1 GEOTECHNICAL DESIGN MANUAL CHAPTER 4 GEOTECHNICAL FIELD INVESTIGATION NYSDOT Geotechnical Page 4-1 December 10, 2013

2 (Intentionally left blank) NYSDOT Geotechnical Page 4-2 December 10, 2013

3 Table of Contents 4.1 OVERVIEW DESIGN-BID-BUILD AND DESIGN-BUILD SUBSURFACE EXPLORATION PROGRAM DEVELOPMENT Terrain Reconnaissance Developing a Terrain Reconnaissance Report Methods of Subsurface Exploration Test Pits Test Borings In-Situ Sampling Methods In-Situ Soil Testing Methods Standard Penetration Test Dynamic Cone Penetrometer Cone Penetrometer Test Flat Plate Dilatometer Test Pressuremeter Test Field Vane Shear Test Geophysical Testing Methods Surface Wave Methods Downhole Shear Wave Velocity Methods Crosshole Shear Wave Velocity Methods Seismic Refraction Seismic Reflection Resistivity Falling Weight Deflectometer Hydraulic Conductivity Testing Methods Percolation Test Well Pumping Tests Seepage Tests Packer Permeability Tests Other Tests PHASING OF SUBURFACE INVESTIGATIONS SUBSURFACE EXPLORATION CRITERIA Bridge Foundations Retaining Walls Embankments Large Cuts and Excavations Culverts Noise Barrier Walls Overhead Signs, Traffic Signals, and Light Standards Pavement Structures Infiltration Basins and Wetland Mitigations Trenchless Pipe Installation NYSDOT Geotechnical Page 4-3 December 10, 2013

4 Table of Contents Other Applications SUBSURFACE EXPLORATION AND SAMPLE TYPES Identification System for Subsurface Explorations Identification System for Individual Soil and Rock Samples FIELD EXPLORATIONS AND SAMPLING Soil and Rock Sampling in Test Borings Bulk Samples Split-Barrel Sampling Progressing the Test Boring for Sampling Obtaining a Sample Packaging and Identification of Samples Thin-Walled Tube Sampling Progressing the Test Boring for Sampling Obtaining a Sample Packaging, Identification, and Transporting of Samples Rock Core Sampling Obtaining a Rock Core Packaging and Identification of Rock Cores Test Boring Logs REFERENCES NYSDOT Geotechnical Page 4-4 December 10, 2013

5 4.1 OVERVIEW This Chapter addresses the geotechnical field investigation, including the development of the subsurface exploration program, the methods of generating subsurface information, and the criteria to be applied for test borings in the various conditions that will be encountered. It is organized by activities and policies involved prior to, during, and after exploration. 4.2 DESIGN-BID-BUILD AND DESIGN-BUILD The requirements of this Chapter shall be applied to projects designed In-House, projects designed by Consultants, and Design-Build projects. When the subsurface exploration program is being prepared by the Departmental Geotechnical Engineers, previous soil borings in the vicinity of the project, nearby utilities and structures, USDA soils maps, USGS topographic maps, aerial photographs, and wetland inventory maps as described in NYSDOT GDM Chapter 2, will be considered in the development of the program. The Regional Geotechnical Engineer is responsible for determining site accessibility and potential impacts to sensitive environmental areas. In addition, the Regional Geotechnical Engineer is responsible for coordination of all traffic control needs, and issues regarding access permits and right-of-entry notifications to impacted property owners. When the subsurface exploration program is being prepared by a Geotechnical Engineering Consultant, the Consultant shall submit to the Regional Geotechnical Engineer, for review and acceptance, a detailed subsurface exploration plan and proposal prior to the commencement of any field operations. The program shall describe the anticipated soil or rock stratification used as the basis of the planned explorations. The program shall outline proposed exploration methods, and locations and termination criteria for all explorations. The subsurface exploration plan shall conform to the requirements of this Manual and of the applicable NYSDOT specifications. Where explorations must be conducted in sensitive environmental areas or in high hazard traffic areas, the exploration program shall describe any special access or traffic control requirements necessary to protect the interests of the Department during the field exploration phase. The Consultant is responsible for all access requirements, access permits, right-of-way notifications, and traffic control. All traffic control shall conform to the latest Department guidelines. 4.3 SUBSURFACE EXPLORATION PROGRAM DEVELOPMENT In the development of a subsurface exploration program, the existing site conditions, available and applicable exploration methods, and available and applicable in-situ testing methods must be considered. This section discusses such considerations Terrain Reconnaissance Terrain reconnaissance is the operation of reviewing available information from various sources and reconnoitering the landscape, to view it with regard to its suitability for engineering purposes, describing the extent and characteristics of the areas encountered, and making an engineering interpretation of the findings. NYSDOT Geotechnical Page 4-5 December 10, 2013

6 Terrain reconnaissance and appraisal operations are performed for the following purposes: 1. To serve as a basis for the appraisal of terrain conditions by correlating the characteristics of the various soil areas with the past construction experiences and performances of existing highways on similar areas. 2. To indicate to the highway planning and location Engineers the relative merits and potential design and construction problems for the mapped areas of different terrain conditions along the general route, so that, if feasible, the optimum areas be occupied and the adverse areas avoided. 3. To serve as a guide in establishing the optimum grade line relative to topography and subsurface conditions. 4. To serve as a general guide for the efficient planning of the necessary subsurface exploration, testing and analysis program for the line finally selected. This reduces the surveys in the "good" areas to an efficient minimum, and permits effective concentrations in the problem areas. 5. To indicate the general earthwork construction material situation, and to indicate the probable locations of borrow and granular materials so that those areas may be explored and sampled for specification and cost purposes. Refer to NYSDOT GDM Chapter 2 for related discussion Developing a Terrain Reconnaissance Report A Terrain Reconnaissance Report describes the anticipated soils to be encountered along a length of proposed roadway. Most of the soil data and information is derived from the National Cooperative Soil Survey, accessed through the USDA National Resources Conservation Service. Information from this source considers the near-surface (within 8 feet) soils. Any preliminary or record logs are also included in the analysis. Subject areas are delineated into Areas of Interest (AOI s). The AOI s are depicted in maps and Engineering Properties, Water Features, Particle Size & Coarse Fragments, and Physical Soil Properties are presented for the soil types mapped in each AOI. Descriptions of the mapped types are typically presented at the end of the report. Typically, for the initial geotechnical field investigation, an examination of the site for the development of the Terrain Reconnaissance Report is essential. The site examination is a visual assessment of the territory. When viewing the landscape in the field, a logical comparison may be made with the soil map of that location. In many of the new soil maps, geologic origin is neglected in favor of a slope percentage. For example: A Palmyra soil located on an esker may be mapped Palmyra 15-20% slope. However, an outwash terrace face may also be mapped Palmyra 15-20% slope. A soil mapped as Alluvial land in the uplands, which may actually be an inwash soil over glacial till and not a flood plain soil. NYSDOT Geotechnical Page 4-6 December 10, 2013

7 Figure 4-1 Generalized Terrain Map Example NYSDOT Geotechnical Page 4-7 December 10, 2013

8 Figure 4-2 Generalized Terrain Map Legend Example NYSDOT Geotechnical Page 4-8 December 10, 2013

9 4.3.2 Methods of Subsurface Exploration Assuming access and utility clearances have been obtained and a survey base line has been established in the field, field explorations are begun. Many methods of field exploration exist; some of the more common are described below. These methods are often augmented by in-situ testing. The testing described in this Chapter provides the Departmental Geotechnical Engineer with soil and rock parameters determined in-situ. This is important, especially on those projects involving soft clays, loose sands, and/or sands below the water table, due to the difficulty of obtaining representative samples suitable for laboratory testing. For each test included, a brief description of the equipment, the test method, and the use of the data is presented Test Pits Test Pits are the simplest methods of inspecting subsurface soils. Test pits consist of excavations performed by hand, backhoe, or dozer. Hand excavations are often performed with shovels or posthole diggers. Test pits offer the advantages of speed and ready access for sampling. However, test pits are severely hampered by limitations of depth and by the fact that advancement through soft or loose soils or below the water table can be extremely difficult. Test pits are used to examine large volumes of near surface soils and can be used to obtain bulk samples for additional testing Test Borings The term Test Boring applies to a bored hole method of subsurface investigation that involves the in-situ sampling and/or testing of soil, rock, and water. The test boring may be progressed as an open hole that utilizes soil or rock boring methods to allow sampling or testing at various depths, or it may be progressed continuously by sampling or testing equipment. If open holes are utilized, the sampling and/or testing is usually performed below the depth which has been disturbed by the hole progression. Various methods of soil and rock boring methods for open holes are discussed below: Hand Augers Hand auger borings are advanced using hand held equipment, typically in areas where access for standard drilling equipment is restricted. Hand auger borings are limited in depth by the presence of ground water or collapsible soils that cause caving in the borehole. Hollow-Flight Augers Hollow-flight augers consist of a continuous flight auger surrounding a hollow drill stem, which is advanced by rotation. Split spoon and undisturbed samples are obtained through the hollow drill stem, which acts like a casing to hold the hole open, so removal of the auger is not necessary for sampling. Refer to ASTM D Standard Practice for Using Hollow-Stem Augers for Geotechnical Exploration and Soil Sampling (AASHTO T306 - Standard Method of Test for Progressing Auger Borings for Geotechnical Explorations). Wash Rotary Method In a Wash Rotary Boring, a downward pressure is applied during rapid rotation of hollow drill rods to which a cutting bit is attached. The drill bit cuts the material and drilling fluid washes the cuttings from the borehole. In most cases this is the fastest method of advancing a borehole and can be used in any type of soil, although soils containing considerable amounts of large gravel or boulders could be NYSDOT Geotechnical Page 4-9 December 10, 2013

10 problematic. Drilling mud or casing can be used to keep the borehole open. Split spoon and undisturbed samples are obtained through the drilling fluid, which holds the borehole open. Rock Boring/Coring - Rock boring through boulders or rock is accomplished by advancing a core barrel through the rock by the application of downward pressure during rotation. Circulating water removes ground-up material from the hole while also cooling the bit. Rock coring involves careful sampling of rock in which the rate of advance is controlled so as to obtain the maximum possible core recovery. Refer to ASTM D2113 Standard Practice for Rock Core Drilling and Sampling of Rock for Site Investigation In-Situ Sampling Methods In-situ sampling methods are used to obtain a portion of the subsurface material for analysis. Insitu methods include soil sampling by SPT, rock core sampling, and undisturbed sampling. These methods are described in Section Standard Penetration Test, Section Rock Core Sampling, and Section Thin-Walled Tube Sampling respectively In-Situ Soil Testing Methods In-situ soil testing methods are used to obtain general strength, friction, and pore water information for soils in their existing state. The methods result in disturbance and displacement of the soil. In many cases the information obtained can be correlated to other design parameters. Various testing methods are described below and the suitability of the methods to various soil types is presented in Table Standard Penetration Test The Standard Penetration Test (SPT) is the most widely used field test, having the advantages of simplicity, a wide variety of correlations for its data, and the fact that a sample is obtainable with each test. As discussed previously, a standard split-barrel sampler attached to a drill rod is advanced into the soil by impacts from a 140-pound (625 N) automatic or safety hammer dropping from a height of 30 inches (750 mm). The sampler is advanced a total of 18 inches (450 mm), and the number of blows required to advance the sampler for each of three 6-inch (150 mm) increments is recorded. The sum of the number of blows for the second and third increments is called the Standard Penetration Value, or more commonly, N-value, which is reported in blows per foot (300 mm). Tests shall be performed in accordance with ASTM D Standard Test Method for Penetration Test and Split-Barrel Sampling of Soils (AASHTO T206 - Standard Method of Test for Penetration Test and Split-Barrel Sampling of Soils). The number of blows for each 6-inch increment (150 mm) is recorded on the Soil Test Boring Logs, along with the type of hammer used and any notes regarding the driving effort (e.g., the sampler was advanced under the weight of the rods or hammer without blows, if the sampler was plugged, refusal before completing 6-inch increment, etc.). Refer to NYSDOT GDM Chapter 8 for related discussion. NYSDOT Geotechnical Page 4-10 December 10, 2013

11 Dynamic Cone Penetrometer The Dynamic Cone Penetrometer is a dynamic method of measuring a soil s in-situ resistance to penetration. In the test, a 17.6 lb (8 kg) weight is repeatedly dropped from a height of 22.6 in (575 mm), driving a cylindrical rod with a cone-shaped point into the ground. The penetration per blow is measured and test data can be correlated to bearing capacity, in-situ density, and other parameters. The equipment used for the test is man portable and is commonly performed in conjunction with hand auger borings. The standard for Dynamic Cone Penetrometer testing is the procedure presented by Sowers and Hedges (1966). The penetrometer resistance values can be correlated to N meas by performing an SPT adjacent to the penetrometer test Cone Penetrometer Test The Cone Penetrometer Test (CPT) is a quasi-static penetration test in which a cylindrical rod with a conical point is advanced through the soil at a constant rate. The cone penetrometer measures the resistance to penetration at the tip of the penetrometer, the end-bearing component of resistance. The equipment used is generally truck or trailer mounted. A series of tests performed at varying depths at one location is commonly called a sounding. The penetrometer can be used in sands or clays, but not in rock or other extremely dense soils. Since soil samples are not generally obtained with penetrometer soundings, they should be augmented by SPT borings or other borings with soil samples taken, and the CPT correlated to the in-situ soils. Several types of penetrometer are in use, including mechanical (Dutch) cone, mechanical friction-cone, electric cone, electric friction-cone, and electro-piezocone. Regarding the various types: Friction-cone penetrometers are equipped with a friction sleeve, which provides the added capability of measuring the side friction component of resistance. Mechanical penetrometers have telescoping tips allowing measurements to be taken incrementally, generally at intervals of 8 inches (200 mm) or less. Electronic penetrometers use electronic force transducers to obtain continuous measurements with depth. Electro-piezocones are also capable of measuring pore water pressures during penetration. Of these, the only cone penetrometer type allowed is the electro-piezocones or some variation thereof (e.g., seismic electro-piezocones). Cone dimensions of a 60-degree tip angle and a 1.55 in 2 (10 cm 2 ) projected end area are standard. The outside diameter of the friction sleeve is the same as that of the base of the cone. Penetration rates are between 10 to 20 mm/sec. The appropriate test method is described in ASTM D Standard Test Method for Performing Electronic Friction Cone and Piezocone Penetration Testing of Soils (electro-piezocones). NYSDOT Geotechnical Page 4-11 December 10, 2013

12 The electro-piezocones can also be used to measure the dissipation rate of the excessive pore water pressure. This type of test is useful for soils that are very sensitive to sampling techniques, such as fibrous peat, muck, or soft clays. In such an application, the cone is equipped with a pressure transducer that is capable of measuring the induced water pressure. Pore water pressures are measured immediately and at several time intervals thereafter. Electro-piezocones can be fitted with other instrumentation above the friction sleeve (e.g., geophone, inclinometer, nuclear density equipment, etc.). Cone penetrometer data is plotted showing the tip stress, the friction resistance, and the friction ratio vs. depth. Pore pressures can also be plotted with depth and correlations of test results have been made to other soil parameters. See NYSDOT GDM Chapter 5 for presentation of CPT data Flat Plate Dilatometer Test A Flat Plate Dilatometer is a 3.75-inch wide and 0.55-inch thick stainless steel blade with a thin 2.4-inch diameter expandable metal membrane on one side. With the membrane flush with the blade surface (unexpanded), the blade is either pushed or driven into the soil using a drill rig. Rods carry pneumatic and electrical lines from the membrane to the surface. At the test elevation (typically depth intervals of 12 inches), pressurized gas is applied to expand the membrane. Both the pressure required to begin membrane movement and that required to expand the membrane into the soil 0.04 inches (1.1 mm) are measured. Additionally, the pressure corresponding to the return of the membrane to its original position upon venting may be recorded. Through developed correlations, information can be deduced concerning material type, pore water pressure, in-situ horizontal and vertical stresses, void ratio or relative density, modulus, shear strength parameters, and consolidation parameters. Compared to the pressuremeter, the flat dilatometer has the advantage of reduced soil disturbance during penetration. Tests shall be performed in accordance with ASTM D Standard Test Method for Performing the Flat Plate Dilatometer Pressuremeter Test A Pressuremeter Test is performed by inserting a cylindrical probe into an open borehole to the test depth, then inflating the probe s flexible membrane laterally to push against the borehole s soil wall. The measured volume change of the membrane is plotted against the applied pressure. Results are interpreted based on semi-empirical correlations from past tests and observation. Insitu horizontal stresses, shear strength, bearing capacities, and settlement can be estimated using these correlations. The pressuremeter test results can be used to obtain load transfer curves (p-y curves) for lateral load analyses. While tests can be done in soft clay or loose sands, the test is best used in dense sands, hard clays and weathered rock which cannot be tested with push equipment. The pressuremeter test is very sensitive to borehole disturbance and the data may be difficult to interpret for some soils. Tests shall be performed in accordance with ASTM D Standard Test Method for Prebored Pressuremeter Testing in Soils. NYSDOT Geotechnical Page 4-12 December 10, 2013

13 Field Vane Shear Test A Field Vane Shear Test consists of advancing a four-bladed vane to the test depth and applying a measured torque at a constant rate until the soil fails in shear along a cylindrical surface. The torque measured at failure provides the undrained shear strength of the soil. A second test run immediately after remolding at the same depth provides the remolded strength of the soil and thus information on soil sensitivity. Tests shall be performed in accordance with ASTM D Standard Test Method for Field Vane Shear Test in Cohesive Soil (AASHTO T223 - Standard Method of Test for Field Vane Shear Test in Cohesive Soil). This method is commonly used for measuring shear strength in soft clays and organic deposits. It should not be used in stiff and hard clays. Results can be affected by the presence of gravel, shells, roots, or sand layers. Shear strength may be overestimated in highly plastic clays and a correction factor should be applied. NYSDOT Geotechnical Page 4-13 December 10, 2013

14 In-Situ Test Method Suitable Soils (1) Unsuitable Soils Correlated Properties Remarks Standard Penetration Test (SPT) Sand, Clay, Residual Soil Gravel Sand and residual soil effective peak internal friction angle, clay undrained peak shear strength, soil modulus. SPT repeatability is highly variable. Disturbed samples. Very variable S u correlations are available for clays. Cone Penetrometer (CPT) or Piezocone with pore pressure measurements (CPTu) Sand, Silt, Clay, Residual Soil Gravel Sand, silt, and residual soil effective peak internal friction angle, clay and residual soil undrained peak shear strength, soil modulus. Continuous evaluation of soil properties. CPT is very repeatable. No samples recovered. Flat Plate Dilatometer (DMT) Sand, Clay, Residual Soil Gravel Sand, silt, and residual soil effective peak internal friction angle, clay and residual soil undrained peak shear strength, overconsolidation ratio, at-rest pressure coefficient, soil modulus. Unreliable results may occur with very dense sand, cemented sand, and gravel. No samples recovered. Pressuremeter Dense Sand, Hard Clay, Weathered Rock Soft Clay, Loose Sands Horizontal stresses, shear strength, bearing capacities, settlement. Results can be used to obtain load transfer curves for lateral load analyses. Sensitive to borehole disturbance and data may be difficult to interpret for some soils. Field Vane Shear (VST) Clay Sand, Residual Soil, Gravel Clay undrained peak shear strength. May overestimate shear strength. Very soft clays need to be corrected. Unreliable results may occur with fissured clays, varved clays, highly plastic clays, sand, residual soil, and gravel. VST repeatability may be variable with rate of rotation. No samples recovered. (1) Residual soils frequently have a dual USCS description of SM-ML and behave as both cohesive soils and cohesionless soils because the residuum soil is close to the opening size of the U.S. No. 200 Sieve (0.075 mm). Table 4-1 Soil Suitability of In-Situ Testing Methods (modified from Canadian Geotechnical Manual (1982) and Holts and Kovacs (1981)) NYSDOT Geotechnical Page 4-14 December 10, 2013

15 Geophysical Testing Methods Geophysical testing methods are non-destructive testing procedures applying wave and electrical current technologies which can provide general information on the subsurface profile, depth to bedrock or water, location of granular borrow areas, peat deposits or subsurface anomalies, etc., and can provide an indication of certain material properties (e.g., shear wave velocity). Geophysical testing methods are not limited to subsurface conditions, but can also be used to evaluate existing structures, foundations, and pavements. Refer to FHWA-IF , Application of Geophysical Methods to Highway Related Problems, for additional information on the use of geophysical test methods for applications other than subsurface conditions Surface Wave Methods Surface wave methods consist of Spectral Analysis of Surface Waves or Multi-channel Analysis of Surface Waves. Both methods are used to measure the thickness, depth, and shear wave velocity of a layer. While Spectral Analysis will typically have 2 geophones, Multi-channel will have additional geophones spread over a larger area. The shear wave velocity is more of a general velocity, rather than a discrete velocity of a layer. Discrete shear wave velocity may be determined by crosshole or downhole methods. Typically the surface wave profiles are limited to a depth of approximately 130 feet using man portable equipment. Additional depth can be achieved, but heavier motorized equipment is required Downhole Shear Wave Velocity Methods Downhole methods for determining shear wave velocity differ from surface methods in that equipment is placed below the ground surface. In downhole methods, either geophone is lowered into the casing placed in the ground or a seismic cone penetrometer (SCPT) is pushed into the ground, with a geophone typically mounted above the friction sleeve on the cone. With either method, a shear wave is induced at the ground surface and the time for arrival is measured at the geophone. If casing is used, care must be taken during construction to assure that the casing is plumb. A major limitation of the SCPT is refusal to advance in dense soils Crosshole Shear Wave Velocity Methods In Crosshole Shear Wave Velocity testing, shear wave velocities are determined between a series of vertical cased holes. A downhole hammer and geophone are lowered to the same depth in different holes. The hammer is tripped and the time for the shear wave to travel to the geophone is recorded. The major limitation to the crosshole method is the expense of installing the required casings. Also, care must be taken during installation of the casings to assure that they are plumb and that equal depths are within the same horizontal plane. NYSDOT Geotechnical Page 4-15 December 10, 2013

16 Seismic Refraction Seismic refraction is used to determine the depth to bedrock. The basic operation of a seismic refraction survey uses one or two 200 ft. cables, each having connections for 12 equally spaced geophones. The cables are hooked up to a seismograph. A seismic energy source is required for producing seismic waves. A sledge hammer is typically used for depths less than 50 feet and either a drop weight or a black powder charge is used for depths between 50 and 100 feet. The seismic compression waves penetrate the overburden material and refract along the bedrock surface. After each shot, the time it takes for the compression wave to arrive at each geophone is recorded by the seismograph. A seismic refraction survey works well for depths less than 100 feet. It can be used for up to 4 soil or rock layers; however, each layer must have a higher shear wave velocity than the overlying layer. The method can be used to investigate structure foundations, highway cuts, highway drainage, and aquifer delineation, and has applications in determining shear wave velocity and the thickness of organics Seismic Reflection Seismic reflection uses a surface seismic wave source to create seismic waves that can penetrate the subsurface. The waves are reflected at interfaces that have either a change in shear wave velocity and/or a change in density (termed impedance contrasts). At impedance contrasts, a portion of the seismic wave is reflected back to the ground surface and a portion continues into the subsurface, where it continues to the next impedance contrast. Seismic reflection techniques can obtain information in excess of 100 feet Resistivity Resistivity testing is used to find the depth to bedrock, applying the premise that soil and rock typically have different electrical resistances. Resistivity is affected by the moisture content of the soil and the presence or lack of metals, salts, and clay particles. Resistivity surveys can be used to model ground water flow through the subsurface, and may also be used to determine the potential for corrosion of foundation materials. Resistivity surveys can reach depths of 160 feet, with the depth of the survey typically 1/3 of the electrode spacing (e.g., to reach a depth of 50 feet an electrode spacing of 150 feet is required) Falling Weight Deflectometer The Falling-Weight Deflectometer (FWD) is a trailer-mounted device that exerts a load on the pavement and records the response of the pavement structure to this loading. The recorded data is analyzed to determine the competency of the existing pavement structure and to determine parameters, such as resilient modulus, to assist in pavement design and evaluation. The FWD testing is performed by the NYSDOT Highway Data Services Bureau. Resilient modulus, M r, is discussed in NYSDOT GDM Chapter 7. NYSDOT Geotechnical Page 4-16 December 10, 2013

17 Hydraulic Conductivity Testing Methods In general design practice, hydraulic conductivity is estimated based on grain size characteristics of the soil strata. In more critical applications, hydraulic conductivity can be better defined through in-situ testing. In-situ test methods utilized to determine hydraulic conductivity include the following: Percolation Test Well pumping tests Seepage Tests Packer permeability tests Other - Slug tests, Piezocone tests, Flood tests A discussion of field measurement of permeability is presented in Sabatini, et al. (2002) and Mayne, et al. (2002), and ASTM D 4043 presents a guide for the selection of various field methods Percolation Test Percolation is defined as the gravity flow of groundwater through the pore spaces in rock or soil. A percolation test is typically used as a test to determine the suitability of a soil for the installation of a domestic sewage-disposal system, in which a hole is dug and filled with water and the rate of water-level decline is measured. The Department utilizes percolation data to determine infiltration rates. To provide national consistency, the NRCS Soil Surveys evaluated percolation rates of about 900 soils to define permeability classes (Uhland and O Neal (1951)). As the surveys evolved, the NRCS transitioned from permeability to the term saturated hydraulic conductivity. The NRCS recommended that the term saturated hydraulic conductivity be used for data expressed as a velocity and obtained by analysis using Darcy s Law on saturated cores. The percolation test involves, as described in NAVFAC Design Manual DM-7.1 Soil Mechanics, digging a hole (generally 2 ft. square), or drilled (4 in. min.) to a depth of the proposed absorption trench, cleaned of loose debris, filled with coarse sand or fine gravel over the bottom 2 in., and saturated for a specified time. To eliminate any smearing during the excavation, the sidewalls should be scratched or scarified to provide open, natural soil which water may percolate. The percolation rate measurement is obtained by filling the hole to a prescribed level (usually 6 in.) and then measuring the drop over a set time limit (usually 30 minutes). In sandy soils, the time limit may be only 10 minutes. Limitations: Attempt to conduct the percolation test in clement weather. If there is heavy rain, snow, ice or freezing rain, the test should be re-scheduled. Typically, depending on the depth, the absorption trenches are dug with a backhoe. The scheduling to obtain the equipment and hauling to the site should be a consideration. The depth of the absorption trench needs to be evaluated to determine it s safe and practical based on site constraints. Typically, a limit on the depth of an absorption trench is 5 ft. (4 ft. test pit with a 1 ft. infiltration test hole). As with all subsurface explorations, the locations are to be identified and cleared as per 16 NYCRR Part 753 Protection of Underground Facilities. NYSDOT Geotechnical Page 4-17 December 10, 2013

18 Well Pumping Tests Well pumping tests can be used to provide an estimate of the overall hydraulic conductivity of a geologic formation, and since it is in essence a full scale test, directly accounts for the layering and directionality of the hydraulic characteristics of the formation. The data provided can be used to determine the requirements for construction dewatering systems for excavations or the capacity of a well. The test method presented in ASTM D4050 applies. Pump tests can be expensive and can take a significant amount of time to complete. Care must be exercised when conducting this type of test if potentially contaminated zones could be mobilized during pumping, adjacent facilities such as drinking wells could be impacted, or dewatering could result in local ground subsidence Seepage Tests Seepage tests can be used in soils with lower hydraulic conductivities than is generally considered suitable for pumping tests and does not require disposal of large volumes of water. Data from seepage tests only reflect the hydraulic conditions near the borehole. Tests can be performed intermittently as the borehole is advanced. Three types of seepage tests are commonly used: falling head, rising head and constant water level methods. Typically either the rising or falling level methods should be used if the hydraulic conductivity is low enough to permit accurate determination of the water level. In the falling head method, the borehole or piezometer is filled with water that is allowed to seep into the soil. The rate of drop of the water surface in the casing is monitored. The rising head method consists of bailing the water out of the borehole and observing the rate of rise until the change becomes negligible. The constant water level method is used if soil is too permeable to allow accurate measurement of the rising or falling water level. In general, the rising head test is preferred because there is less chance of clogging soil pores with suspended sediment, although there is the danger of the soil at the bottom of the borehole becoming loosened or quick if too great a gradient is imposed. General guidance on these types of tests is provided in Mayne, et al. (2002) Packer Permeability Tests Packer permeability tests can be used to measure the hydraulic conductivity of a specific soil or rock unit. The information obtained is used primarily in seepage studies. This test is conducted by inserting the packer units to the desired test depth, which has been determined from cores and geophysical logs of the borehole, after the cased boring has been properly cleaned out. The packers are expanded to seal off the zone being tested, and water is injected into the borehole under constant pressure. Measurements of the flow rate are taken at regular time intervals. Upon completion of testing at a particular depth, the packers can be moved to a new test depth. See Mayne, et al. (2002) for additional information on this type of test. NYSDOT Geotechnical Page 4-18 December 10, 2013

19 Other Tests Slug Test - Short duration test that can be performed in a borehole in which a screened pipe has been installed. The hydraulic conductivity can be estimated by monitoring the rate of rise or fall of the water level in the borehole as a solid object is lowered into or removed from the pipe. ASTM D 4044 describes the appropriate test method. Slug tests are not very reliable and may underestimate hydraulic conductivity. Piezecone Test - Performed in conjunction with a Cone Penetrometer Test, the test involves advancing a cylindrical rod with a conical point through the soil to the desired depth, followed by recording pore pressures while the cone is held stationary. Details of the equipment and methodology used to conduct the piezocone test are provided in Sabatini, et al. (2002). Piezocone data can be useful to estimate the hydraulic conductivity of silts and clays, but is subject to a large amount of uncertainty, and should be used only as a preliminary estimate of permeability. Flood Test - Or pilot infiltration test, are applied mainly in the design of infiltration facilities. Given that tests are performed in test pits approximately 100 ft 2 (9 m 2 ) in size, they are not always feasible. Generally only used where unusual site conditions that are poorly modeled by correlation to soil gradation characteristics are encountered, and there is plenty of water available to conduct the test. 4.4 PHASING OF SUBSURFACE INVESTIGATIONS Subsurface investigations are typically conducted in two phases - preliminary and final. The preliminary phase of subsurface investigation should be conducted early enough in the design process to assist in the selection of foundation types and in the determination of bridge/structure location and length. The preliminary phase should also consider scour, seismic site class, and similar specific concerns, where appropriate. Where possible, the testing locations for the preliminary phase should be readily accessible and within the current Department right-of-way (ROW). The final phase of subsurface investigation supplements the preliminary, expanding on information that was obtained, filling in gaps of information where none was obtained, and/or adjusting to a modified project scope. The information collected during the final phase and any additional laboratory analyses will be used to finalize foundation and earthwork recommendations for the project. NYSDOT Geotechnical Page 4-19 December 10, 2013

20 4.5 SUBSURFACE EXPLORATION CRITERIA This section discusses the various applications of test borings within a subsurface exploration program. It presents the minimum number of borings required, and the locations and anticipated depths of the borings, for each of the applications. The frequency and spacing of soil borings indicated in the following are the minimum requirements. Engineering judgment should be applied to address anticipated or potential variation in subsurface conditions and the type of facility to be designed. GPS coordinates (latitude and longitude) and ground elevation must be established at all soil borings. Test boring criteria is based on the use of the Standard Penetration Test (SPT) to obtain soil samples. Unless directed otherwise, SPTs shall be conducted continuously in the upper 10 feet of the subsurface and every 5 feet below that depth. If the Drill Crew encounters soft material (sampler advances with little to no hammer blows) and the site/structure characteristics warrant, undisturbed samples will be required. The term blow(s) used herein refers to hammer blows recorded during an SPT. NYSDOT Geotechnical Page 4-20 December 10, 2013

21 4.5.1 Bridge Foundations All bridges shall have sufficient test borings taken at each proposed abutment and pier to meet the minimum geotechnical site investigation indicated below: Criteria for Test Boring Termination Number and Locations of Test Borings General Spread footing on Soil Water Crossing Rock Continuous 40 ft. (12 m) of 40 blow material or Continuous 50 ft. (15 m) of 25 blow material (blows resulting from Standard Penetration Test) The above criteria will apply unless Rock is encountered (see below) Criteria begins below anticipated bottom of footing elevation, unless at a Water Crossing (see below) Downstate Seismic Criteria: One boring at each bridge shall be drilled to a minimum 100 ft. (30 m) depth Continuous sampling for top 15 ft. (4.5 m) below anticipated bottom of footing elevation Criteria begins a minimum of 25 ft. (7.5 m) below bottom of stream bed (to account for extreme scour event) Minimum of 10 ft. (3 m) of NX rock core with at least 85% recovery Minimum of 20 ft. (6 m) of NX rock core where rock socketed drilled shafts or micropiles might be used Minimum of 10 ft. (3 m) of NX core below anticipated bottom of footing elevation where rock is encountered above anticipated bottom of footing Minimum of 15 ft. (4.5 m) of NX rock core with at least 85% recovery in the last 5 ft (1.5 m) where boulders exceeding 5 ft. (1.5 m) are probable 2 borings per substructure, located near the ends of the proposed substructure One boring at each bridge should be driven casing Where top of rock elevation or soil conditions are variable, additional borings may be warranted Table 4-2 Bridge Foundations - Minimum Requirements NYSDOT Geotechnical Page 4-21 December 10, 2013

22 Flexible Walls Temporary or Permanent (walls with embedded elements) CHAPTER Retaining Walls All retaining walls shall have sufficient test borings taken along the proposed line of the wall to meet the minimum geotechnical site investigation indicated below. Note that anchored walls require additional borings in the anchored zone, as depicted in Figure 4-3. Function Criteria for Test Boring Termination Number and Locations of Test Borings Gravity and Fill Type walls Same criteria as for Bridge Foundations Wall length less than 50 ft (15 m) Minimum of 1 boring General Rock 3 times the proposed retained height below the anticipated bottom of excavation, unless Rock is encountered (see below) Minimum of 10 ft. (3 m) of NX rock core with at least 85% recovery Minimum of 20 ft. (6 m) of NX rock core where rock socketed soldier piles might be used Minimum of 15 ft. (4.5 m) of NX rock core with at least 85% recovery in the last 5 ft. (1.5 m) where boulders exceeding 5 ft. (1.5 m) are probable Wall length of ft (30 m) Wall length greater than 100 ft, or Rock 1 boring at each end of the wall 1 boring at each end of the wall A boring at the point of maximum wall height Additional borings between the ends of the wall, spaced at , depending on the characteristics of the site and structure, and the soil/rock conditions Anchored Walls (additional borings in anchored zone) 2 times the proposed retained height below the anticipated bottom of excavation, unless Rock is encountered If Rock is encountered, minimum of 10 ft. (3 m) of NX rock core with at least 85% recovery in the last 5 ft. (1.5 m) Wall length less than 100 ft (30 m) Wall length of 100 ft (30 m) or more Minimum of 1 boring, located 1.5 times the retained height behind the proposed wall. Borings spaced at , located 1.5 times the retained height behind the proposed wall. Table 4-3 Retaining Walls - Minimum Requirements NYSDOT Geotechnical Page 4-22 December 10, 2013

23 See Walls and Slopes Requiring Additional Explorations in NYSDOT GDM Chapter 17. For example, retaining walls which are known to require ground anchors for support require further investigation. Figure 4-3 identifies testing locations to be performed to adequately explore the subsurface conditions for the retaining wall and for the anchor design. Figure 4-3 Site Explorations for Anchored Walls NYSDOT Geotechnical Page 4-23 December 10, 2013

24 4.5.3 Embankments All roadway embankments shall have sufficient test borings taken along the proposed line of the embankment to meet the minimum geotechnical site investigation indicated below. General Criteria for Test Boring Termination 2 times the maximum proposed fill height, unless Organic or Plastic soil is encountered, or if Rock is encountered If Organic or Plastic (not till) soil is encountered, 10 ft. (3 m) below the Organic/Plastic deposit, or to 4 times the proposed fill height, whichever is shallower If Rock is encountered, 5 ft. (1.5 m) of minimum AX rock core Undisturbed sampling in soft plastic deposits Number and Locations of Test Borings 1 boring every along the centerline or line of maximum fill height 1 boring every at toe of existing embankment or beyond In all areas where soft or unsuitable foundation soils may be encountered Table 4-4 Embankments - Minimum Requirements Large Cuts and Excavations All large cuts and excavations shall have sufficient test borings taken along the proposed cut area to meet the minimum geotechnical site investigation indicated below. Criteria for Test Boring Termination Number and Locations of Test Borings General 10 ft. (3 m) below the anticipated bottom of excavation or 10 ft. (3 m) into rock, whichever is shallower If Rock is encountered, minimum AX rock core 1 boring every along proposed cut area Where top of rock elevation and/or soil conditions are variable, additional borings may be warranted Test pits and probes may be utilized to obtain information between the borings Table 4-5 Large Cuts and Excavations - Minimum Requirements NYSDOT Geotechnical Page 4-24 December 10, 2013

25 4.5.5 Culverts All culverts (pipe, box, floorless, etc) shall have sufficient test borings taken along the proposed line of the culvert to meet the minimum geotechnical site investigation indicated below. Large Culverts are culverts having an interior width greater than 5 feet, but no greater than 20 feet (greater than 20 feet is considered a bridge). Small Culverts are culverts having an interior width of 5 feet or less. Criteria for Test Boring Termination Number and Location of Test Borings Large Culverts Small Culverts Same criteria as for bridge foundations 10 ft. (3 m) below anticipated invert elevation In soil, continuous sampling for top 10 ft. (3 m) below anticipated invert elevation If Rock is encountered, minimum AX rock core 1 boring at each end of the culvert Additional borings between the ends of the culvert, spaced at For culvert extensions, 1 boring every (minimum 1) 1 boring every along the line of the proposed culvert For culvert extensions, 1 boring every (minimum) Table 4-6 Culverts - Minimum Requirements NYSDOT Geotechnical Page 4-25 December 10, 2013

26 4.5.6 Noise Barrier Walls All noise barrier walls shall have sufficient test borings taken along the proposed line of the wall to meet the minimum geotechnical site investigation indicated below. Criteria for Test Boring Termination General 40 ft. (12 m) below the anticipated top of foundation or 10 ft. (3 m) into rock, whichever is shallower, or 10 ft. (3 m) into rock (NX rock core), whichever is shallower If Organic or Plastic (not Till) soil is encountered, 10 ft. (3 m) below the Organic/Peat deposit or 40 ft. (12 m) below the anticipated top of foundation, whichever is deeper Number and Location of Test Borings 1 boring at each end of the noise barrier Additional borings between the ends of the noise barrier, spaced at Table 4-7 Noise Barrier Walls - Minimum Requirements NYSDOT Geotechnical Page 4-26 December 10, 2013

27 4.5.7 Overhead Signs, Traffic Signals, and Light Standards Overhead signs, traffic signals, and light standards are typically constructed on drilled shaft foundations, with design sheets for overhead signs allowing for shallow footings. All overhead signs, traffic signals, light standards, and similar structures shall have sufficient test borings taken at each proposed foundation to meet the minimum geotechnical site investigation indicated below. Overhead Signs Traffic Signals and Light Standards Criteria for Test Boring Termination Continuous 30 ft. (9m) of 10 blow material or 10 ft. (3 m) of rock (NX rock core w ith at least 85% recovery), w hichever is shallow er Criteria begins below elevation of potential shallow foundation Continuous sampling for top 10 ft. (3 m) below elevation of potential shallow foundation 30 ft. (9 m) below the anticipated top of foundation or 10 ft. (3 m) of rock (NX rock core), whichever is shallower If Organic or Plastic (not Till) soil is encountered, 10 ft. (3 m) below the Organic/Peat deposit or 30 ft. (9 m) below the anticipated top of foundation, whichever is deeper Number and Location of Test Borings 1 boring at each foundation 1 boring at each foundation Table 4-8 Overhead Signs, Signals, and Light Standards - Minimum Requirements NYSDOT Geotechnical Page 4-27 December 10, 2013

28 4.5.8 Pavement Structures Subsurface investigation requirements for pavement structure design vary with location, traffic level, and project size. At a minimum, the subsurface exploration program must determine the composition of the pavement structure, the thickness of the subbase layer, and the character of the subgrade/embankment material. All pavement structures shall have sufficient test borings taken within the proposed area of pavement work to meet the minimum geotechnical site investigation indicated below. Criteria for Test Boring Termination General Minimum 10 ft. (3 m) below top of pavement Continuous sampling for top 5 ft. (1.5 m) or to bottom of former pavement layers, whichever is deeper. Number and Location of Test Borings Borings spaced at 100 ft. 300 ft., depending on the characteristics of the proposed area of pavement work Where conditions are diverse, additional pavement cores and borings at multiple locations may be warranted Table 4-9 Pavement Structure - Minimum Requirements Infiltration Basins and Wetland Mitigations Subsurface investigation requirements for infiltration basins or wetland mitigations vary with application, site conditions, and facility geometry. All infiltration basins and wetland mitigations shall have sufficient test borings taken within the proposed area of the facility to meet the minimum geotechnical site investigation indicated below. Criteria for Test Boring Termination Number and Location of Test Borings General Continuous sampling for top 10 ft. (3 m) below anticipated bottom elevation or 10 ft. (3 m) into rock (minimum AX rock core), whichever is shallower 1 boring every acre within the proposed area of the facility Additional borings in irregular shaped or separate areas that may be less than 1 acre Additional borings, test pits, or percolation tests may be utilized to obtain information between the borings Table 4-10 Infiltration Basins and Wetland Mitigations - Minimum Requirements NYSDOT Geotechnical Page 4-28 December 10, 2013

CIVL451. Soil Exploration and Characterization

CIVL451. Soil Exploration and Characterization CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

More information

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode INDIRECT METHODS SOUNDING OR PENETRATION TESTS STANDARD PENETRATION TEST (SPT) Reference can be made to IS 2131 1981 for details on SPT. It is a field edtest to estimate e the penetration e resistance

More information

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 4.1 Introduction...4-1 4.2 Subsurface Investigation...4-2 4.2.1 Preliminary

More information

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:! In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible

More information

Site Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions

Site Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions This is an attempt to create a stand alone self learning module on site investigation. Fasten your seat belts. Sit back, relax and enjoy. 1 2 Site Investigation Some unsung heroes of Civil Engineering

More information

c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc.

c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc. Design Manual Chapter 6 - Geotechnical 6B - Subsurface Exploration Program 6B-2 Testing A. General Information Several testing methods can be used to measure soil engineering properties. The advantages,

More information

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering

More information

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum Malaysian Civil Engineering Standard Method of Measurement (MyCESMM) CLASS D: SITE INVESTIGATION WORK Measurement covered under other classes: Excavation not carried out for the purpose of soil investigation

More information

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives In this section you will learn the following Penetrometer Tests Standard penetration test Static cone penetration test Dynamic cone

More information

How To Design A Foundation

How To Design A Foundation The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural

More information

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED

More information

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration

More information

Caltrans Geotechnical Manual

Caltrans Geotechnical Manual Cone Penetration Test The cone penetration test (CPT) is an in-situ sounding that pushes an electronic penetrometer into soil and records multiple measurements continuously with depth. Compared with rotary

More information

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces.

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces. Project No. 208-8719 January, 2009 Ref: 2-8719BR Anthony Hudson - Broadscale Geotechnical Investigation - Proposed Commercial Development - 52 Old Pacific Highway, Pimpama Page 32 iii) Pavements should

More information

Chapter 5 FIELD AND LABORATORY TESTING PROCEDURES

Chapter 5 FIELD AND LABORATORY TESTING PROCEDURES Chapter 5 FIELD AND LABORATORY TESTING PROCEDURES Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 5.1 Introduction...5-1 5.2 Sampling Procedure...5-1 5.2.1 Soil Sampling...5-1

More information

KWANG SING ENGINEERING PTE LTD

KWANG SING ENGINEERING PTE LTD KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters

More information

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns 1. Introduction 1.1 Scope of Work The Asian Disaster Preparedness Centre (ADPC) is implementing the project Seismic Hazard and Vulnerability Mapping for Rangamati, Bandarban and Khagrachari Municipality.

More information

NOTES on the CONE PENETROMETER TEST

NOTES on the CONE PENETROMETER TEST GE 441 Advanced Engineering Geology & Geotechnics Spring 2004 Introduction NOTES on the CONE PENETROMETER TEST The standardized cone-penetrometer test (CPT) involves pushing a 1.41-inch diameter 55 o to

More information

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No.

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No. GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES Materials Engineering Report No. 2009-8M (Supersedes Report No. 21) F CHOWDHURY GEOMECHANICS AND STRUCTURAL MATERIALS ENGINEER S REHMAN GEOTECHNICAL

More information

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 (PREVIEW) SP 36 (Part 2) : 1988 COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 IS 1893 : 1979 (Reaffirmed 1987) CODE OF PRACTICE FOR SUBSURFACE INVESTIGATION FOR FOUNDATIONS 1.1 This code deals

More information

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Lecture No. # 13 (Refer Slide Time: 00:18) So last class, it was

More information

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION ACCREDITATION SCHEME FOR INSPECTION BODIES TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION Technical Note SI 01: 3 February 2016 The SAC Accreditation

More information

Geotechnical Testing Methods II

Geotechnical Testing Methods II Geotechnical Testing Methods II Ajanta Sachan Assistant Professor Civil Engineering IIT Gandhinagar FIELD TESTING 2 1 Field Test (In-situ Test) When it is difficult to obtain undisturbed samples. In case

More information

Table of Contents 10.1 GENERAL... 10.1-1

Table of Contents 10.1 GENERAL... 10.1-1 Table of Contents Section Page 10.1 GENERAL... 10.1-1 10.1.1 Overview... 10.1-1 10.1.2 Role of Uncertainty in Property Interpretation... 10.1-1 10.1.3 Role of Drainage in Property Interpretation... 10.1-2

More information

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding

More information

FINAL REPORT ON SOIL INVESTIGATION

FINAL REPORT ON SOIL INVESTIGATION FINAL REPORT ON SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION AT SS-6B AREA AT HPCL VISAKH REFINERY VISAKHAPATNAM ANDHRA PRADESH J.J. ASSOCIATES(VISAKHAPATNAM) AETP(P) LIMITED #11-6-3, RockDale Layout,

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

hs2 Ground A non-technical guide

hs2 Ground A non-technical guide hs2 Ground Investigations A non-technical guide Contents HS2 ground investigations 1 Essential Q&A 2 2 In-ground investigation techniques 9 2.1 Cable percussion borehole 10 2.2 Rotary core borehole 12

More information

Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme

Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme Main Report Deliverable 02 Sub-Surface Properties of Soil Development in Rangamati, Bandarban and Khagrachari Municipality

More information

Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT

Strength Determination of Tooth-Paste Like Sand and Gravel Washing Fines Using DMT Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT David L. Knott, P.E. and James M. Sheahan, P.E. HDR Engineering, Inc. 3 Gateway Center Pittsburgh, PA 15222-1074 Phone:

More information

PILE FOUNDATIONS FM 5-134

PILE FOUNDATIONS FM 5-134 C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics

More information

Fundamentals of CONE PENETROMETER TEST (CPT) SOUNDINGS. J. David Rogers, Ph.D., P.E., R.G.

Fundamentals of CONE PENETROMETER TEST (CPT) SOUNDINGS. J. David Rogers, Ph.D., P.E., R.G. Fundamentals of CONE PENETROMETER TEST (CPT) SOUNDINGS J. David Rogers, Ph.D., P.E., R.G. Cone Penetration Test CPT soundings can be very effective in site characterization, especially sites with discrete

More information

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1: BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN DRA FOR SAFETY D1-1 ANNEX D1 BASIC CONSIDERATIONS

More information

Geotechnical Investigation Test Report

Geotechnical Investigation Test Report Geotechnical Investigation Test Report Report No. htsc/rcd/ 3457 Dated: - 20/03/2010 Asphalt Standard Penetration Test as per IS 2131 ------------- IS 6403 Soil Job Card No - 1649 Cement Client/Department

More information

Work Type Definition and Submittal Requirements

Work Type Definition and Submittal Requirements Work Type: Highway Materials Testing Geotechnical Laboratory Testing, Geotechnical Laboratory Testing, Standard Penetration (SPT) & Rock Coring, Cone Penetration Test, Solid Stem Auger Drilling, and Materials

More information

Cone Penetration Testing in Geotechnical Practice. Tom Lunne Peter K. Robertson John J.M. Powell

Cone Penetration Testing in Geotechnical Practice. Tom Lunne Peter K. Robertson John J.M. Powell Cone Penetration Testing in Geotechnical Practice Tom Lunne Peter K. Robertson John J.M. Powell BLACKIE ACADEMIC & PROFESSIONAL An Imprint of Chapman & Hall London Weinheim New York Tokyo Melbourne Madras

More information

A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil

A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil ISSN: 319-53 (An ISO 39: 00 Certified Organization) A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil Utpal Kumar Das Associate Professor, Department

More information

ODOT/OSU collaboration on the development of CPT Capabilities for use in Ohio Transportation Projects

ODOT/OSU collaboration on the development of CPT Capabilities for use in Ohio Transportation Projects CPT Cone Penetration Testing ODOT/OSU collaboration on the development of CPT Capabilities for use in Ohio Transportation Projects Presented by: Jason Ross, Staff Engineer, BBC&M Engineering, Inc. Kirk

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

Standard Test Method for Mechanical Cone Penetration Tests of Soil 1

Standard Test Method for Mechanical Cone Penetration Tests of Soil 1 Designation: D 3441 98 AMERICAN SOCIETY FOR TESTING AND MATERIALS 100 Barr Harbor Dr., West Conshohocken, PA 19428 Reprinted from the Annual Book of ASTM Standards. Copyright ASTM Standard Test Method

More information

Soil Classification Through Penetration Tests

Soil Classification Through Penetration Tests Pak. J. Engg. & Appl. Sci. Vol. 9, Jul., 2011 (p. 76-86) Soil Classification Through Penetration Tests A. H. Khan, A. Akbar, K. Farooq, N. M. Khan, M. Aziz and H. Mujtaba Department of Civil Engineering,

More information

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 5 : Geophysical Exploration [ Section 5.1 : Methods of Geophysical Exploration ]

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 5 : Geophysical Exploration [ Section 5.1 : Methods of Geophysical Exploration ] Objectives In this section you will learn the following General Overview Different methods of geophysical explorations Electrical resistivity method Seismic refraction method 5 Geophysical exploration

More information

Geotechnical Standards Eurocodes. An update

Geotechnical Standards Eurocodes. An update Geotechnical Standards Eurocodes. An update Professor Ltd Sussex University EUROCOE 7 (EN 1997) Part 1 published. 2004 National Annex published 2007 Part 2 published Mar 2007 National Annex published 2010

More information

ENCE 4610 Foundation Analysis and Design

ENCE 4610 Foundation Analysis and Design This image cannot currently be displayed. ENCE 4610 Foundation Analysis and Design Shallow Foundations Total and Differential Settlement Schmertmann s Method This image cannot currently be displayed. Strength

More information

Standard penetration test (SPT)

Standard penetration test (SPT) Standard penetration test (SPT) Evolution of SPT Test methods and standards Influence of ground conditions on penetration resistance SPT energy measurement and corrections for SPT Use of SPT results Profiling

More information

VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE

VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE 2.0 SITE INVESTIGATION METHODOLOGY The following section summarizes the Site investigation methodology applied during the subsurface investigation and hydrogeological assessment completed at the CRRRC

More information

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils Appendix D.1 Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils General Notes Pertinent to All Testing 1. For infiltration trench (I-1) and basin (I-2) practices, a minimum field

More information

Standard Test Procedures Manual

Standard Test Procedures Manual STP 240-6 Standard Test Procedures Manual Section: PENETRATION TEST & SPLIT- BARREL SAMPLING 1. SCOPE 1.1. Description of Test This method describes the standard penetration test using the split-barrel

More information

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer HS-4210_MAN_09.08 product manual HS-4210 Digital Static Cone Penetrometer Introduction This Manual covers the measurement of bearing capacity using the Humboldt Digital Static Cone Penetrometer (DSCP).

More information

Cone Penetration Test (CPT)

Cone Penetration Test (CPT) Cone Penetration Test (CPT) The cone penetration test, or CPT in short, is a soil testing method which will provide a great deal of high quality information. In the Cone Penetration Test (CPT), a cone

More information

Using Combination of SPT, DMT and CPT to Estimate Geotechnical Model for a Special Project in Turkey

Using Combination of SPT, DMT and CPT to Estimate Geotechnical Model for a Special Project in Turkey Using Combination of SPT, DMT and CPT to Estimate Geotechnical Model for a Special Project in Turkey Figen Orhun Onal GE, M.Sc., Site Works Manager, Zemin Etud ve Tasarım A.Ş., Istanbul, figen.orhun@zetas.com.tr

More information

An Automatic Kunzelstab Penetration Test

An Automatic Kunzelstab Penetration Test An Automatic Kunzelstab Penetration Test Yongyuth Sirisriphet 1, Kitidech Santichaianant 2 1 Graduated student: Faculty of Industrial Education in and Technology. King Mongkut's University of Technology

More information

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013 INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013 Copyright by the authors - Licensee IPA- Under Creative Commons license 3.0 Research article ISSN 0976 4399 Reliability of

More information

ALLOWABLE LOADS ON A SINGLE PILE

ALLOWABLE LOADS ON A SINGLE PILE C H A P T E R 5 ALLOWABLE LOADS ON A SINGLE PILE Section I. BASICS 5-1. Considerations. For safe, economical pile foundations in military construction, it is necessary to determine the allowable load capacity

More information

Cone Penetration Testing (CPT) Michael Bailey, P.G. U.S. Army Corps of Engineers, Savannah District

Cone Penetration Testing (CPT) Michael Bailey, P.G. U.S. Army Corps of Engineers, Savannah District Cone Penetration Testing (CPT) Michael Bailey, P.G. U.S. Army Corps of Engineers, Savannah District Recommended publications ASTM D 5778-07 Standard Test Method for Electronic Friction Cone and Piezocone

More information

DIRECT PUSH DRILLING.

DIRECT PUSH DRILLING. DIRECT PUSH DRILLING. CONCEPT. Direct Push Drilling is a method of drilling and sampling where the tools are pushed or driven into the ground. No rotation is involved so all the samples are uncontaminated

More information

ASSESSMENT OF SHEAR WAVE VELOCITY FROM INDIRECT INSITU TESTS

ASSESSMENT OF SHEAR WAVE VELOCITY FROM INDIRECT INSITU TESTS Proceedings of Indian Geotechnical Conference IGC-2014 December 18-20, 2014, Kakinada, India ASSESSMENT OF SHEAR WAVE VELOCITY FROM INDIRECT INSITU TESTS Kant, L., M. Tech Student, Department of Earthquake

More information

TECHNICAL SPECIFICATION FOR GEOTECHNICAL INVESTIGATION

TECHNICAL SPECIFICATION FOR GEOTECHNICAL INVESTIGATION SHEET 1 OF 50 TECHNICAL SPECIFICATION FOR GEOTECHNICAL INVESTIGATION 1.0 GENERAL 2.0 SCOPE This specification covers the technical requirements for a detailed Geotechnical investigation and submission

More information

In Situ Subsurface Characterization

In Situ Subsurface Characterization 27 In Situ Subsurface Characterization J. David Frost Georgia Institute of Technology Susan E. Burns Georgia Institute of Technology 27.1 Introduction 27.2 Subsurface Characterization Methodology 27.3

More information

1.0 INTRODUCTION 1 2.0 SCOPE OF WORK 2 3.0 EXECUTION OF FIELD WORK 2 4.0 LABORATORY TESTS 8 5.0 FINDINGS OF THE GEOTECHNICAL INVESTIGATION 9

1.0 INTRODUCTION 1 2.0 SCOPE OF WORK 2 3.0 EXECUTION OF FIELD WORK 2 4.0 LABORATORY TESTS 8 5.0 FINDINGS OF THE GEOTECHNICAL INVESTIGATION 9 REPORT ON GEOTECHNICAL INVESTIGATION FOR LPG MOUNDED STORAGE AT VISAKHA REFINERY, MALKAPURAM, VISAKHAPATNAM (A.P) FOR HINDUSTAN PETROLEUM CORPORATION LIMITED CONTENTS SR.NO. DESCRIPTION PAGE NO. 1.0 INTRODUCTION

More information

GUIDELINE FOR HAND HELD SHEAR VANE TEST

GUIDELINE FOR HAND HELD SHEAR VANE TEST GUIDELINE FOR HAND HELD SHEAR VANE TEST NZ GEOTECHNICAL SOCIETY INC August 2001 CONTENTS Page 1.0 Introduction 2 2.0 Background 2 3.0 Recommended Practice 3 4.0 Undrained Shear Strength 3 5.0 Particular

More information

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire

More information

Use and Application of Piezocone Penetration Testing in Presumpscot Formation

Use and Application of Piezocone Penetration Testing in Presumpscot Formation Use and Application of Piezocone Penetration Testing in Presumpscot Formation Craig W. Coolidge, P.E. Summit Geoengineering Services, Rockland, Maine ABSTRACT: This paper examines the advantages and limitations

More information

CIV4249 1. SITE INVESTIGATION AND EXPLORATION TABLE OF CONTENTS

CIV4249 1. SITE INVESTIGATION AND EXPLORATION TABLE OF CONTENTS Unit CIV4249: Foundation Engineering 1.1 CIV4249 1. SITE INVESTIGATION AND EXPLORATION TABLE OF CONTENTS 1. GENERAL... 2 1.1. Objectives... 2 1.2. Reasons for investigating Subsurface... 2 1.3. Sources

More information

DIRECTIONAL DRILLING

DIRECTIONAL DRILLING DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation

More information

King Saud University College of Engineering Civil Engineering Department DEFORMATION OF PARTIALLY SATURATED SAND. Sultan Musaed Al-Ghamdi

King Saud University College of Engineering Civil Engineering Department DEFORMATION OF PARTIALLY SATURATED SAND. Sultan Musaed Al-Ghamdi King Saud University College of Engineering Civil Engineering Department DEFORMATION OF PARTIALLY SATURATED SAND By Sultan Musaed Al-Ghamdi Submitted in Partial Fulfillment of The Required For the Degree

More information

CHAPTER THREE GEOTECHNICAL INVESTIGATION AND SAMPLING

CHAPTER THREE GEOTECHNICAL INVESTIGATION AND SAMPLING CHAPTER THREE GEOTECHNICAL INVESTIGATION AND SAMPLING 3.0 GENERAL All Geotechnical work performed by an approved consultant for the State of Indiana or Local Agencies, such as any Indiana local municipalities

More information

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

Testing Procedures. Note: Please refer to Table 2 for a list of completed borings.

Testing Procedures. Note: Please refer to Table 2 for a list of completed borings. Testing Procedures Drilling and Sampling: Standard penetration tests (SPT) were conducted for every ten feet of boring advancement. SPT tests were conducted in accordance with ASTM D1586, using a 140 pound

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

GLOSSARY OF TERMINOLOGY

GLOSSARY OF TERMINOLOGY GLOSSARY OF TERMINOLOGY AUTHORIZED PILE LENGTHS - (a.k.a. Authorized Pile Lengths letter) Official letter stating Engineer's recommended length of concrete piles to be cast for construction of foundation.

More information

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge. TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION 1.1 Introduction The design and construction of foundations require a good knowledge of the mechanical behaviour of soils and of their spatial variability. Such information can be

More information

Table of Contents 16.1 GENERAL... 16.1-1. 16.1.1 Overview... 16.1-1 16.1.2 Responsibilities... 16.1-1

Table of Contents 16.1 GENERAL... 16.1-1. 16.1.1 Overview... 16.1-1 16.1.2 Responsibilities... 16.1-1 Table of Contents Section Page 16.1 GENERAL... 16.1-1 16.1.1 Overview... 16.1-1 16.1.2 Responsibilities... 16.1-1 16.1.2.1 Geotechnical Section/Bridge Bureau Coordination... 16.1-1 16.1.2.2 Geotechnical

More information

Washington 98102-3699, mike.bailey@hartcrowser.com

Washington 98102-3699, mike.bailey@hartcrowser.com LESSONS LEARNED FROM A STONE COLUMN TEST PROGRAM IN GLACIAL DEPOSITS Barry S. Chen 1, P.E., Member, Geo-Institute and Michael J. Bailey 2, P.E., Member, Geo-Institute ABSTRACT A stone column test program

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

Use of the Cone Penetration Test for Geotechnical Site Characterization in Clay-Mantled Karst. T. C. Siegel 1 and P. E. Cargill 2

Use of the Cone Penetration Test for Geotechnical Site Characterization in Clay-Mantled Karst. T. C. Siegel 1 and P. E. Cargill 2 Use of the Cone Penetration Test for Geotechnical Site Characterization in Clay-Mantled Karst T. C. Siegel 1 and P. E. Cargill 2 Abstract Adapted for use as a mechanical soil exploration device in the

More information

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore

More information

Anirudhan I.V. Geotechnical Solutions, Chennai

Anirudhan I.V. Geotechnical Solutions, Chennai Anirudhan I.V. Geotechnical Solutions, Chennai Often inadequate In some cases, excess In some cases, disoriented Bad investigation Once in a while good ones Depends on one type of investigation, often

More information

CHAPTER 9 SOIL EXPLORATION 9.1 INTRODUCTION

CHAPTER 9 SOIL EXPLORATION 9.1 INTRODUCTION CHAPTER 9 SOIL EXPLORATION 9.1 INTRODUCTION The stability of the foundation of a building, a bridge, an embankment or any other structure built on soil depends on the strength and compressibility characteristics

More information

DYNAMIC CONE PENETRATION TEST INSTRUCTIONAL MANUAL GEOTECHANICAL

DYNAMIC CONE PENETRATION TEST INSTRUCTIONAL MANUAL GEOTECHANICAL DYNAMIC CONE PENETRATION TEST INSTRUCTIONAL MANUAL GEOTECHANICAL J. P. Scientific Instruments 7, Civil Lines, Roorkee-247667 DYNAMIC CONE PENETRATION TEST CONTENTS: PAGE NO. 1.0 INTRODUCTION 03 2.0 PROBLEM

More information

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM DATE: December 04, 1996 This document is subject to change. If in doubt, verify current status with Technical Services

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: rajuvs_b@yahoo.com

More information

EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND

EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND D.L. Avalle, Broons Hire (SA) Pty Ltd, Australia J.P. Carter, The University of Sydney, Australia Abstract Impact rolling, utilising a non-circular

More information

CPTWD (Cone Penetration Test While Drilling) a new method for deep geotechnical surveys

CPTWD (Cone Penetration Test While Drilling) a new method for deep geotechnical surveys CPTWD (Cone Penetration Test While Drilling) a new method for deep geotechnical surveys Authors : Massimo Sacchetto-Engineer-: S P G drilling company -Adria (Ro) Italy Kjell Elmgren Engineer ENVI Environmental

More information

CEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests

CEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests PURPOSE: The parameters of the shear strength relationship provide a means of evaluating the load carrying capacity of soils, stability of slopes, and pile capacity. The direct shear test is one of the

More information

Module5: Site investigation using in situ testing

Module5: Site investigation using in situ testing Module5: Site investigation using in situ testing Topics: Introduction Penetration testing 1. Standard penetration test 2. Cone penetration test Strength and compressibility testing 1. Field vane shear

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

SECTION 02401 SHEETING, SHORING AND BRACING

SECTION 02401 SHEETING, SHORING AND BRACING SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State

More information

SECTION 411 DRILLED PIERS

SECTION 411 DRILLED PIERS Section Payment will be made under: Pay Item Foundation Excavation Foundation Excavation for Bent No. at Station Foundation Excavation for End Bent No. at Station Pay Unit Cubic Yard Lump Sum Lump Sum

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.

(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles. Chapter 4 Specifications Designs 3. Visitors Centers 3. Visitors Centers. The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module - 4

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines

More information