SUMMARY 1.1. 3. Heating REFERENCES 1.2. Thermal Insulation. 222 07 19-1



Similar documents
Fiberglas, Exterior Wall Thermal Insulation

EcoTouch Insulation with PureFiber Technology

B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation

B. Types of mechanical insulation specified in this section include the following:

SECTION PRE-ENGINEERED BUILDING BLANKET INSULATION

SECTION HVAC INSULATION. A. All work specified in this Section is subject to the provisions of Section

DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

CODE NOTES. Insulation Requirements in Commercial Buildings for Mechanical and Service Hot-Water Piping

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

SECTION HVAC AND PLUMBING INSULATION

ROXUL Board Insulation Section Master Guide Specification (CAVITYROCK ) Page 1 April 2016

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

4 Installation Requirements

Controlling Condensation On CWP Insulation BY ED LIGHT, MEMBER ASHRAE; JAMES BAILEY, P.E., MEMBER ASHRAE; AND ROGER GAY

Pipe and Equipment Insulations. Micro-Lok HP. High Performance Fiber Glass Pipe Insulation

FIRESTOPPING & SMOKE SEALS

Product Guide Specification

SECTION HVAC INSULATION

Guide Specification SECTION HVAC INSULATION PART 1 - GENERAL 1.1 SUMMARY

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION MECHANICAL INSULATION

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

SUGGESTED SPECIFICATION EXHAUST SYSTEM SILENCER, FLEX CONNECTOR, INSULATION BLANKETS, WALL / ROOF THIMBLES

COATING & WRAPPING OF UNDERGROUND PIPING

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

GreenGuard Housewrap Installation Guide

SECTION HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Engineering Specifications

TEXAS A&M CENTRAL ACADEMIC BUILDIING & PATRIOT S CASA SUBMITTAL Pre-Insulated Piping

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

Asphalt Shingle Application Requirements

CHAPTER 7: Building Systems ROOFING SYSTEMS

Thermwire. Selection Guide. Freeze Protection Heating Cable. Thermwire -Wrap. Pre-Assembled. Thermwire-Comp. Thermwire-Melt.

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Guide Specifications for Maple Flooring Systems

Electric Heat Tracing INSTALLATION PROCEDURES

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

SECTION FIBERGLASS INSULATION

SECTION PIPE HANGERS AND SUPPORTS

Avoiding Air Barrier Pitfalls

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS

DIVISION 4300 STORM DRAINAGE

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

City of San Diego, CWP Guidelines

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION COLD-FORMED METAL DECK FRAMING Elevations Steel Deck Framing by Trex

TABLE OF CONTENT

3 Single-Coated Foam Tapes

SECTION THERMOPLASTIC MEMBRANE ROOFING

CATHODIC PROTECTION SYSTEM DESIGN

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:

Roxul Board Insulation Section Master Guide Specification (CAVITYROCK DD) Page 1 October 2013

s ation lic app ntial Foamular sideor RE uide F Ily G am ation F sul In

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA

SECTION SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.

SECTION STORM DRAINAGE SYSTEM

Removable Insulation Blankets from A to Z

CONTROL METHODS. There are five ways to control the release of asbestos fibers:

ITEM THERMOPLASTIC MEMBRANE ROOFING

Refrigeration Installation 101

SECTION HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION

COMMERCIAL BUILDING APPLICATIONS

The Truth About Asbestos In Your Home

GYPSUM AREA SEPARATION FIREWALLS GA

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

Chapter 7 Plumbing Connections

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

GigaCrete Specification PlasterMax

SECTION MORTUARY REFRIGERATORS

INSTALLATION GUIDE. americanwick.com WICK (9425)

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION STANDING SEAM METAL ROOFING

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

Tundra Series Windows January 2016

Division 9. SignaFlor Pad and Pour Flooring System

Wastewater Capital Projects Management Standard Construction Specification

Window Installation Instructions

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS

ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES

Renovating Your Basement

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Laminate Flooring T-Lock Angle-Drop Installation Instructions

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023

Asbestos Management POLICY

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS PHILLIP STREET, SYDNEY

EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS

FRP AQUATIC DUCTWORK COMPONENTS LEADERS IN FIBERGLASS REINFORCED PLASTIC DUCT PRODUCTS

2.18 INTERIOR & EXTERIOR FINISHES VAPOR & AIR BARRIERS

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

Transcription:

PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunctionn with good construction practice and professional judgment. Thiss guide is to aid in the creation of a complete building specification that is to be fully reviewed and edited by the engineer. Sections of this guide should be included, edited, or omitted based on the t requirements of a specific project. It is the responsibility of both the specifier and the purchaser to determine if a product or system is suitable for its intended use. Neither Owens Corning, nor any of its subsidiary or affiliated com- panies, assume any responsibility for the content of this specification guide relative to actual projects and specifically disclaim any and all liability for any errors or omissions in design, detail, structural capability, attachment details, shop drawings or other construc- tion related details, whether based upon the information provided by Owens Corning or otherwise. SECTION 22 07 19 PART 1 - GENERAL 1.1 SUMMARY Section Includes: Provide the following: Note to Specifier: The following temperature ranges are typical for these systems. However, if project requirements call for service temperatures outside the ranges listed, consult the manufacturer's published data to determine operating temperature limitations of the insulation product or products under consideration. 1. Cold Piping Systems (chilled water, brine, refrigerant), 32 F (0 C) to 65 F (18 C). 2. Dual Temperature Systems, 32 F (0 C) to 220 F (104 C). 3. Heating Systems (steam, steam condensate, hot water), ambient up to 450 F ( 232 C). 4. Domestic and Servicee Hot Water Systems, ambient up to 180 F (82 C). Items Not Insulated: Unless otherwise indicated, do not install insulationn on the following: 1. Drainage piping located in crawl spaces. 2. Underground piping. 3. Chrome-plated pipes and fittings unless there is a potential for personnel injury. 1.2 REFERENCES Materials shall meet the property requirements of one or more of the following specifications as applicable to the specific product or end use: 1. American Society for Testing of Materials (ASTM):: a. ASTM C547, Standard Specification for Mineral Fiber Pipe Insulation. b. ASTM C585, Standard Practice for Inner and Outer Diameters of Rigid Thermal Insulation for Nominal Sizes of Pipe and Tubing (NPSS System). c. ASTM C795, Standard Specification forr Thermal Insulation for Use in Contact with Austenitic Stainless Steel. d. ASTM C921, Standard Practice for Determining the Properties of Jacketing Materials for Thermal Insulation. 222 07 19-1

e. ASTM C1136, Standard Specification for Flexible, Low Permeance Vapor Retarders for Thermal Insulation. f. ASTM C1393, Standard Specification for Perpendicularly Oriented Mineral Fiber Roll and Sheet Thermal Insulation for Pipes and Tanks. g. ASTM C1729, Standard Specification for Aluminum Jacketing for Insulation. h. ASTM D1784, Standard Specification for Rigid Poly (Vinyl Chloride) (PVC) Compounds and Chlorinated Poly (Vinyl Chloride) (CPVC) Compounds. i. ASTM E84, Standard Test Method for Surface Burning Characteristics of Building Materials. 2. Underwriters Laboratories (UL) a. UL 723, Test for Surface Burning Characteristics of Building Materials. 1.3 1.4 1.5 DEFINITIONS The term "mineral fiber" as defined by the above specifications includes fibers manufactured of glass, rock, or slag processed from a molten state, with or without binder. SYSTEM PERFORMANCE Insulation materials furnished and installed hereunder should meet the minimum thickness requirements of American Society of Heating, Refrigeration, and Air Conditioning Engineers ASHRAE 90.1 (2010), "Energy Efficient Design of New Buildings." However, if other factors such as condensation control or personnel protection are to be considered, the selection of the thickness of insulation should satisfy the controlling factor. ADMINISTRATIVE REQUIREMENTS Coordination: Coordinate size and location of supports, hangers, and insulation Division 23 Section Hangers and Supports of HVAC Piping and Equipment. shields specified in 1. Coordinate clearancee requirements with piping installer for piping insulation application. 2. Coordinate installationn and testing of heat tracing. Scheduling: Schedule insulation application after pressure testing systems and, where required, after installing and testing heat tracing. 1.6 SUBMITTALSS Product Data: Submit product characteristics, performance criteria, and limitations, including installation instructions, for each type of product indicated. 1. For adhesives and sealants, submit documentationn including printed statementt of VOC content. Shop Drawings: 1. Detail application of protective shields, saddles, and inserts at hangers. D. Sustainable Design Submittals: Submit manufacturer s sustainable design certifications as specified. Qualification Data: For Installer. 222 07 19-2

1.7 1.8 QUALITY ASSURANCE Installer Qualifications: A qualified installer who has beenn trained by and is acceptable to manufacturer to install manufacturer's products. DELIVERY AND STORAGE OF MATERIALS Delivery: Deliver materials in manufacturer s original packaging. Storage: Store and protect products in accordance with manufacturer ss instructions. Store in a dry indoors location. Protect insulation materials from moisture and soiling. Do not install insulation that has been damaged or wet. Remove it from jobsite. 1. An exception may be allowed in cases where the contractorr is able to demonstrate that wet insulation when fully dried out (either before installation or afterward following exposure to system operating temperatures) will provide installed performance thatt is equivalent in respects to new, completely dry insulation. In such cases, consult the insulation manufacturer for technical assistance. PART 2 - PRODUCTS 2.1 MANUFACTURER 2.2 Owens Corning Insulating Systems, LLC, Toledo, OH 43659; www.owenscorning.com. INSULATION MATERIALS General: 1. Products shall not contain asbestos, lead, mercury, or mercury compounds. 2. Owens Corning pipe insulation is not known to contain penta-, octa, or deca-brominated diphenyl flame retardant substances, such as deca-brominee (deca-bde). 3. Insulation materials for use on austenitic stainlesss steel shall be qualified as acceptable according to ASTM C795. Certifications: 1. Only Owens Corning SSL II with ASJ Max andd VaporWick pipe products are GREENGUARD Indoor Air Quality Certified and GREENGUARD Gold Certified. 2. Owens Corning pipe products are certified by SCS Global Services to containn a minimum of 53% recycled glass content, 31% pre-consumer and 22% post-consumer (except Flexwrap Insulation). 3. Owens Corning pipe products are UL listed andd labeled (except Flexwrap Insulation and Pipe and Tank Insulation). 4. No Wrap FIBERGLAS Pipe Insulation and Jacketed FIBERGLAS Pipe Insulation (ASJ Max, VaporWick, Evolution, ASJ) have received thee Cradle to Cradle Products Innovation Institute's Bronze Level Material Health Certificate. 5. These products Environmental Product Declarationn (EPD) has been certified by UL Environment. Molded Fibrous Glass Pipe Insulation: Comply with ASTM C547, Type I, Grade A; and Type IV, Grade B; and ASTM C585, for sizes required and of a type suitable for installation on piping systems as required. One of the following types shall be used: 222 07 19-3

1. For indoor systems operating at temperatures from 0 F (-18 C) to +1000 F (538 C) with heat-up schedule: a. Owens Corning SSL II with ASJ Max FIBERGLAS Pipe Insulation. 2. For systems operating at temperatures up to +850 F (232 C), no heat up-schedule required. 3. For systems operating at temperatures to +1000 F (538 C) with heat-up schedule and always above the ambient temperature: a. Owens Corning No Wrap Pipe Insulation. 4. For systems operating below ambient (32 F (0 C) to +65 F (18 C)) temperature: a. Owens Corning VaporWick Pipe Insulation. (see HVAC Piping Insulation VaporWick Pipe Insulation) D. Perpendicular Oriented Mineral Fiber Insulation: ASTM C1393, Type IIIB, Category 2: 1. For piping equal to or larger than 10 in (250 mm) diameter operating at temperatures up to +850 F (454 C): a. Owens Corning Flexwrap FIBERGLAS Insulation. E. Perpendicular Oriented Mineral Fiber Insulation: ASTM C1393, Type II, Category 1: 1. For piping equal to or larger than 10 in (250 mm) diameter operating at temperatures up to +650 F (343 C): a. Owens Corning FIBERGLAS Pipe and Tank Insulation. 2.3 FIELD-APPLIED JACKETS General: Field-applied jackets shall comply with ASTM C1136; Type I or Type II. 1. At Below-Ambient Temperatures: Type I. 2. At Above-Ambient Temperatures: Type II, where a vapor barrier is not required. PVC Jackets: ASTM D1784, Class 16354-C; 0.020 in thick PVC jacketing and fitting covers. 1. Acceptable Manufacturer: Proto Corp., Clearwater, FL 33762; www.protocorporation.com Aluminum Jackets: ASTM C1729, Class A, 0.016 in thick aluminum moisture barrier factory-heat-laminated to the interior surface. jacket with 3 mil thick polysurlyn 1. Acceptable Manufacturer: ITW Insulation Systems, Houston, TX 77022; www.itwinsulation.com 2.4 ACCESSORY MATERIALS Accessories: following: Provide accessories per insulating system manufacturer s recommendations, including the 1. Closure Materials: Butt strips, bands, wires, staples, mastics, adhesives, and pressure-sensitive tapes. a. Mold resistant mastics are recommended for chilled water applications. 2. Field-Applied Jacketing Materials: Sheet metal, plastic, canvas, fiberglass cloth, insulating cement, PVC fitting covers. 3. Support Materials: Hanger straps, hanger rods, saddles, support rings, and high density inserts. 222 07 19-4

Adhesives For Indoor Applications: VOC content of f 50 g/l or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24). PART 3 - EXECUTION 3.1 EXAMINATIONN Verify that materials and accessories can be installedd in accordance with Contract Documents and material manufacturers' recommendations. Verify, by inspecting product labeling, submittal data, and/or certifications which may accompany the shipments, that materials and accessories to be installed on the project comply with applicable specifications and standards and meet specified thermal and physical properties. Before starting work under this section, carefully inspect the site and installed work of other trades and verify that such work is complete to the point where installation of materials and accessories under this section can begin. 3.2 PREPARATION Ensure that surfaces over which insulation is to be installed are clean and dry. Ensure that insulation is clean, dry, and in good mechanical condition with factory-applied vapor or weather barriers intact and undamaged. Wet, dirty, or damaged insulation shall not be acceptable for installation. Ensure that pressure testing of piping and fittings has been completed prior to installing insulation. 3.3 SAFETY PRECAUTIONS Insulation contractor's employees shall be properly protected during installation of insulation. Protection shall include proper attire when handling and applying insulation materials, and shall include, but not be limited to, disposable dust respirators, gloves, hard hats, and eye protection. 3.4 INSTALLATION General: Install insulation materials and accessories in accordance with Contract Documents and manufacturer's published instructions to ensure that it will serve its intended purpose. 1. Install insulation on piping subsequent to painting and acceptance tests. 2. Install insulation i materials with smooth and even surfaces. Insulate each continuous run of piping with full-length units of insulation, with single cut piece to complete run. Do not use cut pieces or scraps abutting each other. Butt insulation jointss firmly to ensure complete, tight fit over piping surfaces. 3. Maintain the integrity of factory-applied vapor retarder jacketing on pipe insulation, protecting it against puncture, tears or other damage. Seal circumferential joints with butt strips that are compatible with ASJ Max facing. Stapling is not required to complete the closure. 4. On cold systems, seal penetrations of the ASJ Max and exposed ends of insulation with vapor barrier mastic. Coat staples used on cold pipe insulation with suitable sealant to maintain vapor 222 07 19-5

barrier integrity. Mastic pipe section ends at every fourth pipe section joint and at each fitting to provide isolation of water incursion. For complete recommendedd instructions on installation consult NAIMAA GUIDE TO NSULATING CHILLED WATER PIPING SYSTEMS WITH MINERAL FIBER PIPE INSULATION 33 F to 60 F (0.5 C to 15.6 C) (PU No. C1228 dated 6/15). 5. When multiple layers are required, all inner layer(s) shall be No Wrap. Support piping so that the insulation is not compromised by the hanger or the effects of the hanger. Provide hanger spacing so that the circumferential joint may be made outside the hanger. Cover the evaporating holes with sealing tape for the length of the metal saddle. 1. Piping systems 3 in (75 mm) in diameter or less, insulated with fiberglass pipe insulation, may be supported by placing saddles of the proper length and spacing under the insulation. 2. For hot or cold piping systems larger than 3 in (755 mm) in diameter, operating at temperatures less than +200 F (93 C) and insulated with fiberglass, provide inserts such as foam or high-density fiberglass with sufficient compressive strength to support the weight of the piping system. 3. At vertical runs, provide insulation support rings, as indicated on Drawings. Fittings: 1. For systems operating below ambient temperature, wrap valves, fittings, and similar items in each piping system with wicking material to ensure a continuous path (100% coverage) for the removal of condensation, priorr to installing insulation. 2. Cover valves, fittings, and similar items in each piping system using one of the following: a. Mitered sections of insulation equivalent in thickness and composition to that installed on straight pipe runs. b. Insulation cement, equal in thickness to thee adjoining insulation. c. PVC Fitting Covers insulated with materiall equal in thickness and composition to adjoining insulation. 3. Seal fitting joints with vapor retarderr sealing tapes or mastics. 4. Use standard oversizing practices for valves and flanges. D. Penetrations: Extend piping insulation without interruption through penetrations, except where otherwise specified. walls, floors and similar piping E. 1. Taper and seal pipe insulation ends, regardless of f service. F. G. Joints: Butt pipe insulationn against hanger inserts. For hot pipes, stagger joints when operating temperature is over 400 F (204 C) double layer. Seal jacketing according to type being used. Seal self- sealing laps by firmly rubbing down surface of tape and flap. Vertical Piping: Protect vertical piping to a height of 8 ft -0 in (2.4 m) ) above the floor. Jacket insulated, exposed vertical piping within the building and insulatedd piping exposed to the outdoors with minimum 0.016 in thick (0.4 mm) aluminum. Accessory Materials (Midwest): Install in conformance with the current edition of the Midwest Insulation Contractors Association (MICA) "Commercial & Industrial Insulation Standards." 222 07 19-6

3.5 3.6 FIELD QUALITY ASSURANCE Upon completion of insulation work, visually inspect the work and verifyy that it has been correctly installed. This may be done while work is in progress, to assure compliance with requirements herein to cover and protect insulation materials during installation. PROTECTION Replace damaged insulation, which cannot be satisfactorily repaired, including insulation with vapor barrier damage and moisture-satura ated insulation. The insulationn contractor shall advise the general and the mechanical contractor as to requirements for protection of the insulation work during the remainder of the construction period, to avoid damage and deterioration of the finished insulation work. END OF SECTIONN Pub. No. 10019399-A 2016 Owens Corning. All Rights Reserved. 222 07 19-7