All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.



Similar documents
East Central College HANSEN HALL LEVEL 300/400 RENOVATIONS PACKAGE

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

B. Related Sections: 1. Section Raceway and Boxes for Electrical Systems.

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

A. Shop Drawing submittals shall include, but not be limited to, the following:

Electrical Code Regulation

GENERAL ELECTRICAL REQUIREMENTS

METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

Raceway and Boxes for Electrical Systems Page 1 of 7

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!

IRRIGATION PUMPING Table of Contents - Section 900

Learning Module 13: Panelboards and Switchboards. 101 Basic Series

Requirements for Electrical Installations

GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS

The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

Electrical Grounding. Appendix C

ELECTRIC METERING COMMERCIAL & INDUSTRIAL

Exhibit C Design Review Guidelines

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes

Generator DoCKInG StatIonS

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

NEC 2014 Code Changes

SECTION LOW VOLTAGE LIGHTING CONTROLS

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

Utility Distribution Systems

Electrical Service Guidelines

Power Management Module 2. Installation

Residential Electrical Inspection. Checklist

This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules.

BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET

ELECTRICAL SAFETY Information Bulletin

SECTION COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY

SERVICE ENTRANCE - UNDERGROUND Single & Three Phase 200, & 320/400 Amp

800 Communications Circuits

For Models #6-5001, #6-7501, # & #10-12K1

SECTION GENERAL PROVISIONS FOR HVAC WORK

LIEBERT VNSA Installation Sheet

CalMod Design-Build Electrification Services

ADDENDUM NO. 2 TO PROJECT NO

SECTION MORTUARY REFRIGERATORS

SWITCHGEAR Section 16. SECTION INCLUDES This Section includes service and distribution switchboards rated 600 V and less.

Element D Services Electrical

Residential Electrical Inspection. Checklist

**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT

SECTION POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL

Residential Electrical Inspection Checklist

Section 10 Electric Switchboards: 0 Through 600 Volts

SECTION HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

Mini Power-Zone Unit Substation Product Description. Product Description. Features. Typical Applications

FIREFINDER XLS ADDRESSABLE FIRE ALARM SYSTEM SECTION 13851

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings

SECTION 807 PUMP STATION REHABILITATION

Cable/Conduit Conversion

Please check with your local inspection authority for any additional requirements before installation.

TYPICAL WIRING OF METER SOCKET FOR SINGLE PHASE, THREE WIRE OVERHEAD SERVICE

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

CONTROL PANEL INSTALLATION INSTRUCTIONS. Single Phase Simplex Page Phase Simplex Page 8-13

DIVISION 26 - ELECTRICAL SECTION CABLES FOR INSTRUMENTATION

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Homeowner Information Guide Electrical Safety. British Columbia Safety Authority

BASIC NEC CODE RULES AND DESIGN PRACTICE

Engineers Edge, LLC PDH & Professional Training

PALM BEACH COUNTY AMENDMENTS TO THE NATIONAL ELECTRICAL CODE, 1999 EDITION

HOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE:

Questions and Answers for Heating and A/C Contractors

Top Commercial / Residential Electrical Requirements *

Installation Manual Version 7.3 IMPORTANT:

SERVICE ENTRANCE REQUIREMENTS MANUAL

GENERAL WIRING RULES FOR HOUSES

SECTION ACCESS CONTROL SYSTEM. CONDITIONS OF THE CONTRACT AND DIVISION 1, as applicable, apply to this Section.

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

2. What building projects are exempted? (permit not required)

Grounding & Bonding Why it is done And How to Install Properly

BRANCH CIRCUIT AND FEEDER REQUIREMENTS

Scepter PVC Molded Junction Boxes

8146/5 Series Breaker Panelboards

AT&T. PARTNER Plus Door Phone. Installation and Operation Manual

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Metering and Monitoring. Basis of Design

Inspecting to a higher standard.

SECTION 22 LIGHTNING PROTECTION SYSTEM

Home Inspection Report

How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work. Section 2 Types of Methods of Measurements page 4

OASIS-PLUS 120V READ ALL INSTRUCTIONS BEFORE OPERATING READ ALL INSTRUCTIONS BEFORE OPERATING OZONE IS A POWERFUL OXIDIZER AND MUST BE USED WITH CARE

UHIR Series. Horizontal or Vertical Mounting Industrial / Commercial Electric Unit Heater. Owner s Manual

Cabinets 101: Configuring A Network Or Server Cabinet

Crawford Inspection Services C.C.B. #

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

STREETLIGHT SYSTEM GROUNDING AND BONDING

Transcription:

DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service, transformers, distribution center, grounding, power and lighting panels, wiring, outlet boxes, receptacles, lighting fixtures, switches, conduits, and raceways and all accessories. QUALITY All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations. WARRANTY All work shall be warranted against defects in materials and labor for a period of one (1) year after date of Substantial Completion. SUBMITTALS Submit six (6) copies of shop drawings and/or brochures of all electrical equipment and materials to be incorporated into the building to the Architect for approval prior to ordering materials. COORDINATION Electrical contractor shall coordinate the electrical hook-up of equipment provided by others. Also, he shall coordinate the location of electrical items with other trades to prevent interference and to permit access to equipment, controls, and access boxes. All work shall be installed to allow easy removal or repair of all building equipment. OPERATION AND MAINTENANCE MANUALS Provide three (3) copies of the operation and maintenance manuals to the Architect at least two (2) weeks prior to completion of the work. PART 2 - PRODUCTS

ELECTRICAL LIGHT FIXTURES EXHAUST FANS AND TIMER SWITCH

ROOF VENTILATORS To be provided and installed by heating and ventilation contractor and wired by electrical contractor. CONDUIT Rigid, galvanized - in concrete. Electrical Metallic Tubing (EMT) - in other locations. Flexible Conduit - Flexible, plastic jacketed, with liquid-tight connectors. Couplings - Set screw, liquid-tight. Rigid P.V.C. - Schedule 40, underground locations. Make connections to motors and equipment with PVC jacketed flexible conduit. Minimum size 1/2 inch for motor connections. Use only 3/8 inch flexible conduit for fixture and control wiring. BUILDING WIRE Interior: THWN and THHN, 98 percent copper, 600 volt insulation. Exterior: THWN, XHHW, 98 percent copper. Conductors size #10 AWG and smaller may be stranded or solid. Conductors #8 AWG and larger shall be stranded. BOXES Sheet metal boxes, Nema OS1, galvanized steel. WIRING DEVICES Wall Switches - Hubbell #1221, NEMA, WD-1, specification grade, AC only, 120/277, general use snap switch, 20 amp. Receptacles - Duplex, Hubbell #5361; GFCI, Hubbell #GF5362. Cover Plates - Stainless steel. MOTOR DISCONNECTS Square D, Class 3110, single phase (2 pole), three phase (3 pole) heavy duty, fusible, 250 or 600 volt as required, NEMA 1 for indoor and NEMA 3R for outdoor or wet locations. CONDUIT SUPPORTS Galvanized conduit strap anchors.

SWITCHBOARDS Switchboards to meet all U.L. and NEMA Standards and NEMA Class construction. Switchboards used as service entrance shall carry U.L. label identifying it as suitable for use as service entrance equipment. G.E. - AV LINE NEMA Class I, front accessible, rear aligned with group mounted devices, fully enclosed, indoor, rated 600 volts, single-phase, 3-wire service with neutral. Main service entrance switch shall be switchboard mounted. Main switch shall be manual operation with electrical trip capability. PANEL BOARDS Panel boards shall meet U.L. Standards 50 and 67 and shall bear U.L. Labels. they shall also meet NEMA Standards. Square D, 120/208 volt, NQOD type with bolt on breakers. Breakers shall be thermal magnetic type, quick-make, quickbreak, enclosure compensated, bolt-in-type. Two and three pole breakers shall be single unit common trip. Breakers used for lighting shall be approved for that purpose and marked "SWD." Cabinet shall be for recessed installation with rust-proof prime paint coating and finish coating of ANSI No. 61 paint. Busbars shall be 98% conductivity copper. Provide panel schedule inside face of door. Door shall have key lock. Terminal lugs shall be U.L. approved for Al/CU termination. PART 3 - EXECUTION WORKMANSHIP Shall be performed in compliance with all applicable safety regulations by experienced electricians in a first class condition. All electrical equipment shall be tested and then adjusted for proper operation. Final start up of equipment shall include a complete demonstration of operation for the Owner's personnel. For exposed runs, attach surface mounted conduit with clamps. Route all conduits parallel or perpendicular to building lines. Splice only in accessible junction or outlet boxes.

Color code conductors to designate neutral conductor and phase. Install all conductors, connections, and splices in accordance with National Electric Code. Provide copper grounding conductors and straps. Mount switches 48 inc. above floor and outlets at 18" above floor. Install identification tags in all switch and outlet boxes to identify that circuit. Provide mounting brackets, busbars drilled and tapped, and filler pieces for unused spaces. Prepare and affix typewritten directory to inside cover of panelboard indicating loads controlled by each circuit. Flush mounted panelboards shall have 2-3/4" spare conduits stubbed out to accessible ceiling space. Provide and install all disconnects for mechanical equipment that do not have a disconnecting means furnished as an integral part of the equipment. Coordinate with Mechanical Contractor. Electrical Contractor shall receive, uncrate, mount, connect and adjust electrical equipment furnished under all Sections of the Specifications. This includes controls, detached motors, controllers, starters, and electrical elements of temperature control systems. Electrical Contractor shall set, align, and connect all separate motors, and furnish lubrication, start-up and test. Electrical Contractor shall provide stencil nameplate for each unit he mounts and shall furnish and install required mountings. Electrical Contractor shall complete Electrical work shown or noted on Electrical Drawings. Electrical Contractor shall furnish and install power and control wiring associated with HVAC Temperature Control System. ****** END OF DIVISION 16 ELECTRICAL *****