Solar Power Plants FAQs



Similar documents
G.O.MS.No. 8 Dated Read the following:-

TELANGANA SOLAR POWER POLICY 2015

Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : dirupneda@rediffmail.com ho_nmk@rediffmail.com

Analysis of state-wise RPO Regulation across India

all that you want to know About Rajasthan Solar Energy

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR

Guidelines for Solar Grid Power Projects

DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY

POLICY FOR IMPLEMENTATION OF SOLAR POWER BASED PROJECTS IN MADHYA PRADESH, 2012

Wind Power Programme in India

Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF

Draft Jharkhand State Solar Power Policy 2015

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background

COMBINED SUMMARY OF STATE POLICIES FOR SOLAR POWER

Methodology for Solar Power Projects

Renewable Energy Certificate Mechanism

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015

Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading

DRAFT OF THE GOA STATE GOVERNMENT POLICY TOWARDS RENEWABLE, SOLAR ENERGY AND ENERGY CONSERVATION- GOA 2014

KERALA STATE ELECTRICITY REGULATORY COMMISSION

THE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE

PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY

DELHI ELECTRICITY REGULATORY COMMISSION

POWER PURCHASE AGREEMENT BETWEEN POWER DISTRIBUTION COMPANY OF ANDHRA PRADESH LIMITED AND M/s. NCE SOLAR PPA No.

Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme

Indian Experiences on Promoting Renewable Energy DR SUSHANTA K CHATTERJEE JOINT CHIEF (REGULATORY AFFAIRS) CENTRAL ELECTRICITY REGULATORY COMMISSION

F. No. 66/185/2016 -WE Ministry of New & Renewable Energy

Karnataka Electricity Regulatory Commission. Discussion note on

National Electricity Policy 03-Feb-2005

KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G. Road, Bangalore

Tamil Nadu WiNd ENErgy ProfilE

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency

Electricity in Egypt

Distributed Generation: Frequently Asked Questions

Full Scale Program for Renewable Energy in Egypt

Renewable Energy Feed-in Tariff Projects Regulations

POWER PURCHASE AGREEMENT BETWEEN SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED

S. No. Year Obligation expressed as percentage of energy consumption (%)

Solar Purchase Power Agreements Brief Sheet

The Real Cost of Electrical Energy. Outline of Presentation

Delhi Solar Energy Policy, 2015

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO , SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.

Success in Scaling-up Solar Energy in Rajasthan, India

Existing Wind Power Policies and Incentives

Alternative Energy Made in Florida. Solar Power Plants for Commercial, Government, and Utility

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3 rd & 4 th Floor, Chanderlok Building, 36, Janpath, New Delhi Tel : / Fax :

DOCUMENT FOR EXPRESSION OF INTEREST FOR EMPANELMENT OF ADVERTISING AGENCIES

Can India s Future Needs of Electricity be met by Renewable Energy Sources? S P Sukhatme Professor Emeritus IIT Bombay.

( Extract from Haryana Government Gazette, dated the 6 th December,2005) HARYANA GOVERNMENT

Financial Analysis of Solar Photovoltaic Power plant in India

INDEX S. No. PARTICULARS Note:

Distributed Energy Resource Options and The Importance of The Electric Power Grid

Grid Connected Solar Power in India. Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India

Draft Solar Energy Purchase Agreement (EPA) subject to approval by TNERC

POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT

KERALA STATE ELECTRICITY REGULATORY COMMISSION

CHAIRMAN & MANAGING DIRECTOR, NATIONAL MINERAL DEVELOPMENT CORPORATION LIMITED(NMDC)

Model Regulations on Forecasting, Scheduling and Deviation Settlement of Wind and Solar Generating Stations at the State level

DRAFT. Model Power Purchase Agreement for Solar Power Generation

Current and expected contribution of RES-E in NA countries

Egypt Renewable energy Projects. Eng. Lamya Youssef Head Of FIT Unit Central Unit Egyptian Electricity Transmission Company EETC

To whom application is to be filed

IREDA-NCEF REFINANCE SCHEME REFINANCE SCHEME FOR PROMOTION OF RENEWABLE ENERGY SUPPORTED BY THE NATIONAL CLEAN ENERGY FUND

Wilson Sonsini Goodrich & Rosati

Solar and Wind Energy for Greenhouses. A.J. Both 1 and Tom Manning 2

Corporate Summary. Company Background

Frequently Asked Questions About. Japan s Feed-in- Tariff System

PICO HYDROPOWER PROMOTION PROJECT

Direct and Indirect Taxation-Law : 1 and : Practice

Stationary Energy Storage Solutions 3. Stationary Energy Storage Solutions

F.No. 334/8/2016-TRU Government of India Ministry of Finance Department of Revenue (Tax Research Unit)

Transcription:

Solar Power Plants FAQs Solar Power industry in India is gaining more and more prominence with each passing day. The domestic/off-grid industry is picking up speed too. Owing to the queries we are receiving regarding the various issues pertaining to Solar Power Plant setup, we thought it would be a great idea to put together a bunch of questions and answer the same. We shall keeping adding to the list as we keep receiving more queries. So, here are the most Frequently Asked Questions and our answers for the same. Do let us know in case you would like us to answer any more questions. Also, kindly point out any inaccuracies/mistakes that you may find here so that we can correct the same for the benefit of everyone. How much land is required to setup a 1 MW solar power generation Unit? The land required for a 1 MW power plant setup is around 4.5-5 acres for Crystalline technology and around 6.5-7.5 acres for Thin-Film technology. This is only a rough benchmark and may vary based on technology and efficiency of panels. What is the life-time of a typical Solar Power plant? The useful life of a typical Solar Power plant is considered to be 25 years. This is the duration for which long-term PPAs are signed and financial models are built. However, Solar Power plants can run beyond 25 years while producing a lower output. Many Solar Panel manufacturers guarantee an output of 90% at the end of 10 years and 80% at the end of 25 years. What would be the total project cost excluding the cost of land? Total project cost per MW would be in the range of Rs.6.5 Crores-Rs.8 Crores depending on the kind of technology you are using, whether or not you are using

tracking systems, the kind of EPC Contractor you choose for power plant system etc. CERC recently announced the benchmark tariff for setup of Solar PV and Thermal Plants in India. Here s the link to the document containing more details: http://www.cercind.gov.in/2013/orders/so242.pdf The table below indicates CERC determined benchmark cost for Financial Year 2013-14. What would be the O & M cost? Central Electricity Regulatory Commission (CERC) benchmark costs for O&M is Rs.11.63 lakhs/year/mw for 2013-14 with a 5.72% increase every year. This varies from project to project based on the number of people you employ for maintenance, frequency of cleaning of panels, onsite-engineer availability etc..

What would be the per unit production cost? Per unit production cost is dependent on how much cost you are setting up the power plant for. Accordingly, the per unit sale cost can be set based on the expected returns. Is there any subsidy available for Solar Power plant setup? Capital Subsidy of 30% is applicable only for captive power plants up to 100 KW. This is expected to be increased to 500 KW for FY 2103-14 but an official confirmation regarding the same is still awaited. Subsidy will not be applicable in case of sale of power. We would like to setup a Solar power plant in Andhra Pradesh but we have not participated in AP solar bidding. What are the other options? Since you have not participated in AP Solar Bidding, one other way would be the REC route. You can sell the generated power to APTRANSCO or third party consumer. Through this route, you sell power to APTRANSCO/third party and also claim RECs for the same. This way, you will be able to get a base tariff (APPC) from APTRANSCO and then additional revenue can be generated through sale of Solar RECs. However, it is to be kept in mind that the following additional benefits may be availed for a Solar PV Project commissioned before June 2014 subject to the condition that REC benefits are not availed: Exemption from Electricity Duty Exemption of Wheeling Charges, Transmission Charges and Cross-subsidy Charges Refund of VAT Refund of Stamp Duty and Registration Charges for purchase of However, it has to be kept in mind that REC revenue is market driven and can fluctuate as both demand and supply are pretty low on Solar front right now.

Kindly refer to our monthly newsletter REChronicles (http://efficientcarbon.com/services/energy/renewable-energy-certificates) for more and up-to-date information on the REC market. Download documents relevant to Andhra Pradesh Solar Policy here: http://nedcap.gov.in/pdfs/2012eny_ms39.pdf http://nedcap.gov.in/pdfs/amendment_to_ap_solar_power_policy.pdf What would be the per unit expected sale price? This depends on the mode of sale of power and the consumer of power. In the case of sale of power to DISCOM, the prevailing Average Pooled Power Purchase Cost (APPC) will be applicable. In the case of sale of power to 3 rd Party consumer, a mutually agreed price can be agreed upon and accordingly a PPA can be signed. It is to be kept in mind that several additional charges such as Wheeling Charges, Distribution Charges, Open-Access Charges, Cross-Subsidy Charges are applicable in the case of sale of power to 3 rd party. These charges vary from State-to-State and DISCOM-to-DISCOM. What permissions/clearances are required to setup a Solar PV Plant? A certain set of permissions need to be obtained and documents need to be submitted in order to setup a Solar PV plant. These may vary from state-to-state. In order to get a Solar PV Project Accredited by AP State Load Dispatch Center (AP SLDC) for REC mechanism, the following are the statutory clearances and environmental clearances to be furnished: Industrial Clearance Land conversion (Agricultural to Non-Agricultural) Environmental Clearance Certificate from APPCB, Hyderabad Contract labour license from AP Labour Department Fire Safety certificate from AP Fire Department Latest tax receipt from the Municipal/Gram Panchayat for the factory land.

Auditor compliance certificate regarding fossil fuel utilization Approval from Chief Electrical Inspector Clearance from Forest department Also, all necessary approvals/agreements before start of Solar PV project construction are to be furnished as and when necessary. These include the following: Land purchase Power Evacuation arrangement permission letter from DISCOM Confirmation of Metering Arrangement and location ABT meter type, Manufacture, Model, Serial No. details for Energy Metering. Copy of PPA (important as Preferential PPA projects are not eligible for REC mechanism) Proposed Model and make of plant equipment Undertaking for compliance with the usage of fossil fuel criteria as specified by MNRE Details of Connectivity with DISCOM Connectivity Diagram and Single Line Diagram of Plant Details of pending court cases with APERC, Supreme Court of India, High Court of A.P. or any other courts Any other documents requested by AP SLDC While these are the documents that AP SLDC requires for REC project accreditation, these are typically the clearances/documents required in general for a Solar PV project.