SCHEDULE OF PRICES CIVIL WORK (PART-A)



Similar documents
CHAPTER NO. 27 QUANTITIES OF MATERIALS

Tender schedule. Rate in

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

LAYING BLOCK AND BRICK

BOQ for Plumbing, Sanitary Works

BILL OF QUANTITIES FOR CIVIL WORKS FOR 8MW POWER PLANT

Chapter. Restoration of Damaged Structures

Revised Specifications & Scale of Amenities for General Pool Residential Accommodation (Type I to VI) Revised Amenities.doc

PROPOSAL FOR THE CONSTRUCTION OF LOW COST HOUSE AT IBRAHIM HYDERY, KARACHI

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI

NATIONAL INSTITUTE OF BIOLOGICALS

- From the Makers of India s Finest Designer Homes

If stepping is required, step at 180mm as seen in this picture.

HOUSE BUILDING DIGEST

TYPICAL ESTIMATE OF A RAINWATER COLLECTION UNIT (110 mm / 150 mm dia PVC Pipelines)

How To Run A Test Lab In Rourkela

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT

CONSTRUCTION OF PERIMETER FENCE - COMMERCIAL AND T&D OFFICE COMPOUND, ONVERWAGT

CONSTRUCTION COSTS INDEX FOR RESIDENTIAL BUILDINGS, SLOVENIA

DENVER MODEL 30 X 30 SPECIFICATIONS

COLORADO MODEL. 35 x 65 SPECIFICATIONS

Schedule of Quantities

STATE BANK OF INDIA.

How to build a Pizza Oven in 4 days

BUDGETARY COST ESTIMATE OF INTERIOR WORK OF LOWER PAREL BRANCH FOR CENTRAL BANK OF INDIA

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

CONSTRUCTION SUMMARY OF THE PEREIRA HOUSE AT MADOL, VERNA GOA.

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

INSTRUCTION FOR ASSEMBLY. 150x180 v Traditional sauna cabin

Free-Form Concrete Pool

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

Section EXTERIOR STONE VENEER Full Mortar

Vanishing Lid Trays Construction Methods with Tile or Masonry

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION STORM DRAIN SYSTEM

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

Bathroom Installation Guide

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

Hanson Building Products. precast basement solutions

STEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet.

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

Installation Instructions

Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below.

Note: All dimensions are nominal. All weights are for shipping purposes only. Availability is subject to change.

TARIFF CODE and updates standard

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

CWC BF Non-Manufactured 2014

GRC Porticos. Lightweight entrance porticos ABBEY ARTSTONE

C-2 Construction, Inc. - NAICS Codes

LEGACY REPORT. (800) (562) A Subsidiary of the International Code Council. *Corrected March 2014

G. M. ENCLAVE PVT. LTD. Corporate office: AB-9, Salt Lake, Sec-I, Kolkata Phone: , Fax:

ATLANTA MODEL SPECIFICATIONS

CHAPTER 2 QUANTITY TAKE-OFF

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

ELECTRIC PERISTALTIC MORTAR POINTING PUMP

PUBLIC RESTROOMS, DESIGN INTENT

No allowance will be made for classification of different types of material encountered.

TECHNICAL SPECIFICATION FOR HIGH MAST LIGHTING SYSTEM, 20 MTRS HEIGHT

BOQ SPECIFICATIONS. The Blind system consist of a coated aluminium tube of 38 mm diameter with provision of fabric clamping.

How to secure your property after a disaster

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE

Preformed Metal Roofing and Siding

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

ELASTOCEM. Technical features. Applications. Two-component flexible, waterproofing and protective cementitious grout.

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

Guide Specifications for Maple Flooring Systems

ENGINEERED QUARTZ STONE

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

SECTION STORM DRAINAGE SYSTEM

These recommendations generally follow the Construction Specifications Institute (CSI) Master Format.

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

Laying the First Course. 1. Excavate the site and construct the footing.

TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE

1.02 SYSTEM DESCRIPTION

Particular / Specification 01 Armed Office Chair:

SECTION PRECAST CONCRETE STRUCTURES

Painting, Estimating. Hourly Rate Guide

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

G4 is browny translucent in colour and is effected by UV light. Therefore it is for internal use unless top coated to protect it from UV light

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Natural Thin Stone Veneer

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

CONSTRUCTION MATERIAL

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Mark Cramer Inspection Services, Inc.

Cedar Cottage Doghouse Plans

MODEL HSR-007 Direct Drive Rolling Steel

Retail Price List 2015

Building Condition Assessment Report

CONTENTS. Page KERBS ETHEKWINI PRODUCTS ETHEKWINI PRODUCTS WATER CHANNELS WATER CHANNELS / GRILL BLOCKS / CHANNEL DRAIN COVERS

Fabcograte FRP Grating. Tolerances: ±1/16. Tolerances: ±1/16. THICKNESS BAR SPACING PANEL SIZE (FT.) WT (LBS) 1" 1.5" x 1.

Transcription:

Page 1 SCHEDULE OF PRICES CIVIL WORK (PART-A) S:# 1 CONSTRUCTION OF SPORTS STADIUM / STADIA @ IN KARACHI BALDIA TOWN (MAIN BUILDING NAME OF WORK:- R/WORK) DECRIPTION OF ITEM Qty: RATE UNIT AMOUNT Excavation in foundation of building bridges and other structure I/c degebeiling dressing refilling around structure with excavatede earth watering and ramming lead upto one chain & lift upto 5"feet.(S:1#18-b / P:No:4) 3600.00 3176.25 %ocft 11435 2 Pavement of 8" deep stone sets chisel dressed set in lime mortar (1 lime,2 surkhi)(p-30) 720.00 20631.19 %Sft 148545 3 Cement concrete brick or stone ballast 1-1/2" to 2" gauge ratio 1:4:8:(P-4 / S # 15) 360.00 9416.28 %Cft 33899 4 Reinforced cement concrete work including all labour and material except the cost of steel reinforcement and its labour for bending and binding which will be paid seperately. This rate also includes all kinds of forms moulds, lifting shuttering curing rendering and finishing the exposed surface (including screening and washing of shingle. ( A ) R.C. work in roof slab, beams coloumns rafts, lintels and other structural members laid in situ or precast laid in position complete in all respect. ( i ) Ratio 1 : 2 : 4 (S.I.# 6-a-i page17) 14648.26 337.00 P.Cft 4936464 5 Fabrication of reinforcement for cement concrete including cutting, bending, laying in position, making joints and fastenings including cost of binding wire (also includes removal of rust from bars).(s.i.no.8-a / P-17) 1242.49 5001.70 P.Cwt 6214544 6 Cement Plaster 1:4 upto 20'height( C) 3/4" thick. (S.I # 11-c Page # 52) 23047.76 3015.76 %Sft 695065 7 Providing and laying 3" thick topping cement concrete (1:2:4) including surface finishing and dividing into panels. (S.I # 16-d page # 42) 21836.00 4411.82 %Sft 963365 8 Providing and laying 2" thick topping cement concrete (1:2:4) including surface finishing and dividing into panels. (S.I # 16-c page # 42) 9462.00 3275.50 %Sft 309928 9 Two coats or bitumen laid hot using 34 lbs for %Sft over roof & blinded with sand at one Cft per % Sft.(S.I # 13 Page # 40). 9462.00 1887.40 %Sft 178586 10 P/F G.I. frames/chowkhate of size 7"x2" or 4-1/2"x3" for door using 20 gauge G.I. sheet I/c welded hinges and fixing at site with necessary hold fasts,filling with cement sand slurry of ratio 1:6:and reparing the jamps,the cost also I/c all carriage tools and pants used in making and fixing. (P-93/29) 397.00 228.90 P.Rft 90873 11 P/F G.I. frames/chowkhate of size 7"x2" or 4-1/2"x3" for window using 20 gauge G.I. sheet I/c welded hinges and fixing at site with necessary hold fasts,filling with cement sand slurry of ratio 1:6:and reparing the jamps,the cost also I/c all carriage tools and pants used in making and fixing. (P-93/29) 324.00 240.50 P.Rft 77922

Page 2 12 P/F in position door and windows and ventilator for first class deodar wood frame 1-3/4" thick commercial ply veneer shutters of first class deadar skeleton (H. allow) and commercial ply wood (3 ply) on both sites i/c hold fasts, hinges iron tower bolts handles and cleats with cord and one moritice lock and hooks. Only Shutters (P-58/9) 391.54 856.53 P.Sft 335363 13 First class deader wood wrought joinery doors and windows etc fixed in position including chowkhats holds fasts hinges iron tower bolts chocks cleats handles and cords with hoks,1-3/4"thick(p-58/7-b) 151.23 1273.76 P.Sft 192629 14 Providing and laying tiles glazed 6" x 6" x 1/4 " on floor or wall facing in required colour & pattern of STILE specification jointed in white cement and pigment over a base of 1:2 grey cement mortar 3/4" thick i/c washing and filling of joints with slaurry of white cement and pigment in desired shape with finishing cleaning and cost of wax polish etc.complete i/c cutting tiles to proper profile.(p-47/s # 60) 584.82 30509.77 %Sft 178427 15 Preparing the surface and painting with matt finish i/c rubbing the surface with Bathy (silicon carbide rubbing brick) filling the voids with zink / chalk / plaster of paris mixture, applying first coat premix making the surface smooth and then painting 2 coats with matt finish of approved made etc complete (new surface) (P-55/S.#.36) 17143.76 3444.38 %Sft 590496 16 Primary coat of chalk under distemper. (P-54 / S # 23) 17143.76 442.75 %Sft 75904 17 18 Erection and removal of centering for R.c.c. of plain cement concrete works of Deadar wood (2nd class) for Vertical.(P/18/S:# 19-b) 721.00 3127.41 %Sft 22549 Providing and laying 1:3:6 cement concrete solid block masonary wall above 6" in thickness set 1:6:cement mortr in ground floor super structure including racking out joints & curring etc, complete. (S.I.NO.24/P-19) 2264.92 13741.87 %Cft 311243 19 Providing and laying 1:3:6 cement concrete solid block masonary wall 6" and below in thickness set in 1:6 cement mortor in ground floor super structure including racking out joints & curring etc, complete. (S.I.NO.23/P-22) 1920.76 15771.01 %Cft 302923 20 P/F 3/8" thick marble tiles of approved quality and colour and shade size 8"x4" / 6"x4" in dado skirting and facing removal / tucking of existing plaster surface etc, Over 1/2" thick base of cement mortar 1:3: setting of tiles in slurry of white cement over mortar base i./c filling the joints and washing the tiles with white cement slurry, currint finishing cleaning and ploishig etc complete. (P-49/S # 68-1) For new works. 168.00 186.04 P.Sft 31255 21 22 Laying floor of approved coloured glazed tiles 1/4"thick in white cement and pigment on a bed of 3/4"thick cement mortar 1:2:complete. (P-43/25) 998.10 27747.06 %Sft 276943 Glazed tiles dado 1/4" thick laid in pigment over 1:2:cement sand motor 3/4" thick I/c finishing.(p-50/s:#.38) 1813.84 28299.30 %Sft 513304 23 Painting Wood Work 3 Coat. (P-69/5-ii-c) 1442.00 2116.41 %Sft 30519

Page 3 24 M/F steel grated doors with 1/16" thick sheeting i/c angle iron frame 2"x2"x 3/8" and 3/4" square bars 4" centre to centre.(p-92/ # 24) 380.00 726.72 P.Sft 276154 25 P/F iron steel grill using salid square bars of size 1/2"x1/2" placed at 4" i/c and frame of flat iron patti of 3/4"x 3/4" i/c circle shape at 1-0 apart equivalent fitted with screws are pins i/c painting 3 coats with Ist coat of red oxide pain etc.(p-94/30) 151.23 194.16 P.Sft 29363 26 Supplying and fixing in position iron/steel grill door with angle iron frame of 1-1/2"x1-1/2" x 1/4" size flat iron of 3/4"x1/4" with approved design and locking arrangement embeded in masonary as per instructions of Engineer Incharge.(S.I # 31 P # 94) 921.00 231.60 P.Sft 213304 Total Cost of Schedule Item: 17040999 (i) (a) (b) PART 'A' SCHEDULE ITEM: COST OF SCHEDULE ITEM EXCEPT R.C.C. & FABRICATION % ABOVE / BELOW ON SCHEDULE TIEM: 5889992 Total (i) (ii) (a) (b) R.C.C. COST OF R.C.C.. 4936464 % ABOVE / BELOW / AT PART ON R.C.C. Total (ii) (iii) (a) (b) FABRICATION COST OF FABRICATION.. 6214544 % ABOVE / BELOW / AT PART ON FABRICATION Total (iii) Total of Schedule Item:( i + ii + iii ) CONTRACTOR EXECUTIVE ENGINEER EDUCATION WORKS DIVISION-I KARACHI

Page 4 S:# 1 DECRIPTION OF ITEM Qty: RATE UNIT AMOUNT P/L porcelain tiles skirting 4" high using full body porcelain tiles of approved size, quality, colour and make, laid in approved pattern set in neat cement mortar, joints grouted with white/coloured cement i/c curing etc. at any height and any floor complete in all respects as shown on the drawings, specifications and as directed by the Engineer Incharge.(R/A) 6325.75 P.Sft Rs. 2 P/A Graffiato (3/8" to 1/2" thick) the product composed of material marble guard stone, oxide demonism HSC natural colour chips and pigment ammonia nitrogen jelicoal on high temperature on ultra violet lamp mixed with acrylic resin anti bacterial & anti fuming alkali showing no blistering winkling or lifting after application, resistant to accelerate weather change and resistant to water head of 100 liter per 1 & hour drying touch dry from 4 to 8 hours and full dry in 72 hours, specific gravity varies from texture to texture for 2.50, to 2.80) (R.A) 6464.00 P.Sft Rs. 3 P/F floor of Verona marble tiles of size 12"x12"x3/4" fine dressed on the surfce without winding set in white cement laid over 3/4" thick bed of 1:2 grey CM setting the tiles with grey cement slurry, jointing and washing the tiles with slurry of white cement and pigment of match the colour of tiles i/c cutting grtining rubbing and chemical polishing etc complete i/c cutting tiles to proper profile. (R.A). 467.20 P.Sft Rs. 4 Extra for using scaffolding pipes (R.A) 14757.34 P.Sft Rs. 6 Extra for steel plates shuttering use for supporting the shuttering work where required with clamps, bolts and all fastening material as required by Engineer / Incharge (L.Q.R.) 20570.85 P.Sft Rs. 7 Difference of S/R Cement. (R.A) 3345.05 P.Bags Rs. Total Cost of Non - Schedule Item: ABSTRACT OF CIVIL WORK (PART'A') TOTAL OF SCHEDULE ITEM PART'A' TOTAL OF NON-SCHEDULE ITEM PART'A' G: TOTAL OF PART CIVIL WORK CONTRACTOR EXECUTIVE ENGINEER EDUCATION WORKS DIVISION-I KARACHI

Page 5 SCHEDULE OF PRICES - SUMMARY OF BID PRICES CONSTRUCTION OF SPORTS STADIUM / STADIA @ IN KARACHI BALDIA TOWN (MAIN BUILDING R/WORK) S:# DECRIPTION OF ITEM TOTAL AMOUNT (RS) (i) TOTAL CIVIL WORK ( PART 'A'). (ii) TOTAL WATER SUPPLY & SANITARY WORK ( PART 'B').. (iii) TOTAL ELECTRIC WORK ( PART 'C'). (iv) TOTAL SUI -GAS WORK ( PART 'D') G:TOTAL RS. ( i + ii + iii + iv) CONTRACTOR EXECUTIVE ENGINEER EDUCATION WORKS DIVISION-I KARACHI

Page 6 S:# DECRIPTION OF ITEM Qty: RATE UNIT AMOUNT 1 P/L porcelain tiles skirting 4" high using full body porcelain tiles of approved size, quality, colour and make, laid in approved pattern set in neat cement mortar, joints grouted with white/coloured cement i/c curing etc. at any height and any floor complete in all respects as shown on the drawings, specifications and as directed by the Engineer Incharge.(R/A) 346.56 200.73 P.Sft 69565 2 P/A Graffiato (3/8" to 1/2" thick) the product composed of material marble guard stone, oxide demonism HSC natural colour chips and pigment ammonia nitrogen jelicoal on high temperature on ultra violet lamp mixed with acrylic resin anti bacterial & anti fuming alkali showing no blistering winkling or lifting after application, resistant to accelerate weather change and resistant to water head of 100 liter per 1 & hour drying touch dry from 4 to 8 hours and full dry in 72 hours, specific gravity varies from texture to texture for 2.50, to 2.80) (R.A) 280.00 27.80 P.Sft 7784 3 P/F floor of Verona marble tiles of size 12"x12"x3/4" fine dressed on the surfce without winding set in white cement laid over 3/4" thick bed of 1:2 grey CM setting the tiles with grey cement slurry, jointing and washing the tiles with slurry of white cement and pigment of match the colour of tiles i/c cutting grtining rubbing and chemical polishing etc complete i/c cutting tiles to proper profile. (RA). 0.00 191.57 P.Sft 0 4 P/L reinforced C.C. 1:2:4: in following S.S. Using OPC having minimum cube crushing strength of 4000 PSI after 28 days i/c mixing transporting, hoisting, placing in position in street form work etc complete as per drawings, instructions of engineer (excluding the coast of reinforcement). (R.A) 0.00 650.00 P.Cft 0 5 Extra for using scaffolding pipes (R.A) 0.00 37.41 P.Sft 0 6 Wooden Boxes providing and fixing and removing waffle boxes of uniform size i.e. 3'-x3'x1.75' of wooden planks 3/4" thick (L.Q.R.) 0.00 2700.00 Each 0 7 Extra for steel plates shuttering use for supporting the shuttering work where required with clamps, bolts and all fastening material as required by Engineer / Incharge (L.Q.R.) 0.00 37.00 P.Sft 0 8 Difference of S/R Cement. (R.A) 0.00 40.00 P.Bags 0 Total Cost of Non - Schedule Item: 77349 ABSTRACT OF CIVIL WORK (PART'A') TOTAL OF SCHEDULE ITEM PART'A' TOTAL OF NON-SCHEDULE ITEM PART'A' G: TOTAL OF PART CIVIL WORK CONTRACTOR EXECUTIVE ENGINEER

Page 7 EDUCATION WORKS DIVISION-I KARACHI

- Page 8

Page 9

Page 10

Page 11

Page 12

Page 13

Page 14

Page 15

Page 16

Page 17

Page 18

0 Page 19

Page 20

Page 21

Page 22

0 Page 23

Page 24

Page 25 0 0