GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No.

Similar documents
CIVL451. Soil Exploration and Characterization

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

Work Type Definition and Submittal Requirements

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Merivale

Caltrans Geotechnical Manual

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces.

Anirudhan I.V. Geotechnical Solutions, Chennai

How To Design A Foundation

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur

SERVICES 2015 ISO 18001

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode

Site Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions

EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND

Work Type Definition and Submittal Requirements

(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

NuGeneration Ltd Site Investigations

Geotechnical Standards Eurocodes. An update

CHAPTER 1 INTRODUCTION

c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc.

GUIDELINE FOR HAND HELD SHEAR VANE TEST

GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005

hs2 Ground A non-technical guide

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns

Geotechnical Investigation Test Report

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

KWANG SING ENGINEERING PTE LTD

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations

SECTION PAVEMENT DESIGN

GEOTECHNICAL DESIGN MANUAL

Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT

SNC-Lavalin Inc. Montcalm Wastewater Pumping Station Upgrades - Geotechnical Report. October 2011

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils

Buildings Department Practice Note for Registered Contractors 38. Registration of General Building Contractors and Specialist Contractors

DIRECTIONAL DRILLING

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples

A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil

WDC Whakatane Central Business District Geotechnical Investigation

VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE

SECTION SUPPORT OF EXCAVATION

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 5 : Geophysical Exploration [ Section 5.1 : Methods of Geophysical Exploration ]

APPENDIX F GEOTECHNICAL REPORT

Use and Application of Piezocone Penetration Testing in Presumpscot Formation

Cone Penetration Testing in Geotechnical Practice. Tom Lunne Peter K. Robertson John J.M. Powell

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Basements and Deep Building Construction Policy 2014

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION

NOTES on the CONE PENETROMETER TEST

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013

Exploration for natural gas

Tunnelling & Underground. Specialists

Table of Contents 16.1 GENERAL Overview Responsibilities

Method Statement FOR. Soil Investigation

Report. Geotechnical Investigation Proposed Easy Access Upgrade Marrickville Railway Station Station Street, Marrickville, NSW

Guide to Carrying Out Engineering Works within Road Structure Safety Zone and Engineering Activity on Land adjoining Public Streets

Fundamentals of CONE PENETROMETER TEST (CPT) SOUNDINGS. J. David Rogers, Ph.D., P.E., R.G.

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

Standard Test Method for Mechanical Cone Penetration Tests of Soil 1

COSMOS 2012: Earthquakes in Action COSMOS 2012

FACTUAL GROUND INVESTIGATION

TECHNICAL REPORT ON SCALA DYNAMIC CONE PENETROMETER IRREGULARITY

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

90 Brighton Road, Surbiton, Surrey

FINAL REPORT ON SOIL INVESTIGATION

Life after 30! Innovative investigation and repair of the Overvaal railway tunnel. r a i l w a y s a n d h a r b o u r s PROJECT TEAM

Riprap-lined Swale (RS)

Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations

Exploration. Exploration methods

ESSENTIAL COMPONENTS OF WATER-LEVEL MONITORING PROGRAMS. Selection of Observation Wells

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives

Establishing the feasibility of your proposed mining venture

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM

Work Breakdown Structure Element Dictionary. Final Design

Report to INFRASTRUCTURE SERVICES Committee for noting

Soil behaviour type from the CPT: an update

Using Combination of SPT, DMT and CPT to Estimate Geotechnical Model for a Special Project in Turkey

JOHNSON STREET BRIDGE REPLACEMENT PROJECT

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

ODOT/OSU collaboration on the development of CPT Capabilities for use in Ohio Transportation Projects

Foundation design to Eurocode 7

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

REPORT OF WORK GUIDELINES

SECTION 1 GENERAL REQUIREMENTS

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

A CODE OF PRACTICE FOR RISK MANAGEMENT OF TUNNEL WORKS

Transcription:

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES Materials Engineering Report No. 2009-8M (Supersedes Report No. 21) F CHOWDHURY GEOMECHANICS AND STRUCTURAL MATERIALS ENGINEER S REHMAN GEOTECHNICAL ENGINEER MARCH 2009

ABSTRACT This guideline has been prepared to assist in the planning, cost estimation, conduct and reporting of geotechnical investigations at Main Roads Western Australia (MRWA) bridge sites. The objectives for these guidelines are to describe the processes or stages of work to be followed for a bridge site investigation. It also describes the information required to design bridge foundations. The guideline also indicates standard of skill, workmanship and reporting to be applied in the investigation process. A flow chart summarising the processes involved in the site investigation is included in the Appendix A of the guideline. This guideline document should be used as a guide and not approached or referred to as a limiting or standard geotechnical investigation/design specification. 2009-8M Page 2 of 12

CONTENTS TOPIC PAGE 1. INTRODUCTION... 4 2. OBJECTIVES... 4 3. STAGES OF INVESTIGATION... 4 3.1 Field Reconnaissance Survey 4 3.2 Desk Top Study 5 3.3 Sampling and Testing 6 3.4 Laboratory Testing 8 4. GEOTECHNICAL REPORTS... 8 REFERENCES... 12 APPENDIX A: FLOW CHART ON GUIDELINES FOR GEOTECHNICAL INVESTIGATIONS FOR BRIDGE STRUCTURES 2009-8M Page 3 of 12

1. INTRODUCTION This guideline document has been prepared to assist in the planning, cost estimation, conduct and reporting of geotechnical investigations at bridge sites. Henceforth for ease of reporting, reference is made only to requirements at bridge sites however corresponding requirements at waterway structures are implicit in this term. 2. OBJECTIVES The objectives for these guidelines are to: Describe processes or stages of work to be followed for a bridge site investigation. Describe information required to design bridge foundations. Indicate standards of skill, workmanship and reporting, which are to be applied. A flow chart summarising the processes involved in a bridge site investigation is included in Appendix A. 3. STAGES OF INVESTIGATION 3.1 Field Reconnaissance Survey For most bridge investigations access and environmental constraints have major influences on cost. It is therefore necessary for a field reconnaissance survey to be conducted as the first stage of a geotechnical investigation. This may be undertaken by MRWA or by a consultant specifically engaged for this survey. Information on the following should result: Legal and physical aspects of access to site and bridge alignment both riverbed and adjoining properties. Availability of any services or supplies of water, electricity, earthworks plant. Buried or overhead services. Photographs of surface conditions. Traffic control requirements. 2009-8M Page 4 of 12

The possible effects of alternative investigation techniques on the environment (for example, ground disturbance, vegetation removal, water discharge, noise etc). On-ground survey details. Tide, river level or other natural constraints. Notes on any exposed geology, for example the presence of boulders, bedrock exposure, swamps etc. The physical relationship of the proposed construction to the immediate natural surroundings and any existing developments. The field reconnaissance survey must be diligently prepared and conducted to allow for reliable cost estimates to be prepared. Experienced and suitably qualified personnel should perform the survey. Further stages of the investigation should be held until the field reconnaissance survey has been completed and reported to MRWA. Cost estimates for the major part of the investigation will be based partly on this reconnaissance survey. 3.2 Desk Top Study Every site investigation should commence with a desk study directed towards collecting, collating and reviewing the following: Design drawings from any previous structure at the site. Previous site investigation reports, borehole logs, penetrometer results and construction experience e.g. piling records. Geological and Topographical maps, survey data and records. Hydrological data. Aerial photographs. Regional seismicity data. Survey records, local knowledge and resources. 2009-8M Page 5 of 12

The collection and collation of the above information, where possible, could be undertaken during the field reconnaissance survey stage. However, further work to fully explore the extent of information available may be required. During the desk study stage, an overview of complexity and risks associated with each geotechnical design should be clearly identified. 3.3 Sampling and Testing This stage of the Geotechnical Investigation is involved with the exploration of subsurface conditions and retrieval of test data for generating geotechnical parameters and geotechnical profiles. Central to the investigation and subsequent design stage an understanding of the ultimate limit state design to be adopted for design is an essential. This should be done by a suitably qualified and experienced geotechnical engineer and conveyed to the personnel conducting the investigation prior to the commencement of site works. The selection of Characteristic Values of geotechnical parameters (refer AS 5100), the modification of these values by using Geotechnical Strength reduction factors and the use of these modified values in calculating ultimate limit state design capacity must be fully understood. Communication between the bridge design engineer and the geotechnical engineer to achieve an appropriate understanding is imperative. Where the geotechnical investigation is limited to the investigation of mobile riverbeds prior discussion with the MRWA Waterways Section is necessary. The objective of this type of investigation is to identify the approximate limits of clear water and live bed scours for the purposes of foundation design of bridges and floodways and invert levels of culverts. The types of geotechnical field investigation are usually site specific and require discussion with the structural and waterways engineers. Defining the scope of the investigation (eg. number of test locations, type of test, frequency and depth) is not covered explicitly by these guidelines. The number, location and depth of tests is to consider: expected sub-surface conditions previous geotechnical information available 2009-8M Page 6 of 12

likely extent of zones in ground influenced by loading need to achieve a reliable geotechnical model for analysis size and importance of the structure requirement to minimise contractor and MRWA risk of changes during the construction programme due to variations in the subsurface conditions from that reported during the investigation stage. Allowance should be made for the anticipated level of variability in ground conditions and possible changes to the design. An experienced geotechnical engineer must make these decisions and discussion on the number, location and depth of the selected tests must be a part of the geotechnical report. This discussion must enable the reader of the report to understand what factors were used to assess these variables and provide a clear understanding of the deliverables. While the above points should be covered by a well planned investigation there may be situations where during the investigation stage it is considered by MRWA or the geotechnical consultant that additional investigation will be required to generate a more reliable model and minimise risk. This work shall be undertaken at a schedule of rates agreed upon prior to the commencement of the investigation. The following references contain supplementary comments, which should be read and implemented into investigation and testing as relevant. structures Australian Standard AS1726 Geotechnical Site Investigations Australian Standard AS1170 Structural Design Actions Australian Standard AS2159 Piling Design and Installation Australian Standard AS5100 Bridge Design-Foundations and Soil supporting All in situ testing, for example Standard Penetration Test (SPT), Electric Friction-Cone Penetration Test (EFCPT) etc, should be carried out in accordance with the relevant Australian Standards and supervised accordingly. The purpose of in situ testing is to determine the soil parameters necessary for the design of foundations. Groundwater must be investigated to determine: 2009-8M Page 7 of 12

the level of the permanent water table at the time of the investigation occurrence of a perched water table condition and its level estimated rates of inflow to excavations effects of de-watering on water table levels and on adjacent structures the presence of sub-artesian conditions the potential aggressiveness of the soil and groundwater, for example SO 4, Cl, ph and Total Dissolved Solids (TDS) to buried concrete and steel. For most cases it will be necessary to install standpipes in selected boreholes to enable sampling and observations of water to be made. An allowance in cost estimates must be given to these installations. 3.4 Laboratory Testing In conducting laboratory testing, procedures to be applied shall be in accordance with Australian Standards, Main Roads Standards, or American Standards (ASTM) and other relevant registered procedures. Because most bridge investigations are based upon Australian Standards requirements, those shall be applied where possible. Laboratory testing shall only be carried out in NATA accredited laboratories for the particular tests in question. All test results shall be presented as NATA endorsed reports. It is advisable to store all soil and rock samples for projects; at least until construction of the sub structure is completed. They are useful to prospective tenderers in assessment of site conditions. They are also valuable in the event of engineering problems or contractual disputes during construction and useful in establishing relationships between site investigation data and in situ conditions. 4. GEOTECHNICAL REPORTS The information contained in a geotechnical report would normally be used for design, tendering and construction purposes. The report should be prepared in two parts: 2009-8M Page 8 of 12

Part 1 ( Site Investigations Report ) details of all field and laboratory test data to be represented Part 2 ( Interpretative Report ) the geotechnical evaluation, interpretation, conclusions and recommendations Each part should be complete in itself with Part 2 containing all the information presented in Part 1, Site Investigations Report. Both parts should contain keys to all symbols, terms and abbreviations used, together with a clear statement of any limitations which apply. A special preface sheet must be included with all information distributed to Tenderers or Contractors. The Information for Tenderers Document shall contain all factual and interpretive data relevant to the construction of the works. Professional opinion shall generally be excluded. Where professional opinion is considered essential to minimising the Principal s risk, it shall be clearly and appropriately qualified as opinion only. Part 1 Presentation of Site Investigation The presentation of factual geotechnical information will include, but not be limited to, the following: Purpose and scope of the geotechnical investigation, including a discussion on the extent and scope of the investigation. Brief description of the project for which the geotechnical report is being compiled giving information about the location of the project, its size and geometry, anticipated loads, structural elements, materials of construction, etc., and also giving a statement of the anticipated geotechnical complexity and risk associated with the project. Dates between which field and laboratory work were performed. Detailed description of methods used for the field and the laboratory work with reference to accepted standards followed, and with discussion on rationale used to determine type, spacing, frequency and locations of all tests. Types of field equipment used. Presentation of field observations which were made by the supervising field personnel during the execution of the sub-surface explorations. 2009-8M Page 9 of 12

Data on fluctuations of groundwater table with time in the boreholes during the performance of the fieldwork and in piezometers after completion of the fieldwork. Compilation of individual boring logs, penetrometer results etc. for each of the test locations with descriptions of sub-surface formations based on field descriptions and on the results of laboratory testing. In addition the location and level of each of the test locations shall be accurately defined by survey control. Colour photographs of rock core. Grouping and presentation of field and laboratory test results in appendices and as summary tables. Names of the persons responsible for geotechnical site investigations and report writing. Part 2 Presentation of Evaluations, Conclusions and Recommendations (a) Evaluation of geotechnical information The evaluation of geotechnical information will include, but not be limited to, the following: Review of the field and laboratory work by the Geotechnical Engineer. In cases where there are limited or partial data, the Geotechnical Engineer should state this. If in the Geotechnical Engineer s opinion, the data are defective, irrelevant, insufficient or inaccurate; he/she should point this out and qualify comments accordingly. Any particular adverse test results should be considered carefully in order to determine whether they are misleading or represent a real phenomenon that must be accounted for in the design. Tabulation and graphical presentation of the results of the field and laboratory work in relation to the requirements of the projects. Determination of the depth to the groundwater table and its seasonal fluctuations. Sub-surface profile(s) in graphic form (geotechnical profile or model), showing the disposition of the various sub-surface formations. Detailed description of all sub-surface formations in relation to their physical properties and their compressibility and strength characteristics. Comments on irregularities such as pockets, cavities etc. 2009-8M Page 10 of 12

Collating and presentation of the geotechnical data for each sub-surface formation. This presentation should be in a form which would enable selection of characteristic values for design. Submission of proposal(s) for further field and laboratory work, if deemed necessary, with comments justifying the need for this extra work. (b) Conclusions and Recommendations The conclusions and recommendations of a geotechnical report will include, but not be limited to the following: Classification of the project according to geotechnical complexity. Selection of suitable characteristic values for the requirements of the project (geotechnical design parameters). Settlement and stability computations. Recommendations concerning problems that may be encountered during excavations, pumping operations, construction of retaining structures and ground anchors, placement of earth materials etc. Comment on likely interaction of work on nearby structures. Recommendations on any other issues e.g. for surface drainage if required. Comments on liquefaction potential, scour depth, unsuitable soil etc. if applicable. 2009-8M Page 11 of 12

REFERENCES GOLDER ASSOCIATES PTY LTD REPORT ON GUIDELINES FOR GEOTECHNICAL INVESTIGATIONS MRWA BRIDGE AND WATERWAY STRUCTURES, Report No 00640283. STANDARDS AUSTRALIA GEOTECHNICAL SITE INVESTIGATION, AS1726. STANDARDS AUSTRALIA STRUCTURAL DESIGN ACTIONS, AS1170 STANDARDS AUSTRALIA PILING - DESIGN AND INSTALLATION, AS2159. STANDARDS AUSTRALIA BRIDGE DESIGN PART 3: FOUNDATION AND SOIL SUPPORTING STRUCTURES, AS5100.3. CLASSIFICATION : SUBJECT AREA : Geotechnical engineering KEYWORDS : Geotechnical, bridge, foundation, investigation 2009-8M Page 12 of 12

APPENDIX A FLOW CHART ON GUIDELINES FOR GEOTECHNICAL INVESTIGATIONS FOR BRIDGE STRUCTURES (2 pages, including this page)

APPENDIX A: FLOW CHART ON GUIDELINES FOR GEOTECHNICAL INVESTIGATIONS FOR BRIDGES Ffield Reconnaissances Survey Legal and physical aspects of access to site and bridge alignment Availability of services, supplies of water, electricity, earthwork plant Buried or overhead services Photographs of surface conditions Traffic control requirements Possible effects of alternative investigation techniques on the environment Tide, river level or other constraints Surface geology Physical relationship of the proposed construction to the surroundings Desk Top Study Review of: Design drawings of proposed and previous structures al the site Previous site investigation information Geological & Topographical maps Hydrological data Aerial photographs Regional seismicity Local knowledge and resources Confirmation of: Structure s geotechnical category Likely foundation loads Waterways report Sampling and Testing Boreholes Drilling method to be a function of ground and site conditions as well as equipment available Sampling interval to be no greater than 3m Down hole insitu testing for example pressuremeter testing Establishment of groundwater levels using piezometers, installed after completion of drilling Borehole locations and levels to be established by survey Samples to be collected, transported and stored in an appropriate manner to avoid damage for later laboratory testing Borehole logs to be supplied in accordance with AS1726 Electric Friction-Cone Measurement of tip and sleeve resistance only refused or termination reason stated Measurement of tip, sleeve and pore water pressure with position of filter noted Measurement of tip, sleeve and shear wave velocity Establishment of groundwater levels using piezometer installation after completion of probing and in the case of testing with pore pressure measurement groundwater levels should be confirmed Probe locations and levels to be established by survey Test Pits Density or strength estimates to be established using standard equipment such as Perth Sand Penetrometer, Dynamic Cone Penetrometer Groundwater seepage entry levels to be noted Collection of bulk or tube samples for laboratory testing Test locations and levels to be established by survey Review information prior to dernobilsation from site to ensure all aspects of the proposed program have been achieved and that information such as groundwater levels are consistent and well established. The scope of testing to be such that Laboratory Testing Consistency or classification of each of the different characteristic layers identified during the field program is established, for example Atterberg limits or Particle Size Distribution Engineering parameters of different materials established, for example consolidation testing on cohesive compressible soils or Unconfined Compressive Strength testing on rock Generate sufficient test results / data for estimation of characteristic" design value Collation of Results Field data to be cross referenced with laboratory test results to ensure continuity of classification Remaining field samples to be checked against field logs to ensure classification consistent with sampled material and logs modified accordingly Field and laboratory information assembled into a logical order to enable reporting or review by independent persons Reporting Site Investigation Information Purpose and scope of the geotechnical investigation, including a discussion on the extent and scope of the Investigation; refer field reconnaissance study and desk top study findings. Brief description of the project for which the geotechnical report is being compiled giving information about the location of the project its size and geometry, anticipated beds, structural elements, materials of construction, etc., and also giving a statement of the anticipated geotechnical complexity and risk associated with the project. Dates between which field and laboratory work were performed. Detailed description of methods used for field and laboratory work with reference to accepted standards followed, and with discussion on rationale used to determine the spacing, frequency and locations of all tests. Types of field equipment used. Names of the persons responsible for geotechnical site investigations and report writing. Presentation of field observations which were made by the supervising field personnel during the execution of the sub-surface explorations. Data on fluctuations of groundwater table with time in the boreholes during the performance of the fieldwork and piezometers after completion of fieldwork. Compilation of boring logs penetrometer results etc with descriptions of sub-surface formations based on field descriptions and on the results of laboratory test. Colour photographs of rock core. Grouping and presentation of field and laboratory test results in appendices. Evaluations. Conclusions and Recommendations (a) Evaluation of geotechnical information The evaluation of geotechnical information may include but not be limited to, the review of the field and laboratory work by Geolechnical Engineer. In cases where there are limited or partial data, the Geotechnical Engineer should state this. If in the Geotechnical Engineer s opinion the data are defective, irrelevant, insufficient or inaccurate, he should point this out and qualify its comments accordingly. Any particularly adverse test results should be considered carefully in order to determine whether they are misleading or represent a real phenomenon that must be accounted for in the design. Tabulation and graphical presentation of the results of the field and laboratory work in relation to the requirements of the projects. Detemination of the depth of the ground water table and the seasonal fluctuations. Sub-surface profile(s) in graphic form (geotechnical profile of model), showing the disposition of the various sub-surface formations. Detailed description of all subsurface formations in relation to their physical properties and their compressibility and strength characteristics. Comment on Irregularities such as pockets, cavities, etc. Grouping and presentation of ranges of variation of the geotechnical data for each subsurface formation. This presentation should be in comprehensive form, which would enable selection of the most appropriate characteristic value for the design. Submission of proposal(s) for further field and laboratory work, if deemed necessary, with comments justifying the need for these extra work. (b) Conclusion and Recommendation The conclusion and recommendations of the geotechnical report will include, but not be limited to the following: Classification of the project according to geolechnical complexity. Selection of suitable characteristics values for the requirements of the project (geotechnical design parameters). Basic settlement and stability oomputations. Recommendations concerning problems that may be accounted during excavations, pumping operations, construction of retaining structures and ground anchors, placement of earth materials etc. Recommendations for surface drainage. Comments on liquafaction potential, scour depth, unsuitable soil etc.