FERMACELL Powerpanel H 2 O for Wet & Moisture affected areas



Similar documents
Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Rockwool Flexi Insulation Application Guide

12.1 Schlüter -KERDI-BOARD

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Mold Preventing I nterior System

Manual lifting and handling

PRODUCTBLADEN GT ROCKPANEL STRUCTURE

BETONYP building boards. The modern way of living.

FireWall. High performance fireresistant. FireWall.

Multi-layer Insulation Blanket for Roofs

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

PART 1 GENERAL 1.1 SECTION INCLUDES

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

C05. S03. P02 P08 FireWall. Including C05. S01. P02 Specialist partitions introduction

GYPSUM AREA SEPARATION FIREWALLS GA

Product Data Sheet ROCKPANEL Rockclad

H-Stud Area Separation Wall System

Tested to BS 6375: Part 1: 1989 and achieved a weathertightness classification of 2000 Pa (Special)

sound reduction systems for commercial, educational and industrial environments

majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY

Energy Company Obligation (ECO): Technical Monitoring Questions

Guidelines for Earthquake Bracing Residential Water Heaters

GigaCrete Specification PlasterMax

pinta ACOUSTIC PANEL [1/7]

CertainTeed. Shaftliner For A rea Separation Firewalls

Composite Panel Firewall Systems

fermacell Timber Frame Systems September 2014

We care about. Environmentally-Friendly Building Products from Renewable Resources. natural building products. Product range overview

Light-Weight Panels. High quality panels.

BEST PRACTICE GUIDE. Fibrelime Premixed Universal Plaster and Render

Façade panels for interior cladding on a wooden supporting structure

Window Installation Instructions

Steel-framed Walls. Insulation

Post and Beam Construction

Hanson Building Products. precast basement solutions

Isover HVAC Application Handbook Installing fire protection insulation to metal ductwork

Guidelines for Earthquake Bracing of Residential Water Heaters

ENVIRONMENTAL INFORMATION APR 1200 products are made from glass mineral wool, one of the most environmentally friendly insulants available.

CEILING SYSTEMS. CI/SfB (35) Xy April [Between us, ideas become reality.] ULTIMA CANOPY. Data sheet. Acoustic performance meets High Design

Services Enclosures and Protected Shafts - Maintaining Compartmentation

PANELIZED HOME INSTALLATION GUIDELINE

Fire Preventive and Fireproof Performance Test and Evaluation Procedure Manual

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

Mezzanine. Technical manual

Dubai Municipality Standard DMS 1: Part 5: 2004

Section Timber Frame Walls. Single layer between studs. Single layer between studs with service void. Between studs with insulated lining

Interior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

IMPACT DAMAGE RESISTANT WALL SYSTEMS

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

Tunnels & Arches OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM

Sika Membran System For Sealing and Waterproofing Construction Gaps in Building Façades

How To Level A Subfloor

The WANZ Guide to Window Installation

If stepping is required, step at 180mm as seen in this picture.

TOOLS FOR SELF RELIANCE REFURBISHING SHEET No 2. Registered Charity No Saws for Woodworking

Mineral fibreglass insulation

WOOD FLOORING ADHESIVES

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

Laminate Flooring T-Lock Angle-Drop Installation Instructions

How to Install Hardwood Flooring Over a Sub Floor

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

39HQ Airovision Air Handling Units

Glasroc F multiboard Five high performances in one board

Timber Decks. Technical Note. March 2007

Euro Oak Installation

Ceilings without fi ller. VoglFuge / VoglJoint. Acoustic design ceilings

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

ProRox Slabs (formerly known as RW slabs)

Standard from CSI Part Section Format For Wood Framing For Metal Framing For Gypsum Sheathing

Partitioning & Ceiling Product Information

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

Gear PEPSI CAN STOVE INSTRUCTIONS

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

Asphalt Shingle Application Requirements

Contents. APA Construction Details. Full fill cavity walls Partial fill cavity walls Solid externally insulated walls 26-37

How to build a Pizza Oven in 4 days

Section 2.4. Built-up Metal Roofs. Rail and bracket system. Standing seam system. Bu02. Product: Earthwool FactoryClad range Bu01

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

T H A N K Y OU F O R Y OUR P U R C H A S E O F A N E S S E N T I A V A N I T Y, P L E A S E R E A D T H E S E V A N I T Y C A R E A N D I N S T A L L

Confort 160. Sliding Systems. Sapa Building System

DIY CABINET REFACING INSTALLATION GUIDE

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

Glass partitions SFB 3074

09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec Master Spec Page 1

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

Installation Instructions

Post-insulation of cellar ceiling and cellar walls

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

Cover: Houghton Estate, luxury residential estate This page: Protea Hotel, Umhlanga Ridge

ModuSec. Secure and efficient IT room solutions Composite Panel Systems Compared. Panel Systems are not all the same!

Transcription:

FERMACELL Powerpanel H 2 O for Wet & Moisture affected areas Powerpanel H 2 O is a cement based board from FERMACELL. Board Characteristics Board Thickness 12.5 mm Board Sizes 1000 x 1200 mm 50 sheets/pallet 2000 x 1200 mm (1) 30 sheets/pallet 2600 x 1200 mm 30 sheets/pallet 3000 x 1200 mm (1) 30 sheets/pallet Weight 1000 kg/m3 12.5 kg/m2 (1) delivery date on request Powerpanel H 2 0 is a cement-bonded light-concrete construction board with a laminated structure, reinforced on both sides beneath the surface with an alkali-resistant glass fibre mesh (5 mm x 5 mm). Powerpanel H 2 0 is non-combustible and conforms to construction material class A1. Powerpanel H 2 0 is the new water resistant board for wet rooms. It has many advantages, whether it is used in domestic bathrooms with showers, in toilets, hospitals in public or business establishments or when subject to chemicals in commercial kitchens and industrial areas. Powerpanel H 2 0 can also be used in swimming pools. In this instance, special treatment of steel profiles is required. Please call for more details. The FERMACELL Waterproofing sealing system consisting of a primer, a waterproofing layer and a flexible sealing strip can be used to further enhance the performance of the whole system, whether it be for FERMACELL or for Powerpanel H 2 0. The FERMACELL leaflet "Waterproofing Systems addresses the requirement for wet rooms, surface preparation, sealing systems and detailed solutions.

Board storage and transport Powerpanel H 2 0 boards are stacked horizontally and delivered on pallets. The boards should be stored flat on a level surface. Storage on end can lead to bowing of the boards and damage to edges. If a stack of boards is laid on a floor then the load bearing capacity of the floor must be observed. Due to their resistance to frost and water the boards may be stored in the open. Care should be taken to protect the boards from dirt, dust and contaminated water as this may compromise the effectiveness of further waterproofing or decorative treatments. Horizontal transportation of boards is possible with forklift trucks or other panel transporters. Single sheets must be transported on end. Manual lifting of the sheets is made easier with panel lifting/transporting tools. If these tools are not available operators should wear gloves. Please contact you supplier regarding the return of wooden pallets. Building site conditions Just like all other building materials FERMACELL Powerpanel H 2 0 boards are subject to movement under the influence of temperature and moisture. To ensure fault free drying of walls and ceilings the following storage and installation conditions must be followed: Powerpanel H 2 0 boards and accessories must be protected against moisture and rain. Dry building materials that have become wet for a short period must not be used until they are completely dry again. The sheet materials must be stored flat on a smooth surface. Damaged materials must not be used for building work. Powerpanel H 2 0 boards and accessories can be used at a relative air humidity of 80 %. For technical reasons, gluing of Powerpanel H 2 0 boards must take place at relative air humidity of 80 % and a room and material temperature of at least + 5 C. The adhesive temperature should be + 10 C. The dry building materials should be adapted to the ambient room temperature, which should not change substantially for 12 hours following the gluing process. Lower temperatures and relative air humidity lengthen the curing times. Gas burner heating can cause damage due to the formation of condensation. This is particularly true for cold internal areas with bad ventilation. Fast, abrupt heating should be avoided as this can cause thermal shock. 2

Cutting Powerpanel H 2 0 boards should be cut with a standard rail-guided hand-held circular saw, preferably a plunge saw type. For accurate and sharp cuts we recommend the use of tungsten tipped saw blades. Vacuum extraction should be provided when using circular saws. The amount of dust can be minimized by using saw blades with fewer teeth (i.e. ripping blades) and a reduced cutting speed. Curves and angled cuts can be achieved with a jigsaw or with a core drill. If no hand-held circular saw is available then Powerpanel H 2 0 boards can be cut with a knife as follows: using a Stanley knife, lightly score the surface in a straight line, ensuring that the mesh is cut. Place the cut line over a supported edge (i.e. the edge of the pallet) and break the board by pushing down evenly along the cut. Then cut the mesh on the back side of the sheet. Sub-structure Steel studs should be a minimum 0.6mm gauge steel and have a 50 mm fixing face. The steel studs should be inserted vertically into the head & base track attached to the ceiling and floor. The studs should be inserted loosely into the head and base tracks; these must NOT be mechanically fixed. When boarding commences, the stud can then be set to the correct centres. The studs should extend a minimum of 15 mm into the head track (nominally a 40 mm head track). For deep flange head tracks and accommodation of deflection head details, please call our Technical Helpline on 0870-6090306. Timber studs should be mechanically fixed to the head and base tracks. For timber studs we recommend a 50 mm fixing face. However, a 38 mm CLS timber may be used as the joint is glued. Note: When steel studwork is used, the stud and track profiles must not be fixed or mechanically connected in any way. 3

Apply jointstik adhesive to the middle of the board edge Staple or screw to the sub-structure Remove excess adhesive once cured Fixing/Mounting Jointing The boards are fixed to steel or timber studs with FERMACELL Powerpanel screws at a spacing of 250 mm; without the need to predrill the holes. When jointing Powerpanel H20 both horizontal and vertical board joints are glued using FERMACELL jointstik. The horizontal joints should be offset by a minimum of 400 mm; i.e. no cross joints. Vertical joints must always be formed over studwork and horizontal joints should be backed. For glued joints, factory cut board edges must be used. The factory prepared FERMACELL Powerpanel H20 boards used for installation must be sharp-edged and absolutely straight. When making the glued joint you must be absolutely certain that the board edges are dust free and the line of adhesive is placed in the middle of the board edge and not on the studs. It is important that when the two boards are pushed tightly together the adhesive fills the joint completely and is visible in the completed joint. Additionally, the boards may be stapled to timber with staples spaced at 200 mm maximum centres. For rooms with increased requirements for corrosion protection, such as swimming pools, saunas, industrial kitchens or dairies, steel studs with corrosion protection (according to DIN EN 13964) for moisture-proof rooms should be used. The jointing material should also conform to the requirements for the corresponding corrosion protection instructions. Call the FERMACELL technical support for further details 0870-6090306. For double layer boarding Powerpanel H20 boards, the joints between the two layers should be offset by a minimum of 200 mm. Jointstick jointing is only required on the outer layer of board. Sub layers are dry butted. The adhesive usage is 20 ml FERMACELL jointstik adhesive per metre of board joint. 4 The adhesive hardens after 12 36 hours according to the room temperature and air humidity, after which the excess adhesive should be removed completely. This can be done with a paint scraper. Note: The maximum width of the joint must not exceed 1 mm.

Partitions with Powerpanel H 2 O In wall areas 12.5 mm thick Powerpanel H 2 0 boards are fixed to studwork set at maximum 600 mm centres. The first Powerpanel H 2 0 board is fixed to the stud profile with FERMACELL Powerpanel screws, starting at the open stud profile side. For wooden studs the first layer of panels is fixed with staples or screws. Then apply the FERMACELL jointstik adhesive in a flat continuous bead to the middle vertical board edge. The second Powerpanel H 2 0 board is placed next to the first board with the boards tight at the top and a gap of 10 15 mm at the base to create a wedge-shaped gap. For this the board length must be about 10 mm shorter than the room height. Place a packer under the board to hold it in this position, then fix the board to the vertical stud about 60 mm below the upper edge with a FERMACELL Powerpanel screw or for a wooden stud suitable screw or staple. When the wedge is removed the weight of the second board forces it against the first. In this way the adhesive is tightly compressed and the joint sealed. Fix the board in a continuous line from the top to the bottom (as installation method A). If required, fixing of the boards can also be carried out with a panel lifter. Using this method also requires sufficient pressure against the edge of the Powerpanel H 2 0 board on the joint adhesive to ensure a tight buttjoint. In this case fix from the centre of the boards outwards to the edges (as installation method B). Fitting of Board Installation Method A Installation Method B Room Height Board length = room height 10 mm 60 Room Height Board length = room height 10 mm 1200 ca. 10 1200 Dimensions in mm Single-sided Maße in mm Panel lifter support 5

Ceilings with Powerpanel H 2 O For ceilings the spacing of the main sub-structure should be selected according to the table below. Ensure that the joists or other load-bearing structure are capable of supporting the weight of the ceiling without excessive deflection (L/360 maximum). The maximum spacing for fixing supports for Powerpanel H 2 0 in ceilings is 40 x board thickness. i.e for 12.5 mm board, supports should be at maximum 500 mm centres. Sub-structure Permitted support width in mm 1) For Single Layer Boarding to 15 kg/m2 Steel Profile Basic Profile CD 60 x 27 x 06 900 Load Bearing Profile CD 60 x 27 x 06 1000 Timber battens (width x height) (mm x mm) Basic batten, 48 x 24 700 Directly Fixed 50 x 30 850 60 x 40 1000 Basic batten, 30 x 50 2) 1000 Suspended 40 x 60 1200 Load bearing batten 48 x 24 700 50 x 30 850 60 x 40 1100 1) Support width means the distance between the suspension points for basic profiles or basic battens and the centre distance of the basic profile or the basic batten for load bearing profiles or battens.. 2) Only in relation to load bearing battens of 50 mm width and 30 mm height. 6

Movement joints (continuous separation of the structure) Movement joints in FERMACELL Powerpanel H 2 0 constructions are required at the same points where movement joints are required in buildings (building shell). They must be able to take up the same amount of movement. It is essential that both the FERMACELL Powerpanel H 2 0 boarding and the sub-structure are separated. 20 20 A Timber sub-structure: Separation of boards: A movement gap must be left between two boards of Powerpanel H 2 0 to allow for differential movement when there is a change of air humidity, there must be an 8 mm gap in the boarding (this must be an open panel joint, not filled, not glued). Ideally the gap should occur at a point that is not visible, e.g. behind a wall T-junction. These should be set where possible. 20 20 A A = Movement dimension in mm Metal sub-structure: Due to the expansion and contraction in Powerpanel H 2 0 caused by changes in temperature and humidity and slightly different movement caused in metal studwork, an expansion gap is required in walls and ceilings at a maximum of every 8 metres. Details of expansion joints are shown in the adjacent drawings. Note that expansion joints which use strips of Powerpanel H 2 0 will maintain the fire and acoustic performance of the wall and ceiling constructions. Where infill profiles are used, guidance should be obtained from the manufacturer. FERMACELL Powerpanel H 2 O partition wall single layer boarding Movement joint with board strips 20 20 20 20 20 A A A A = Movement dimension in mm FERMACELL Powerpanel H 2 O partition wall double layer boarding Movement joint with board strips FERMACELL Powerpanel H 2 O partition movement joint with additional cover profile FERMACELL Powerpanel H 2 O ceiling structure movement joint with single layer boarding Board strips glued on one side and secured with screws 7

Specification Building material class: Non-flammable, A1 according to EN 13501-1 Dimension tolerances: L, B Thickness tolerance: ± 1 mm ± 0,5 mm Equalization humidity: approx. 5 % Water vapour diffusion resistance figure : 56 according to DIN EN 12572 Thermal conductivity 10,tr : 0.173 W/(mK) according to DIN EN 12664 Heat transfer resistance R 10,tr : 0.07 (m2k)/w according to DIN EN 12664 Specific heat output c p : 1000 J/(kgK) Bending: approx. 6,0 N/mm2 E module bending: ph: approx. 5200 N/mm2 approx. 10 Surface The most popular surface finish for Powerpanel H 2 0 is tiling. For showers and permanently wet areas we recommend the use of the FERMACELL Waterproofing system. For further information on the FERMACELL Waterproofing system, please call our Technical Hotline on 0870-6090306. In areas where Powerpanel H 2 0 does not come into direct contact with water, but is used due to high air humidity and not covered in tiles, then the adhesive joints and junction areas should be scraped flush and the area over the joints and screw heads should be flush filled with Powerpanel H 2 0 FST (surface finish). Alternatively the whole surface can be skimmed with Powerpanel H 2 0 FST. Prior to finishing (see datasheet) Powerpanel H 2 0 should be sealed with FERMACELL Board Sealer or a sand-based board sealer to give a key. A render can also be applied to Powerpanel H 2 0. The board should be sealed as stated previously and the render layer should not exceed 4 mm. FERMACELL lightmortar can also be used a render finish in internal areas. 8

Construction Designation Structure Wall- Sub- Mineral Maximum Sound Fire thickness structure Boarding wool Wall Height Rating R w Rating [mm] Stud Size [mm] [mm]/ kg/m2 [mm] [db] 1S11 H 2 O 100 75 x 0.6 1 x 12.5 mm 60/27 4500 49 F 30-A H 2 O per side (EI 30) 125 100 x 0.6 5000 1S11 H 2 O-FC 100 75 x 0.6 1 x 12.5 mm 60/27 4500 51 F 30-A H 2 O and (EI 30) 125 100 x 0.6 1 x 12.5 mm 5000 Gypsum fibre board 1S29 H 2 O-FC 110 75 x 0.6 1 x 12.5 mm 60/27 4500 56 F 30-A H 2 O and (EI 30) 135 100 x 0.6 1 x 12.5 mm + 10 mm 5000 Gypsum fibre board 1S31 H 2 O 125 75 x 0.6 2 x 12.5 mm H 2 0 60/27 5500 57 F 120-A (EI 120) 150 100 x 0.6 6500 1S31 H 2 O-FC 125 75 x 0.6 1 x 12.5 mm 60/27 5500 60 F 120-A Gypsum fibre board + (EI 120) 150 100 x 0.6 1 x 12.5 mm 6500 H 2 O per side 1H11 H 2 O 85 Wood 1 x 12.5 mm 60/27 3100 42 F 60-B 40 x 60 H 2 O per side (EI 60) 105 Wood 40 x 80 4100 For mixed structures using FERMACELL Powerpanel H 2 O and FERMACELL Gypsum fibre boards the fixing instructions for FERMACELL Gypsum fibre boards must also be obeserved. Load carrying capacity of Powerpanel H20 using a proprietary cavity fixing as follows: a. Single boarded - 40 kg b. Double boarded - 50 kg. Load carrying capacities incorporate a safety factor of 2. The indicated load values can be added together, if the fixings are spaced at 500 mm or separated by a stud. For shorter fixing spacing, the load per fixings should be reduced by 50 %. The sum of single loads for walls should not exceed 1.5 kn/m. 9

FERMACELL Powerpanel H 2 O single layer partition wall Fire protection: F 30-A, Soundproofing: R w = 49 db, Wall thickness: From 100 mm (6) (5) (1) (3) (8) (2) Schematic drawing (1) FERMACELL Powerpanel H 2 O 12.5 mm (2) Glued joint (3) Track Profile (4) Stud Profile (minimum 50 mm fixing face x 0.6 mm gauge) (5) Cavity insulation (6) Isolation strip (7) Flexible sealant (8) FERMACELL Powerpanel screws (7) Querschnitt Plan Section (9) Suitable fixing (6) (7) (4) 7 (1) (1) (5) (3) 3(3) (4) (9) (2) Cross Section T-Junction Corner Junction 10

FERMACELL Powerpanel H 2 O double layer partition wall Fire protection: F 120-A, Soundproofing: R w = 57 db, Wall thickness: From 125 mm (6) (8)(8) (5) (1) (2) (3) (7) Plan Section Schematic drawing (1) FERMACELL Powerpanel H 2 O 12.5 mm (2) Glued joint (3 Track Profile (4) Stud Profile (minimum 50 mm fixing face x 0.6 mm gauge) (5 Cavity insulation (6) Isolation strip (7) Flexible sealant (8) FERMACELL Powerpanel screws (9) Suitable fixing (6) (7) (4) (1) (1) (3) (3) (9) Cross Section T-Junction Corner Junction (2) 11

FERMACELL is a registered. trademark. Fermacell GmbH 2 The Courtyard, Reddicap Trading Est. Sutton Coldfield, B75 7BU www.fermacell.co.uk Technical changes reserved. Issue 02/2010 The current issue is valid. For further information contact Fermacell customer information on : Tel.: 0870-6090306 Fax: 0870-2402948 fermacell-uk@xella.com