Existing Wind Power Policies and Incentives
|
|
|
- Wesley Bond
- 10 years ago
- Views:
Transcription
1 Existing Wind Power Policies and Incentives Consultation on National Wind Energy Mission January 9, 2014 New Delhi
2 Wind Power Progress (in MW) Potential (at 80 m) : 1,02,000 Achievement so far : 20, th Plan Target : 9,000 Achievement during 11 th Plan : 10,260 Achievement during : 3,196 Achievement during : 1,700 Target for 12 th Plan : 15,000 Target for : 2,500 Achievement during (so far) : 1100
3 Why Incentives? Confidence in technology Low PLFs as compared to conventional sector Feed-in tariff not adequate - CERC guidelines not followed Negative NPV NPV of equity cash flow - Negative Rs Lakhs, which indicates inadequacy of tariff In-firm nature of output Grid availability and instability Project Viability
4 Central Government Policies and Incentives
5 Depreciation Accelerated Depreciation withdrawn w.e.f Ministry trying to re-instate the same in consultation with MoF At present, a total of 35% Depreciation allowed in the 1 st year of the project (15% normal + 20% additional depreciation for infrastructure project)
6 GBI Scheme GBI- Rs.0.50/kWh subject to max Rs crore/mw (increased from Rs. 62 lakh/mw) GBI over and above the FIT Duration : > 4 years, and < 10 years Total disbursement in a year not to exceed Rs. 25 lakhs per MW during first four years. GBI scheme applicable for the 12 th FYP period having a target of 15,000 MW Captive producers allowed but open access (merchant power) not allowed. Effective retrospectively w.e.f
7 Renewable Energy Certificate (REC) Launched in 2010, REC is a tradable certificate where one certificate is equal to 1MWh of wind energy generated Purchased by DISCOM, Open Access and Captive Consumer to fulfill the RPO obligation The floor and forbearance price of 1 Non-solar REC is Rs and Rs respectively Non-compliance of RPO has a direct bearing on REC mechanism 7
8 Central Fiscal Policy Direct taxes Exemption on Income Tax on earnings from the Project u/sec 80IA for 10 years. Indirect taxes Exemption of Excise Duty on WEG. Custom duty concessions for certain wind turbine components available Special bearings Gear Box Yaw components Wind turbine controllers Parts of the above components Rotor blades of wind turbines Parts and sub-parts of blades Raw materials for blades, parts and sub-parts of blades
9 Incentive in Research & Development The income tax department provides for a weighted deduction for an in house R&D activity, which entitles wind turbine manufacturers to claim 200% of the expenditure (other than expenses on land and building) incurred for in-house R&D activity
10 Foreign Direct investment 100% FDI is allowed in wind power sector Has helped greatly in bringing investment After introduction of GBI, FDI has increased in wind sector 10
11 State Government Policies and Incentives
12 Renewable Purchase Obligation 26 SERCs specified the mandatory purchase obligation under Section 86, 1(e) of the Electricity Act, 2003, for purchase of fixed percentage of energy generated from RE sources. The RPO percentage varies from 0.5% to 10.25%, depending on the local renewable resources and the electricity distributed in those states. RPO obligation can be fulfilled through direct purchase via bilateral contracts and tradable REC mechanism which can further generate revenue for RE projects.
13 Feed in Tariff State FiT (Rs./kWh) Andhra Pradesh SERCs announced feedin tariff for purchase of electricity generated from wind power projects. The present feed-in tariff varies from Rs to Rs per unit Gujarat 4.15 Karnataka 4.15 Madhya Pradesh 5.92 Maharashtra WPD w/m 2 : 5.81 WPD w/m 2 : 5.05 WPD w/m 2 : 4.31 WPD >400 w/m 2 : 3.88 Rajasthan 5.46 ( for projects in Jaisalmer, Jodhpur and Barmer districts) 5.73 (for others) Tamil Nadu 3.51
14 Wheeling, Banking & Third Party Sale Favorable provision for wheeling, banking and third party sale by wind power For wind, wheeling charge for the different states are in the range of 2% (MP and MH) to 7.5% (WB). The states of Karnataka, Tamil Nadu and Andhra Pradesh charge 5% of the total energy fed to the grid. For wind, Tamil Nadu and Karnataka allow 5% and 2% of the total renewable energy fed to the grid as bankable energy and can be availed anytime during the financial year. Rajasthan and Maharashtra provide 6 months (Apr-Sep) and 12 months of banking period respectively. The state of Andhra Pradesh doesn t permit banking.
15 Electricity duty Other Incentives Renewable energy projects are exempted from electricity duty by state government VAT Reduced or no VAT on Renewable energy components in some states Tamil Nadu has reduced VAT from 14.5% to 5% Karnataka offers 5.5% VAT for all the renewable energy components Gujarat, Tamil Nadu and Maharashtra offer 5% VAT for all renewable components
16 Other Incentives Capital Subsidy Maharashtra has the provision for capital subsidy to the extent of 11% for wind energy projects set up by the cooperative sector. Rajasthan provides soft loan equal to 1/3 of capital cost at low interest rate. Exim Policy Green technology (including wind energy) is listed as a focused group scheme. Under this scheme, export of RE product to all countries is entitled for an additional duty credit equivalent to 2% - 5% of freight on board (FOB) value of exports
17 Project Facilitation C-WET provides all technical support to developers including wind resource assessment and DPR preparations State nodal agencies (SNAs) facilitate project development right from resource assessment to the final commissioning. SNA supports the developer by facilitating development of infrastructure at identified sites and also verifies the legal statutory clearances sought by the developer from different departments. MEDA in Maharashtra has created the Green Cess (tax) fund. This is a dedicated fund in Maharashtra for the development of RE and a part of this fund is utilized to create infrastructure for grid connectivity with proposed wind farms. Similar tax (Cess) is being collected in Karnataka.
18 RAJASTHAN(1/2) Electricity Duty Banking Other Incentives Exemption for captive consumption. Six Monthly Basis i.e. Apr. to Sept. & Oct. to March. Utilization of banking energy is not permitted in Dec. to Feb. (* the Hon'ble Commission Proposed to reduce the period of banking on monthly basis in Draft Tariff Regulation, 2014) Benefit of Industry status (eligible for incentives to industrial units under the schemes administered by Industries Department)
19 RAJASTHAN(2/2) Land Transmission & Wheeling Charges Government concessional rates viz. 10% of DLC rates; with Max. allocation of 5 Hect./MW; and The conversion charges (private land to industrial use) will be 10% of charges levied for industrial purposes under the relevant rules. Transmission 50% of normal charge ; and Wheeling 50% of normal charges specified for 33 kv, in case if distribution licensee network below 132 kv level is utilized.
20 Madhya Pradesh(1/2) Electricity Duty Exemption for a period of 10 year (Captive consumption & Third party sale). Banking 100% 2% of banked energy as banking fees to the concerned State Distribution Company/State Power Trading Company. Transmission & Wheeling Charges Exemption from open access charges to captive/oa consumers in case if power procured from RE sources; and Wheeling charge grant to DISCOM - 4 % in case of third-party sale within the state
21 Madhya Pradesh(2/2) Land Government Revenue land use Rs1/-(token) premium per year (as per circular No. F VII-2A, dated and No. F VII-Nazool, dated ) Other Incentives No cess for electricity supplied by WEGs; VAT/Entry Tax exemption for Wind power plant(as per MP Govt. Notification No. 380, dated ); Benefit of Industry status (eligible for incentives under State's Industrial Promotion Policy); and Pro rata reduction in contract demand on a permanent basis(for industrial consumer buying energy from WEGs)
22 Gujarat(1/2) Electricity Duty Banking Other Incentives Except in case of TPS, the electricity generated from the WTGs is exempted from ED. For TPS: Banking not provided. For CPP (not opting REC): Banking (slotwise) allowed for 1 month, then surplus power to be purchased at 85% of P.T by the utility For CPP (opting REC): Banking not provided. WTGs for Captive use are exempted from demand cut to the extent of 30% of the installed capacity.
23 Gujarat(2/2) Land Transmission & Wheeling Charges The WTGs may be set up on private land, or revenue wasteland / GEDA land, if available For TPS: Normal OA charges/losses applicable; For Captive Use: 66 KV and above: Normal OA charges/losses applicable; <66 Kv: Normal OA charges and applicable <66 Kv (only one WTG): Normal OA charges and
24 MAHARASHTRA(1/2) Electricity Duty Banking Other Incentives For CPP and TPS, ED will not be levied for first 10 years from thecod of project. Slot wise settlement in banking allowed on yearly basis for self use or third party sale. Surplus energy up to the end of FY limited to 10% of net energy delivered to be paid at lowest slab of HT TOD tariff applicable on 31st March of the FY in which energy was generated. OA consumer sourcing power from wind has option of reduction of Contract demand. 100% refund of Octroi Tax / Entry Tax for equipments of WPP's will be made through Green Energy Fund by MEDA
25 MAHARASHTRA(2/2) Land Transmission & Wheeling Charges Developer/Investor can be allotted Govt barren land (permissible for industrial use), at declared windy sites, on lease basis with 30 yrs agreement Promotional Transmission charges for RE generators (Rs 0.29/kWh). Normal transmission loss (4.24%). Normal wheeling charges and losses applicable.
26 ANDHRA PRADESH(1/2) Electricity Duty Banking Captive generation exempted from payment of Electricity Duty, subject to the condition that the electricity generated shall be utilized fully by them. for CPP & TPS banking allowed during all 12 months. banking year is from Jan to Dec. banking charges in of energy injected. Drawal permitted only during 6 months from July to december. The banked enery remain unutilized as on 31st Dec shall be lapsed. Drawal of banked energy during peak hrs i.e. 06:00 to 09:00 & 18:00 too 21:00 not permitted.
27 ANDHRA PRADESH(2/2) Land Transmission & Wheeling Charges Each Eligible developer may be allocated available Govt. land to harness upto a maximum of 200 MW of wind power initially. After commissioning of 100 MW capacity Wind farms in 1st stage in the allocated Govt.land, the Government may allocate land for another 100 MW capacity Wind Farms. The application from the developers for Government land will be considered on a first-cum-first-served basis. Total Wheeling and Transmission Charges (Including losses) in 5% of Electricity delivered to the Grid
28 TAMIL NADU Banking Allowed for One financial year April to March. Banking charges 0.94 Rs/unit. Unutilized energy at the end of FY to be paid by of the relevant tariff (preferential tariff). WEGs availing REC will be allowed to bank power for 1 month, surplus power after a month will considered to be lapsed. Other Incentives/Subsidy Tamil Nadu Power Finance and infrastructure Dev Corporation Ltd Provides the Loan to Power Sector. Transmission & Wheeling Charges 40% of the transmission charges and 40% of the wheeling charges as applicable to the conventional power to the Wind power. Apart from these charges, the WEGs shall have to bear the actual line losses in kind as specified in the respective orders of the Commission and amended from time to time.
29 KARNATAKA Transmission & Wheeling Charges Banking 5% of injected Energy (in-kind) banked for yearly basis, carried forward month to month. banking 2% of the input energy (order dated ); difference of UI charges. CPPs availing RECs are liable to pay normal transmission wheeling charges and banking would be allowed on monthly basis, excess energy at the end of the month would be purchased by the Disbn licensee os that area at APPC determined by KERC. Proposed Banking Scenario (KERC- Draft Wheeling and Banking Agreement)
30 Issues Rajasthan The Hon ble Commission in its draft tariff Regulation, 2014 has proposed to reduce the period of banking i.e. on monthly basis which was earlier on six monthly basis ; and 14.5% which is not reasonable return to investor and also not in line with CERC RE Regulation and is defiance of National Tariff Policy Gujarat In preferential tariff calculation there is a computational error in RoE and AD which has reduced the RoE of the investors. Karnataka At present, third party sale with REC is not allowed in the state which limits the wind investment in the state Tariff determined on average basis shall not consider time value of money The banking should not be revised as per the draft wheeling and banking agreement format published recently Tamil Nadu Tariff determined on average basis shall not consider time value of money No wind power policy in the state. Conducive policy required Evacuation issue
31 THANK YOU
Wind Power Programme in India
Wind Power Programme in India Ministry of New & Renewable Energy 1 st August 2012, New Delhi 1 Renewable Power Sector in INDIA Share of Installed Renewable Capacity 13% 4% 13% 70% Wind Solar Hydro Biomass
Renewable Energy Certificate Mechanism
Opportunities in Financing Renewable Energy Projects focusing on FiT and RECs Balawant Joshi Director, [email protected], [email protected] In this presentation.. Investment Potential for Renewable
Tamil Nadu WiNd ENErgy ProfilE
Tamil Nadu WiNd ENErgy ProfilE Wind energy in Tamil Nadu has witnessed tremendous growth propelling the State to the number one position in India in terms of renewables. However the challenge that remains
KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF
KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Shri. K.J.Mathew, Chairman Shri. C. Abdulla, Member Shri. M.P.Aiyappan, Member Petition No. CT/SOLAR JNNSM/KSERC/2010 August 4,
Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading
Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading Target Clients v Renewable Energy Generators in India v RPO mandated entities in India v Investors seeking
In Focus. India s Renewable Energy Certificate Market
2011 1 India s Renewable Energy Certificate Market In Focus India s Renewable Energy Certificate Market Carbon Credit Capital LLC 561 Broadway New York, NY 10012 Tel: 212-925-5697 (Main Office) www.carboncreditcapital.com
THE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE
THE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE PRESENTATION BY : MR KESHAV PRASAD MEMBER, DELEGATION OF THE CONFEDERATION OF INDIAN INDUSTRY (CII) & CHIEF OPERATING OFFICER, IL&FS ENERGY
G.O.MS.No. 8 Dated 12.02.2015 Read the following:-
GOVERNMENT OF ANDHRA PRADESH ABSTRACT ENERGY, INFRASTRUCTURE & INVESTMENT DEPARTMENT - Development of Solar Power in Andhra Pradesh Andhra Pradesh Solar Power Policy, 2015 Orders Issued. ------------------------------------------------------------------------------------------------------------
Grid Connected Solar Power in India. Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India
Grid Connected Solar Power in India Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India Indian Power Sector (31 March 2012) Thermal Hydro Nuclear Renewable 1,31,353 MW
Analysis of state-wise RPO Regulation across India
The Renewable Purchase Obligations (RPO) has been the major driving force in India to promote the renewable energy sector. But the State Electricity Regulatory Commissions (SERCs) have defined their respective
Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : [email protected] [email protected]
Draft ver2 Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : [email protected] [email protected] 1 TABLE OF CONTENTS S.No Contents Page No 1. PREAMBLE 3 2. OBJECTIVES 3 3. OPERATIVE
DRAFT OF THE GOA STATE GOVERNMENT POLICY TOWARDS RENEWABLE, SOLAR ENERGY AND ENERGY CONSERVATION- GOA 2014
DRAFT OF THE GOA STATE GOVERNMENT POLICY TOWARDS RENEWABLE, SOLAR ENERGY AND ENERGY CONSERVATION- GOA 2014 Drafted by Goa Energy Development Agency (GEDA) team for the approval by the State Govt. of Goa
Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background
Renewable Energy Certificate Mechanism for India Background ABPS Infrastructure Advisory India is abundantly gifted with a variety of renewable energy (RE) sources. However, not all states are endowed
Financing of Renewable Energy in India: Implications for Policy. Gireesh Shrimali Climate Policy Initiative gireesh.shrimali@cpihyd.
Financing of Renewable Energy in India: Implications for Policy Gireesh Shrimali Climate Policy Initiative [email protected] CPI analyzes the effectiveness of policies relevant to climate change
Karnataka Electricity Regulatory Commission. Discussion note on
Karnataka Electricity Regulatory Commission Discussion note on Draft KERC (Forecasting, Scheduling, Deviation settlement and related matters for Wind and Solar Generation sources) Regulations, 2015. 1.0.
F. No. 66/185/2016 -WE Ministry of New & Renewable Energy
F. No. 66/185/2016 -WE Ministry of New & Renewable Energy India has set an ambitious target of reaching 175 GW of installed capacity from renewable energy sources including 100 GW from solar and 60 GW
S. No. Year Obligation expressed as percentage of energy consumption (%) 1 2011-12 6.00 2 2012-13 7.10 3 2013-14 8.20
Background paper for prescribing Renewable Purchase Obligation (RPO) for Captive consumption of CPP & open access consumers in the State for the period ending March, 2017 and related amendment in regulations:
RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR
RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR NOTIFICATION 23 rd December, 2010 No.RERC/Secy/Reg. 82 : In exercise of powers conferred under sections 61, 66, 86(1)(e) and 181 of the Electricity Act,
COMBINED SUMMARY OF STATE POLICIES FOR SOLAR POWER
COMBINED SUMMARY OF STATE POLICIES FOR SOLAR POWER Sl. Name of State/ Description Andaman and Nicobar Island 1 Order Date Policy for power Generation through New and Renewable Energy Sources in Andaman
Direct and Indirect Taxation-Law : 1 and : Practice
Direct and Indirect Taxation-Law : 1 and : Practice RollNo... Time allowed : 3 hours Maximum marks : 100 Total number of questions : 8 Total number of printed pages : 6 NOTE : All references to sections
Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency
RENEWABLE ENERGY INDUSTRIAL ENERGY EFFICIENCY BUILDING ENERGY EFFICIENCY Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency A RANGE OF FINANCIAL SUPPORT
all that you want to know About Rajasthan Solar Energy
all that you want to know bout Rajasthan Solar Energy Policy, 2014 General 01 Registration Land Timelines Fee & Charges 06 08 11 13 all that you want to know bout Rajasthan Solar Energy Policy, 2014 Rajasthan
Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme
Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme This agreement made at on this day of two thousand between M/s. (Renewable Energy Generator name and address) hereinafter
PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY
PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY 1. OBJECTIVE : 1.1. This procedure shall provide guidance to the entities to implement
Indian Experiences on Promoting Renewable Energy DR SUSHANTA K CHATTERJEE JOINT CHIEF (REGULATORY AFFAIRS) CENTRAL ELECTRICITY REGULATORY COMMISSION
Indian Experiences on Promoting Renewable Energy DR SUSHANTA K CHATTERJEE JOINT CHIEF (REGULATORY AFFAIRS) CENTRAL ELECTRICITY REGULATORY COMMISSION Introduction Clean energy promotion in India Focus on
a) Whether there is a need to revisit the existing approach for debt: equity ratio or to continue with the existing composition?
Summary of the comments and suggestions received on Approach Paper on Terms and Conditions of Tariff Regulations for the tariff period 1.4.2014 to 31.3.2019 ( Ref No. 20/2013/CERC/Fin(Vol-I)/Tariff Reg/CERC
IWL: NO!: 06: 2016 08th February, 2016. The Secretary BSE Limited Phiroze Jeejeebhoy Towers Limited Dalal Street, Mumbai 400 001
IWL: NO!: 06: 2016 08th February, 2016 The Secretary BSE Limited Phiroze Jeejeebhoy Towers Limited Dalal Street, Mumbai 400 001 The Secretary National Stock Exchange Limited Exchange Plaza Bandra Kurla
Delhi Solar Energy Policy, 2015
DRAFT VERSION FOR PUBLIC COMMENT Delhi Solar Energy Policy, 2015 GOVERNMENT OF NCT OF DELHI DELHI SECTRETARIAT, I.P. ESTATE, NEW DELHI- 110002 10 September 2015 NOTIFICATION The Government of NCT of Delhi
TWO NEW MUST-HAVE RESEARCH REPORTS ON THE RENEWABLE ENERGY SECTOR
TWO NEW MUST-HAVE RESEARCH REPORTS ON THE RENEWABLE ENERGY SECTOR A) Renewable Energy Development in India 2009 B) Biofuels in India (For details, see overleaf) Two New Reports on Renewable Energy and
PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO 220-221, SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.
PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO 220-221, SECTOR 34-A, CHANDIGARH Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.2010 In the matter of : Determination of generic levellised generation
DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015
DRAFT 31.3.2015 KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 The Kerala State Electricity Regulatory Commission hereby publishes
Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014
Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014 Table of Contents 1- PREAMBLE - 1 2- OBJECTIVES - 1 3- OPERATIVE PERIOD - 1 4- IMPLEMENTATION PLAN - 2 5- ELIGIBLE ENTITIES - 2 6- TARGETS
Wind Energy Sector: Re-introduction of Accelerated Depreciation benefit remains a key Fver
Wind Energy Sector: Re-introduction of Accelerated Depreciation benefit remains a key positive Fver for the sector, though concerns on RPO compliance continue Summary February 2015 ICRA RESEARCH SERVICES
Trends in Private and Public Investments in Agricultural Marketing Infrastructure in India
Agricultural Economics Research Review Vol. 21 (Conference Number) 2008 pp 371-376 Trends in Private and Public Investments in Agricultural Marketing Infrastructure in India M.S. Jairath* National Institute
Draft Jharkhand State Solar Power Policy 2015
Draft Jharkhand State Solar Power Policy 2015 Government of Jharkhand Department of Energy Notification No. ------ Date:./2015 Preamble: In order to reduce the dependence on fossil fuel based generation,
KERALA STATE ELECTRICITY REGULATORY COMMISSION
KERALA STATE ELECTRICITY REGULATORY COMMISSION Notification No. 2096/KSERC/CT/2014 Dated, Thiruvananthapuram 10 th June 2014. In exercise of the powers conferred under sections 66, 86 (1) (e) and 181 of
I M P L E M E N TAT I O N O F T H E R E N E WA B L E E N E R GY C E R T I F I CAT E ( R EC) F RA M E WO R K I N I N D I A
I M P L E M E N TAT I O N O F T H E R E N E WA B L E E N E R GY C E R T I F I CAT E ( R EC) F RA M E WO R K I N I N D I A S H O R T-T E R M S O L U T I O N S ACKNOWLEDGEMENTS We acknowledge the support
WORKING PAPER. India: Implementing incentives focused on energy. Anuradha R.V., Sumiti Yadava (Clarus Law Associates)
WORKING PAPER N 06/12 april 2012 CliMate India: Implementing incentives focused on energy Anuradha R.V., Sumiti Yadava (Clarus Law Associates) www.iddri.org Challenges for climate policy and governance
DRAFT National Mission on Small Hydro
DRAFT National Mission on Small Hydro Enriching Remote Areas through Small Hydro 1. Introduction The National Mission on Small Hydro will be a joint initiative of the Government of India and State Governments
Methodology for Solar Power Projects
Annexure E Methodology for Solar Power Projects This methodology is applicable to the solar power projects included in the composite policy for new and renewable (non-conventional energy sources) power
Rooftop Solar PV Power : Potential,Growth and Issues related to
177 th Capacity Building Program for Officers of the Regulatory Commissions IIT Kanpur Rooftop Solar PV Power : Potential,Growth and Issues related to B D Sharma Connectivity and Metering 30 th January
IDENTIFICATION OF DEALERS
VAT TIN A dealer who is liable to pay tax and whose turnover exceeds the threshold limits as specified, has to apply for VAT registration and after being registered, he will be issued VAT TIN. VAT registration
Abstract. Key words: REC Mechanism, ROC-UK, Policy- Regulatory Intervention, Solar and Wind,
Promotion of Wind and Solar Energy through Renewable Energy Certificate System: Lessons from Renewable Obligation Certificate, United Kingdom experience for India Sushanta K Chatterjee a1, 2 Prasoom Dwivedi
DELHI ELECTRICITY REGULATORY COMMISSION
DELHI ELECTRICITY REGULATORY COMMISSION DELHI ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION AND RENEWABLE ENERGY CERTIFICATE FRAMEWORK IMPLEMENTATION) REGULATIONS, 2011 No. Dated:. NOTIFICATION
Success in Scaling-up Solar Energy in Rajasthan, India
Success in Scaling-up Solar Energy in Rajasthan, India Shreemat Pandey Principal Secretary to Chief Minister Rajasthan, India 1. Introduction Solar power is attractive because it is abundant and offers
ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION
ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION RENEWABLE POWER PURCHASE OBLIGATION (COMPLIANCE BY PURCHASE OF RENEWABLE ENERGY / RENEWABLE ENERGY CERTIFICATES) REGULATIONS, 2012 Regulation No. 1 of 2012
Software Technology Parks of India
Software Technology Parks of India (DeitY, An Autonomous Society under Ministry of Communication & Information Technology, Govt. of India) Ganga Software Technology Complex, Sec 29, Noida 201303. UP Phone:
Economics, Regulation, and Implementation Strategy for Renewable Energy Certificates in India
3 Economics, Regulation, and Implementation Strategy for Renewable Energy Certificates in India Anoop Singh Introduction Renewable energy sources (RES) have been promoted through a number of policies including
TELANGANA SOLAR POWER POLICY 2015
TELANGANA SOLAR POWER POLICY 2015 1 GLOSSARY COD CII GoTS GoI MNRE MoP NCE NOC NSM PCB PPA PV R&D REC RPPO RLDC SGST SLDC SPC SPP SPV SRP Scheduled Commercial Operations Date Confederation of Indian Industry
Government support & initiative to build a robust cold chain. Ministry of Food Processing Industries, Government of India
Government support & initiative to build a robust cold chain Ministry of Food Processing Industries, Government of India NCCD Conclave with Nodal Officers For Cold-chain Development 9-May-2014 Current
DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION
DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT No. Dated: -12-2011 NOTIFICATION In exercise of powers conferred under sections 61, 66, 86(1)(e)
Full Scale Program for Renewable Energy in Egypt
Full Scale Program for Renewable Energy in Egypt Contents Evolution of Egypt Needs of Electricity and its supply mix Renewable Energy Policy and Targets Renewable Energy Program Components Conclusions
Solar Power Plants FAQs
Solar Power Plants FAQs Solar Power industry in India is gaining more and more prominence with each passing day. The domestic/off-grid industry is picking up speed too. Owing to the queries we are receiving
The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA)
The Status of the Wind Power Market in Egypt Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA) Berlin, June 11 th, 2013 1 Contents Key Challenges for
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Draft Maharashtra Electricity Regulatory Commission (Net Metering for Rooftop Solar Systems) Regulations, 2015 Electricity Act, 2003 No. MERC / Legal
The progressive growth of the Indian Power Market
The progressive growth of the Indian Power Market Rajesh K Mediratta, Director, IEX [email protected] Agenda India: Key Statistics Indian Power Market Perspective Introduction to IEX Products
Presentation Title ( Arial, Font size 28 )
Presentation Title ( Arial, Font size 28 ) Acquisition of 1,140 MW Welspun Renewable Portfolio Date, Venue, etc..( Arial, Font size 18 ) June, 2016 Message Box ( Arial, Font size 18 Bold) Disclaimer Certain
PACKAGE OF INCENTIVES The incentives under the 1997 scheme shall be available for eligible units of the following categories:
Assam Fiscal Incentives, Exemptions & Subsidies PACKAGE OF INCENTIVES The incentives under the 1997 scheme shall be available for eligible units of the following categories: 1. SSI unit 2. Tiny unit 3.
POLICY FOR IMPLEMENTATION OF SOLAR POWER BASED PROJECTS IN MADHYA PRADESH, 2012
POLICY FOR IMPLEMENTATION OF SOLAR POWER BASED PROJECTS IN MADHYA PRADESH, 2012 (1) Preamble Energy is a prime mover of the development of any economy. While conventional fuels like coal and oil have been
Renewable Energy Feed-in Tariff Projects Regulations
for Consumer Protection and Renewable Energy Feed-in Tariff Projects Regulations Oct. 2014 EgyptERA s crew has prepared this document so as to answer all the questions related to the renewbales supporting
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION. No. L-1/(3)/2009-CERC Dated the 7 th August 2009
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION No. L-1/(3)/2009-CERC Dated the 7 th August 2009 In exercise of powers conferred by section 178 of the Electricity Act, 2003 and all other
TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Notification No. TNERC/RPO/ 19/1 dated 07-12-2010
TAMIL NADU ELECTRICITY REGULATORY COMMISSION Notification No. TNERC/RPO/ 19/1 dated 07-12-2010 In exercise of powers conferred by section 181 of the Electricity Act, 2003 (Central Act 36 of 2003) read
The Rising Sun Grid parity gets closer kpmg.com/in
ENERGY AND NATURAL RESOURCES The Rising Sun Grid parity gets closer A point of view on the Solar Energy sector in India September 2012 kpmg.com/in 01 Foreword The Solar PV industry has seen dynamic changes
Procedure for classification of wind power projects into wind zone class
Procedure for classification of wind power projects into wind zone class a. The value of annual mean Wind Power Density (WPD) of the windy sites declared by Centre for Wind Energy Technology (C-WET) under
Guidelines for Solar Grid Power Projects
Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited
Frequently Asked Questions
Frequently Asked Questions Q 1) Can we avail input credit for all purchases like stationery, consumables, machine parts etc., made in Karnataka if our supplier issues a tax invoice, charging VAT? Q 2)
PRESS NOTE REVISION OF ELECTRICITY TARIFF FOR 2016-17
KARNATAKA ELECTRICITY REGULATORY COMMISSION 6th & 7th Floor, Mahalakshmi Chambers, No. 9/2, M.G. Road, Bangalore-560001 PRESS NOTE REVISION OF ELECTRICITY TARIFF FOR 2016-17 The Karnataka Electricity Regulatory
THE GREEN ELECTRCITY MARKET IN DENMARK: QUOTAS, CERTIFICATES AND INTERNATIONAL TRADE. Ole Odgaard Denmark
Workshop on Best Practices in Policies and Measures, 11 13 April 2000, Copenhagen THE GREEN ELECTRCITY MARKET IN DENMARK: QUOTAS, CERTIFICATES AND INTERNATIONAL TRADE Ole Odgaard Denmark Abstract: The
Regulation for Renewable Energy Development: Lessons from Sri Lanka Experience
Regulation for Renewable Energy Development: Lessons from Sri Lanka Experience Priyantha D C Wijayatunga Asian Development Bank, Manila, Philippines * Corresponding author. Tel: +6326326131, Fax: +6326362338,
INDEX S. No. PARTICULARS Note:
INDEX S. No. PARTICULARS T1 Profit & Loss Account - Transmission Business T2 Profit & Loss Account - SLDC Business T3 Annual Revenue Requirement - Transmission Business T4 Annual Revenue Requirement -
WIND POWER IN INDIA: PROS AND CONS AN OVERVIEW
Int. J. Elec&Electr.Eng&Telecoms. 2013 Sunita Singh, 2013 Review Article ISSN 2319 2518 www.ijeetc.com Vol. 2, No. 2, April 2013 2013 IJEETC. All Rights Reserved WIND POWER IN INDIA: PROS AND CONS AN OVERVIEW
PROCEDURE FOR AVAILING DUTY BENEFITS FOR MINI-GRID OR MICRO GRID SOLR POWER PLANTS
ANNEXURE-A PROCEDURE FOR AVAILING DUTY BENEFITS FOR MINI-GRID OR MICRO GRID SOLR POWER PLANTS I (a) (b) (c) (d) The application for Total Bill of Material may be submitted online in the format at Annexure
ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR 751 012 *****************
ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR 751 012 ***************** Case Nos. 61,62,63,64, 69, 70, 71 & 72/2014/ 348 Date.23.03.2015 To The Authorized Officer,
( Extract from Haryana Government Gazette, dated the 6 th December,2005) HARYANA GOVERNMENT
( Extract from Haryana Government Gazette, dated the 6 th December,2005) HARYANA GOVERNMENT RENEWABLE ENERGY DEPARTMENT NOTIFICATION The 23 rd November, 2005 POLICY FOR PROMOTING GENERATION OF ELECTRICITY
KERALA STATE ELECTRICITY REGULATORY COMMISSION
KERALA STATE ELECTRICITY REGULATORY COMMISSION Dated 24 th January 2014 NOTICE Notice is hereby given that Kerala State Electricity Regulatory Commission has published the Draft Kerala State Electricity
PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY
PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY 1 Objective (1) This procedure shall provide guidance to the entities to implement Renewable
Torrent Power Limited Distribution, Ahmedabad Truing Up for FY 2012-13 and Determination of Tariff for FY 2014-15
ANNEXURE: TARIFF SCHEDULE FOR FY 2014-15 TARIFF SCHEDULE EFFECTIVE FROM 1 st May, 2014 TARIFF SCHEDULE FOR AHMEDABAD - GANDHINAGAR LICENSE AREA OF TORRENT POWER LIMITED- AHMEDABAD TARIFF FOR SUPPLY OF
Electricity in Egypt
T: (+20) 2 3760 4592 F: (+20) 2 3760 4593 A: 16 Hussein Wassef Street, Messaha Square Dokki, Giza, Egypt 12311 www.ide.com.eg Electricity in Egypt Policy and Regulatory Reform November 2015 Electricity
Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility
Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility Welcome to SREDA Siddique Zobair Member (EE & C) Sustainable & Renewable Energy Development Authority
DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT)
DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT No. Dated: October, 2009 NOTIFICATION (DRAFT) In exercise of powers conferred under sections 61, 66,