Backstop NT. Backstop NT Specifications DS180. A High Performance, Polymer-Based, Noncementitious Water-Resistive Membrane and Air Barrier



Similar documents
Dryvit Finish System For Exterior Soffits

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

Dryvit Textured Acrylic Finishes (TAFS) 100% Acrylic Exterior Architectural Coatings

Third Party Inspection Guidelines For Inspectors As Part of the dryvitcare EIFS Repair/Restoration

EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS

INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS

FIRESTOPPING & SMOKE SEALS

Dark colors will increase the surface temperature of the EIFS wall.

GigaCrete Specification PlasterMax

CHAPTER 7: Building Systems ROOFING SYSTEMS

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

Product Guide Specification

Avoiding Air Barrier Pitfalls

ROXUL Board Insulation Section Master Guide Specification (CAVITYROCK ) Page 1 April 2016

2015 DuROCK Alfacing International Limited

Asphalt Shingle Application Requirements

Colorado State University. Durrell Center Roof Repair

MASTERFORMAT SPECIFICATION

Standard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

SECTION METAL WALL PANELS

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

DuPont Tyvek Commercial Air Barrier Assemblies Exceed Air Barrier Association of America, ASHRAE 90.1

Moisture Control. System Solutions to Prevent Mold

Guide Specifications for Maple Flooring Systems

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

SECTION PRE-ENGINEERED BUILDING BLANKET INSULATION

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING

THE DOW CHEMICAL COMPANY Issued: August 1, LARKIN CENTER 1605 JOSEPH DRIVE MIDLAND MICHIGAN (989)

REPORT NUMBER: COQ-003 ORIGINAL ISSUE DATE: July 19, 2013

The Minnesota Lath and Plaster Bureau Repairing Cracks in Stucco

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

COMMERCIAL BUILDING APPLICATIONS

ITEM THERMOPLASTIC MEMBRANE ROOFING

Construction. SikaProof A-08 Edge, A-12 Edge. Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing system. Product Description

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION

2.18 INTERIOR & EXTERIOR FINISHES VAPOR & AIR BARRIERS

EcoTouch Insulation with PureFiber Technology

The Prefab Package. Modular EIFS construction offers benefits to today s busy jobsites. Building Envelope. Roland Serino, P.E., of Dryvit Systems Inc.

Re-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY

ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING. January 24,

SCENIC VIEW SV 10 SECTION SOLAR CONTROL FILMS

Figure 1A. Typical brick veneer installation over wood frame construction.

Please read the entire document before purchasing and installing any of these products

09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec Master Spec Page 1

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE SYSTEM DESCRIPTION TORCH SYSTEM OVER POLYISO (15,17,19 YR) TH/BS-TH/CS

THERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

GreenGuard Housewrap Installation Guide

BLACK JACK ALL WEATHER ROOF COATING

SECTION FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE)

10DBMC International Conference On Durability of Building Materials and Components LYON [France] April 2005

Residential Roofing Guide

DELTA Premium Moisture Management Systems for Foundations.

Division 9. SignaFlor Pad and Pour Flooring System

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.

Water Vapor Permeance of Wood Structural Panels and Wood Wall Construction

Condensation Fact Sheet METAL BUILDING MANUFACTURERS ASSOCIATION

ICC-ES Evaluation Report. ESR-3493 Reissued September 2014 This report is subject to renewal September 2015.

LP OSB Sheathing & Structural 1 Sheathing

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

SECTION STANDING SEAM METAL ROOFING

Figure 1 The GENERAL CONTRACTOR blames the applicator (if available) for improper installation and

ATLAS Roofing Products

09990 MOLD REMEDIATION, LEAD-BASED PAINT ABATEMENT AND ENCASEMENT OF ASBESTOS

Specifications. PermaTone, Inc. Manufacturer s Long Form Specifications Interior Finish Coatings PF-405

Chapter 2 Basis of design and materials

REFLECTIT. Reflectit Application Instructions Spray and Roller DS % Acrylic Coating Providing a Pearlescent Appearance

ALPHA 15-Year Permathane II FR w/granules

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

Sto Specification R100. Guideline Specification for Repair of Exterior Insulation and Finish (EIFS) Wall Assemblies

Carpet Tile Installation Guidelines

BENTLEY ELEMENTS COLLECTION LVT

Peel & Seal Self-Stick Roofing Solutions

CHAPTER 3 MOISTURE TESTING

Jacksonville, FL

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS REPORT HOLDER: FIRESTONE BUILDING PRODUCTS COMPANY, LLC

Manufactured Stone Veneer Installation Instructions

NRCA s steep-slope manual is thoroughly revised for 2013

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

12 POLYURETHANE ADHESIVE (PU 105)

continuing professional education. As such, it construed to be an approval or endorsement by

application instructions

MARTIN TESTING LABORATORIES (MTL) PAINTS AND COATINGS TESTING CAPABILITIES

SECTION METAL ROOF & WALL PANELS

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

STUCCOMAX Installation Specifications Exterior One-Coat Stucco over EPS Foam, PU Foams, Exterior Gypsum Board, MgO Board and Cement Block

Presented by: Jennifer Doyle, P.E., RRC, LEED AP

DUPONT TYVEK BUILDING WRAPS VS. ZIP SYSTEM WALL SHEATHING

How to repair your existing low slope flat roof.

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

Transcription:

Backstop NT A High Performance, Polymer-Based, Noncementitious Water-Resistive Membrane and Air Barrier Backstop NT Specifications

DRYVIT SYSTEMS, INC. MANUFACTURER S SPECIFICATION CSI MASTERFORMAT SECTIONS 07 25 00, 07 26 13, 07 27 26 DRYVIT BACKSTOP NT WATER-RESISTIVE MEMBRANE AND AIR BARRIER PART I - GENERAL 1.01 SUMMARY This document contains all the manufacturer s requirements for the proper design, use, and installation of the Dryvit Backstop NT Texture, Smooth, and Spray air/water-resistive barrier. This document is intended to be used in conjunction with: A. Backstop NT Application Instructions, DS181 B. Backstop NT Product Data Sheet, DS455 C. Backstop NT Air/Water-Resistive Barrier Details, DS840 1.02 REFERENCES A. Section Includes 1. ASTM C 297 Standard Test Method for Flatwise Tensile Strength of Sandwich Constructions 2. ASTM C 1177 Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing 3. ASTM C 1396 (formerly C 79) Standard Specification for Gypsum Board 4. ASTM D 522 Standard Test Methods for Mandrel Bend Test of Attached Organic Coatings 5. ASTM D 1970 Standard Specification for Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection 6. ASTM D 2370 Standard Test Method for Tensile Properties of Organic Coatings 7. ASTM D 2247 (Federal Test Standard 141A Method 6201) Standard Practice for Testing Water Resistance of Coatings in 100% Relative Humidity 8. ASTM E 2098 Test Method for Determining the Tensile Breaking Strength of Glass Fiber Reinforcing Mesh for use in Class PB Exterior Insulation and Finish Systems (EIFS), after Exposure to Sodium Hydroxide Solution 9. ASTM E 72 Standard Methods for Conducting Strength Tests of Panels for Building Construction 10. ASTM E 84 Standard Test Method for Surface Burning Characteristics of Building Materials 11. ASTM E 96 Standard Test Methods for Water Vapor Transmission of Materials 12. ASTM E 283 Standard Test Method for Determining Rate of Air Leakage Through Exterior Windows, Curtain Walls and Doors Under Specified Pressure Differences Across the Specimen 13. ASTM E 331 Test Method for Water Penetration of Exterior Windows, Skylights, Doors and Curtain Walls by Uniform Static Air Pressure Difference 14. ASTM E 1233 Standard Test Method for Structural Performance of Exterior Windows, Curtain Walls and Doors by Cyclic Air Pressure Differential 15. ASTM E 2178 Standard Test Method for Air Permeance of Building Materials 16. ASTM E 2357 Standard Test Method for Determining Air Leakage of Air Barrier Assemblies 17. ASTM E 2134 Test Method for Evaluating the Tensile-Adhesion Performance of Exterior Insulation and Finish Systems (EIFS) 18. ASTM E 2485 (formerly EIMA Std. 101.01) Standard Test Method for Freeze-Thaw Resistance of Exterior Insulation and Finish Systems (EIFS) and Water-Resistive Barrier Coatings 19. ASTM E 2570 Standard Test Methods for Evaluating Water-Resistive Barrier (WRB) Coatings Used under Exterior Insulation and Finish Systems (EIFS) or EIFS with Drainage 20. AATCC Test Method 127-2008 Water Resistance: Hydrostatic Pressure Test 21. Federal Specification TT-C-555B Resistance to Wind-Driven Rain 22. DS494, Dryvit AquaFlash System 1.03 DEFINITIONS A. Contractor: The contractor that applies the Backstop NT Texture, Smooth, and Spray to the substrate. B. Sheathing: A substrate in sheet form. C. Substrate: The material to which the Backstop NT is applied. D. Substrate System: The total wall assembly including the attached substrate to which the Backstop NT is applied. E. Air/Water-Resistive Barrier Materials: A combination of Backstop NT and Dryvit Grid Tape with AquaFlash Liquid and AquaFlash Mesh or Dryvit Flashing Tape and Flashing Tape Conditioner. 2

1.04 DESCRIPTION A. General: Dryvit Backstop NT is available in Texture, Smooth and Spray and is a flexible polymer based, noncementitious, protective coating used as an air/water-resistive barrier when applied over acceptable exterior substrates. B. Design Requirements 1. Acceptable surfaces for Backstop NT include: (Refer to DS 181 for more specific requirements) a. Exterior grade gypsum sheathing meeting ASTM C 1396 (formerly C 79) requirements for water resistant core or Type X core at the time of application. b. Exterior sheathing having a water-resistant core with fiberglass mat facers meeting ASTM C 1177. c. Exterior fiber reinforced cement or calcium silicate boards. d. APA Exterior or Exposure 1 Rated Plywood, Grade C-D or better, nominal 1/2 in (12.7 mm) minimum, installed with the C face out. e. APA Exterior or Exposure 1 Fire Retardant Treated (FRT) Plywood, Grade C-D or better, nominal 1/2 in (12.7 mm) minimum, installed with the C face out. f. APA Exposure 1 Rated Oriented Strand Board (OSB) nominal 1/2 in (12.7 mm), minimum. Note: Applications over OSB sheathing requires a minimum of 2 coats of Backstop NT Smooth or Spray. Backstop NT Texture is not recommended for the field of wall application over OSB. g. Unpainted, unsealed concrete and CMU. 2. Backstop NT is not intended to be used as waterproofing for exterior horizontal surfaces or below grade applications. 3. Backstop NT shall not be exposed to weather for longer than 30 days prior to being covered. 4. Deflections of the substrate systems shall not exceed 1/240 times the span. 3

C. Performance Requirements: Backstop NT shall meet the following performance criteria: TEST TEST METHOD CRITERIA RESULTS Tensile Bond ASTM C 297/E 2134* Minimum 15 psi (104 kpa) Substrate: Minimum 19 psi (131 kpa) Flashing Minimum 431 psi (2970 kpa) - No deleterious effects after 10 cycles after 10 cycles No deleterious effects after after 14 days exposure 1 14 days exposure ASTM E 96 Proc. B* Vapor Permeable Backstop NT: 7 Perms 2 Backstop NT Spray: 7.9 Perms 2 Freeze-thaw ASTM E 2485 Method B* No deleterious effects Water Resistance ASTM D 2247* No deleterious effects Water Vapor Transmission Air Leakage ASTM E 283 No ICC or ANSI/EIMA Criteria Air Permeance ASTM E 2178 No ICC or ANSI/EIMA Criteria Air Barrier Assembly ASTM E 2357 No ICC or ANSI/EIMA Criteria Nail Sealability ASTM D 1970 No ICC or ANSI/EIMA Criteria Structural ASTM E 1233 Proc. A* Minimum 10 positive Performance cycles at 1/240 deflection; No cracking in field, at joints or interface with flashing Racking ASTM E 72* No cracking in field, at joints or interface with flashing at net deflection of 1/8 in (3.2 mm) Restrained Environmental ICC-ES Procedure* 5 cycles; No cracking in field, at joints or interface with flashing Water Penetration ASTM E 331* No water penetration beyond the inner-most plane of the wall after 15 minutes at 2.86 psf (137 Pa) Weathering UV Exposure Accelerated Aging ASTM D 2898 Method B* ICC-ES Procedure* 210 hours of exposure 25 cycles of wetting and drying 0.002 cfm/ft 2 (0.01 l/sec/m 2 ) 1.2x10-4 cfm/ft 2 @ 1.6 psf (0.0006 l/s/m 2 @ 75Pa) (<0.001 cfm/ft 2 @ 6.24 psf (0.05 l/sec m 2 @300 Pa) ABAA Criteria Hydrostatic Pressure Test AATCC 127* ICC: 21.6 in (549 mm) water column for 5 hours Surface Burning ASTM E 84 Flame Spread < 25 Characteristics Smoke Developed < 450 * ASTM E 2570 Standard Test Method for Evaluating Water-Resistive Barrier (WRB) Coatings Used Under Exterior Insulation and Finish Systems (EIFS) or EIFS with Drainage, also referred to as AC212 Acceptance Criteria for Water-Resistive Coatings Used as Water- Resistive Barriers over Exterior Sheathing 1. No cracking, checking, rusting, crazing, erosion, blistering, peeling, or delamination when viewed under 5x magnification 2. Defined as a Class III vapor retarder per the 2009 IBC and IRC 4

1.05 SUBMITTALS A. Product Data The contractor shall submit to the owner/architect manufacturer s product data sheets describing products that will be used on this project. B. Samples As required for the specific Dryvit Exterior Insulation and Finish System specified. 1.06 QUALITY ASSURANCE A. Qualifications 1. Product Manufacturer: Shall be Dryvit Systems, Inc. All materials shall be manufactured or sold by Dryvit and shall be purchased from Dryvit or its authorized distributor. a. Materials shall be manufactured at a facility covered by a current ISO 9001:2008 and ISO 14001:2004 certification. Certification of the facility shall be done by a registrar accredited by the American National Standards Institute, Registrar Accreditation Board (ANSI-RAB). 2. Contractor: Shall be experienced and competent in the waterproofing trade and application of liquid air and water-resistive barriers. B. Certification 1. Backstop NT shall be recognized for the intended use by the applicable building code(s). 1.07 DELIVERY, STORAGE, AND HANDLING A. All Dryvit materials shall be delivered to the job site in the original, unopened packages with labels intact. B. Upon arrival, materials shall be inspected for physical damage, freezing, or overheating. Questionable materials shall not be used. C. Materials shall be stored at the job site and at all times in a cool, dry location, out of direct sunlight, protected from inclement weather and other sources of damage. Storage temperature shall be from 40 F (4 C) minimum to 100 F (38 C) maximum. 1.08 PROJECT CONDITIONS A. Environmental Requirements 1. Application of wet materials shall not take place during inclement weather unless appropriate protection is provided. Protect materials from inclement weather until they are completely dry. 2. At the time of application of Backstop NT, the air and wall surface temperatures shall be from 40 F (4 C) minimum to 100 F (38 C) maximum. These temperatures shall be maintained, with adequate air ventilation and circulation, for a minimum of 12 hours thereafter, or until the products are completely dry. B. Existing Conditions: The contractor shall have access to electric power, clean water, and a clean work area at the location where the Dryvit Backstop NT materials are to be applied. 1.09 SEQUENCING AND SCHEDULING A. Installation of the Dryvit Backstop NT shall be coordinated with other construction trades. 1.10 LIMITED MATERIALS WARRANTY A. When used with a Dryvit EIFS, Backstop NT is covered by and subject to the terms and conditions of Dryvit s written limited materials warranty applicable to the specific Dryvit system or products used. When used with other claddings, Backstop NT is covered by and subject to the terms and conditions of Dryvit s written limited materials warranty for Backstop NT. Dryvit makes no other warranties expressed or implied, including implied warranties of merchantability or fitness for a particular purpose. 1.11 DESIGN RESPONSIBILITY A. It is the responsibility of both the specifier and the purchaser to determine if a product is suitable for its intended use. The designer selected by the purchaser shall be responsible for all decisions pertaining to design, detail, structural capability, attachment details, shop drawings, and the like. Dryvit has prepared guidelines in the form of specifications and product data sheets to facilitate the design process only. Dryvit is not liable for any errors or omissions in design, detail, structural capability, attachment details, shop drawings, or the like, whether based upon the information prepared by Dryvit or otherwise, or for any changes which purchasers, specifiers, designers, or their appointed representatives may make to Dryvit s published comments. PART II PRODUCT 2.01 MANUFACTURER A. All materials shall be obtained from Dryvit or its authorized distributors. Substitutions or additions of materials other than specified will void the warranty. 5

6 2.02 COMPONENTS A. Air/Water-Resistive Barrier Components: 1. Dryvit Backstop NT: A flexible, polymer-based, noncementitious, water-resistive membrane and air barrier available in Texture, Smooth, and Spray. 2. Dryvit Grid Tape : An open weave fiberglass mesh tape with pressure sensitive adhesive available in rolls 4 in (102 mm) wide by 100 yds (91 m) long. B. Flashing Materials: Used to protect substrate edges at terminations. 1. Liquid Applied: An extremely flexible water-based polymer material, ready for use. a. Shall be AquaFlash Liquid and AquaFlash Mesh 2. Sheet Type: a. Shall be Flashing Tape and Surface Conditioner 1) Dryvit Flashing Tape : A high density polyethylene film backed with a rubberized asphalt adhesive available in rolls 4 in (102 mm), 6 in (152 mm) and 9 in (229 mm) wide by 75 ft (23 m) long. 2) Dryvit Flashing Tape Surface Conditioner : A water-based surface conditioner and adhesion promoter for the Dryvit Flashing Tape. PART III EXECUTION 3.01 EXAMINATION A. Prior to application of Backstop NT the contractor shall verify that the substrate: 1. Is of a type listed in Section 1.04.B.1. 2. Is flat within 1/4 in (6.4 mm) in a 4 ft (1.2 m) radius. 3. Gaps do not exceed 1/4 in (6.4 mm). Larger gaps shall be corrected by replacing sheathing material. 4. Is sound, dry, connections are tight; has no surface voids, projections, or other conditions that may interfere with the application of Backstop NT. 5. Is otherwise in conformance with Dryvit s Backstop NT Data Sheet, DS455, and Application Instructions, DS181. B. Ambient and surface temperatures are minimum 40 F (4 C) to maximum 100 F (38 C). C. The contractor shall notify the general contractor and/or architect and/or owner of all discrepancies. Work shall not proceed until discrepancies have been corrected. D. All roof/wall intersections, decks, balconies and other attachments, as well as eves, chimneys, mechanical equipment, signage etc. are properly flashed to divert water to the outside of the specified cladding. E. All openings and penetrations are properly flashed and wrapped with the air/water-resistive barrier to prevent water intrusion damage. 3.02 SURFACE PREPARATION A. The Backstop NT materials shall be protected by permanent or temporary means from inclement weather and other sources of damage prior to, during, and following application until completely dry. B. Protect adjoining work and property during application of Backstop NT. C. The substrate shall be prepared as to be free of foreign materials such as oil, efflorescence, dust, dirt, paint, wax, water repellents, moisture, frost and any other materials that inhibit adhesion. 3.03 INSTALLATION A. Backstop NT Texture 1. General: Backstop NT Texture shall be applied in accordance with current published Dryvit Backstop NT Application Instructions, DS181. 2. Backstop NT Texture is ready to use after an initial spin-up using a "Twister" paddle or equivalent mixing blade, powered by a 1/2 in (12.7 mm) drill, at 450 500 rpm. Do not add cement or any other additive. 3. Apply a strip of Dryvit Grid Tape over all sheathing joints, including inside and outside corners and trowel apply a layer of Backstop NT - Texture over the Dryvit Grid Tape. 4. Depending on the substrate, Backstop NT Texture may be applied using a trowel, roller, or texture spray equipment and backrolled. Refer to Backstop NT Application Instructions, DS181 for complete details. 5. Apply Backstop NT Texture over the entire wall surface, including previously treated joints. Refer to the chart on the Backstop NT Product Data Sheet, DS455, or Application Instructions, DS181, for proper tools and respective coverage. 6. Allow to dry a minimum of 4 hours prior to application of Dryvit AquaFlash or Dryvit Flashing Tape and adhesively applied EPS insulation board or specified cladding. Cool damp weather will require longer drying times. During cool damp weather, Flashing Tape Surface Conditioner may be necessary for proper Flashing Tape adhesion. 7. Install the specified Dryvit Exterior Insulation and Finish System or specified cladding per published installation instructions for the specific system or cladding being used.

B. Backstop NT Smooth 1. General: Backstop NT Smooth is used in conjunction with Dryvit Backstop NT Texture joint treatment and shall be applied in accordance with current, published Dryvit Backstop NT Application Instructions, DS181. 2. Backstop NT Smooth is ready to use after an initial spin-up using a "Twister" paddle or equivalent mixing blade, powered by a 1/2 in (12.7 mm) drill, at 450 500 rpm. Do not add cement or any other additive. 3. Prior to Backstop NT Smooth application, sheathing joints, including inside and outside corners, shall be treated with Backstop NT Texture and Dryvit Grid Tape. All fastener heads shall also be spotted with Backstop NT Texture. Refer to Backstop NT Application Instructions, DS181, for complete details. Allow to dry a minimum of 2 hours or until dry to the touch. Cool humid conditions will require longer drying time. 4. Apply Backstop NT Smooth over the entire wall surface, including previously treated fasteners and sheathing joints. Refer to the chart on the Backstop NT Product Data Sheet, DS455, or Application Instructions, DS181, for proper tools and respective coverage. Note: Applications over OSB sheathing requires a minimum of 2 coats of Backstop NT Smooth or Spray. Backstop NT Texture is not recommended for the field of wall application over OSB. 5. Allow to dry a minimum of 4 hours prior to application of Dryvit AquaFlash or Dryvit Flashing Tape and adhesively applied EPS insulation board or specified cladding. Cool damp weather will require longer drying times. During cool damp weather, Flashing Tape Surface Conditioner may be necessary for proper Flashing Tape adhesion. 6. Install the specified Dryvit Exterior Insulation and Finish System or specified cladding per published installation instructions for the specific system or cladding being used. C. Backstop NT Spray 1. General: Backstop NT Spray shall be applied in accordance with current published Dryvit Backstop NT Application Instructions, DS181. 2. Backstop NT Spray is ready to use after an initial spin-up using a "Twister" paddle or equivalent mixing blade, powered by a 1/2 in (12.7 mm) drill, at 450 500 rpm. Do not add cement or any other additive. 3. A maximum of 16 oz (473 ml) of clear potable water may be added if required to adjust workability. 4. Apply a strip of Dryvit Grid Tape over all sheathing joints, including inside and outside corners and trowel apply a layer of Backstop NT - Texture over the Dryvit Grid Tape. 5. Backstop NT Spray may be applied using airless spray equipment. Refer to Backstop NT Application Instructions, DS181 for complete details. 6 Apply Backstop NT Spray over the entire wall surface, including previously treated joints. Refer to the chart on the Backstop NT Product Data Sheet, DS455, or Application Instructions, DS181, for proper tools and respective coverages. 7. Allow to dry a minimum of 4 hours prior to application of Dryvit AquaFlash or Dryvit Flashing Tape and adhesively applied EPS insulation board or specified cladding. Cool damp weather will require longer drying times. During cool damp weather, Flashing Tape Surface Conditioner may be necessary for proper Flashing Tape adhesion. 8. Install the specified Dryvit Exterior Insulation and Finish System or specified cladding per published installation instructions for the specific system or cladding being used. 3.04 FIELD QUALITY CONTROL A. The contractor shall be responsible for the proper storage and application of the Dryvit materials. B. Dryvit assumes no responsibility for on-site inspections or application of its products. 3.05 CLEANING A. All excess Dryvit materials shall be removed from the job site by the Contractor in accordance with contract provisions. B. All surrounding areas, where Dryvit materials have been installed, shall be left free of debris and foreign substances resulting from the Contractor s work. 3.06 PROTECTION A. The Dryvit materials and the project shall be protected from damage and inclement weather until dry. 1. The Dryvit Backstop NT Texture, Smooth, or Spray shall not be exposed for longer than 30 days prior to being covered with the Dryvit Exterior Insulation and Finish System or specified cladding. 7

DISCLAIMER Information contained in this specification conforms to standard detail and product recommendations for the installation of the Dryvit Backstop NT products as of the date of publication of this document and is presented in good faith. Dryvit Systems, Inc. assumes no liability, expressed or implied, as to the architecture, engineering or workmanship of any project. To ensure that you are using the latest, most complete information, contact: Dryvit Systems, Inc. One Energy Way West Warwick, RI 02893 401-822-4100 www.dryvit.com *The Trained Contractor Certificate indicates certain employees of the company have been instructed in the proper application of Dryvit products and have received copies of Dryvit s Application Instructions and Specifications. The Trained Contractor Program is not an apprenticeship. Each trained contractor is an independent company experienced in the trade and bears responsibility for its own workmanship. Dryvit System s, Inc. assumes no liability for the workmanship of a trained contractor. Dryvit Systems, Inc. One Energy Way West Warwick, RI 02893 (800) 556-7752 www.dryvit.com Printed in USA. Issued 03-17-15 Dryvit Systems Inc. 2000 For more information on Dryvit Systems or Continuous Insulation, visit these links. 8