FIELD COATING OF STEEL PIPE AND FITTINGS INSTALLED UNDERGROUND AND IN SUBSURFACE STRUCTURES

Similar documents
COATING & WRAPPING OF UNDERGROUND PIPING

SC2000 CEMENT BONDING PROCEDURES

Solvent Cementing Instructions For Plastic Pipe & Fittings

Specification for Pipe Coating Repairs Offshore

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

BLACK JACK ALL WEATHER ROOF COATING

CATHODIC PROTECTION SYSTEM DESIGN

Tractor Painting Tips

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

GigaCrete Specification PlasterMax

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

SECTION WATER STORAGE TANK PAINTING

PROCEDURES PREVENTION OF ACCIDENTAL IGNITION

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS

Minor Cracks in Horizontal Surfaces

WATERPROOFING FOR CONCRETE STRUCTURES

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

SECTION 15 AIR RELEASE VALVE ASSEMBLIES General

BLADE REPAIR INSTRUCTION BOOKLET

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

GB Tubulars RECOMMENDED PRACTICE For CASING on LOCATION

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

GENERAL RUBBER LINING PRINCIPLES

Standard For Lining Ductile Iron Pipe and Fittings For Sewer Service

TEXAS A&M CENTRAL ACADEMIC BUILDIING & PATRIOT S CASA SUBMITTAL Pre-Insulated Piping

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

Section SEWER PIPE INSTALLATION AND TESTING

Vinyl Composition Tile Installation System

CONTROL METHODS. There are five ways to control the release of asbestos fibers:

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Herringbone Pattern Flooring

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING General Materials Equipment...

SECTION FIRE HYDRANTS

Your guide to home maintenance. Flat Roofs

FIRESTOPPING & SMOKE SEALS

Installation System. Existing Resilient Sheet Floors

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

SEAMS SEAMING USING SEAM TAPE

PR11 Plastic Repair, Adhesive

Voltmaster Trash Pumps Model TSP2, TSP3 and TSP4

RAUFOSS EXPLOSIVE COMPRESSION FITTINGS

Section Four: Linings and Coatings

Pictorial Surface Preparation Standards For Painting Steel Surfaces

Notes. Material 1. Personal Protective Equipment 2.

Maintenance & repair Solutions

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

Scotch-Weld TM. Acrylic Adhesives. DP8405NS Green. Product Data Sheet. Date: March 2014 Supersedes: August 2013

R44 SERVICE BULLETIN SB-89 (supersedes R44 Safety Alert dated 23 February 2015)

SIGMACOVER 300. PRODUCT DATA SHEET December 12, 2014 (Revision of November 1, 2013) DESCRIPTION

Division 9. SignaFlor Pad and Pour Flooring System

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

TERMOSIGN APPLICATION INSTRUCTIONS

DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION

SECTION PRE-ENGINEERED BUILDING BLANKET INSULATION

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

University of Tennessee Safety Guidelines

Chapter 5 - Aircraft Welding

FIELD ACCEPTANCE OF FIELD WELDING GUIDE

Pipe Protection Tape System

BENTLEY ELEMENTS COLLECTION LVT

Resurfacing Concrete. Page 1 of 5

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.

Compressed Gas Cylinder Program

AMERICAN Mechanical Joint Pipe For Water, Sewage or Other Liquids

James M. Pleasants Company

BUILT-UP ROOF COATING SMOOTH and GRANULE SURFACE SPECIFICATION

SOLAR PV SYSTEM MAINTENANCE GUIDE

Scotch-Weld TM. DP410 Off-White. Product Data Sheet. Product Description. Key Features Rapid cure at room temperature; cure rate may be accelerated

This will also provide you with the knowledge to insure long life for your Investment

PERSONAL PROTECTIVE EQUIPMENT (PPE)

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:

Scotch-Weld TM. Epoxy Adhesive 1838 B/A Green 1838 B/A Tan 1838-L B/A Translucent. Technical Data February, Product Description

INSTALLATION AND OPERATION INSTRUCTIONS NOT FOR OXYGEN OR OTHER OXIDIZING GASES

WATERPROOFING OF WET ROOMS

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

Carpet Tile Installation Guidelines

SECTION SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.

GEORGIA INSTITUTE OF TECHNOLOGY ENVIRONMENTAL HEALTH AND SAFETY PERSONAL PROTECTIVE EQUIPMENT

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

1. Initial Precautions 2. Technical Precautions and Suggestions 3. General Information and Cure Stages 4. Understanding and Controlling Cure Time

Construction. 3-part thixotropic epoxy patching mortar. Product Description. Tests

Weatherproofing Kit for Connectors and Antennas

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

FIVE STAR PRODUCTS, INC. (800)

3 Scotch-Weld TM. Urethane Adhesives 3532 B/A 3535 B/A 3549 B/A. Technical Data January, 2010

RECOATING AND RENEWING SPF ROOFING SYSTEMS

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN

Application Instructions for Avery Dennison Films SF S LTR EZ RS, Conform Chrome

Safe Operating Procedure

Threaded Inline Air Heaters

Transcription:

LAST REVIEW DATE: REVIEW CYCLE: 12/23/15 5 Years SPECIFICATION: TITLE: VOLUME: REGISTRATION NO.: GAS TARGET TRAINING GROUPS: OTHER TARGET TRAINING GROUPS: REVISIONS (See ): G-8209-5 2 (Section 1.0), 10, Yellow Book, Electric Construction Standards Volume 3 (Section 21) GAS0351 Gas Construction, Corrosion Control, Pressure Control, Tunnels, LNG, Major Projects, Gas QA, EH&S Operations, Per Diem Contractors, Other Gas Contractors Transmission Operations (Electric), Construction, Energy Services This specification has been revised to incorporate comments made by GTI s technical experts and Con Edison s subject matter experts. 1) Table of Contents - Added Section 2.0. 2) Section 2.0 - Added Legal Requirements. Renumbered subsequent sections. 3) Section 3.1 - Reworded to emphasize the need for properly installed coatings. 4) Section 3.2 - Added reference to AMM. 5) Section 3.6 - Added reference to enclosed space. 6) Section 4.0 - System C Changed Hot Service Enamel to Coal Tar Enamel. Changed Black Magic Primer to Black Magic Asphalt Paint. Updated manufacturers. 7) Section 6.3 - Changed Sandblasting to grit blasting. 8) Section 10.2 (A) - Revised the electrical coating inspection requirements for transmission and distribution mains, based on their length.

G-8209-5 Gas Operations Standards TITLE: EFFECTIVE DATE: January 22, 2016 TABLE OF CONTENTS SECTION TITLE 1.0 SCOPE 2 2.0 LEGAL REQUIRMENTS 2 3.0 ENVIRONMENTAL AND SAFETY IMPACT 2 4.0 MATERIAL 3 5.0 COATING SELECTION 4 6.0 SURFACE PREPARATION - ALL SYSTEMS 4 7.0 APPLICATION OF PRIMER 5 8.0 COATING APPLICATION 6 9.0 REPAIRS OF DAMAGED COATING 9 10.0 INSPECTIONS 10 11.0 PROTECTION, PRECAUTIONS, QUALITY CONTROL 12 ENVIRONMENTAL REVIEW BY: J. Fox SAFETY REVIEW BY: J. Fox PREPARED BY: APPROVED BY: DATE: VOLUME: 2 (Section 1.0), 10 and Yellow Book, Electric Vol 3 (Section 21) Patrick Williams General Manager Construction Standards, O&M Manual, J. Lucente Technical Operations 12/23/15 Yellow Book, Electric Construction Standards 1 OF 12

1.0 SCOPE 1.1 This specification covers the field coating of all steel gas, electric feeder and related equipment, cooling water, gasoline, and diesel pipe and fittings installed underground and in subsurface structures: A) System A: Mastic B) System B: Cold Applied Tape C) System C: Hot Coal Tar Enamel (See Section 1.2) 1.2 Hot Coal Tar Enamel may only be used with approval from Corrosion Control. 2.0 LEGAL REQUIREMENTS 2.1 CFR 49. Part 192, subpart I, 192.451 through 491 2.2 16NYCRR 255.255.451 through 491 3.0 ENVIRONMENTAL AND SAFETY IMPACT 3.1 For buried pipe and structures, properly installed and maintained approved coatings will result in minimizing external corrosion and subsequent product leaks when used in conjunction with effective passive or active cathodic protection methods. Properly installed and maintained approved coatings on subsurface pipe and facilities will minimize atmospheric corrosion. 3.2 All operations that are performed (i.e. coal tar removal, disposal, installation, etc.) must be in compliance with all applicable specifications, Corporate Environmental Health and Safety Procedures (CEHSPs), General Environmental Health and Safety Instructions (GEHSIs) and Asbestos Management Manual (AMM). 3.3 Applicators of coatings, such as hot coal tar enamel, shall follow all regulatory requirements that apply to their coating operations. Therefore, applicators are responsible for having engineering controls in place to meet applicable air quality regulations. This means that applicators working within the five boroughs of New York City shall comply with NYC Administrative Code Title 24, Subchapter 6 Emissions Standards, Subpart 24-141, and applicators working in Westchester County shall comply with all state, county, and local air regulations. It is each applicator s responsibility to obtain required air permits. 2

3.0 ENVIRONMENTAL AND SAFETY IMPACT (Continued) 3.4 All employees should be given updated, product specific Hazardous Communication Training for the products/materials used in this specification. 3.5 Where employees are required to work around hot liquids, adequate ventilation and PPE must be used, including respiratory protection if necessary. 3.6 If employees enter an enclosed space (manhole), proper enclosed space (manhole) entry procedures, including atmosphere testing, must be followed. 4.0 MATERIAL System Material Unit Stock No. Product Manufacturer Roskote R-28 CE Royston Labs Inc. Mastic Mastic Gallon 631-1211 -----------------or----------------- A Thick'n Quick Royston Labs Inc. Felt Roll 000-0067 15# Roofing Paper (Asphalt) Tapecoat H35 Gray Tapecoat Company B Cold Applied Tape 2" Width Roll 631-3324 (Primerless) -----------------or----------------- or T/R Green Royston Labs Inc. 4" Width Roll 631-3316 (Primerless) -----------------or----------------- Gator Butyl 601-HP Pipe Gator Corporation Coal Tar Enamel Lone Star Specialties Enamel - - C Primer - - Black Magic Asphalt Paint Hercules Felt - - Duramat Power Marketing Group, Inc. A, B, C Degreaser Quart 634-1853 Envirosolv 655 Fine Organics Corp. 3

5.0 COATING SELECTION Unless otherwise specified, Table 1 shall be used in selecting the proper coating system. TABLE 1: COATING SELECTION ITEMS TO BE COATED PREFERRED METHOD ALTERNATE Welded joints, elbows, offsets, sleeves, damaged System B System C coating on pipe, pipe in manholes, straight pipe, etc. Irregular surface fittings, all bolted fittings, valves, reinforcements, weldolets, non-bolted compression couplings, posi-hold type couplings, irregular pipe surfaces in manholes, etc. System A System C 6.0 SURFACE PREPARATION ALL SYSTEMS 6.1 Coal Tar Mill/Field Coating A) Coal tar wrap may contain asbestos and/or PCBs. If a painted surface is encountered, lead, cadmium, and chromium may be present. Refer to CEHSP S10.00, "Lead Management Program." See applicable GEHSIs or CEHSPs for Personal Protective Equipment (PPE), handling, training, and disposal requirements. B) All existing loose/disbonded coal tar coating shall be removed from the area to be coated in accordance with AMM 6.04. Remaining edges shall be cut on a taper. 6.2 Other Mill/Field Coatings These coatings may contain asbestos and/or PCBs. If a painted surface is encountered, lead, PCBs or other hazardous constituents may be present; refer to CEHSP S10.00, "Lead Management Program." All handling and/or removal of mill/field coatings shall comply with procedures specified in applicable GEHSIs and CEHSPs. All mill coating adhesive should be removed from the pipe surface to be coated. 4

6.0 SURFACE PREPARATION ALL SYSTEMS (Continued) 6.3 Power tool clean the bare pipe surface to be coated to a bright, shiny metal surface (to remove rust, mill scale, weld splatter or sharp edges). When approved by Con Edison's Field Representative, hand tool cleaning is acceptable in areas not accessible to power tool cleaning. Grit blasting of the pipe surface to a commercial gray metal finish is an acceptable alternate to power tool cleaning. 6.4 Wash the surface to be coated (to remove oil, grease, dirt, etc.) using only the degreaser listed in Section 4.0. This washing shall be done by wiping the surface to be coated with clean rags soaked with the degreaser. A final wipe with a white, clean rag shall be done; the white rag shall be free of dust, dirt, etc. Chemical resistant gloves, such as, neoprene or nitrile and coveralls such as, Tyvek should be worn. The coating shall not be applied until all of the degreaser has evaporated from the surface being coated. 6.5 Ambient temperatures at or below 45 F may cause moisture in the air or on the pipe to "freeze". To enhance the immediate bond or remove the frozen moisture and ice on the pipe surface in colder temperatures, the mastic or tape or coal tar enamel primer shall be stored in a heated area, and the pipe shall be heated with an appropriate heat source. After heating pipe surface, wipe pipe with a clean, white rag; white rag shall be free of dirt, dust, etc. The coating shall not be applied until pipe surface is clean and dry. 7.0 APPLICATION OF PRIMER 7.1 There is no primer required with System A Mastic or System B Cold Applied Tape. 7.2 System C Hot Coal Tar Enamel requires primer. The approved primer shall be stirred thoroughly. Apply the primer to a clean dry pipe surface by brushing, leaving a uniform coating completely covering the surface of the pipe or fitting and overlapping the mill coating on each side by at least four inches. Allow the primer to dry. The hot coal tar enamel shall be applied immediately after the primer has dried. 5

8.0 COATING APPLICATION 8.1 System A Mastic A) The mastic is furnished properly formulated for application. Normal appearance is thicker than most coatings, but it can be brushed evenly. Stir mastic thoroughly prior to use. Apply mastic by brush, keeping generous amounts of mastic on the brush; however apply by brushing on thin coats. Use only clean brushes that are not caked or hard due to prolonged use. B) Apply a first thin coat of mastic and let dry for approximately 15 minutes; then apply a second coat. It takes approximately 45 minutes for the second coat to dry. Each coat of mastic shall overlap any adjacent coating. NOTE: The drying times mentioned here are variable and dependent upon ambient temperature and relative humidity. Drying times longer than those indicated are possible. C) Do not backfill until the mastic is completely dry. If emergency backfilling is required, as authorized by Con Edison's Field Representative, pipeline felt shall be wrapped loosely around the coating to protect it against abrasion. D) For touch-ups of factory (mill) coated fittings with mastic, follow surface preparation steps as in Section 6.0 for exposed metal and 1/2" of adjacent mill coating. Apply mastic as in Section 8.1 overlapping mill coating by 1/2". Only one coat of mastic shall be applied for touch-ups. NOTE: All bolt threads, heads, and nuts shall be given one coat of mastic regardless of the condition of the factory coating. 6

8.0 COATING APPLICATION (Continued) 8.2 System B Cold Applied Tape A) Field coating of welded joints, elbows, offsets, etc. using cold applied tape shall be done as follows: 1) We recommend using 2" wide tape for pipe 8" diameter and smaller and 4" wide tape for larger diameters. 2) Remove paper separator from side of tape which will be in contact with pipe. 3) The tape shall be applied by the "spiral wrap" method. Overlap each adjacent tape layer 1/2". Wrap first and last turn of tape 1 1/4 times around pipe, overlapping mill coating by 4". 4) For pipe, sleeves, barrels, couplings, etc., 16" in diameter and larger, a second layer of tape shall be applied following steps "1" through "3". This second layer of tape shall be started at the opposite end, and the application angle reversed. NOTE: Application of tape with a minimum 50% overlap is equivalent to two layers of tape. 5) For pipe, sleeves, barrels, couplings, etc., 16" diameter and larger, a "cigarette wrap" application is acceptable using wider tape as long as there are no wrinkles, bubbles, or voids in the tape. Wrap shall be 1 1/4 turns with 1/2" overlap between adjacent tape wraps and 4" on the mill coating. Two layers of tape shall be applied. 7

8.0 COATING APPLICATION (Continued) 8.3 System C Hot Coal Tar Enamel(See Section 1.2) A) An alternate for System A or B is System C Hot Coal Tar Enamel. Pipe and fittings shall be coated with the coal tar enamel specified herein. The enamel shall be heated in kettles equipped with accurate and easily read thermometers. Upon removal from its container, the enamel shall be broken into small pieces before it is placed in the heating kettle. Overheating the enamel results in green-yellow acrid smoke and will carbonize the enamel rendering it useless. Continued stirring is essential to obtain uniform heating. The heating and pouring temperatures are: Maximum Kettle Temp., 525 F. Minimum Pouring Temp. 485 F. The enamel shall be kept free flowing and above the minimum pouring temperature both in the kettle and in the pouring buckets. B) Field coating of welded joints, elbows, offsets, etc., using Hot Coal Tar Enamel, shall be done as follows: 1) Strips of felt shall be cut long enough to go around the pipe 1 1/4 times. Using the felt strips as slings, enamel shall be poured onto the surface of the pipe and felt and spread to at least 3/32 inch thickness over the area to be coated. The felt sling shall be discarded and disposed of in an approved manner after the first coat of enamel. 2) The enamel shall be inspected for voids, thin spots, sags, wrinkles, and other defects. Defects shall be corrected before the application of the second coat. 3) A second coat of enamel, at least 1/32 inch thick, shall be applied over the first coat using new strips of felt. The second enamel coat with a felt wrapper shall extend over the area being coated and overlap previously applied mill coatings by at least four inches. 4) Excess enamel shall be evident along all felt edges to get good sealing properties. 8

8.0 COATING APPLICATION (Continued) 8.3 System C Hot Coal Tar Enamel (See Section 1.2) (Continued) 5) The inside face of all felt strips shall be sealed with enamel to keep out moisture. 6) Where hot enamel overlaps mill coatings other than coal tar, a transition area forms between the mill and field coatings. After the enamel is applied, this area shall be wrapped with cold applied tape, System "B", 1 1/4 times around the pipe. C) Field coating of irregular fittings, using Hot Coal Tar Enamel, shall be done using two separate coats of enamel. The first coat of enamel shall be at least 3/32-inch thick. It shall be inspected for voids, thin spots, wrinkles, sags, blisters and other defects which shall be repaired prior to the application of the second coat. The second coat of enamel shall be at least 1/32-inch thick. The working parts of valves shall be coated in accordance with Sections 6.0 and 8.1 of this Specification using System A Mastic. 9.0 REPAIRS OF DAMAGED COATING 9.1 Repairs of damaged coating on fittings only using System A Mastic shall be done in accordance with Sections 6.0 and 8.1 of this Specification. 9.2 Repair of damaged coating using: A) Cold Applied Tape System "B" 1) Follow all applicable steps in accordance with Sections 6.0 and 8.2. 2) Cut a piece of tape (patch) large enough to cover damaged area, overlapping mill coating by at least 2". 3) Cut a second piece of tape long enough to wrap around the pipe 1 1/4 times. 4) Remove the paper separator from side of tape which will be in contact with pipe. 9

9.0 REPAIRS OF DAMAGED COATING 10.0 INSPECTIONS 5) Apply the patch. 6) Wrap the second piece of tape around the pipe 1 1/4 times, covering the patch. Avoid too much handling and stretching of tape, which will result in wrinkles and bubbles in the tape. B) Hot Coal Tar Enamel System "C" (See Section 1.2) 1) Follow all applicable steps in Sections 6.0, 7.2, and 8.3 with the following exceptions: a) This coating shall be used only to repair hot coal tar enamel coatings. b) The loose or disbonded coating shall be removed in accordance with procedures specified in applicable GEHSIs, CEHSPs, and variances. The edges of the coating shall be cut on a taper. c) When the primer has become dry, hot enamel shall be poured on the primed metal, and a first piece of felt shall be carefully applied over the opening. d) After a second application of hot enamel, a second piece of felt, larger than the first by not less than 4" in any direction, shall be immediately placed over the patched area. 10.1 For System A Mastic, no electrical inspections shall be performed. A thorough visual inspection of the finished coating shall be performed in order to insure that no holidays or voids are present in the coating. 10

10.0 INSPECTIONS (Continued) 10.2 For System B Cold Applied Tape, A) For any length transmission main operating at 125 psig and any distribution main 100 feet or more in length, the coating shall be electrically inspected using a Holiday Detector prior to backfilling the pipe in the excavation. On mains less than 100 feet in length and services, the piping shall be electrically inspected using a Holiday Detector prior to backfilling where practical. The peak voltage of the Holiday Detector shall be between 12,000 and 15,000 volts (except electric feeder pipe which shall be 18,000 to 20,000 volts) measured with the electrode in contact with the coated pipe. B) An "X" test shall be performed periodically to assure proper coating adhesion to the pipe surface. The test shall consist of two cuts, crisscrossing through the tape and adhesive to the pipe surface. The cuts shall be approximately 4 inches in length. The four cut edges of the tape at the center of the "X" shall be pulled up. If a majority of the tape/adhesive is pulled off the pipe surface, the tape/adhesive was applied improperly and must be removed from the entire coated joint or pipe section. New tape/adhesive shall be applied following Sections 6.0 and 8.2. If a majority of the tape/adhesive is not pulled off the pipe surface, the tape/adhesive was applied properly. The damaged tape/adhesive shall be repaired as per Section 9.0 10.3 For System C Hot Coal Tar Enamel, an Electrical Spark Inspection, shall be made on all coated pipe and fittings as per Section 10.2. The peak voltage of the Holiday Detector shall be as in Section 10.2. There are no exceptions to this electrical inspection. 10.4 All coating defects found from the inspections described in Sections 10.1, 10.2, and 10.3 shall be repaired as per Section 9.0 and inspected again. 11

11.0 PROTECTION, PRECAUTIONS, QUALITY CONTROL 11.1 The mastic and primer are flammable materials and must be kept away from open flames, sparks or high temperatures. Avoid breathing vapors and use only with adequate ventilation and/or approved respiratory protection. Keep containers closed when not in use. Contact with the skin shall be avoided. 11.2 The enamel pieces, placed in the heating kettles, shall be kept clean, dry and free of dirt, grass, weeds, or foreign matter. 11.3 All heating kettles, pouring buckets, daubers, etc., shall be cleaned once a day and kept in a workmanlike condition. Enamel left in the kettle overnight or from a previous day will be removed and disposed of in an approved manner. 11.4 Rolls of pipeline felt and cold applied tape shall be stored in sheds or on platforms under suitable cover to keep them dry. All rolls shall be carefully handled to prevent distortion of the rolls and damage to the edges which may interfere with their use. 11.5 When practical do not coat in rain, snow, fog, or windy weather which may cause moisture, dust or dirt to collect on the surface to be coated. Wet or dirty pipe or fittings shall not be coated until properly cleaned as per Section 6.0 and dried. 12