Detailed Estimation and Pumpstation Overview. Nathaniel Osgood 3/3/2004



Similar documents
How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No December 2014

Pricing of Construction Contract Change Order Documentation

LECTURE 10. Resource Allocation and Resource Leveling

PROJECT COST ESTIMATES & FEASIBILITIES

The Task. for. PERI Construction-Exercise 2003

How to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No May 15, 2013

Cost Estimating Concepts

Introduction PURPOSE OF THIS BOOK

CHAPTER 4 TYPES OF COST ESTIMATES

Construction Contract Fundamentals. Baker Tilly refers to Baker Tilly Virchow Krause, LLP,

Civil Engineering & Construction

CHAPTER 2 QUANTITY TAKE-OFF

How to estimate the cost of installing an Electrical Distribution Center (EDC)

Estimating Activity Durations CSTM 462

PREPARING DETAILED BREAKDOWNS FOR CHANGE ORDER PROPOSALS

Project Organization. System and Project Management 1.040/1.401J Nathaniel Osgood

Takeoff and Estimating for Design-Build Contractors

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

The minimum reinforcement for the stem wall is the placement of:

RISK MITIGATION IN FAST TRACKING PROJECTS

CPM -100: Principles of Project Management

Spec. Standard: 11/27/ Revision: 11/27/06

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

HOW TO ESTIMATE THE COST OF A COMMERCIAL FIRE ALARM SYSTEM

Product Comparison Windows Technology. Spreadsheet. Estimate Management. Takeoff

SOMETIMES the cost of installing a landscape plan

CONSTRUCTION CONTRACT TERMINOLOGY

How to Estimate the Cost of HIGHRISE CAST IN PLACE FLAT SLAB CONSTRUCTION. Peter M Hamilton July 2015

1.040 Project Management

CHAPTER 6 PROJECT CASH FLOW

Contract Administration

Estimate Memorandum/ Basis of Estimate

EVA (C/SCSC) and Basics of Project Control. Nathaniel Osgood 4/7/2004

LONG INTERNATIONAL. Long International, Inc Whistling Elk Drive Littleton, CO (303) Fax: (303)

TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG

Reasons for Change Orders

SUCF PROJECT COST REPORTING GUIDE

Embedded Parts Introduction - Anchors

CHAPTER 8 Planning and Budgeting

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Free-Form Concrete Pool

Review of Schedule Specification Requirements District SAP/WBS breakdown Asset template Cost & Resource Loading Stored Material Costs

OBJECTIVE To establish procedures for administration of construction manager agreements, including negotiation, contracting and payments.

CHAPTER 8 PROJECT TIME-COST TRADE-OFF

Sage Estimating. Better Estimates By Every Measure.

Evaluation of Building Information Modeling (BIM) Estimating Methods in Construction Education

Document Comparison. AIA Documents A and A131CMc 2003

REIMBURSEMENT PROCEDURE for FEMA PUBLIC ASSISTANCE

VOLUME 4 FINANCIAL OFFER LUMP SUM CONTRACTS. Annex Introduction. Annex Recapitulation. Annex Breakdown of the Lump-sum Price

PROJECT PROCUREMENT MANAGEMENT

1.040 Project Management

Construction Economics & Finance. Module 6. Lecture-1

Auditing construction contract change orders

WORK SCOPE. Domains in which we work:

Dynamic Change Management for Fast-tracking Construction Projects

Note: All dimensions are nominal. All weights are for shipping purposes only. Availability is subject to change.

CHANGE ORDER PROTOCOL

Hanson Building Products. precast basement solutions

HOW TO ESTIMATE THE COST OF T-BAR

Moving Small Mountains Vesuvius Dam Rehab

Project Delivery Methods & Contract Types CSTM 102 Spring 2013

CHAPTER 5 ESTIMATING WORK ITEMS COSTS, IDIRECT COSTS, MARKUP AND CONTRACT PRICING

Project Time Management

Contract Works and What you need to Know

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

OUTLIER ANALYSIS. Data Mining 1

METHOD OF STATEMENT FOR STATIC LOADING TEST

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

99.37, 99.38, 99.38, 99.39, 99.39, 99.39, 99.39, 99.40, 99.41, cm

LOWELL REGIONAL WASTEWATER UTILITY SPECIFICATIONS FOR THE LOWELL MA CONCRETE FLOODWALL REPAIRS

Pricing Your Work (Overhead Recovery Review)

Project Cost Risk Analysis: The Risk Driver Approach Prioritizing Project Risks and Evaluating Risk Responses

AACE International Examinee Format of Definitions Certified Estimating Professional (CEP)

Introduction to Construction Project/Jobsite Management

OP-B-11-D2 ADMINISTRATION OF CONSTRUCTION MANAGER AGREEMENTS

AGENDA FOR LUNCH SEMINAR WITH FMI AUGUST 28, :30 PM INTRODUCTION TO GOVERNMENT CONTRACTING

Bills of Quantity. D. Atkinson December Nature of Bills

EXHIBIT 2-2-C PROGRESS SCHEDULES

Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD

CHAPTER 9 PROJECT FINANCE AND CONTRACT PRICING

Construction Technologies Career Field Pathways and Course Structure

Estimating Trench Excavation

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION STORM DRAINAGE TABLE OF CONTENTS

[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices

COST ESTIMATING METHODOLOGY

10 Steps to Building a More Profitable Construction Business. Leslie Shiner, MBA Sage Certified Consultant

Transcription:

Detailed Estimation and Pumpstation Overview Nathaniel Osgood 3/3/2004

Announcements TP2 Due Date: March 15 PS4 out tonight Due March 19 Team project Recording of recitation Pietroforte Lecture Important lecture will link to PS 4 Seminars March 16 th & 22 nd

Recall the Estimation Phases

Detailed Estimates - Methodology After most or all of the detail design work is complete, approximate estimates are supplemented by detailed estimates Stage 1: Quantity takeoff Measurement of material & Labor quantities Quantities usually recapped by trade for control reasons Stage 2: Direct Cost contribution Σ[Quantity] x [Unit Costs] = Estimated direct cost of construction

Notes on Detailed Estimates Have differing ranges of uncertainties Distributions typically asymmetric More an art than a science or bookkeeping Detailed quantitative estimates possible but ignore important qualitative factors Wealth of trade-specific and method-specific detail complexity Frequently depends heavily on subcontractor estimates (opaque quotes)

Important General Lesson Precision in detailed estimated does not mean accuracy! Two types of complexity at issue Detail complexity (myriad components required) System complexity (dynamic interactions, etc.) Always consider: What are assumptions behind the estimate? What factors are being ignored? How might these factors change the estimate?

Cost Classification Direct Cost Labor Cost Material Cost Equipment Cost ST&S Expenses Indirect Cost ( Overhead ) Interest on loans Trailer rental Office costs AC/heat Planning&logistics Supervision

Overhead Costs Project Overhead Project specific Management staff, Utilities, Supplies, Engineering, Tests, Drawings, Rents, Permits, Insurance Can and should be estimated directly Can be quite uncertain (mgmt sub. quality, time, etc.) Firm Overhead General office Salaries, office rent, utilities, insurance, taxes, shops/storage yards, other expenses Hard to estimate; often use % multiplier Sometimes distinction unclear (e.g. lumpy central-office investments)

Project Organization Estimation Introduction Conceptual Estimation Cost indices Cost-capacity factors Component ratios Parameter costs Detailed Estimation Quantity Takeoff Labor Cost Estimation Probabilistic methods

Fair-Cost Estimates Prepared from the actual bid documents provided to the bidders (before award) Used by owner s representative to evaluate changes (after award) May use RS Means or other sources No lump-sum subcontract quotations Somewhat diff. disaggregation than bid May be simplified number of line items May be more detailed in certain breakdowns (related to subcontractor work) Primary basis for measuring job progress, for scheduling and for cost control.

Contractor s Bid Estimate Low enough to obtain the work, yet high enough to make profit Often relies on Historical Historical productivity data for company Intuition Intuition on speed of movement Quantity Quantity takeoff for most important items Sometimes less detailed than fair-cost estimates - subcontractors from 30% to 80% of the project Is estimating a streamlined process? A look at bids received for a typical project in a competitive area will sometimes show more than 50% difference between the low and the high bidders

Definitive Estimates There comes a time when a definitive estimate can be prepared that will forecast the final project cost with little margin for error This error can be minimized through the proper addition of an evaluated contingency Four categories for purposes of reviewing definitive estimates: Traditional Design-Build Professional CM Unit-price

Definitive Estimates - Traditional Lump-sum - definitive estimate = low bidder s quotation + evaluated contingency Fast track guaranteed maximum price, cost- plus-a-fee Definitive estimate will need Detailed project and specifications Firm material quotations Subcontractor quotes Prices for major equipment

Definitive Estimates Design-Build Lump-sum, guaranteed maximum price, cost- plus-a-fee Lump-sum can be misleading to an unknowledgeable owner. The cost is known but the facility that is going to be delivered is unknown In guaranteed maximum price and cost-plus plus-a-fee contracts the definite estimates can be obtained earlier if compared to the traditional approach because one entity is performing both design and construction

Definitive Estimates - CM The definitive estimate can be accurately prepared about the same time as the guaranteed-maximum or cost-plus plus-a-fee option under traditional approach Examples show that is possible to develop definitive estimates after the detailed design is about 95% complete.

Definitive Estimates Unit Price Unit-Price Projects: Usually heavy construction projects like dams, tunnels, highways, and airports - Prices constants while quantities vary within limits inherent in the nature of work. Quantities may overrun or underrun owing to a number of potential causes such as additional foundation, excavation to solid rock, poor ground conditions, etc. Without reliable geological information the final cost may not be known accurately until the end of the project

Project Organization Estimation Introduction Conceptual Estimation Cost indices Cost-capacity factors Component ratios Parameter costs Detailed Estimation Quantity Takeoff Labor Cost Estimation Probabilistic methods

Quantity Takeoff Really requires thinking! Systematic identification of quantities of materials and work required Key features sought Exhaustive Mutually exclusive Used to calculate several factors Amount of material (e.g. concrete CY) Equipment utilization Labor Breakdown often uses CSI or WBS taxonomies

Quantity Takeoff Subtleties I Elements required by construction method E.g. construction joints Reuse of materials and equipment influenced by Specification Schedule (itself being estimated, adjusted) Space (can complicate or prevent concurrency e.g. adequate space for 2 cranes? 2 people?) Must estimate both Cost & Time Sometimes requires iteration Hidden dependencies of cost on schedule

Quantity Takeoff Subtleties II Division between different parties Easy to think other party taking care of particular elements E.g. think excavation cost is included in unit cost of piping Choice of construction approach has big impact Estimation of labor costs particularly tricky Prices: In United States, highly detail intensive Productivity: Many qualitative components Impact of Type I vs Type II error

Project Organization Estimation Introduction Conceptual Estimation Cost indices Cost-capacity factors Component ratios Parameter costs Detailed Estimation Quantity Takeoff Labor Cost Estimation Probabilistic methods

Labor Estimation Most subtle, tricky For easy transferability, should separate into Q: Unit (Quantity) P: $/hour (Labor Price per hour) W: hour/unit (Labor hours per unit -- productivity) Total cost $ = Q * P * W

Labor Price Estimation (P) Components Wages (varies by area, jurisdiction, seniority, ) Insurance (varies w/contractor record, work type) Social security (FICA; ½ by employer, employee) Unemployment tax (state) Fringe benefits (apprenticeship, vacation, health ) Wage premiums

For shift work Wage Premiums Sometimes adjust hours Overtime 1.5-3x for overtime Some crafts paid overtime if over 32 hours Hazardous/arduous work Work on swinging scaffold Larger crane Underground work

Further Issues Complicated, heterogeneous rules, exceptions throughout US complicate estimation Probably more complicated than for other industries Problem particularly acute for union shops Frequently combine into crew-based estimate Reason about price of standard crew Helps factor in labor rules Quite substantial variation between contractors in how handle

Labor Productivity Estimation (W) Difficult but critical High importance of qualitative factors (environment, morale, fatigue, learning, etc) The primary means by which to control labor costs Historical data available Department of Labor, professional orgs, state govs..)

Productivity Considerations Considerations Location of jobsite (local skill base, jurisdiction rules) Learning curves Work schedule (overtime, shift work) Weather Elaborate work-arounds arounds,, costs Environment Location on jobsite, noise, proximity to matereials Management style Worksite rules

Common Productivity Variations Productivity Job Factors for Comparable Installations Building Construction Nonworking supervision Craft skill Job conditions Work conditions Shift work Total building range Industrial Construction Light industrial Heavy industrial Total industrial range Nuclear Power Plants Pre-Three Mile Island Post-Three Mile Island Total nuclear power plant range 1.0 to 1.15 1.0 to 1.20 1.0 to 1.20 1.0 to 1.20 1.0 to 1.20 1.0 to 2.00 1.25 to 2.25 1.50 to 3.00 1.25 to 3.00 2.25 to 4.00 3.00 to 5.00 2.25 to 5.00

Learning Curves

Productivity Effects of Overtime

Project Organization Award Methods General points Bidding Negotiation Lifecycle Costing Estimation Introduction Conceptual Estimation Cost indices Cost-capacity factors Component ratios Parameter costs Detailed Estimation Quantity Takeoff Labor Cost Estimation Probabilistic methods

Successive Estimation Top-down approach to rapid estimation Identify Expected value and variance Irreducible uncertainty due to external factors Overall variance is Σ of variance of components Break down highest variance items More detail lowers variance Result: Frequently only have to estimate small portions of total project to get good estimate

Range Estimation Estimate Low-Mean Mean-High of bids will receive Estimate range of uncertainty for entire project based on this Can use to reason about confidence intervals

Quantity Take-off Assignment 3: Introduction Assignment 3: Example Construction Drawings Construction Methods

Assignment 2: What to measure? Formwork (Square Feet) Formwork Formwork Add-on s: Anchor Bolts Joint Filler Chamfer PVC waterstop Construction Joints For the Wet Well Floor For the Operating Floor For Internal walls and partitions (qty) (Linear Feet) (Linear Feet) (Linear Feet) (Linear Feet)

How is it constructed? 1. Install Formwork 2. Install rebar 3. Pour concrete 4. Finish it (small slopes etc.) 5. Wait & Repeat (construction joints) 6. Uninstall formwork 7. Point & Patch, Rub Think from bottom to top GRAVITY RULES!

Construction Drawings Navigation Drawing Title Cross Section Detail

Take-off Template Characterize each object you measure (Description) Specify which plane you measure Specify dimensions of the ENTIRE object Try to keep North consistent Formwork Total (SF) Sum b f b a b c a Sketch 1 Sketch 2 c c a Sketch 3 d Item Description Drawings Sketch a b c 1 Invert Edge Form Sum Qty or d Units Quantity Deriver Signoff

Example: Define an object Item Description 1 Invert Edge Form a Invert Slab (bottom) b Invert Slab (W & E sides) c Invert Slab (N & S sides) d

Example: Find relevant drawings

Example: Define Planes & Dimensions Sides of Invert Slab S-1101, S-1105 1 44.00 6.00 54.50 SF 1,182.0

Casting a concrete slab on grade Sequence: 1. Form and edges 2. Reinforcement and embedment 3. Striking off or straightedge 4. Floating (if smoother surface is needed) 5. Control joints 6. Troweling (if very smooth surface is needed) 7. Curing (under damp conditions) (You are not responsible for this formwork in the assignment)

Casting a concrete wall Sequence: 1. Coated form (one side only) 2. Reinforcing 3. Ties and inspection 4. Coated form (2 side) 5. Placing concrete 6. Curing 7. Stripping of formwork and snapping off ties 8. Point and Patch 9. Rub