Steel and composite bridges in Germany State of the Art



Similar documents
Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

1.2 Advantages and Types of Prestressing

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA

A transverse strip of the deck is assumed to support the truck axle loads. Shear and fatigue of the reinforcement need not be investigated.

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

Optimum proportions for the design of suspension bridge

The following sketches show the plans of the two cases of one-way slabs. The spanning direction in each case is shown by the double headed arrow.

Preliminary steel concrete composite bridge design charts for Eurocodes

Safe & Sound Bridge Terminology

SECTION 3 DESIGN OF POST TENSIONED COMPONENTS FOR FLEXURE

METHOD OF STATEMENT FOR STATIC LOADING TEST

Design rules for bridges in Eurocode 3

US 51 Ohio River Bridge Engineering and Environmental Study

Chapter 5 Bridge Deck Slabs. Bridge Engineering 1

Spon Press PRESTRESSED CONCRETE DESIGN EUROCODES. University of Glasgow. Department of Civil Engineering. Prabhakara Bhatt LONDON AND NEW YORK

Eurocode 4: Design of composite steel and concrete structures

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width

SECTION 3 DESIGN OF POST- TENSIONED COMPONENTS FOR FLEXURE

16. Beam-and-Slab Design

Index Series Prestressed Florida-I Beams (Rev. 07/12)

Detailing of Reinforcment in Concrete Structures

SLAB DESIGN. Introduction ACI318 Code provides two design procedures for slab systems:

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

Optimising plate girder design

New Troja Bridge in Prague Concept and Structural Analysis of Steel Parts

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1

SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP

4B The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

Bridge Type Selection

APPENDIX H DESIGN CRITERIA FOR NCHRP PROJECT NEW BRIDGE DESIGNS

DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

Simplified Design to BS 5400

INTRODUCTION TO BEAMS

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

AASHTOWare Bridge Design and Rating Training. STL8 Single Span Steel 3D Example (BrDR 6.6)

Design of Bridges. Introduction. 3 rd to 4 th July Lecture for SPIN Training at the University of Dar es Salaam

WI LEY Blackwell. Multi-storey Precast Concrete Framed Structures. Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE

Canadian Standards Association

Overhang Bracket Loading. Deck Issues: Design Perspective

In-situ Load Testing to Evaluate New Repair Techniques

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico

Evaluation of Appropriate Maintenance, Repair and Rehabilitation Methods for Iowa Bridges

Numerical modelling of shear connection between concrete slab and sheeting deck

Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China

5 Steel elements. 5.1 Structural design At present there are two British Standards devoted to the design of strucof tural steel elements:

Technical Notes 3B - Brick Masonry Section Properties May 1993

BRIDGE REHABILITATION TECHNIQUES

Long-term serviceability of the structure Minimal maintenance requirements Economical construction Improved aesthetics and safety considerations

EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES

ADVANCED SYSTEMS FOR RATIONAL SLAB REINFORCEMENT

Prestressed Concrete I-Beam and TxGirder Haunch Design Guide

Structural Analysis of the Sutong Bridge Dorian Janjic

Brandangersundet Bridge A slender and light network arch

SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading:

Statics of Structural Supports

Reinforced Concrete Slab Design Using the Empirical Method

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC October 27, 2015 Session 26

Cable-Stayed Bridge as an Alternative for Medium and Short Span Bridges

This manual was produced using ComponentOne Doc-To-Help.

How To Write An Analysis System For Bridge Test

1,045 m length of the Deh Cho Bridge

Formwork for Concrete

Rapid Short and Medium Span Bridge Construction Using Innovative. Precast Structural Systems

Design of reinforced concrete columns. Type of columns. Failure of reinforced concrete columns. Short column. Long column

Chapter 3 Pre-Installation, Foundations and Piers

STEEL BUILDINGS IN EUROPE. Multi-Storey Steel Buildings Part 10: Guidance to developers of software for the design of composite beams

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

SECTION 5 ANALYSIS OF CONTINUOUS SPANS DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: BRYAN ALLRED

DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS

Bridging Your Innovations to Realities

TRUSSES. (b) Space Truss. Bracings. (e) Truss Bridge. (d) Bracings in Single Storey Buildings. (c) Bracings in Multi-storey Building

Introduction to LRFD, Loads and Loads Distribution

Session 5D: Benefits of Live Load Testing and Finite Element Modeling in Rating Bridges

RC Detailing to Eurocode 2

Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile

Joist. Reinforcement. Draft 12/7/02

Chapter 8. Flexural Analysis of T-Beams

Detailing of Reinforcement in Concrete Structures

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

SLAB DESIGN EXAMPLE. Deck Design (AASHTO LRFD 9.7.1) TYPICAL SECTION. County: Any Hwy: Any Design: BRG Date: 7/2010

Design and Construction of Cantilevered Reinforced Concrete Structures

Foreword. This manual provides technical information for designers and contractors to design and plan the construction operation.

IN-SERVICE PERFORMANCE AND BEHAVIOR CHARACTERIZATION OF THE HYBRID COMPOSITE BRIDGE SYSTEM A CASE STUDY

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

New Design Concepts for Advanced Composite Bridges - The Friedberg Bridge in Germany

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

Truss. are both simple and A Matsuo Example continuous trusses. The

FLOORS REINFORCEMENT Shear Stud Connector for steel- concrete composite structures cold applied by pins

PRESTRESSED CONCRETE. Introduction REINFORCED CONCRETE CHAPTER SPRING Reinforced Concrete Design. Fifth Edition. By Dr. Ibrahim.

Composite Construction with KÖCO- Stud Welding Technology IMPRESSIVE TECHNOLOGY 6/

U.S. Department of Labor Occupational Safety and Health Administration Directorate of Construction. April 2015

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

Fifteen years experience of design, production and assembling of prestressed Bridge decks in Timber

ARCH 331 Structural Glossary S2014abn. Structural Glossary

9.3 Two-way Slabs (Part I)

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar

Transcription:

Steel and composite bridges in Germany State of the Art Univ.-Prof. Dr.-Ing. G. Hanswille Institute for Steel and Composite Structures University of Wuppertal Germany Univ.-Prof. em. Dr.-Ing. Dr. h.c. G. Sedlacek Institute for Steel and Lightweight Structures RWTH Aachen Germany 1 Contents Introduction Typical composite road bridges with open sections and box girders Composite box girders with wide cantilevering concrete decks Composite bowstring arches Composite trusses Composite bridges for small and medium spans Cable stayed bridges Canal bridges 2 1

Advantages of composite bridges Very slender and aesthetic bridges due to the optimal combination. of high tensile strength of structural steel and the high compressive strength of concrete High durability of normal reinforced concrete decks due to restrictive crack width limitation. In comparison with steel bridges composite bridges have a better behaviour with regard to freezing in winter. Because the low dead weight of the composite bridges deck is, composite bridges have advantages with regard to the foundation and settlements of supports. Due to innovative erection methods composite bridges are often used for bridges over passing existent railways or highways without any restrictions for the traffic. Where existing freeways with two lanes are widened the short erection time of composite bridges avoids longer restrictions for traffic. 3 Composite Bridges with open and closed cross-sections Werra-Bridge Einhausen 4 2

Typical cross-sections for composite bridges plate girder bridge with three rolled or welded main girders 16,75m 2,00 2,575 45 cm 35 cm 5,80 12,75m 2,00 2,5% 5,80 2,575 25cm cross-section with two separated box girders 45cm 35cm 2,5% box girder 55cm 40 cm 2,5% 3,00 1,80 7,15 1,80 3,00 25cm 25cm airtight welded box girders 6,80m 4,30 8,15m 4,30 5 Bridge Schleusetal view 55 72,5 80,0 80,0 80,0 75,0 72,5 67,0 58,0 40,0 680,0 5,00 cross-section at midspan 2875 1300 5700 mm 1300 2475 3,25 11,00 11,00 460 290 7000 mm 25,25 m 6 3

Bridge Schleusetal 7 Bridge Schleusetal transportation of steel girders on site erection of steel girders by cranes casting of the concrete deck by moveable formwork 8 4

Examples for formwork systems formwork tables on temporary consoles retractable console rollers wedges formwork tables scaffold beam 9 Bridge across the river Ruhr near Hagen-Freeway A1 cross-section at supports 1,96 14,50 1,50 1,50 14,50 1,96 3% cross-section at midspan 3% concrete end cross girder 1,25 4,50 4,76 3,20 3,46 3,01 2,50 6,00 2,50 3,52 3,52 2,50 6,00 2,50 3,01 35,06m view 2,70 1,30 4,00m 73,48m 95,77m 71,83m 10 5

Bridge across the river Ruhr near Hagen-Freeway A1 11 Bridge Neuötting -Double composite box girder 2.00 3.75 cross-section at midspan 11.50 0,52 0,34 30.00 3.00 cross-section at support 11.50 concrete C35/45 2.00 3.75 6.92 0,35 4.01 6.99 4.00 concrete C 50/60 4.39 6.23 4.36 3.30 7.00 3.30 7.00 3.30 3.30 3.30 HHW 366.00 362.00 95.00 154.00 68.00 58.00 470.00 0 1 2 3 4 5 12 6

Double composite bridge Neuötting box girder with double composite action at internal supports composite bottom flange 13 Box girders with corrugated webs Bridge Altwipfergrund 14 7

Bridge Langerfeld Freeway A1 view 30,5 40,0 42,0 42,0 42,0 42,0 42,0 36,0 316,5 36,75 2,25 14,50 14,50 1,75 1,50 cross-section 7,75 7,75 2,25 4% 6% 40 0,00 4% 15% 0,00 35 6% 4% -2,95 1,60 3,35 5,90 5,90 3,35 3,35 5,65 5,65 3,60 18,50 18,25 15 Langerfelder Bridge Highway A1 16 8

Langerfelder Bridge Highway A1 Detailing at internal supports support stiffener transverse stiffener for hydraulic press elastomer bearings plate for jacking supports by hydraulic press in case of exchanging bearings wedge shaped bearing plate 17 Composite box girders with wide cantilevering concrete decks Bridge Albrechtsgraben 18 9

Composite box girders with wide concrete decks Bridge Reichenbachtal Bridge Elben Bridge Schwarza Bridge Oehde 19 Bridge Wilde Gera 28,00m 2,00 10,00 1,50 1,50 10,00 2,00 5,50 5,50 transverse tension member longitudinal beams 35 3,15 5,00 1,20 3,80 3,80 1,20 5,00 3,15 35 Erfurt Schweinfurt 3,30 1,80 DB Wilde Gera 14,50 30 36 42 42 42 42 42 42 42 42 42 42 36 252m 30 20 10

Bridge Wilde Gera 21 Bridge Wilde Gera Highway A71 transverse steel tension members transverse frames 22 11

Bridge Wilde Gera Highway A71 cantilever erection of the arch 23 Bridge Wilde Gera Highway A71 Bridge girder during launching 24 12

Bridge Albrechtsgraben - Highway A71 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 770 45 55 60 70 70 70 45 40 40 45 70 60 50 45 2,00 29,00 25,00 2,00 6,00 1,50 4,15 4,15 1,50 6,00 25 Bridge Albrechtsgraben - Highway A71 26 13

Different detailing of transverse tension members 27 Joints between the longitudinal girders/box girders and the transverse tension members Bridge Albrechtsgraben Bridge Schwarza 28 14

Detailing of the transverse tension members D c A A Z s outside longitudinal girder Z s,q section A-A Z a Z s vertical stirrupps pulling down joint horizontal loops tension member 29 Acessment of different solutions for transverse tension members geometry of the concrete slab a constant depth of the slab over the total width of the bridge deck is required, uniaxial load transfer in transverse direction haunched concrete slab, expensive formwork, bi-axial load transfer in transverse and longitudinal direction slabs with constant depth and haunches in longitudinal direction are possible, uniaxial load transfer in transverse direction internal forces in the tension member high stresses due to local concentrated wheel loads (Fatigue resistance) higher stresses due to local loads. Resistance of the tension member to normal forces, bending moments and vertical shear should be considered no significant stresses in the steel tension member due to local loads connections economical simple connections with the top flanges of the box girder and the secondary longitudinal girders complicate connection caused by the eccentricity between the tension member and the top flanges of the box girder 30 15

Sequense of casting of concrete Method I : continuous in one direction 1 Method II: continuous in one direction but regions at internal supports are casted in a second step after the concrete in mid-span 45 55 70 70 70 70 690 70 70 70 55 45 regions is effective 10 20 30 40 50 60 70 80 90 100 110 120 Method III: span-wise in reverse direction cross-section 28,50 70,0 70,0 7,5 7,5 3 x 15,0 17,5 7,5 3 x 15,0 17,5 7,5 3 x 15,0 3,80 1 2 3 4 5 6 7 8 9 10 11 12 Method I 4 1 2 3 8 5 6 7 12 9 10 11 Method II 4 3 2 1 8 7 6 5 12 11 10 9 Method III 31 bending moments acting on the composite section due to dead weight of concrete - M y = -105,3 M y = -103,2 M y = -107,5 - - Method I M y = -31,9 M y = -43,7 M y = -31,9 - + + M y = 27,2 M y = 28,1 M y = -45,4 - + M y = 25,6 Method II M y = -32,5 M y = -33,5 - - + + + M y = 26,5 M y = 27,3 M y = 25,4 Method III [M y in MNm] 32 16

Formwork carriage running on the top of the deck formwork carriage for cantilevers formwork tables on temporary consoles 33 Formwork carriage running on the top of the deck Bridge Wilde Gera 34 17

Formwork underneath the concrete deck formwork carriage for outer cantilevers formwork tables on temporary consoles Bridge Albrechtsgraben 35 Formwork underneath the concrete deck (system Kirchner) Bridge Schwarza 36 18

Exchange of concrete decks Normally it is a general requirement in Germany to have separate bridges for each traffic direction in order to be able to divert the full traffic on the remaining bridge in case of major maintenance work on the other. The concrete deck is the most vulnerable part of a bridge section. With regard to the expected intensive increase of road traffic and local wheel loads in future, the concrete deck must be regarded as a wearing part in contrast to the steel structure with implication of different lifetimes of the concrete deck and the steel structure. In case of one main composite box girder for both traffic directions the flow of traffic has to be maintained in both directions just on one half of the bridge during a future replacement of the bridge deck. For this procedure the bridge deck will be partially cut out with high-pressure water method and will be replaced by a new bridge deck. During this procedure significant additional stresses result in the superstructure, which have to be considered during design and construction. 37 Different possibilities for the exchange of the concrete slab A B exchange of one half of the deck exchange over a quarter of the bridge in two steps B 1 The width of the span is the most important factor for choosing the different methods. Method A can only be used for spans up to 50 m. Methods B or C are possible for the exchange of the concrete deck of bridges with larger spans of up to 100 m. B 2 C exchange of one half of the deck with additional horizontal bracing Horizontal bracing 38 19

Bridge Oehde Freeway A1 00 10 20 30 40 50 60 70 3,8% 44,70 56,0 72,80 72,80 64,0 56,0 44,70 418,30 m 2310 3800 5600 3800 2310 2,5% 3785 3800 5600 3800 39 Bridge Oehde Freeway A1 transverse tension member 40 20

Bridge Oehde Freeway A1 P1 P3 P2 P6 P4 P5 P9 P7 P8 P11 P10 P13 P12 P15 P14 concrete deck with partially prefabricated concrete elements launching of the bridge with partially prefabricated concrete elements 41 Composite bowstring arches Saalebridge Besedau 42 21

Composite bow string arches Composite bow string arches with concrete decks are an often used system where the construction depth is limited e.g. for bridges over canals and rivers.the reinforced concrete deck is connected with the steel structure by horizontal bracings at the end of the bridge and is acting as a tension member in the main system. 43 Normal forces in the concrete tension member For the normal forces in the concrete member the effects of tension stiffening of concrete between cracks should be considered. The concrete member acts as a tension member in the main system. N= N s +N a ε s,2 ε s,m N a,2 N a = N a,2 -ΔN ts N N s= N s,2 + ΔN t,s N a N a = N a,2 -ΔN ts ΔN t,s N s N s,2 N s,cr N s,crn 44 22

Bridge Ladbergen near Ladbergen Highway A1 plan 3958 800 cross-section 1500 1500 800 15389 15389 2000 19850 19850 view 104270 end-bracing 2400 10100 9750 2000 9750 10100 2400 45 Detailing of composite bowstring arches 46 23

Composite trusses Bridge St. Kilian 47 Composite truss bridge with double composite action Bridge Nantenbach across the river Main C B C A 12,5 7 83,20m 208,00m 83,20m C 8 C A 9 10 B view 48 24

Composite truss bridge with double composite action Bridge Nantenbach across the river Main 20 20 14,30 20 20 14,30 20 20 14,30 50 50 1,00 1,40 R=2650,00m 1,00 1,20 1,40 R=2650,00m 1,00 1,40 3,95 80 6,80 80 3,95 15,26 2,00 50 R=2650,00m 1,20 1,10-1,80 80 6,80 80 80 2,60 2,60 80 1,60 2,60 1,60 49 Composite truss bridge Kragenhofer view 58,40 73,60 59,20 58,40 249,60 2600 2200 14300 4700 2200 2600 700 280 400 R= 1552,35 9000 cross-section 4350 5600 4350 50 25

Bridge St. Kilian 28,5 m 5,0 m 51 Bridge St. Kilian steel trusses with hollow sections and cast iron nodes 52 26

Composite bridges for small and medium spans Bridge Oberhartmannsreuth 53 Composite bridges with rolled sections for small an medium spans Advantages short construction time simple erection method because of no steelwork on site. steelwork only in the shop small total depth of the composite section concrete slab without any pre-stressing 54 27

Longitudinal reinforcement at internal supports L+l b b QRT L+l b concentrated shear connectors at the end of the girder l b -anchorage length of the reinforcement bottom layer of reinforcement A s,min = 16 a=10 cm The longitudinal reinforcement at internal supports should be placed over a length not smaller than L= 0,15 L St where L St is larger span length adjacent to the support considered. at the end of the steel girder the number of shear connectors should be increased due to local introduction of the tensile force in the reinforcement in the composite section. In case of sagging bending moments at internal supports due to temperature effects, traffic loads and settlements of supports for the tensile forces in the bottom flange a connection by steel plates or studs in combination with loops is required. 55 Detailing of transverse supporting beams in concrete b min = 80cm (indirect support ) b min = 60 cm (direct support) b>b min b>90 cm 56 28

Detailing of partially prefabricated concrete elements C nom = 4,5cm 1,0 21 shear reinforcement mortar seal h c 4,0 2,5 3cm the depth of the concrete above the prefabricated elements h c should be not less than 20 cm within the traffic lanes. in other regions h c should not be less than 15 cm. 2,5 cm Elastomeric support strips with a thickness of 2 cm and a width of 3 cm. The minimum value of pressing should be 3-5 mm and the maximum value should not exceed 10 mm. 57 Casting of concrete in case of smaller span length the transverse supporting beams and the concrete slab should be casted in one operation. in case of larger span length or for bridges with a big total length at first the midspan regions and subsequently the internal supports and the transverse supporting beams should be casted. 0,15 L casting of midspan regions L casting of supporting beams and the slab at internal support 58 29

VFT-Bridges with welded or rolled I-sections in situ concrete slab steel girder in the shop precasted concrete flange transport on site steel girder installation by crane 59 VFT-Filler beams 3200 rolled section 640 shear connection 60 30

VFT-Filler beams 61 Preflex - Beams steel girder prestressed composite bottom flange The Preflex-Beam is a girder with a pre-stressed composite bottom flange where the pre-stressing is applied by elastic bending of the steel girder. The pre-stress causes a higher bending resistance and a high flexural stiffness. Therefore the deflections under serviceability conditions very small. This type of beam is often used for railway and road bridges where the available construction depth is highly restricted. Ratios of span to structural depth up to 45 are possible for road bridges. 62 31

Preflex Girders pre-stressing of the concrete bottom flange δ campered steel girder F v F v pre-stressing forces F v applied to the steel girder (elastic bending) F v F v F v F v casting of the concrete bottom flange removing of the prestressing force F v after hardening of concrete causes compressive stresses in the concrete bottom flange casting of the concrete top flange on site 63 Composite bridge with Preflex-Girders Hermann-Lieberum Bridge in Leipzig continuous beam, span 33 m and construction depth 130 cm 64 32

Cable stayed bridges 65 cable stayed bridge Wesel across the river Rhein 10 20 30 40 50 60 70 80 90 53,24 64,554 64,554 64,554 64,554 64,554 334,82 61,76 396,132 376,412 D C 66 33

Cable stayed bridge Wesel across the river Rhein cross-section axes 10-70 550 4250 2800 4250 700 700 550 550 6150 400 6150 550 67 Cable stayed bridge Wesel across the river Rhein 3500 cross-section axes 70-90 27500 mm 8750 3000 8750 3500 2,5% 2,5% 7710 5900 2000 5900 7710 13800 68 34

Joint between the steel and the concrete section concrete end cross girder joint with overlapping steel plates and headed studs concrete end cross girder 69 concrete end cross girder 70 35

Pylon in high strength concrete composite section +145,30m 3000 2000 3000 1000 4000 1000 concrete section 500 400 4000 3295-3971.+15,90 71 cables Use of parallel strand cables of galvanized waxed and PE-coated strands instead of traditionally used fully locked coil ropes. 72 36

erection stages 10 70 80 90 stages I and II stage III stages III to VIII stage IX 73 Canal bridges canal bridge Lippe 74 37

Canal bridge Magdeburg view 57,10 106,20m 57,10 6,30 10x5,71 10x5,31 10x5,31 10x5,71 10 20 30 40 7,81 cross-section 3,98 34,04 3,98 42,00 m 75 Canal bridge Magdeburg total length 228 m span length 57,1 m 106,2 m 57,1 m Structural steel 9.500 t 76 38

Canal bridge Magdeburg transverse frame 1900 4819 1087.5 740 2440 740 77 Launching of the bridge stage 2 stage 11 stage 17 stage 22 78 39

Canal-bridge Lippe 24,00m 24,80m 24,00m A B C D 4,75 28,00m 3,00 4,75 28,00m 3,00 +56,50 NW +56,50 NW 7,84 2,21 2,16 10,82 10,82 2,16 2,21 2,21 4,33 4,33 4,33 4,33 4,33 4,33 2,21 30,40m LT7 LT6 LT5 LT4 LT3 LT2 LT1 LT7 LT6 LT5 LT4 LT3 LT2 LT1 79 Canal-bridge Lippe 80 40

7 th Japanese German Bridge Colloquium Osaka 2007 Thank you very much for your attention 81 41