Anterior Cruciate Ligament Reconstruction Delayed Rehab Dr. Walter R. Lowe



Similar documents
ANTERIOR CRUCIATE LIGAMENT RECONSTRUCTION Hamstring Graft/PTG-Accelerated Rehab

Theodore B. Shybut, M.D Cambridge St. #10A Houston, Texas Phone: Fax: Sports Medicine

MEDIAL PATELLA FEMORAL LIGAMENT RECONSTRUCTION Rehab Protocol

Meniscus Repair Rehabilitation Dr. Walter R. Lowe

Anterior Cruciate Ligament Reconstruction Accelerated Rehabilitation Protocol Dr. Mark Adickes

Meniscus Repair Rehabilitation Protocol Dr. Mark Adickes

Knee Arthroscopy/Lateral Release Rehabilitation Dr. Walter R. Lowe

Anterior Cruciate Ligament Reconstruction. ACL Rehab Protocol

Medial Collateral Ligament (MCL) Rehabilitation Protocol

ACL Reconstruction: Patellar Tendon Graft/Hamstring Tendon Graft

Noyes Knee Institute Rehabilitation Protocol for ACL Reconstruction: Revision Knees, Allografts, Complex Knees

William J. Robertson, MD UT Southwestern Orthopedics 1801 Inwood Rd. Dallas, TX Office: (214) Fax: (214) 3301 billrobertsonmd.

Noyes Knee Institute Rehabilitation Protocol for Primary ACL Reconstruction: Early Return to Strenuous Activities

Cincinnati Sportsmedicine and Orthopaedic Center

Anterior Cruciate Ligament Reconstruction Rehabilitation Protocol

Post-Operative ACL Reconstruction Functional Rehabilitation Protocol

ACL Reconstruction Post Operative Rehabilitation Protocol

ACCELERATED REHABILITATION PROTOCOL FOR POST OPERATIVE POSTERIOR CRUCIATE LIGAMENT RECONSTRUCTION DR LEO PINCZEWSKI DR JUSTIN ROE

GALLAND/KIRBY ACL RECONSTRUCTION WITH MENISCUS REPAIR POST-SURGICAL REHABILITATION PROTOCOL

Noyes Knee Institute Rehabilitation Protocol: Medial Ligament Repair or Reconstruction

Dr Doron Sher MB.BS. MBiomedE, FRACS(Orth)

Post Operative Total Knee Replacement Protocol Brian White, MD

The Insall Scott Kelly Center for Orthopaedics and Sports Medicine 210 East 64th Street, 4 th Floor, New York, NY 10065

Eastern Suburbs Sports Medicine Centre

REHABILITATION PROTOCOL

SLAP Lesion Repair Rehabilitation Protocol Dr. Mark Adickes

Anterior Cruciate Ligament (ACL) Rehabilitation

PREOPERATIVE: POSTOPERATIVE:

Cincinnati SportsMedicine and Orthopaedic Center

Brian P. McKeon MD Jason D. Rand, PA-C, PT Patient Information Sheet: Anterior Cruciate Ligament

Anterior Cruciate Ligament Reconstruction Progression Rehabilitation Program By Jenna Hennebry, Erin Stiefel, and Lauren Schmidt

ACL Reconstruction Protocol

POSTERIOR CRUCIATE LIGAMENT RECONSTRUCTION POSTOPERATIVE REHABILITATION PROTOCOL

Inland Orthopaedic Surgery & Sports Medicine

Cincinnati SportsMedicine and Orthopaedic Center

Anterior Shoulder Instability Surgical Repair Protocol Dr. Mark Adickes

ACL Non-Operative Protocol

Rehabilitation Guidelines for Patellar Tendon and Quadriceps Tendon Repair

Cincinnati SportsMedicine and Orthopaedic Center

AQUATIC/LAND BASED CLINICAL PROTOCOL FOR GRADE I/II MCL INJURY

Knee Arthroscopy (Meniscectomy)

Rehabilitation Protocol: Total Knee Arthroplasty (TKA)

AN ACCELERATED REHABILITATION PROGRAMME FOR ENDOSCOPIC ANTERIOR CRUCIATE LIGAMENT RECONSTRUCTION

Rehabilitation Guidelines for Knee Multi-ligament Repair/Reconstruction

Rehabilitation Protocol: Total Hip Arthroplasty (THA)

Patellofemoral/Chondromalacia Protocol

Noyes Knee Institute Rehabilitation Protocol: Meniscus Repair

ACL RECONSTRUCTION POST-OPERATIVE REHABILITATION PROGRAMME

Post Surgery Rehabilitation Program for Knee Arthroscopy

Mary LaBarre, PT, DPT,ATRIC

Rehabilitation. Modalities and Rehabilitation. Basics of Injury Rehabilitation. Injury Rehabilitation. Vocabulary. Vocabulary

HSS: NYP/WC: Fax: Hip Arthroscopy Rehabilitation Labral Debridement with or without FAI Component

Rehabilitation after ACL Reconstruction: From the OR to the Playing Field. Mark V. Paterno PT, PhD, MBA, SCS, ATC

Rehabilitation Guidelines for Autologous Chondrocyte Implantation. Ashley Conlin, PT, DPT, SCS, CSCS

ACL Reconstruction Physiotherapy advice for patients

ACL Reconstruction Rehabilitation Program

Introduction This case study presents a 24 year old male soccer player with an Anterior Cruciate Ligament (ACL) tear in his left knee.

Post Surgery Rehabilitation Program

Hip Bursitis/Tendinitis

HIPABDUCTOR REPAIR PROTOCOL (Gluteus Medius/Minimus Repair)

Patellar Dislocation Conservative and Operative Rehabilitation

Anterior Cruciate Ligament Reconstruction Rehabilitation Protocol

Rehabilitation Guidelines for Posterior Cruciate Ligament Reconstruction

REHABILITATION GUIDELINES AUTOLOGOUS CHONDROCYTE IMPLANTATION USING CARTICEL

Rehabilitation Guidelines for Meniscal Repair

ANTERIOR CRUCIATE LIGAMENT RECONSTRUCTION

ACL Reconstruction Rehabilitation Protocol

Rehabilitation After Knee Meniscus Repair

Physical & Occupational Therapy

Steps to Success: A Guide to Knee Rehabilitation

Progression to the next phase is based on Clinical Criteria and/or Time Frames as appropriate.

ACL Rehabilitation Protocol

Ira K. Evans, M.D. Sports Medicine North Orthopedic Specialty Center One Orthopedics Drive Peabody, MA

Hip Arthroscopy Rehabilitation Protocol

Rehabilitation of Sports Hernia

Rehabilitation Guidelines for Medial Patellofemoral Ligament Repair and Reconstruction

Pre - Operative Rehabilitation Program for Anterior Cruciate Ligament Reconstruction

Hip Arthroscopy Labral Repair Rehabilitation Protocol

Hip Arthroscopy Post-operative Rehabilitation Protocol

REHABILITATION AFTER REPAIR OF THE PATELLAR AND QUADRICEPS TENDON

William J. Robertson, MD UT Southwestern Orthopedics 1801 Inwood Rd. Dallas, TX Office: (214) Fax: (214) 3301 billrobertsonmd.

Rehabilitation after ACL Reconstruction

B. TED MAURER, MD POSTOPERATIVE REHABILITATION PROTOCOL TOTAL KNEE ARTHROPLASTY

Knee sprains. What is a knee strain? How do knee strains occur? what you ll find in this brochure

ORTHOPAEDIC REHABILITATION OF THE ATHLETE: GETTING BACK IN THE GAME

Rehabilitation Protocol: Hip Arthroscopy Femoral Acetabular Impingement Debridement/Osteochondroplasty. Richard M. Wilk, M.D. Michael Kain, M.D.

Jon Henry, MD Hip Arthroscopy Rehabilitation Protocol

Modified Brostrom-Gould Repair for Chronic Lateral Ankle Instability:

Arthroscopic Labral Repair Protocol-Type II, IV, and Complex Tears:

ACL Reconstruction Rehabilitation Protocol

ACL Rehabilitation Pathway. Expediating Safe Return to Optimum Performance.

Goals of Post-operative operative Rehab. Surgical Procedures. Phase 1 Maximum protection and Mobility (1-4 weeks)

Rehabilitation Guidelines for Lateral Ankle Reconstruction

Total Knee Arthroplasty. TKA - Indications. Technical Goals - TKA. Prosthesis parallel to Floor/Stance. Mechanical Axis/Center of Joint

SLAP Repair Protocol Arthroscopic Labral Repair Protocols (Type II, IV and Complex Tears)

ChondroCelect Rehabilitation Program

REHABILITATION GUIDELINES FOR SUBSCAPULARIS (+/- SUBACROMINAL DECOMPRESSION)

Rehabilitation After ACL Reconstruction

Transcription:

Anterior Cruciate Ligament Reconstruction Delayed Rehab Dr. Walter R. Lowe This rehabilitation protocol has been designed for patients who have undergone an ACL reconstruction (HS graft/ptg/allograft) in addition to other surgical issues that may delay the initial time frame of the rehabilitation process. Dependent upon the particular procedure, this protocol also may be slightly deviated secondary to Dr. Lowe s medical decision. The ACL protocol for Hamstring Tendon Grafts and Allografts is the same as for the Bone Patellar Tendon Bone Grafts with the following exceptions: 1. When performing heel slides, make sure that a towel/sheet is used to avoid actively contracting the hamstrings. 2. Do not perform isolated hamstring exercises until the 4 th week post-op. The following may be considered criteria for this protocol: Concomitant meniscal repair Concomitant ligament reconstruction Concomitant patellofemoral realignment procedure ACL revision reconstruction The protocol is divided into several phases according to postoperative weeks and each phase has anticipated goals for the individual patient to reach. The overall goals of the reconstruction and the rehabilitation are to: Control joint pain, swelling, hemarthrosis Regain normal knee range of motion Regain a normal gait pattern and neuromuscular stability for ambulation Regain normal lower extremity strength Regain normal proprioception, balance, and coordination for daily activities Achieve the level of function based on the orthopedic and patient goals The physical therapy is to begin 2 nd day post-op. It is extremely important for the supervised rehabilitation to be supplemented by a home fitness program where the patient performs the given exercises at home or at a gym facility. Important post-op signs to monitor: Swelling of the knee or surrounding soft tissue Abnormal pain response, hypersensitive Abnormal gait pattern, with or without assistive device Limited range of motion Weakness in the lower extremity musculature (quadriceps, hamstring) Insufficient lower extremity flexibility Return to activity requires both time and clinic evaluation. To safely and most efficiently return to normal or high level functional activity, the patient requires adequate strength, flexibility, and endurance. Isokinetic testing and functional

evaluation are both methods of evaluating a patient s readiness to return to activity. Dr. Walter R. Lowe Phase 1-Weeks 1-2 Delayed Protocol WEEK EXERCISE GOAL 1-2 ROM 0-90 ROM (passive) --meniscus repair, MCL, ACL revision 0-90 --patellar realignment 0-75 Patellar mobs Ankle pumps Gastroc/soleus stretches Heel slides Wall slides Quad sets x 10 minutes SLR (flex and abd) Heel raise/toe raise Wall squats WEIGHT BEARING --meniscus repair NWB --MCL wt bearing as tolerated per Dr. Lowe --ACL revision wt bearing as tolerated Electrical stimulation as needed with knee at 0 ext BRACE Remove brace to perform ROM activities I-ROM when walking with crutches ROM (see above, depends on procedure) Control pain, inflammation, and effusion Adequate quad contraction NWB to TDWB per Dr. Lowe (depends on procedure)

Phase 2-Weeks 2-4 ACL Delayed WEEK EXERCISE GOAL 2-4 ROM 0-90 Passive, 0-90 Patellar mobs Ankle pumps Gastoc/soleus stretch Light hamstring stretch at wk 4 Heel/Wall slides to reach goal Multi-angle isometrics (90-60 ) Quad sets with biofeedback SLR (flex, abd, add) Wall Squats Heel raise/toe raise BALANCE TRAINING Weight shifts (side/side, fwd/bkwd) Single leg balance (dependent upon procedure) E-stim/biofeedback as needed BRACE I-ROM when walking with crutches ROM to 90 flexion and 0 extension Diminish pain, inflammation, and effusion Quad control Initiate weight bearing as permitted by Dr. Lowe

Phase 3-Week 4-6 ACL Delayed WEEK EXERCISE GOAL 4-6 ROM 0-125 Passive, 0-125 Gastoc/soleus/hs stretch Heel/wall slides to reach goal Progressive isometric program SLR in 4 planes with ankle weight/tubing Heel raise/toe raise Mini-squats/Wall squats Initiate isolated hamstring curls Multi-hip machine in 4 planes Leg Press-double leg eccentric Initiate bike when 110 flexion EFX/Retro treadmill Lateral/Forward step-ups/downs Lunges BALANCE TRAINING Single leg stance Weight shift Balance board/two-legged Cup walking/hesitation walking WEIGHT BEARING PWB to FWB as allowed by quad control Discharge crutches when FWB is allowed BRACE Measure for functional brace ROM 0-125 Increase lower extremity strength and endurance Minimize pain, swelling, and effusion Increase weight-bearing status from PWB to FWB Discharge I-ROM with issuance of functional brace

Phase 4-Week 6-12 ACL Delayed WEEK EXERCISE GOAL 6-10 ROM 0-135 Passive, 0-135 Gastoc/soleus/hs stretch Continue exercises from wk 4-6 Leg Press-single leg eccentric Lateral lunges BALANCE TRAINING Two-legged balance board Single leg stance with plyotoss Cup walking ½ Foam roller work BRACE Functional brace as needed 10-12 ROM 0-135 Passive, 0-135 Gastoc/soleus/hs stretch Continue exercises from wk 4-10 Initiate jogging protocol-start on minitramp as tolerated, progress to treadmill Progress with proprioception training Walking program Bicycle for endurance Full weight bearing, normal gait Restore full knee ROM (0-135 ) Increase strength and endurance Enhance proprioception, balance, and neuromuscular control

Phase 5-Week 12-16 ACL Delayed WEEK EXERCISE 12-16 ROM Continue all stretching activities Continue exercises from wk 4-12 Initiate plyometric training drills Progress jogging/running program Initiate isokinetic training (90-30 ), (120-240 /sec) Restore functional capability and confidence Restore full knee ROM (0-135 ) Enhance lower extremity strength and endurance

Phase 6-Week 16-20 ACL Delayed WEEK EXERCISE 16-20 ROM Continue all stretching activities Continue all exercises from previous phases Progress plyometric program Increase jogging/running program Swimming (kicking) Backward running FUNCTIONAL PROGRAM Sport specific drills CUTTING PROGRAM Lateral movement Carioca, figure 8 s as needed Maintain muscular strength and endurance Perform selected sport-specific activity Progress skill training Enhance neuromuscular control Phase 7-Week 20-36 ACL Delayed

WEEK EXERCISE 20-36 Continue advanced strengthening FUNCTIONAL PROGRAM Progress running/swimming program Progress plyometric program Progress sport training program Progress neuromuscular program as needed Return to unrestricted sporting activity Achieve maximal strength and endurance Progress independent skill training Normalize neuromuscular control drills At six and twelve months, a follow-up isokinetic test is suggested to guarantee maintenance of strength and endurance. Advanced weight training and sport specific drills are advised to maintain a higher level of competition.