1 Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) [email protected] Prof. V.S. Raju 1 CHOICE OF APPROPRIATE FOUNDATION AND EXECUTION Optimum foundation design should ensure: technical adequacy, cost effectiveness and ease of execution. This is not easy, because of many variables including insufficient and inaccurate information at the time of design. Variation in strata and changes in project requirement during execution 2 1

2 TOPICS COVERED Inadequacy of the Investigations and Inappropriate Foundation Recommendations with Illustrative Examples 1. Fertilizer Plant on the East Coast 2. Fertilizer Plant in Gangetic Belt 3. Office cum Residential Complex at Jodhpur 4. University Campus at Adilabad District 5. L&T Serene County (Residential Campus) 3 FERTILIZER PLANT ON THE EAST COAST The average soil strata consists of : top layer of dense fine sand 4 to 8 m thick. followed by soft marine clay up to a depth of 14 to 18 m below ground level. very stiff clay up to 30 to 40 m below ground level. 4 2

3 5 PROBLEMS DUE TO THE PRESENCE OF SOFT CLAY LAYER For site grading, 1-2 m fill is required - results in a settlement of 12 cm of soft clay. - Along with clay, sand layer also moves down. In case of pile foundation, large negative drag on piles from soft clay and sand layer. Considerable reduction in pile capacity (upto 50%), and hence increase in the number of piles. For structures like bulk storage with large area loads, the stability of soft clay layer and lateral flow to be checked. Large settlements of floors and lateral forces on neighbouring pile foundations. 6 3

4 FOUNDATIONS ADOPTED Precast driven piles were chosen, with bitumen coat in the top layers to reduce the negative drag. All light structures, not sensitive to settlements, are supported on shallow foundations. For structures having distributed loads over large areas (silos, water storages), surcharge provided on the periphery to achieve reduced shear stresses on soft clay. 7 CHOICE OF THE PILE The original recommendation was to go for bored piles, 45 cm in diameter. Two alternative pile types have been tested. a) Precast driven piles 40 cm x 40 cm, 22 m long (to be able to drive). b) Bored cast in situ piles, 45cm dia, 22 m long Full scale tests for a final decision on the choice of the pile type. 6 test piles, 3 each of the 2 types, installed in locations in close proximity. 3 different Bored cast in-situ piles were installed by bailer boring method. 8 4

5 RESULTS OF PILE LOAD TESTS 9 Table 1: WORKING LOAD IN TONS AS PER IS 2911 Pile No. (1) 2 / 3 of Load at 12 mm settlement (2) Failure Load (3) Half of Failure Load (4) Working Load (smaller of 2 and 4) (5) P (100) * B P B P B The pile length is 19.5 m, and failure load extrapolated for 22 m length is 100 tons. 10 5

6 CONCLUSIONS Precast driven piles with design load of 70 to 100 tonnes adopted for the following reasons : For comparable dimensions, the precast pile has 50 to 80% higher capacity than a bored pile. Precast pile offers better protection to reinforcement. This is particularly important under the present saline ground water conditions. The jetting of precast pile up to 12 m will reduce the friction over this depth, and consequently the effects of negative drag. In case of precast piles, the negative drag can be reduced by applying a slip layer of bitumen. 11 Conclusions (Contd.) Bored piles not preferred for the following reasons: Lower Capacity Boring operations through stiff fissured clay will result in softening of this layer, thereby limiting the load carrying capacity of piles. There is no possibility of applying any slip layer and to reduce the negative drag. 12 6

7 ANTICIPATED NEGATIVE DRAG 40 tonnes based on theoretical consideration. Field load tests on i) Short piles resting on soft clay, ii) Instrumented piles, where the load distribution with depth has been measured. Model tests for the proper choice of bitumen coating to reduce negative drag. i) Precast concrete 10 cm dia and 50 cm long piles were used. ii) Bitumen coatings using different grades of bitumen were applied, and results showed 80 to 90% reduction in friction. iii) Finally SAE 80 grade bitumen was adopted. 13 FERTILIZER PLANT IN GANGETIC BELT The Soil Strata: Silty sand with low N values (<10) upto 10 m depth, N > 20 beyond 20 m depth. N-values ranging between 10 to 20 for the layer between 10 to 20 m depth. High water table with possibility of liquefaction during earthquake. 14 7

8 PHASE I : INITIAL FOUNDATION DESIGN RCC Piles, Driven Cast-in situ, 400 mm dia Sand Compaction Piles, 2-3 Rows Around RCC Piles, Pile capacities Vertical downward : 50 t, Tension : 5t, Lateral : 2.5t, Result Total Requirement 16,000 RCC Piles 32,000 Compaction Piles Problem of execution on time 15 REVIEW AND FURTHER INVESTIGATION (Pile Load Tests) Revised Pile Capacities Vertical : 65t Tension : 25t Lateral : 3.5t Reduction in RCC Piles : 40% Increase in spacing of compaction piles from 3d to 4 d ; reduction in Compaction Piles : 50% Saving in construction time : 6 months Substantial cost savings as well. 16 8

9 SETTLEMENT (mm) PHASE II OF THE PLANT No RCC Piles. 900 mm dia Vibro-Stone Columns with varied spacing (2d,2.25d and 2.5d) to suit the foundation requirement. Full scale field trials. Several Footing tests for confirmation. Substantial savings in time and cost. 17 LOAD kg / m 2 x LOAD SETTLEMENT CURVES FOR SINGLE COLUMN LOAD TEST 18 9

10 SETTLEMENT (mm) LOAD kg / m 2 x Aonla (Compressor House) Single column Test Aonla (Benefield) Aonla (Prill Tower) Three Column Test LOAD SETTLEMENT CURVES FOR SINGLE AND THREE COLUMN TEST 19 Office cum Residential Complex at Jodhpur 2-3 Storeyed Buildings Investigations Done 8 Bore holes drilled to 6 m depth each. As per bore logs Rocky strata. Strata starts at Ground level (GL) in all bore holes except in Bore hole 5, where it starts at 1.5 m. BH 5 is at the extreme corner of the plot where nothing is planned to be built. Bore logs do not give the core recovery, which is a must to be given

11 Recommendations by Investigation Agency 1. Open foundations (footings) 2. Unconfined compressive strength of rock range given 650 to 850 t/m 2 3. Calculated safe bearing capacity (SBC) 80 to 100 t/m 2 21 FOUNDATION RECOMMENDATIONS (Contd ) 4. Recommended SBC is 40 t/m 2 at 1m below GL, except in BH 5; where SBC is 10 t/m 2 at 1.2 m depth and 40 t/m 2 from 2 m depth onwards. 5. The SBC adopted in Design is not known. It should have been written on the drawings

12 WHAT HAPPENED AT SITE 1. Foundation Depth adopted: 1.5m. 2. Foundation sizes 1.5m x 1.5m to 2.3m x 2.3m 3. For excavation Rock Blasting has been done 4. Instead of excavating / blasting individual pits for each footing, the entire foot print of all the buildings has been blasted and excavated. 23 What Happened at Site (Contd ) 5. This resulted in excavated rock material ranging from huge boulders to rubble of volume of about 25,000 m 3 (Actually needed 10% of this). 6. Additional issues: (a) How to dispose of the excavated material. (b) Huge quantity of soil material for plinth filling needed

13 Prof. V.S. Raju s Investigation of the Situation and Foundation Recommendations Basis : Site visit Inspection of the strata in the excavated pits Study of the soil report 1. The investigation is not as per the relevant Indian Standards. 25 Prof. V.S. Raju s Recommendations (Contd ) 2. The recommendations in the report are wrong and are less by a Factor 3 to The correct SBC values are 150 t/m 2 (on a conservative side) with a minimum size of footing as 0.8m x 0.8m. Depth of footing 0.5m to 1m

14 Prof. V.S. Raju s Recommendations (Contd ) 4. There is absolutely no justification to stipulate a foundation depth of 1.5m for the entire site. 5. There was no need at all to make the footing sizes so big as given (1.5m x 1.5m to 2.3m x 2.3m) 6. There is no need to blast the strata over the entire foot print of the building. 27 Prof. V.S. Raju s Recommendations (Contd ) 7. No need to blast for the individual footings also as the required likely sizes are 0.8m x 0.8m to 1.2m x 1.2m, depth 0.5 m to 1.0m only. Pavement breakers (jack hammers) will do the job

15 Photographs of Blasted Rocks 29 rap Photographs of Blasted Rocks 30 15

16 5.8 m to 25m soft rock University Campus at Adilabad District Total area ~ 300 acres For Phase I development, Only 7 boreholes Bore logs improper and inadequate. First SPT at 10 m below GL. Pile Foundations recommended and executed, which are not at all required. Pile safe capacity for 600 mm dia, 12 m length : 83 tons (Very low) - Settlement of pile up to 10 % of pile diameter could not be attained by 3 times the design load. Prof. V.S. Raju to 1.80 m Brown clay 1.80 mto 5.80 m yellow clay & Murrum First SPT at 10m below G.L, Required every 1m to 1.5m Typical Bore Profile Prof. V.S. Raju 32 16

17 Pile Load Tests: Five Initial Load Tests At 3 times the design load, settlements are only 2 mm to 27 mm as against permitted 45 mm to 60 mm. Pile capacities are not revised. Piles, which are not required in the first place are grossly over designed. Prof. V.S. Raju Acres site L&T Serene County Strata Rocks and Boulders with local depressions, highly uneven. 10 towers between 11 and 14 floors Recommended SBC by the soil Investigation Agency 30 t/m 2 - One value for the entire site? 34 17

18 30 m L&T Serene County Prof. V.S. Raju 35 Extreme Issue was with one of the 10 towers built Tower Dimension : 75 m x 30 m Highly variable strata at Founding Level. 75 m Hard Rock SBC 400 t/m 2 Hard Murrum Soft Clay 80 t/m 2 4 m thick 0 t/m 2 Prof. V.S. Raju Tower Foot Print 36 18

19 Important: These type of variations do occur in rocky and bouldry strata The soft clay is due to a old pond, which normally gets covered up during site grading. 37 All these examples reaffirm the requirement of high quality Geotechnical Investigation, Interpretation by a qualified Foundation Engineer in close collaboration with the Structural Designer

20 THANK YOU JAI HIND 20

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Lecture No. # 13 (Refer Slide Time: 00:18) So last class, it was

More information

Anirudhan I.V. Geotechnical Solutions, Chennai

Anirudhan I.V. Geotechnical Solutions, Chennai Anirudhan I.V. Geotechnical Solutions, Chennai Often inadequate In some cases, excess In some cases, disoriented Bad investigation Once in a while good ones Depends on one type of investigation, often

More information

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire

More information

FINAL REPORT ON SOIL INVESTIGATION

FINAL REPORT ON SOIL INVESTIGATION FINAL REPORT ON SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION AT SS-6B AREA AT HPCL VISAKH REFINERY VISAKHAPATNAM ANDHRA PRADESH J.J. ASSOCIATES(VISAKHAPATNAM) AETP(P) LIMITED #11-6-3, RockDale Layout,

More information

PILE FOUNDATIONS FM 5-134

PILE FOUNDATIONS FM 5-134 C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics

More information

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch USE OF MICROPILES IN TEXAS BRIDGES by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch DEFINITION OF A MICROPILE A micropile is a small diameter (typically less than 12 in.), drilled and

More information

An Automatic Kunzelstab Penetration Test

An Automatic Kunzelstab Penetration Test An Automatic Kunzelstab Penetration Test Yongyuth Sirisriphet 1, Kitidech Santichaianant 2 1 Graduated student: Faculty of Industrial Education in and Technology. King Mongkut's University of Technology

More information

A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil

A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil ISSN: 319-53 (An ISO 39: 00 Certified Organization) A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil Utpal Kumar Das Associate Professor, Department

More information

ENCE 4610 Foundation Analysis and Design

ENCE 4610 Foundation Analysis and Design This image cannot currently be displayed. ENCE 4610 Foundation Analysis and Design Shallow Foundations Total and Differential Settlement Schmertmann s Method This image cannot currently be displayed. Strength

More information

Site Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions

Site Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions This is an attempt to create a stand alone self learning module on site investigation. Fasten your seat belts. Sit back, relax and enjoy. 1 2 Site Investigation Some unsung heroes of Civil Engineering

More information

Geotechnical Investigation Test Report

Geotechnical Investigation Test Report Geotechnical Investigation Test Report Report No. htsc/rcd/ 3457 Dated: - 20/03/2010 Asphalt Standard Penetration Test as per IS 2131 ------------- IS 6403 Soil Job Card No - 1649 Cement Client/Department

More information

1.0 INTRODUCTION 1 2.0 SCOPE OF WORK 2 3.0 EXECUTION OF FIELD WORK 2 4.0 LABORATORY TESTS 8 5.0 FINDINGS OF THE GEOTECHNICAL INVESTIGATION 9

1.0 INTRODUCTION 1 2.0 SCOPE OF WORK 2 3.0 EXECUTION OF FIELD WORK 2 4.0 LABORATORY TESTS 8 5.0 FINDINGS OF THE GEOTECHNICAL INVESTIGATION 9 REPORT ON GEOTECHNICAL INVESTIGATION FOR LPG MOUNDED STORAGE AT VISAKHA REFINERY, MALKAPURAM, VISAKHAPATNAM (A.P) FOR HINDUSTAN PETROLEUM CORPORATION LIMITED CONTENTS SR.NO. DESCRIPTION PAGE NO. 1.0 INTRODUCTION

More information

How To Design A Foundation

How To Design A Foundation The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural

More information

HOUSE BUILDING DIGEST

HOUSE BUILDING DIGEST HOUSE BUILDING DIGEST (Construction Specifications-Foundations) Creating Enabling Environment for Affordable Housing for All This is an attempt by BMTPC to provide useful but often ignored information

More information

COSMOS 2012: Earthquakes in Action COSMOS 2012

COSMOS 2012: Earthquakes in Action COSMOS 2012 COSMOS 2012 What is SFSI and why is it important? Soil issues in Earthquakes Structures where SFSI important Retaining structures (lateral earth pressure) Foundations (spread and pile footings, bearing

More information

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore

More information

Method Statement FOR. Soil Investigation

Method Statement FOR. Soil Investigation Method Statement FOR Soil Investigation PREPARED BY JUNE 2010 Infratech ASTM CO., LTD. TABLE OF CONTENTS Chapter Title Page Table of Contents..1 List of Appendix... 2 List of Table... 2 List of Figures...

More information

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer HS-4210_MAN_09.08 product manual HS-4210 Digital Static Cone Penetrometer Introduction This Manual covers the measurement of bearing capacity using the Humboldt Digital Static Cone Penetrometer (DSCP).

More information

KWANG SING ENGINEERING PTE LTD

KWANG SING ENGINEERING PTE LTD KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters

More information

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge. TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may

More information

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 (PREVIEW) SP 36 (Part 2) : 1988 COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 IS 1893 : 1979 (Reaffirmed 1987) CODE OF PRACTICE FOR SUBSURFACE INVESTIGATION FOR FOUNDATIONS 1.1 This code deals

More information

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives In this section you will learn the following Penetrometer Tests Standard penetration test Static cone penetration test Dynamic cone

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

CIVL451. Soil Exploration and Characterization

CIVL451. Soil Exploration and Characterization CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

More information

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration

More information

ASSESSMENT OF SHEAR WAVE VELOCITY FROM INDIRECT INSITU TESTS

ASSESSMENT OF SHEAR WAVE VELOCITY FROM INDIRECT INSITU TESTS Proceedings of Indian Geotechnical Conference IGC-2014 December 18-20, 2014, Kakinada, India ASSESSMENT OF SHEAR WAVE VELOCITY FROM INDIRECT INSITU TESTS Kant, L., M. Tech Student, Department of Earthquake

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples FOUNDATION DESIGN Proportioning elements for: Transfer of seismic forces Strength and stiffness Shallow and deep foundations Elastic and plastic analysis Foundation Design 14-1 Load Path and Transfer to

More information

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode INDIRECT METHODS SOUNDING OR PENETRATION TESTS STANDARD PENETRATION TEST (SPT) Reference can be made to IS 2131 1981 for details on SPT. It is a field edtest to estimate e the penetration e resistance

More information

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM Swaminathan Srinivasan, P.E., M.ASCE H.C. Nutting/Terracon David Tomley, P.E., M.ASCE KZF Design Delivering Success for

More information

Geotechnical Testing Methods II

Geotechnical Testing Methods II Geotechnical Testing Methods II Ajanta Sachan Assistant Professor Civil Engineering IIT Gandhinagar FIELD TESTING 2 1 Field Test (In-situ Test) When it is difficult to obtain undisturbed samples. In case

More information

GUJARAT NARMADA VALLEY FERTILIZER CO. LTD. (GNFC Ltd) TECHNICAL REPORT GEOTECHNICAL INVESTIGATION FOR PROPOSED TDI PLANT AT VILLAGE RAHIYAD, DAHEJ

GUJARAT NARMADA VALLEY FERTILIZER CO. LTD. (GNFC Ltd) TECHNICAL REPORT GEOTECHNICAL INVESTIGATION FOR PROPOSED TDI PLANT AT VILLAGE RAHIYAD, DAHEJ GUJARAT NARMADA VALLEY FERTILIZER CO. LTD. (GNFC Ltd) TECHNICAL REPORT OF GEOTECHNICAL INVESTIGATION FOR PROPOSED TDI PLANT AT VILLAGE RAHIYAD, DAHEJ BY: DR.K.C.THAKER B.E.(CIVIL) ; M.TECH (S.M.); (I.I.T,

More information

2009 Japan-Russia Energy and Environment Dialogue in Niigata S2-6 TANAKA ERINA

2009 Japan-Russia Energy and Environment Dialogue in Niigata S2-6 TANAKA ERINA Importance of the Site Investigation for Development of Methane Hydrate Hokkaido University Hiroyuki Tanaka Civil Engineer My Background Site Investigation Soil Parameters for Design Very Soft Clay and

More information

ALLOWABLE LOADS ON A SINGLE PILE

ALLOWABLE LOADS ON A SINGLE PILE C H A P T E R 5 ALLOWABLE LOADS ON A SINGLE PILE Section I. BASICS 5-1. Considerations. For safe, economical pile foundations in military construction, it is necessary to determine the allowable load capacity

More information

BUTE Department of Construction Management and Technology

BUTE Department of Construction Management and Technology BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):

More information

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:! In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible

More information

Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme

Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme Main Report Deliverable 02 Sub-Surface Properties of Soil Development in Rangamati, Bandarban and Khagrachari Municipality

More information

load on the soil. For this article s examples, load bearing values given by the following table will be assumed.

load on the soil. For this article s examples, load bearing values given by the following table will be assumed. How Many Piers? By Gary Collins, P.E. A clear-cut guide to helical pier spacing Introduction Helical pier spacing is not an exact science. How many does it take to support a structure adequately or repair

More information

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. The design of any foundation consists of following two parts.

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. The design of any foundation consists of following two parts. 8.7. Design procedure for foundation The design of any foundation consists of following two parts. 8.7.1 Stability analysis Stability analysis aims at removing the possibility of failure of foundation

More information

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013 INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013 Copyright by the authors - Licensee IPA- Under Creative Commons license 3.0 Research article ISSN 0976 4399 Reliability of

More information

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No.

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No. GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES Materials Engineering Report No. 2009-8M (Supersedes Report No. 21) F CHOWDHURY GEOMECHANICS AND STRUCTURAL MATERIALS ENGINEER S REHMAN GEOTECHNICAL

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

King Saud University College of Engineering Civil Engineering Department DEFORMATION OF PARTIALLY SATURATED SAND. Sultan Musaed Al-Ghamdi

King Saud University College of Engineering Civil Engineering Department DEFORMATION OF PARTIALLY SATURATED SAND. Sultan Musaed Al-Ghamdi King Saud University College of Engineering Civil Engineering Department DEFORMATION OF PARTIALLY SATURATED SAND By Sultan Musaed Al-Ghamdi Submitted in Partial Fulfillment of The Required For the Degree

More information

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns 1. Introduction 1.1 Scope of Work The Asian Disaster Preparedness Centre (ADPC) is implementing the project Seismic Hazard and Vulnerability Mapping for Rangamati, Bandarban and Khagrachari Municipality.

More information

Pile test at the Shard London Bridge

Pile test at the Shard London Bridge technical paper Pile test at the Shard London Bridge David Beadman, Byrne Looby Partners, Mark Pennington, Balfour Beatty Ground Engineering, Matthew Sharratt, WSP Group Introduction The Shard London Bridge,

More information

Quality control: Annex-A.

Quality control: Annex-A. Quality control: Quality of the constructed work has been checked by our staff as per frequency and provision mentioned section 900 in MoRT&H and as per provision mentioned in Concession Agreement. The

More information

SERVICES 2015 ISO 18001

SERVICES 2015 ISO 18001 SERVICES 2015 A family business with a solid foundation of experience, we handle all aspects of site investigation.... Phase 1 Environmental Studies Phase 2 Intrusive Investigations Phase 3 Remediation

More information

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces.

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces. Project No. 208-8719 January, 2009 Ref: 2-8719BR Anthony Hudson - Broadscale Geotechnical Investigation - Proposed Commercial Development - 52 Old Pacific Highway, Pimpama Page 32 iii) Pavements should

More information

DESIGNING STRUCTURES IN EXPANSIVE CLAY

DESIGNING STRUCTURES IN EXPANSIVE CLAY DESIGNING STRUCTURES IN EXPANSIVE CLAY A GUIDE FOR A RCHITECTS AND E NGINEERS Table of Contents 1. Introduction Page 1 2. Common Foundation Systems Page 2 3. Drilled Piers Page 3 a. Skin Friction Piers

More information

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE ENGINEERED FOUNDATIONS Department of Public Works Jeff Hill, PE What is an engineered foundation. A Foundation Design Developed by a Trained Professional (Engineer) Types of Foundations (All of which can

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc.

c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc. Design Manual Chapter 6 - Geotechnical 6B - Subsurface Exploration Program 6B-2 Testing A. General Information Several testing methods can be used to measure soil engineering properties. The advantages,

More information

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering

More information

SETTLEMENT MONITORING OF DISCRETE REINFORCED SOIL LAYER BENEATH MAT FOUNDATIONS, CALIFORNIA, USA

SETTLEMENT MONITORING OF DISCRETE REINFORCED SOIL LAYER BENEATH MAT FOUNDATIONS, CALIFORNIA, USA SETTLEMENT MONITORING OF DISCRETE REINFORCED SOIL LAYER BENEATH MAT FOUNDATIONS, CALIFORNIA, USA Ken Hoevelkamp, PE Geopier Foundation Company West, Inc., Irvine, CA, USA Brendan FitzPatrick, PE Geopier

More information

Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels

Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels Estimation of Adjacent Building During Drilling of Urban Tunnels Shahram Pourakbar 1, Mohammad Azadi 2, Bujang B. K. Huat 1, Afshin Asadi 1 1 Department of Civil Engineering, University Putra Malaysia

More information

EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND

EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND D.L. Avalle, Broons Hire (SA) Pty Ltd, Australia J.P. Carter, The University of Sydney, Australia Abstract Impact rolling, utilising a non-circular

More information

GEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design

GEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design GEOTECHNICAL ENGINEERING FORMULAS A handy reference for use in geotechnical analysis and design TABLE OF CONTENTS Page 1. SOIL CLASSIFICATION...3 1.1 USCS: Unified Soil Classification System...3 1.1.1

More information

Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair

Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair Eric M. Klein, P. E., Rummel, Klepper & Kahl, LLP, Baltimore, Maryland Kenneth B. Andromalos, P. E., Brayman Environmental,

More information

Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT

Strength Determination of Tooth-Paste Like Sand and Gravel Washing Fines Using DMT Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT David L. Knott, P.E. and James M. Sheahan, P.E. HDR Engineering, Inc. 3 Gateway Center Pittsburgh, PA 15222-1074 Phone:

More information

GLOSSARY OF TERMINOLOGY

GLOSSARY OF TERMINOLOGY GLOSSARY OF TERMINOLOGY AUTHORIZED PILE LENGTHS - (a.k.a. Authorized Pile Lengths letter) Official letter stating Engineer's recommended length of concrete piles to be cast for construction of foundation.

More information

Load Testing of Drilled Shaft Foundations in Limestone, Nashville, TN Dan Brown, P.E., Ph.D.

Load Testing of Drilled Shaft Foundations in Limestone, Nashville, TN Dan Brown, P.E., Ph.D. Dan A. Brown and Associates Consulting Geotechnical Engineers 300 Woodland Rd. (423)942-8681 Sequatchie, TN 37374 fax:(423)942-8687 Load Testing of Drilled Shaft Foundations in Limestone, Nashville, TN

More information

Caltrans Geotechnical Manual

Caltrans Geotechnical Manual Cone Penetration Test The cone penetration test (CPT) is an in-situ sounding that pushes an electronic penetrometer into soil and records multiple measurements continuously with depth. Compared with rotary

More information

UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA

UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA John R. Wolosick, P.E.,D.GE 1, Michael W. Terry, P.E. 2, W. David Kirschner 3 and Robert F. Scott Jr. P.E. 4 SYNOPSIS In

More information

vulcanhammer.net This document downloaded from

vulcanhammer.net This document downloaded from This document downloaded from vulcanhammer.net since 1997, your source for engineering information for the deep foundation and marine construction industries, and the historical site for Vulcan Iron Works

More information

Table of Contents 16.1 GENERAL... 16.1-1. 16.1.1 Overview... 16.1-1 16.1.2 Responsibilities... 16.1-1

Table of Contents 16.1 GENERAL... 16.1-1. 16.1.1 Overview... 16.1-1 16.1.2 Responsibilities... 16.1-1 Table of Contents Section Page 16.1 GENERAL... 16.1-1 16.1.1 Overview... 16.1-1 16.1.2 Responsibilities... 16.1-1 16.1.2.1 Geotechnical Section/Bridge Bureau Coordination... 16.1-1 16.1.2.2 Geotechnical

More information

Comprehensive Design Example 2: Foundations for Bulk Storage Facility

Comprehensive Design Example 2: Foundations for Bulk Storage Facility Comprehensive Design Example 2: Foundations for Bulk Storage Facility Problem The project consists of building several dry product storage silos near an existing rail siding in an open field presently

More information

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900

More information

and the design of construction working platforms

and the design of construction working platforms Federation A presentation to the Australian Geomechanics Society Victoria i Branch 11 August 2010 Dr Stephen Buttling Piling rig bearing pressures and the design of construction working platforms 1 The

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

Work Type Definition and Submittal Requirements

Work Type Definition and Submittal Requirements Work Type: Highway Materials Testing Geotechnical Laboratory Testing, Geotechnical Laboratory Testing, Standard Penetration (SPT) & Rock Coring, Cone Penetration Test, Solid Stem Auger Drilling, and Materials

More information

Dead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell)

Dead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell) Introduction Fugro LOADTEST Overview STATIC LOAD TESTING O-cell Bi-directional testing State of the art Dr Melvin England Fugro LOADTEST Static load tests Previous/existing technology Developments O-cell

More information

FRANKIPILE. High Pile Loads Optimum Adaptation to Foundation Soil Low-noise Manufacturing Process

FRANKIPILE. High Pile Loads Optimum Adaptation to Foundation Soil Low-noise Manufacturing Process FRANKIPILE High Pile Loads Optimum Adaptation to Foundation Soil Low-noise Manufacturing Process The FRANKIPILE Application possibilities The FRANKIPILE can be used in a wide range of foundation soil conditions

More information

Permafrost in Marine Deposits at Ilulissat Airport in Greenland, Revisited

Permafrost in Marine Deposits at Ilulissat Airport in Greenland, Revisited NICOP IX International Conference on Permafrost University of Alaska Fairbanks 2008 Session 28: Cold Regions Infrastructures and Transportation Permafrost in Marine Deposits at Ilulissat Airport in Greenland,

More information

Jack-in Piling Environmental Friendly Piling System

Jack-in Piling Environmental Friendly Piling System Jack-in Piling Environmental Friendly Piling System Part 1 - Chris Loh 7 Nov 12 CSC HOLDINGS LIMITED Gracious Piling Environmental Friendly Low Noise No Vibration Jack-in Piling How Many Decibels? Permissible

More information

Electronic Soil Test Logging. Strategic Advantage or Unnecessary Headache?

Electronic Soil Test Logging. Strategic Advantage or Unnecessary Headache? 1 Electronic Soil Test Logging Strategic Advantage or Unnecessary Headache? 2 The Plan 3 4 What is it? Digitally Recording Soil Test Data Why? 5 6 Traditional Work Flow Field Digital Entry Sample Review

More information

ATLAS RESISTANCE Pier Foundation Systems

ATLAS RESISTANCE Pier Foundation Systems ATLAS RESISTANCE Pier Foundation Systems Foundation Repair Systems for Civil Construction Applications: Residential, Commercial, Industrial Atlas Resistance Piers have been used to restore and/or stabilize

More information

Emergency repair of Bridge B421

Emergency repair of Bridge B421 Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)

More information

NOTES TO THE PERFORMANCE BASED SPECIFICATION FOR HOTMIX ASPHALT WEARING COURSE SURFACING

NOTES TO THE PERFORMANCE BASED SPECIFICATION FOR HOTMIX ASPHALT WEARING COURSE SURFACING TNZ P/23 NOTES: 2005 FOR HOTMIX ASPHALT WEARING COURSE SURFACING 1. BACKGROUND 1.1 Specification Use The specification is to be used where the Engineer requires a dense graded, open graded (permeable)

More information

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL performed by Lee E. Harris, Ph.D., P.E. Consulting Coastal

More information

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum Malaysian Civil Engineering Standard Method of Measurement (MyCESMM) CLASS D: SITE INVESTIGATION WORK Measurement covered under other classes: Excavation not carried out for the purpose of soil investigation

More information

Requirements for an Excavation and Lateral Support Plan Building (Administration) Regulation 8(1)(bc)

Requirements for an Excavation and Lateral Support Plan Building (Administration) Regulation 8(1)(bc) Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-57 Requirements for an Excavation and Lateral Support Plan Building

More information

SITE INVESTIGATION FACILITIES

SITE INVESTIGATION FACILITIES SITE INVESTIGATION FACILITIES Drilling Hydraulic rotary & calax drilling rigs100/150mm Diameter boreholes having drilling capacity up to 200m depth. Auger drilling 100/150mm diameter boreholes up to maximum

More information

Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file

Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file Notation B1 = lowest level of basement slab c = cohesion E = drained Young s Modulus Eu = undrained Young s Modulus

More information

patersongroup Geotechnical Investigation Proposed Multi-Storey Buildings 267 O Connor Street Ottawa, Ontario Prepared For Mastercraft Starwood Group

patersongroup Geotechnical Investigation Proposed Multi-Storey Buildings 267 O Connor Street Ottawa, Ontario Prepared For Mastercraft Starwood Group Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Archaeological Services 267 O Connor Street Ottawa, Ontario Prepared

More information

FREDERICK SHERRELL LTD

FREDERICK SHERRELL LTD FREDERICK SHERRELL LTD CONSULTING ENGINEERING GEOLOGISTS AND GEOTECHNICAL ENGINEERS 66 WEST STREET TAVISTOCK DEVON PL19 8AJ Your Ref: Our Ref: 2962.NS.JR Telephone: 01822 612915 Facsimile: 01822 617394

More information

patersongroup Geotechnical Investigation Proposed Residential Development 590 Hazeldean Road - Ottawa Prepared For 2118356 Ontario Inc.

patersongroup Geotechnical Investigation Proposed Residential Development 590 Hazeldean Road - Ottawa Prepared For 2118356 Ontario Inc. Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Residential Development 590 Hazeldean Road - Ottawa Archaeological

More information

we are Presence in India

we are Presence in India Business areas large-diameter piling bored cast-in-situ piling and hard-rock boring driven cast-in-situ, driven precast and precast spun piles diaphragm walls and cut-off walls secant pile and sheet pile

More information

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Sl.No. PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Description of item Qty Unit Rate Amount 1 Demolishing tile work/cement concrete/( carefully taking out the closet and other

More information

How to Design Helical Piles per the 2009 International Building Code

How to Design Helical Piles per the 2009 International Building Code ABSTRACT How to Design Helical Piles per the 2009 International Building Code by Darin Willis, P.E. 1 Helical piles and anchors have been used in construction applications for more than 150 years. The

More information

The Stabilizer TM. Benefits. www.griptite.com. Supplemental support system for sagging beams and floor joists within a crawl space

The Stabilizer TM. Benefits. www.griptite.com. Supplemental support system for sagging beams and floor joists within a crawl space The Stabilizer TM Supplemental support system for sagging beams and floor joists within a crawl space Pre-drilled holes in steel plate allow for connection to beam or floor joists. Benefits Levels and

More information

Worked Example 2 (Version 1) Design of concrete cantilever retaining walls to resist earthquake loading for residential sites

Worked Example 2 (Version 1) Design of concrete cantilever retaining walls to resist earthquake loading for residential sites Worked Example 2 (Version 1) Design of concrete cantilever retaining walls to resist earthquake loading for residential sites Worked example to accompany MBIE Guidance on the seismic design of retaining

More information

Rehabilitation of Existing Foundation Building to Resist Lateral and Vertical Loads

Rehabilitation of Existing Foundation Building to Resist Lateral and Vertical Loads International Journal of Current Microbiology and Applied Sciences ISSN: 2319-7706 Volume 3 Number 12 (2014) pp. 950-961 http://www.ijcmas.com Original Research Article Rehabilitation of Existing Foundation

More information

Assessment. Ian Uglow Technical Director, SLR Consulting [email protected]. 7 th October 2010

Assessment. Ian Uglow Technical Director, SLR Consulting iuglow@slrconsulting.com. 7 th October 2010 Peat Stability Risk and Hazard Assessment Ian Uglow Technical Director, SLR Consulting [email protected] 7 th October 2010 What goes into a Peat Stability Risk Assessment? You will need: An understanding

More information

A case study of large screw pile groups behaviour

A case study of large screw pile groups behaviour Jongerenforum Geotechniek 5 juni 2015 A case study of large screw pile groups behaviour Alice Manzotti Content of the presentation 2 Introduction General soil conditions at the site Foundation design -

More information

The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma

The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma Bart B. Barrett, B.S., P.E.1 Kerry S. Lee, M.B.A., P.E., M. ASCE2 Erik L. Nelson, Ph.D., P.E., M. ASCE3

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 [email protected]

More information