested using NABL accredited mobile laboratory or at any accredited laboratory in the presence of parties involved. Both parties shall seal Main and Check meters. Defective meter shall be replaced immediately; (6) Reading of Main and Check meters shall be taken periodically at appointed day and hour by authorized officer of Distribution Licensee / State Transmission Utility and generator or his representative; (7) Check meter readings shall be considered when Main Meters are found to be defective or stopped. Provided that, if difference between the readings of main and check meter vis-à-vis main meter reading exceeds twice the percentage error applicable to relevant class, both meters shall be tested and the one found defective shall be immediately replaced and reading of other will be considered; (8) If during test or calibration, both the main meter and the check meter are found to have errors beyond permissible limits, the bill shall be revised for the previous 3 (Three) months or for the exact period if known and agreed upon by both the parties, by applying correction as determined by the meter testing Wing of the State Transmission Utility / Distribution Licensee to the consumption registered by the meter with lesser error; (9) The REG shall check the healthiness of meters (due to blowing of the P.T. fuses or due to any other causes) by superficially checking indicator lamps or by taking readings as frequently as possible. If both the main meter and the check meter fail to record energy either due to the blowing of the P.T. fuses or due to any other causes, the energy imported /exported may be arrived at based on the standby meter, if available, or by mutual agreement of the parties involved; 7/12
8 (10) The interface meters may be Time of Day (TOD) meters with appropriate communication facilities to be connected with SLDC / Control Centre; (11) The REG shall comply with the scheduling provisions as specified in the Commission s regulations, orders and codes in force. 5. Adjustment of Energy Generated and Wheeled. (1) The minimum limit of load for sale to third parties / Captive use by the REG shall be governed by the Commission s Intra-State Open Access Regulations in force. When the REG is synchronized with the grid, the Captive / third party consumer shall be liable to pay to the Distribution Licensee for the net energy consumed during the billing month at the applicable rate. The net energy consumption in a month shall be slot wise as detailed below: (a) That is, peak generation shall be adjusted against peak consumption; (b) Normal generation shall be adjusted against normal consumption; (c) Off peak generation shall be adjusted against off peak consumption; (d) Peak and normal generation may be adjusted against lower slot consumption at the request of REG. (2) As and when the Commission implements the Intra-State ABT, the adjustment of energy is subject to the Intra-State ABT regulation in force 6. Billing. - (1) The Distribution Licensee shall raise bills at the end of the month for the net energy consumed by the Captive / third party user after adjusting the wheeled energy at the rate applicable to that category of consumer, where the consumption by the Captive / third party user is 8/12
9 more than the generation of the REG; (2) The Distribution Licensee shall raise bills on the REG or the Captive/Third party consumer, as the case may be, for the charges payable towards startup power and power drawn for other purpose, wheeling charges, excess demand & excess energy charges, cross subsidy surcharge wherever applicable etc, as per the order / regulations of the Commission for the time being in force; (3) The STU shall raise bills on the REG holder for the charges payable towards transmission charges, scheduling and system operation charges, etc. as per the order / regulations of the Commission for the time being in force; (4) Wherever the Renewable energy generation in a billing month is in excess of the consumption in that month, the balance energy shall be sold to the Distribution Licensee at a price not exceeding the pooled cost of power purchase as defined in Tamil Nadu Electricity Regulatory Commission (Renewable Energy Purchase Obligation) Regulations, 2010 and amendments issued from time to time. 7. Charges. (1) Transmission and Wheeling Charges including losses. - The REG is permitted to pay provisionally the transmission and wheeling charges at % vide Commission s Order dated. As and when the Commission indicates the normative transmission and wheeling charges, the REG agrees to pay the difference to the STU / Distribution Licensee and continue to pay the transmission and wheeling charges as per the Commission s regulations, codes or orders in force; (2) Grid availability Charges. - (a) Startup Power - The drawal of energy by the REG during the start up from the Distribution Licensee shall be claimed as per the Commission s Orders / Regulations in force. 9/12
10 (b) Standby Power - If adequate generation does not materialize or if drawal by the Captive / third party consumer exceeds generation, energy charges and demand charges shall be regulated as follows: (i) Energy Charges - When the REG is synchronized with the grid, the Captive / third party consumer shall be liable to pay to the distribution licensee for the net energy consumed during the billing month at the applicable rate. The net energy consumption shall be slot wise. (ii) Demand Charges - 100% of applicable demand charges for that category of user for the demand supplied by the Distribution Licensee and the applicable percentage of deemed demand charges as per Commission s Order applicable from time to time for the demand supplied by the REG. (3) Scheduling and System Operation charges. - As per the Commission s regulation / order in force. (4) Power Factor disincentive. Captive / third party consumers of renewable energy shall be liable for disincentive based on the gross energy consumption and the applicable demand as per the Tariff Order in force. (5) Reactive energy charges. - Reactive power charges will be charged as per the Tamil Nadu Electricity Regulatory Commission s Renewable Tariff order No... dated (6) Peak hour extra charges and off-peak hour rebate. - Peak hour extra charges and off-peak hour rebate shall be on net energy consumption after deducting generation in the REG during the respective peak hour block and off-peak hour block; and (7) Any additional charges that may be approved by the Commission at a later date shall also be levied as approved by the Commission. 10/12
11 8. Payment of Security Deposit. - The Captive / third party consumer drawing power from the REG shall pay to the distribution licensee a security deposit for the net energy supplied by the distribution licensee as specified by the Commission in its orders / regulations for the time being in force. 9. Applicability of the Acts and Regulations. - Both the parties shall be bound by the provisions contained in the Electricity Act, 2003, Regulations, notifications, orders and subsequent amendments, if any, made from time to time by the Commission. 10. Terms and conditions agreement period. - (1) The tenure of this agreement shall be (years/months/days/hours) calculated from the date of this agreement and thereafter the tenure may be extended for further periods based on the mutual agreement between the STU/Distribution Licensee and the REG consistent with the Commission s Intra-State Open Access regulations. The classification of the terms (Long term, Short term, etc.) is as per the Commission s Intra State Open Access Regulations; (2) The parties to the agreement may at any time renegotiate the existing agreement mutually within the framework of the relevant regulations, codes and orders of the Commission in force; (3) The parties to the agreement shall be given the option to exit for violation of the agreement after serving a notice of three months on the other party. 11. Settlement of Disputes. - If any dispute or difference of any kind whatsoever arises between the parties relating to this agreement, it shall, in the first instance, be settled amicably, by the parties, failing which either party may approach the 11/12
12 Commission for the adjudication of such disputes under section 86 (1) (f) of the Electricity Act, Force Majeure. - Both the parties shall ensure compliance of the terms of this agreement. However, no party shall be liable for any claim for any loss or damage whatsoever arising out of failure to carry out the terms of this agreement to the extent that such failure is due to force majeure events as defined in this agreement. But any party claiming the benefit of this clause shall satisfy the other party of the existence of such an event(s). In witness whereof Thiru. acting for and on behalf of (REG name) and Authorized Officer acting for and on behalf of the Distribution Licensee have hereunto set their hands on the day, month and year herein above first mentioned. In the presence of witnesses: Signature 1) Renewable Energy Generator 2) In the presence of witnesses: Common seal Signature 1) Authorized Officer of the Distribution Licensee. 2) (By the order of the Commission) Secretary, Tamil Nadu Electricity Regulatory Commission. 12/12
Draft Solar Energy Purchase Agreement (EPA) subject to approval by TNERC
Draft Solar Energy Purchase Agreement (EPA) subject to approval by TNERC This agreement made at on this day of Two thousand between M/s. (Solar Power Generator name and address) hereinafter called the
KERALA STATE ELECTRICITY REGULATORY COMMISSION
KERALA STATE ELECTRICITY REGULATORY COMMISSION Notification No. 2096/KSERC/CT/2014 Dated, Thiruvananthapuram 10 th June 2014. In exercise of the powers conferred under sections 66, 86 (1) (e) and 181 of
KERALA STATE ELECTRICITY REGULATORY COMMISSION
KERALA STATE ELECTRICITY REGULATORY COMMISSION Dated 24 th January 2014 NOTICE Notice is hereby given that Kerala State Electricity Regulatory Commission has published the Draft Kerala State Electricity
DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015
DRAFT 31.3.2015 KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 The Kerala State Electricity Regulatory Commission hereby publishes
DELHI ELECTRICITY REGULATORY COMMISSION
DELHI ELECTRICITY REGULATORY COMMISSION DELHI ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION AND RENEWABLE ENERGY CERTIFICATE FRAMEWORK IMPLEMENTATION) REGULATIONS, 2011 No. Dated:. NOTIFICATION
DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT)
DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT No. Dated: October, 2009 NOTIFICATION (DRAFT) In exercise of powers conferred under sections 61, 66,
RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR
RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR NOTIFICATION 23 rd December, 2010 No.RERC/Secy/Reg. 82 : In exercise of powers conferred under sections 61, 66, 86(1)(e) and 181 of the Electricity Act,
DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION
DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT No. Dated: -12-2011 NOTIFICATION In exercise of powers conferred under sections 61, 66, 86(1)(e)
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Draft Maharashtra Electricity Regulatory Commission (Net Metering for Rooftop Solar Systems) Regulations, 2015 Electricity Act, 2003 No. MERC / Legal
S. No. Year Obligation expressed as percentage of energy consumption (%) 1 2011-12 6.00 2 2012-13 7.10 3 2013-14 8.20
Background paper for prescribing Renewable Purchase Obligation (RPO) for Captive consumption of CPP & open access consumers in the State for the period ending March, 2017 and related amendment in regulations:
Karnataka Electricity Regulatory Commission. Discussion note on
Karnataka Electricity Regulatory Commission Discussion note on Draft KERC (Forecasting, Scheduling, Deviation settlement and related matters for Wind and Solar Generation sources) Regulations, 2015. 1.0.
POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT
POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT This Power Purchase agreement is entered into at (place).. on this. day of between Electricity Supply Company Limited
INDEX S. No. PARTICULARS Note:
INDEX S. No. PARTICULARS T1 Profit & Loss Account - Transmission Business T2 Profit & Loss Account - SLDC Business T3 Annual Revenue Requirement - Transmission Business T4 Annual Revenue Requirement -
ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION
ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION RENEWABLE POWER PURCHASE OBLIGATION (COMPLIANCE BY PURCHASE OF RENEWABLE ENERGY / RENEWABLE ENERGY CERTIFICATES) REGULATIONS, 2012 Regulation No. 1 of 2012
TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Notification No. TNERC/RPO/ 19/1 dated 07-12-2010
TAMIL NADU ELECTRICITY REGULATORY COMMISSION Notification No. TNERC/RPO/ 19/1 dated 07-12-2010 In exercise of powers conferred by section 181 of the Electricity Act, 2003 (Central Act 36 of 2003) read
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION. No. L-1/(3)/2009-CERC Dated the 7 th August 2009
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION No. L-1/(3)/2009-CERC Dated the 7 th August 2009 In exercise of powers conferred by section 178 of the Electricity Act, 2003 and all other
FIXED CHARGE: This is a cost that goes towards making the service available, including
ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer
Analysis of state-wise RPO Regulation across India
The Renewable Purchase Obligations (RPO) has been the major driving force in India to promote the renewable energy sector. But the State Electricity Regulatory Commissions (SERCs) have defined their respective
Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems
Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems This Agreement is made and entered into this day of, 20, ( Effective Date ) by and between the Orlando Utilities Commission
Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background
Renewable Energy Certificate Mechanism for India Background ABPS Infrastructure Advisory India is abundantly gifted with a variety of renewable energy (RE) sources. However, not all states are endowed
POWER PURCHASE AGREEMENT BETWEEN SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED
POWER PURCHASE AGREEMENT BETWEEN SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED AND M/s. NCE SOLAR PPA No. This Power Purchase Agreement ( Agreement ) entered into on this day of 20 between Southern
PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY
PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY 1. OBJECTIVE : 1.1. This procedure shall provide guidance to the entities to implement
G.O.MS.No. 8 Dated 12.02.2015 Read the following:-
GOVERNMENT OF ANDHRA PRADESH ABSTRACT ENERGY, INFRASTRUCTURE & INVESTMENT DEPARTMENT - Development of Solar Power in Andhra Pradesh Andhra Pradesh Solar Power Policy, 2015 Orders Issued. ------------------------------------------------------------------------------------------------------------
DRAFT. Model Power Purchase Agreement for Solar Power Generation
DRAFT Model Power Purchase Agreement for Solar Power Generation This Model PPA is applicable where the Parties intend to enter into a long term PPA for the entire useful life (i.e. 25 years) of the solar
POWER PURCHASE AGREEMENT BETWEEN POWER DISTRIBUTION COMPANY OF ANDHRA PRADESH LIMITED AND M/s. NCE SOLAR PPA No.
Draft PPA POWER PURCHASE AGREEMENT BETWEEN POWER DISTRIBUTION COMPANY OF ANDHRA PRADESH LIMITED AND M/s. NCE SOLAR PPA No. 1. This Power Purchase Agreement ( Agreement ) entered into this day of between
TERMS AND CONDITIONS
Virginia Electric and Power Company TERMS AND CONDITIONS XXIV. GENERATOR INTERCONNECTION STANDARD Electric generator interconnection service includes only the ability to interconnect an electric generator
ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR 751 012 *****************
ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR 751 012 ***************** Case Nos. 61,62,63,64, 69, 70, 71 & 72/2014/ 348 Date.23.03.2015 To The Authorized Officer,
SMALL GENERATION SYSTEM INTERCONNECTION AGREEMENT (10 kw OR LESS)
SMALL GENERATION SYSTEM INTERCONNECTION AGREEMENT (10 kw OR LESS) Interconnection Agreement, Terms, and Conditions This Small Generation System Interconnection Agreement (10 kw or less) ( Agreement ),
SUPPLEMENTAL AGREEMENT BETWEEN STOCK BROKER AND CLIENT
SUPPLEMENTAL AGREEMENT BETWEEN STOCK BROKER AND CLIENT THIS SUPPLEMENTAL AGREEMENT entered into on this day of 200_, to the AGREEMENTS BETWEEN STOCK BROKER AND CLIENT for Cash and Derivatives Segment of
DRAFT SOLAR (PV / THERMAL) POWER PURCHASE AGREEMENT
DRAFT SOLAR (PV / THERMAL) POWER PURCHASE AGREEMENT POWER PURCHASE AGREMENT BETWEEN M/S. AND BIHAR STATE ELECTRICITY BOARD THIS DEED OF AGREEMENT is made this.. day of (Month),..(Year) (hereinafter called
PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY
PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY 1 Objective (1) This procedure shall provide guidance to the entities to implement Renewable
PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY
PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY 1. OBJECTIVE 1.1. This procedure shall provide guidance to the entities to implement Renewable Energy Certificate
National Electricity Policy 03-Feb-2005
National Electricity Policy 03-Feb-2005 Under the provisions of section 3(1) of the Electricity Act, 2003, the Central Government is required to prepare the National Electricity Policy for development
DRAFT DISTRICT MINERAL FOUNDATION TRUST DEED THIS DEED OF TRUST EXECUTED AT ------------ONTHIS THE ------DAY OF IN THE YEAR TWO THOUSAND FIFTEEN.
DRAFT DISTRICT MINERAL FOUNDATION TRUST DEED THIS DEED OF TRUST EXECUTED AT ------------ONTHIS THE ------DAY OF IN THE YEAR TWO THOUSAND FIFTEEN. BY THE STATE GOVERNMENT OF -------------, represented by
TRIPARTITE AGREEMENT BETWEEN STOCK BROKER, SUB - BROKER AND CLIENT
TRIPARTITE AGREEMENT BETWEEN STOCK BROKER, SUB - BROKER AND CLIENT This Agreement (hereinafter referred to as Agreement ) is entered into on this day of 20, by and between M/s. First Global Stockbroking
Unofficial translation. The Electricity (Capacity) Market Rules
Chapter I General Provisions Article 1. Scope of Activity Unofficial translation The Electricity (Capacity) Market Rules These Rules regulate: a) Functioning of Electricity and Guaranteed Capacity Market
HOMEOWNERS LIMITED REPRESENTATIVE SERVICE AGREEMENT With SERVICE FIRST INSURANCE GROUP LLC. Of CYPRESS PROPERTY & CASUALTY INSURANCE COMPANY
HOMEOWNERS LIMITED REPRESENTATIVE SERVICE AGREEMENT With SERVICE FIRST INSURANCE GROUP LLC. Of CYPRESS PROPERTY & CASUALTY INSURANCE COMPANY This Agreement is made and entered into effective as of October
NORTH LITTLE ROCK ELECTRIC DEPARTMENT NET METERING RULES
NORTH LITTLE ROCK ELECTRIC DEPARTMENT NET METERING RULES TABLE OF CONTENTS DEFINITIONS... D-1 SECTION 1. GENERAL PROVISIONS 1.01. Purpose... 1-1 1.02. Other Provisions... 1-1 SECTION 2. NET METERING REQUIREMENTS
PROFORMA OF POWER OF ATTORNEY BY THE JOINT VENTURE/ CONSORTIUM MEMBERS (Non Judicial Stamp of Rs.100/- duly notarized)
PROFORMA OF POWER OF ATTORNEY BY THE JOINT VENTURE/ CONSORTIUM MEMBERS (Non Judicial Stamp of Rs.100/- duly notarized) KNOW ALL MEN BY THESE PRESENTS THAT WE PARTIES whose details are given hereunder:
CONTRACT FOR THE SALE AND PURCHASE OF ELECTRICITY GENERATED BY WIND POWER
CONTRACT FOR THE SALE AND PURCHASE OF ELECTRICITY GENERATED BY WIND POWER ASSISTANCE TO ENERGY SECTOR TO STRENGTHEN ENERGY SECURITY AND REGIONAL INTEGRATION CONTRACT NUMBER EPP-I-08-03-00008-00 AUGUST,
Agreement for Setting up Margin Trading Account (Updated to July 16, 2013)
Agreement for Setting up Margin Trading Account (Updated to July 16, 2013) I/We hereby acknowledge that I/we have received and fully understood the explanation provided by your company regarding the margin
Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva
Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva Issued: August 2009 SIZED UP TO 100 KVA TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Applicability... 1 1.2 Definitions...
ELECTRICITY MARKET ACT
1 NB: Unofficial translation Ministry of Trade and Industry, Finland ELECTRICITY MARKET ACT (386/1995; amendments up to 1172/2004 included) In accordance with a decision by Parliament, the following is
PAYMENT BOND. KNOW ALL MEN BY THESE PRESENTS that we,, as Principal (the Principal ), and, a corporation organized
PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS that we,, as Principal (the Principal ), and, a corporation organized and existing under laws of the of, with a principal office at, and authorized to do business
TERMS OF ELECTRICITY SALES 2010. as recommended by Finnish Energy Industries
TERMS OF ELECTRICITY SALES 2010 as recommended by Finnish Energy Industries Content: A. General, concluding an electricity sale contract, the prerequisites for electricity sales, commencement of electricity
ELECTRICITY SUPPLY/ TRADE LICENSE KORLEA INVEST A.S
Hamdi Mramori Street, No 1 Prishtina 10000 Kosovo Tel: +381 (0) 38 247 615 ext. 103 Fax: +381 (0) 38 247 620 e-mail: [email protected] www.ero-ks.org ELECTRICITY SUPPLY/ TRADE LICENSE GRANTED TO: KORLEA
Kiwi Energy NY LLC 144 North 7 th Street #417 Brooklyn, NY 11249 1-877- 208-7636 www.kiwienergy.us
Kiwi Energy NY LLC 144 North 7 th Street #417 Brooklyn, NY 11249 1-877- 208-7636 www.kiwienergy.us Natural Gas / Electricity SALES AGREEMENT Customer Disclosure Statement Page 1 Price: Variable rate per
Net Energy Metering Southern California Edison
NET ENERGY METERING To encourage small electrical customers to install environmentally friendly sources of electrical power, the State of California has passed laws to make the process of interconnecting
APPENDIX 7 TO LGIP INTERIM INTERCONNECTION SYSTEM IMPACT STUDY AGREEMENT
APPENDIX 7 TO LGIP INTERIM INTERCONNECTION SYSTEM IMPACT STUDY AGREEMENT THIS AGREEMENT is made and entered into this day of, 20 by and between, a organized and existing under the laws of the State of,
C O N T R A C T N o. F M V I D 2015/106. ACL Desktop
Annex 4 To the Regulations of the Procurement Provision of Maintenance Service for the Computerised Accounting Audit Software ACL Desktop, procurement identification No. FM VID 2015/2016, organised by
Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014
Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014 Table of Contents 1- PREAMBLE - 1 2- OBJECTIVES - 1 3- OPERATIVE PERIOD - 1 4- IMPLEMENTATION PLAN - 2 5- ELIGIBLE ENTITIES - 2 6- TARGETS
Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering
Title 20 PUBLIC SERVICE COMMISSION Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES Chapter 02 Engineering Authority: Public Utility Companies Article, 2-121, 5-101 and 5-303, Annotated Code of Maryland.
How To Write A Contract In The European
(Form-9) Agreement with Contractor for THIS AGREEMENT (hereinafter, together with the appendices and all the documents annexed hereto and forming an integral part hereof, referred to as the Contract )
MODEL CONTRACT FOR PROVISION OF HEALTH CARE SERVICES. This Contract is entered into on / /, corresponding to / /1430H by and between:
Page 1 of 6 MODEL CONTRACT FOR PROVISION OF HEALTH CARE SERVICES This Contract is entered into on / /, corresponding to / /1430H by and between: (Name of Insurance Company), headquartered in (Name of City),
SOLAR ENERGY DEVELOPMENT IN THAILAND
18 December 2014 SOLAR ENERGY DEVELOPMENT IN THAILAND 1. Energy Regulatory Commission The Energy Industry Act B.E. 2550 (A.D. 2007) was published and became effective in December 2007. It established a
Standard Conditions of Direct Contract On Purchase of Balance Electricity. (About the Commercial Operator Buying the Balance Electivity)
Standard Conditions of Direct Contract On Purchase of Balance Electricity (About the Commercial Operator Buying the Balance Electivity) Tbilisi August 31, 2006 Preamble a) Commercial Operator carries out
Tamil Nadu WiNd ENErgy ProfilE
Tamil Nadu WiNd ENErgy ProfilE Wind energy in Tamil Nadu has witnessed tremendous growth propelling the State to the number one position in India in terms of renewables. However the challenge that remains
( Extract from Haryana Government Gazette, dated the 6 th December,2005) HARYANA GOVERNMENT
( Extract from Haryana Government Gazette, dated the 6 th December,2005) HARYANA GOVERNMENT RENEWABLE ENERGY DEPARTMENT NOTIFICATION The 23 rd November, 2005 POLICY FOR PROMOTING GENERATION OF ELECTRICITY
Dakota Energy Cooperative, Inc. POLICY STATEMENT
Dakota Energy Cooperative, Inc. POLICY STATEMENT Subject: Member Owned Small Renewable Energy Policy No. 57 Rate and Interconnection Requirements Issue Date: May 21, 2008 Revised Date: December 16, 2014
TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents
Annexure-1-B ANNEXURE TO TARIFF ORDER PASSED BY MPERC For Financial Year 2006-07 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS Table of Contents Sr No Particulars
Appellate Tribunal for Electricity (Appellate Jurisdiction) APPEAL No. 297 of 2013
Dated: 23 rd April, 2015 Appellate Tribunal for Electricity (Appellate Jurisdiction) APPEAL No. 297 of 2013 Present: Hon ble Mr. Rakesh Nath, Technical Member Hon ble Mr. Justice Surendra Kumar, Judicial
Annexure 5 MODEL STOCK BROKER AND SUB-BROKER AGREEMENT
Annexure 5 MODEL STOCK BROKER AND SUB-BROKER AGREEMENT This Agreement entered into this day of 200_ at between, Member of the Stock Exchange, ordinarily carrying on business in sale and purchase of shares
ELECTRIC DISTRIBUTION COMPANY/ COMPETITIVE RETAIL ELECTRIC SERVICE PROVIDER AGREEMENT FOR OHIO POWER COMPANY'S OHIO RETAIL ACCESS PROGRAM.
ELECTRIC DISTRIBUTION COMPANY/ COMPETITIVE RETAIL ELECTRIC SERVICE PROVIDER AGREEMENT FOR OHIO POWER COMPANY'S OHIO RETAIL ACCESS PROGRAM THIS AGREEMENT is made and entered into effective as of, 20, (the
TELANGANA SOLAR POWER POLICY 2015
TELANGANA SOLAR POWER POLICY 2015 1 GLOSSARY COD CII GoTS GoI MNRE MoP NCE NOC NSM PCB PPA PV R&D REC RPPO RLDC SGST SLDC SPC SPP SPV SRP Scheduled Commercial Operations Date Confederation of Indian Industry
POWER PURCHASE AGREEMENT
POWER PURCHASE AGREEMENT BY AND BETWEEN Bangladesh Power Development Board (BPDB) AND Sponsor Company - RELATING TO- 3 MWP GRID TIED SOLAR POWER PLANT AT SARISHABARI, JAMALPUR, BANGLADESH. Dated as of
PROVO CITY UTILITIES NET METERING LICENSE AGREEMENT
PROVO CITY UTILITIES NET METERING LICENSE AGREEMENT Customer-Owned Electric Generating Systems of 25kW or Less This NET METERING LICENSE AGREEMENT ( Agreement ) is between ( Customer ) and Provo City -
NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF. THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM
NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM BY AUTHORISED PERSONS Effective from 1 October 2011 to 30 September
I USE OF SYSTEM CHARGES EFFECTIVE FROM 1 APRIL 2015
I USE OF SYSTEM CHARGES EFFECTIVE FROM 1 APRIL 2015 Contracted Capacity Peak Period ( /kwh) Off-Peak Period ( /kwh) Reactive Power ( /kvarh) Uncontracted Capacity 7 Uncontracted Standby Capacity CCS 8
WAGES PAYMENT SERVICES AGREEMENT
WAGES PAYMENT SERVICES AGREEMENT This Agreement is made on this the [ day of [, 2015 by and between: First Party: AND Second Party: Al Khaliji France S.A. P.O. Box 4207, Al Maktoum Street, Deira, Dubai,
e-voting Agreement This Agreement made and entered into at this day of, between
e-voting Agreement This Agreement made and entered into at this day of, between Central Depository Services (India Limited, a company incorporated under the Companies Act, 1956, having its registered office
S U R E T Y P E R F O R M A N C E B O N D. U.S. Environmental Protection Agency Underground Injection Control Financial Responsibility Requirement
S U R E T Y P E R F O R M A N C E B O N D U.S. Environmental Protection Agency Underground Injection Control Financial Responsibility Requirement BOND COVERS THE PLUGGING OF INJECTION WELLS Date bond executed:
BROKERAGE AGREEMENT. THIS AGREEMENT is made on BETWEEN:
BROKERAGE AGREEMENT THIS AGREEMENT is made on BETWEEN: Patria Finance, a.s., a company organized and existing under the laws of the Czech Republic, registered office: Jungmannova 745/24, 110 00 Prague
(House and Land) Approved by the Nova Scotia Real Estate Commission for use by Industry Members under the Real Estate Trading Act.
AGREEMENT OF PURCHASE & SALE FOR TURN KEY NEW CONSTRUCTION (House and Land) Approved by the Nova Scotia Real Estate Commission for use by Industry Members under the Real Estate Trading Act The Buyer of
N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS
N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS 14:8-4.1 Scope This subchapter sets forth net metering requirements that apply to electric power suppliers, basic generation service providers
MAINTENANCE AND PERFORMANCE BONDS
MAINTENANCE AND PERFORMANCE BONDS CITY OF AUSTELL MAINTENANCE BOND FOR SUBDIVISION KNOWN ALL MEN BY THESE PRESENTS, that Subdivider,, (hereinafter called the Principal), as Principal and, a corporation
MOBILE VOICE SERVICES PROVISION AGREEMENT
MOBILE VOICE SERVICES PROVISION AGREEMENT A. CUSTOMER INFORMATION Please select if you re an existing Customer Contract #. Corporate/Individual Name.. TIN...... Physical Address.. Postal Address......
Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : [email protected] [email protected]
Draft ver2 Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : [email protected] [email protected] 1 TABLE OF CONTENTS S.No Contents Page No 1. PREAMBLE 3 2. OBJECTIVES 3 3. OPERATIVE
DRAFT DEBENTURE TRUST DEED
DRAFT DEBENTURE TRUST DEED THIS TRUST DEED is made this day of 2007, between incorporated under the Companies Act, 1956 with its registered office at (hereinafter called "the Company") of the One Part,
LEASED LINE INTERNET SERVICE CONTRACT
LEASED LINE INTERNET SERVICE CONTRACT This contract for leased line internet service executed is on... by and between Bhutan Telecom Limited, a company incorporated and existing under the Companies Act
Commercial agency agreements are controlled by Royal Decrees, Ministry of Commerce Resolutions and Council of Ministers Resolutions.
'SELECTING AN AGENT' This summary deals with commercial agencies, which is a term covering both agencies and distributorships. Only Saudi national companies or companies which are wholly Saudi-owned may
REQUEST FOR QUOTATIONS
ROMANIA NATIONAL AGENCY FOR FISCAL ADMINISTRATION REVENUE ADMINISTRATION MODERNIZATION PROJECT REQUEST FOR QUOTATIONS FOR PROJECT MANAGEMENT SOFTWARE RAMP/9 Country: ROMANIA Name of the Project: Revenue
Electric Rate Schedule
Electric Rate Schedule Schedule R-2009 - Residential Service Applicable to residential customers for all domestic uses. Winter November thru April: Facilities Charge First 800 kwh used per month Over 800
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE Effective: April 2015 Billing Cycle Supersedes: November 2012 Billing
TRANSMISSION SERVICE RATE SCHEDULE Effective from 1 April 2015
TRANSMISSION SERVICE RATE SCHEDULE Effective from 1 April 2015 A SERVICE CONNECTION CHARGES Note : All charges in this Schedule are exclusive of GST. 1 Service Connection This includes cables, associated
Connection of micro-generation to the electricity distribution network
Connection of micro-generation to the electricity distribution network Network recommendation YA9:09 Sivu 1(20) CONTENTS INTRODUCTION...3 1. MARKINGS AND DEFINITIONS...3 2. DEFINITION OF MICRO-GENERATION