1 JOHNSON STREET BRIDGE REPLACEMENT Victoria, BC GEOTECHNICAL INVESTIGATION REPORT Prepared for: City Hall No. 1 Centennial Square Victoria, BC VW 1P Prepared by: Stantec 7 Dominion Street, Suite 5 Burnaby, BC V5G L7 Tel: () -1 Fax: () -75 Project No.: 1559 October 19, 9
2 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Table of Contents TABLE OF CONTENTS 1 Introduction... 1 Site Background Site Description Stereo Air Photo Interpretation... Site Investigation and General Subsurface Conditions....1 Geotechnical Site Investigation.... General Subsurface Conditions Soil Conditions West Abutment/Approach Section Upper Victoria Harbour Section East Abutment/Approach Section..... Bedrock and Groundwater Conditions... 5 Closure... List of Tables Table 1: Provided Stereo Air Photographs... Table : Bedrock and Groundwater Elevation Summary... 5 List of Appendices Appendix A Appendix B Appendix C... Statement of General Conditions... Drawings... Borehole Records October 19, 9 Project No i
3 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Section 1: Introduction 1 INTRODUCTION Stantec, acting in general accordance with the terms of reference provided in our June 1, 9 proposal (proposal no. 15), has completed a geotechnical investigation for the proposed Johnson Street Bridge Replacement Project (the Project) in Victoria, BC. The purposes of the geotechnical investigation were to identify subsurface soil conditions, as well as both current and historical site conditions, in order to provide the City of Victoria with information necessary to develop a preliminary design and alignment for a new bridge. The scope of work for this study consisted of a visual assessment of the site conditions, a review of historical air photographs of the Project site, a geotechnical drilling program, laboratory testing, and preparation of this report. The results of environmental and archaeological site assessments are presented under separate covers. SITE BACKGROUND.1 Site Description For the purposes of this report, the Project site has been divided into three sections: West Abutment/Approach; Upper Victoria Harbour; and, East Abutment/Approach. The existing E&N rail bridge bounds each of these sections to the south and the shorelines of the Harbour are the dividing lines between the sections. The West Abutment/Approach section is bounded to the west by the intersection of Esquimalt Road and Harbour Road, and to the north by a technology park and shipyard. The section slopes up at roughly % from the intersection of Esquimalt and Harbour Roads to the Galloping Goose Recreational Trail. An approximately 7 m wide area located immediately to the east of the Trail is relatively flat and lightly vegetated (i.e., grass covered). This 7 m wide area is approximately.5 m below the elevation of the E&N railway (to the south), and approximately 5.5 m above the average grade of the technology park (to the north). The 7 m wide area and the technology park are separated by a 1.5 m high lock block retaining wall and a cut slope. To the east of the 7 m wide area, the West Abutment/Approach section slopes down to the Upper Victoria Harbour at roughly 1% and is lightly vegetated with a few small trees. The Upper Victoria Harbour section is defined as the area between the east and west shorelines of the Harbour, within approximately m north of the existing E&N rail bridge. Barriers constructed of wooden piles and cross-bracing extend between 1 and 15 m north of the existing bridge piers and define the shipping lane beneath the existing bridge. Several wooden piles are located along the east shoreline and are visible during low tide. Both submerged and buried telephone conduits are known to traverse the Harbour within this section of the alignment. The East Abutment/Approach section is bounded to the east by Store Street (near the intersection of Pandora Avenue), and to the north by an undeveloped land parcel and a heritage building (Janion Building). The western 15 m of this section of the alignment is sand and gravel covered shoreline that slopes up from the Harbour at roughly 1%. To the west of the shoreline is a triangular area that October 19, 9 Project No
4 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Section : Site Background is relatively flat and covered with cobbles, boulders and vegetation (trees and shrubs). We understand that this triangular area is a Riparian Area of Interest. The remainder of this section (to the east of the triangular area) consists of an asphalt paved parking lot. The parking lot is approximately 5.5 m above the triangular area, and the slope between these two areas is at roughly 5% and covered with boulders (rip-rap).. Stereo Air Photo Interpretation Historical slope stability issues and historical shoreline erosion or erosion protection measures were evaluated based on visual site walkovers and a review of stereo air photographs. The stereo air photographs used in our evaluation were provided by the Geographic Information Centre at the University of British Columbia (Vancouver campus), and included the photograph stereo pairs listed below in Table 1. Table 1: Provided Stereo Air Photographs Flight No. Date ME5 9C May 5, 5 15BCB 97 March 1, BCB (unknown month) BC May 7, 19 15BC 5 May 7, 19 BCC 1 August, 197 A1 19 (unknown month) A51 19 (unknown month) The stereo air photographs, in conjunction with multiple visits to the Project site, provide no evidence of the presence of head scarps or slope failures along the east and west shorelines and adjacent parcels of land. Based on our review of the provided stereo air photographs, the West Abutment/Approach section of the proposed bridge alignment appears to be relatively unchanged since 19 in terms of development, topography, and vegetation. The East Abutment/Approach section has remained relatively unchanged since the stereo air photograph taken on May 7, 19. Prior to this date, the previously referenced triangular area (between the shoreline and the parking lot) was used for storage of marine supplies and materials. A wooden pier/dock structure was located beyond the shoreline prior to 19 (the wooden support piles of which remain visible today during times of low tide). The paved extension of Pandora Street (from Store Street to the Johnson Street Bridge) was completed between 197 and 197. October 19, 9 Project No. 1559
5 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Section : Site Investigation and General Subsurface Conditions SITE INVESTIGATION AND GENERAL SUBSURFACE CONDITIONS.1 Geotechnical Site Investigation Stantec completed a preliminary subsurface investigation program that consisted of twelve boreholes distributed across the proposed new bridge alignment. The locations of ten of the boreholes (BH9-1 to BH9-1) were selected by the Owner s Engineer, and adjusted in the field based on site access and environmental restrictions. The locations of the remaining two boreholes (BH9-11 and BH9-1) were selected by Stantec based on site access and findings from the initial phase of the investigation program. Six of the boreholes (BH9-1, BH9- to BH9-1) were completed in the East and West Abutment/Approach sections of the alignment using a truck-mounted drill rig with solid-stem auger capabilities. Four of these boreholes (BH9-1, BH9- to BH9-1) were completed on September, 9 with Sea to Sky Drilling Ltd. (Sea to Sky), while the remaining two boreholes (BH9-11 and BH9-1) were completed on September 1, 9 with Beck Drilling and Environmental Services Ltd. (Beck). These six boreholes were advanced to auger refusal on suspected bedrock, and representative soil samples were collected from the auger flights as drilling proceeded. Borehole BH9-9 was advanced to 15. m below existing site grade but did not terminate on bedrock. As a result, a Dynamic Cone Penetration Test (DCPT) was completed at the location of BH9-9 (with Beck). The DCPT refused on suspected bedrock at a depth of 17. m below existing site grade. The remaining six boreholes (BH9- to BH9-7) were completed from August 1 to September, 9 in Upper Victoria Harbour using a truck-mounted drill rig (operated by Sea to Sky) that was loaded on to a barge (operated by Spectrum Marine Services Inc). These six boreholes were completed to refusal on suspected bedrock using a wash rotary boring system and Standard Penetration Tests (SPTs). Soil samples were collected from the SPTs using a 5 mm diameter splitspoon sampler. The field work was continuously monitored by a Stantec representative, who identified the sample locations, classified the soils, kept a detailed log of each borehole, and observed and recorded pertinent site features. Representative soil samples were collected from the boreholes and brought to the Stantec soils laboratory in Burnaby, BC for further visual identification and classification, and natural water content measurements. The boreholes were carried out at locations shown on Drawing No. 1 (Appendix B). October 19, 9 Project No. 1559
6 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Section : Site Investigation and General Subsurface Conditions. General Subsurface Conditions The subsurface soil strata and groundwater conditions encountered in the boreholes are described in detail on the Borehole Records, with additional and supplementary information provided in this section. All soil descriptions and identifications were made in accordance with ASTM Standard D (Visual Manual Procedure). The detailed borehole logs, along with an explanation of the symbols and terms used in their description, are provided in Appendix C...1 Soil Conditions..1.1 West Abutment/Approach Section In general, the subsurface soil conditions within this section of the proposed bridge alignment consisted of approximately m of fill (clayey silt, sandy silt, and sandstone) over native deposits of brown, silty clay. The native silty clay encountered in this section of the alignment is generally firm to stiff, and transitions to very stiff with depth. The measured water content of the samples of silty clay ranged from 15 to 9%. The silty clay deposit is generally underlain by a.5 to 1 m thick layer of dense/stiff glacial till. The glacial till is, in turn, underlain by suspected bedrock...1. Upper Victoria Harbour Section In general, a layer of very soft, black clayey silt or very loose, grey sand was encountered at the surface of the Harbour bottom. These deposits typically contained some organics and shells, and varied in thickness from 1 to m. The black clayey silt and grey sand is underlain by very thick deposits of grey, silty clay. In-situ Torvane readings indicated that the silty clay deposit is generally very soft to soft; however, firm to stiff silty clay was encountered at depth within several of the boreholes completed in this section of the bridge alignment. Atterberg Limits tests on the samples of silty clay indicate that it is of high plasticity. The measured water content of samples of the silty clay ranged from 1 to 11%. Bedrock was encountered beneath the silty clay in each of the boreholes completed in this section of the bridge alignment. Based on samples collected and observations made during the drilling, the bedrock is grey Gabbro and is slightly fractured/broken at the surface...1. East Abutment/Approach Section Surficial soils in this section of the proposed new bridge alignment consisted of layers of variable fill. The fill within the existing east bridge abutment consists of loose gravelly sand, whereas the fill within the approach area (east of the existing bridge abutment) consisted of firm to stiff silty clay that contained some organics and debris (i.e., broken glass, pieces of brick). A layer of black, coal slag was encountered within the triangular parcel of land (located to the northeast of the existing bridge abutment). The elevation of the base of the fill layers ranges from Elev. 1. m to Elev..1 m (Geodetic). October 19, 9 Project No. 1559
7 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Section : Site Investigation and General Subsurface Conditions The fill is underlain by deposits of loose to medium dense silty sand and stiff, grey silty clay; however, a 75 mm thick layer of soft organic silt was encountered between the fill and silty clay at the location of borehole BH9-9. The silty sand and silty clay is underlain by suspected bedrock... Bedrock and Groundwater Conditions The boreholes for the preliminary subsurface investigation were all terminated on suspected bedrock. Based on the collected samples and observations made during the investigation, the bedrock consists of dark grey Gabbro and is slightly fractured or broken at the surface. The groundwater table was only encountered in the East Abutment/Approach section of the proposed bridge alignment, and only in three of the four boreholes within this section (BH9-, BH9-9, and BH9-11). The depth to the groundwater table will vary from year to year and from season to season, and will depend on many factors including surface and subsurface drainage, precipitation, and the hydrogeology of the area. A summary of the bedrock and groundwater elevations at the twelve borehole locations is provided in Table below. Table : Borehole Bedrock and Groundwater Elevation Summary Ground Surface/Water Elevation (Geodetic) Elevation of Refusal on Suspected Bedrock (Geodetic) Elevation of Groundwater Table (Geodetic) BH9-1.1 m 1. m Not encountered *BH9-1.9 m -1. m --- *BH9-1.9 m -. m --- *BH9-1. m -19. m --- *BH9-5.9 m -.5 m --- *BH9-. m -5. m --- *BH9-7. m -1. m --- BH9-. m -.5 m.7 m BH m -.1 m.9 m BH9-1. m -. m Not encountered BH m -. m 1.9 m BH9-1. m. m Not encountered *Indicates borehole was drilled on a barge in Upper Victoria Harbour. To account for the variation in the tide height throughout the day, the water elevation for the boreholes drilled on the barge in Upper Victoria Harbour (BH9- to BH9-7) was averaged over the duration of the drilling period. October 19, 9 Project No
8 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Section : Closure CLOSURE This report was prepared for the exclusive use of and their agents. Any use of this report or the material contained herein by third parties, or for other than the intended purpose, should first be approved in writing by Stantec. Use of this report is subject to the Statement of General Conditions provided in Appendix A. It is the responsibility of, who is identified as the Client within the Statement of General Conditions, and its agents to review the conditions and to notify Stantec should any of these not be satisfied. The Statement of General Conditions addresses the following: Use of the report Basis of the report Standard of care Interpretation of site conditions Varying or unexpected site conditions Planning, design or construction This report has been prepared by Adam McIntyre, B.A.Sc., EIT and Thomas Crilly, M.Sc., P.Eng. Respectfully submitted, Stantec Consulting Ltd. Original signed by: Adam McIntyre, B.A.Sc., EIT Engineer, Geotechnical Group Original signed by: Thomas Crilly, M.Sc., P.Eng Senior Engineer, Geotechnical Group AM/TC/zn [File Ref: P:\_CMiC Projects\151_to_15\1559 Johnson Street Bridge\C Geotechnical Studies\Report & Letters\ Geotechnical Investigation Report.docx] October 19, 9 Project No. 1559
9 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Appendix A Statement of General Conditions APPENDIX A Statement of General Conditions
10 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Appendix A Statement of General Conditions Statement of General Conditions USE OF THIS REPORT: This report has been prepared for the sole benefit of the Client or its agent and may not be used by any third party without the express written consent of Jacques Whitford Stantec AXYS Limited and the Client. Any use which a third party makes of this report is the responsibility of such third party. BASIS OF THE REPORT: The information, opinions, and/or recommendations made in this report are in accordance with Jacques Whitford Stantec AXYS Limited s present understanding of the site specific project as described by the Client. The applicability of these is restricted to the site conditions encountered at the time of the investigation or study. If the proposed site specific project differs or is modified from what is described in this report or if the site conditions are altered, this report is no longer valid unless Jacques Whitford Stantec AXYS Limited is requested by the Client to review and revise the report to reflect the differing or modified project specifics and/or the altered site conditions. STANDARD OF CARE: Preparation of this report, and all associated work, was carried out in accordance with the normally accepted standard of care in the state or province of execution for the specific professional service provided to the Client. No other warranty is made. INTERPRETATION OF SITE CONDITIONS: Soil, rock, or other material descriptions, and statements regarding their condition, made in this report are based on site conditions encountered by Jacques Whitford Stantec AXYS Limited at the time of the work and at the specific testing and/or sampling locations. Classifications and statements of condition have been made in accordance with normally accepted practices which are judgmental in nature; no specific description should be considered exact, but rather reflective of the anticipated material behavior. Extrapolation of in situ conditions can only be made to some limited extent beyond the sampling or test points. The extent depends on variability of the soil, rock and groundwater conditions as influenced by geological processes, construction activity, and site use. VARYING OR UNEXPECTED CONDITIONS: Should any site or subsurface conditions be encountered that are different from those described in this report or encountered at the test locations, Jacques Whitford Stantec AXYS Limited must be notified immediately to assess if the varying or unexpected conditions are substantial and if reassessments of the report conclusions or recommendations are required. Jacques Whitford Stantec AXYS Limited will not be responsible to any party for damages incurred as a result of failing to notify Jacques Whitford Stantec AXYS Limited that differing site or sub-surface conditions are present upon becoming aware of such conditions. PLANNING, DESIGN, OR CONSTRUCTION: Development or design plans and specifications should be reviewed by Jacques Whitford Stantec AXYS Limited, sufficiently ahead of initiating the next project stage (property acquisition, tender, construction, etc), to confirm that this report completely addresses the elaborated project specifics and that the contents of this report have been properly interpreted. Specialty quality assurance services (field observations and testing) during construction are a necessary part of the evaluation of sub-subsurface conditions and site preparation works. Site work relating to the recommendations included in this report should only be carried out in the presence of a qualified geotechnical engineer; Jacques Whitford Stantec AXYS Limited cannot be responsible for site work carried out without being present.
11 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Appendix B Drawings APPENDIX B Drawings
12
13 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Appendix C Borehole Records APPENDIX C Borehole Records
14 STRATA PLOT SYMBOLS AND TERMS USED ON BOREHOLE AND TEST PIT RECORDS Gravel & Boulders Sand Silt Clay Low/High Low/High Plasticity Plasticity Till Topsoil Peat Fill Sandstone Siltstone Mudstone Igneous Bedrock Rock Initial water level reading Trace 1-% Some (date) -5% 5-5% Long term water level reading Terminology used for describing soil strata based upon the proportion of individual particle sizes present: less than 1% Adjective (e.g. silty or sandy) And (e.g. silt and sand) The standard terminology to describe cohesionless soils includes the state of packing, as determined by laboratory test or by the Standard Penetration Test 'N' -value: the number of blows of 1 pound (kg) hammer falling inches (7 mm), required to drive a inch (5.mm) O.D. split spoon sampler one foot (5 mm) into the soil. The state of packing approximately relates to the SPT 'N' value as follows: State of Packing Very Loose Loose 'N' Value < -1 Relative Density % < Medium Dense State of Packing 'N' Value Dense Very Dense >5 >5 Relative Density % The standard terminology to describe cohesive soils includes the consistency, which is based on undrained shear strength as measured by insitu vane tests, penetrometer test, unconfined compression tests, or occasionally by standard penetration tests. Consistency Very Soft Undrained Shear Strength kips/sq.ft. kpa <.5 <1.5 'N' Value < Consistency Stiff Undrained Shear Strength kips/sq.ft. kpa 'N' Value -15 Soft Very Stiff Firm Hard >. > > GS... Grab Sample RC... Rock Core NR... No Recovery AS... Auger Sample SS... Split spoon sample (Obtained by performing the Standard Penetration Test) ST... Shelby tube or thin wall tube Ps... Piston Sample UNDIST.. Undisturbed Sample
15 BH9-1 DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. Geodetic.1 m NORTHING EASTING DRILLING METHOD No Solid Stem Auger CO CH 1 5 mm of Asphalt Pavement over 75 mm of Concrete Light brown, silty CLAY, trace sand, trace gravel, very stiff GS 1-1 GS 1-1 Insitu Shear Vane (kpa) Remoulded Shear Vane (kpa) Pocket Penetrometer (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W WL Dynamic Cone Penetration Test, blows/.m Auger refusal on suspected Bedrock at Elev. 1. m Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT - Standard Penetration Test PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Logged by: AM/RI Date: Sept. 1, 9
16 DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. BH9- Geodetic 1.9 m DRILLING METHOD No. NORTHING EASTING Wash Rotary/SPT Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W P W WL Standard Penetration Test, blows/.m AREA UNDER WATER Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT - Standard Penetration Test PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Logged by: AM/RI Date: Sept. 1, 9
17 No DATUM Geodetic NORTHING 59 ELEVATION 1.9 m EASTING 77 Sept., 9 Sea to Sky Drilling Ltd. Wash Rotary/SPT DRILLING CO. BH9- DRILLING METHOD cont'd AREA UNDER WATER Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m Dark grey, sandy, silty CLAY, trace organics, very soft SPT CH firm below Elev. -9. m Dark grey, fractured GABBRO SPT refusal on suspected Bedrock at Elev. -1. m. SPT - SPT Refusal >> Sample Type: GS - Grab Sample SPT - Standard Penetration Test Logged by: AM/RI ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Date: Sept. 1, 9
18 DATUM ELEVATION Sept. 1, 9 Sea to Sky Drilling Ltd. DRILLING CO. BH9- Geodetic 1.9 m DRILLING METHOD No. NORTHING EASTING Wash Rotary/SPT Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W P W WL Standard Penetration Test, blows/.m AREA UNDER WATER Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT - Standard Penetration Test PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Logged by: AM/RI Date: Sept. 1, 9
19 DATUM ELEVATION Sept. 1, 9 Sea to Sky Drilling Ltd. DRILLING CO. BH9- Geodetic 1.9 m NORTHING EASTING DRILLING METHOD No Wash Rotary/SPT cont'd AREA UNDER WATER Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m Black, clayey SILT, some organics, some shells, very soft SPT -1 9 >> MH Grey, silty CLAY, trace shells, very soft NR NR SPT - 97 >> without shells below Elev m SPT >> 1 1 -some sand lenses from Elev m to Elev. -1. m -soft to firm below Elev. -1. m SPT SPT CH Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Logged by: AM/RI Date: Sept. 1, 9
20 DATUM ELEVATION Sept. 1, 9 Sea to Sky Drilling Ltd. DRILLING CO. BH9- Geodetic 1.9 m DRILLING METHOD No. NORTHING EASTING Wash Rotary/SPT cont'd Grey, silty CLAY, trace shells, soft to firm Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m SPT trace fine gravel below Elev. -1. m SPT SPT refusal on suspected Bedrock at Elev. -. m. 5 7 Sample Type: GS - Grab Sample SPT - Standard Penetration Test Logged by: AM/RI ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Date: Sept. 1, 9 9
21 BH9- DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. Geodetic 1. m NORTHING EASTING DRILLING METHOD No Wash Rotary/SPT Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W L Standard Penetration Test, blows/.m AREA UNDER WATER Grey SAND, some silt, some gravel, trace shells, very loose to loose -9 mm of Gravel, trace sand at Elev. -. m SPT -1 NR NR 11 9 SM Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT - Standard Penetration Test PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Logged by: AM/RI Date: Sept. 1, 9
22 BH9- No DATUM Geodetic NORTHING 599 ELEVATION 1. m EASTING 79 Sept., 9 DRILLING CO. Sea to Sky Drilling Ltd. DRILLING METHOD Wash Rotary/SPT cont'd Grey SAND, some silt, some gravel, trace shells, very loose to loose SPT - Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m NR NR 1 Grey, silty CLAY, trace shells, trace sand, soft 11 SPT some sand, without shells below Elev m SPT - SPT SPT CH Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT -7 SPT - Standard Penetration Test Logged by: AM/RI PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Date: Sept. 1, 9
23 BH9- DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. Geodetic 1. m DRILLING METHOD No. NORTHING EASTING Wash Rotary/SPT cont'd Grey, silty CLAY, some sand, soft Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m Bedrock (no sample collected) -- 1 SPT refusal on suspected Bedrock at Elev m Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT - Standard Penetration Test PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Logged by: AM/RI Date: Sept. 1, 9 9
24 BH9-5 DATUM ELEVATION Aug. 1, 9 Sea to Sky Drilling Ltd. DRILLING CO. Geodetic.9 m NORTHING EASTING DRILLING METHOD No Wash Rotary/SPT Insitu Shear Vane (kpa) Remoulded Shear Vane (kpa) Pocket Penetrometer (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W WL Standard Penetration Test, blows/.m AREA UNDER WATER SP Grey SAND, trace silt, trace shells, very loose SPT 5-1 Grey, silty CLAY, very soft SPT 5-9 Sample Type: GS - Grab Sample SPT - Standard Penetration Test Logged by: AM/RI ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Date: Sept. 1, 9
25 BH9-5 No DATUM Geodetic NORTHING 5999 ELEVATION.9 m EASTING 75 Aug. 1, 9 DRILLING CO. Sea to Sky Drilling Ltd. DRILLING METHOD Wash Rotary/SPT cont'd Grey, silty CLAY, very soft Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m SPT 5- SPT >> 9 >> 9 11 CH 1 Atterberg Limits test on sample from Elev. -1. m. WL = 11% = % SPT 5-5 SPT >> 11 >> 9 1 SPT >> SM Grey, silty SAND, some clay, trace gravel, trace shells, loose to medium dense SPT Grey, silty CLAY, soft to firm SPT SPT5-1 Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: 7 Logged by: AM/RI Date: Sept. 1, 9 5
26 DATUM ELEVATION Aug. 1, 9 Sea to Sky Drilling Ltd. DRILLING CO. BH9-5 Geodetic.9 m NORTHING EASTING DRILLING METHOD No Wash Rotary/SPT cont'd Grey, silty CLAY, soft to firm Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m SPT CH SPT Dark grey, fractured GABBRO SPT refusal on suspected Bedrock at Elev. -.5 m. SPT Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT - Standard Penetration Test PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Logged by: AM/RI Date: Sept. 1, 9 9
27 BOREHOLE RECORD BH9- No DATUM Geodetic NORTHING 599 ELEVATION. m EASTING 75 Sept. 1, 9 DRILLING CO. Sea to Sky Drilling Ltd. DRILLING METHOD Wash Rotary/SPT Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m AREA UNDER WATER Black, clayey SILT, some sand, some gravel, some organics, some shells, very soft NR NR 1 7 MH Grey, silty CLAY, trace sand, trace shells, very soft SPT -1 SPT - SPT SPT - Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: 1 Logged by: AM/RI Date: Sept. 1, 9
28 BOREHOLE RECORD BH9- No DATUM Geodetic NORTHING 599 ELEVATION. m EASTING 75 Sept. 1, 9 DRILLING CO. Sea to Sky Drilling Ltd. DRILLING METHOD Wash Rotary/SPT cont'd Grey, silty CLAY, trace sand, trace shells, very soft Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m SPT without sand and shells, firm to stiff below Elev m SPT - SPT SPT CH -soft to firm below Elev m SPT SPT-1 Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: 1 Logged by: 7 AM/RI Date: Sept. 1, 9 5
29 BH9- No DATUM Geodetic NORTHING 599 ELEVATION. m EASTING 75 Sept. 1, 9 DRILLING CO. Sea to Sky Drilling Ltd. DRILLING METHOD Wash Rotary/SPT cont'd 19 Grey, silty CLAY, some clayey silt layers, soft to firm -trace of gravel and sand lenses below Elev m -some clayey silt layers and soft below Elev. -1. m SPT-11 Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) 717 W WL Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa Standard Penetration Test, blows/.m SPT SPT SPT Dark grey, fractured GABBRO 7 -- SPT refusal on suspected Bedrock at Elev. -5. m. SPT-15 7 Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT - Standard Penetration Test PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Logged by: AM/RI Date: Sept. 1, 9 9
30 BOREHOLE RECORD BH9-7 No DATUM Geodetic NORTHING 5 ELEVATION. m EASTING 75 Aug. 1, 9 DRILLING CO. Sea to Sky Drilling Ltd. DRILLING METHOD Wash Rotary/SPT Insitu Shear Vane (kpa) Remoulded Shear Vane (kpa) Pocket Penetrometer (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W WL Standard Penetration Test, blows/.m AREA UNDER WATER Black, clayey SILT, trace sand, trace gravel, trace organics, trace shells, very soft SPT >> MH NR NR 7 Dark grey, silty CLAY, some shells, very soft 19 SPT 7-19 >> 9 NR NR Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Logged by: AM/RI Date: Sept. 1, 9
31 BOREHOLE RECORD BH9-7 cont'd No DATUM Geodetic NORTHING 5 ELEVATION. m EASTING 75 Aug. 1, 9 DRILLING CO. Sea to Sky Drilling Ltd. DRILLING METHOD Wash Rotary/SPT Grey, silty CLAY, some shells, very soft Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m SPT CH -trace sand, without shells below Elev. -9. m SPT stiff below Elev m SPT SPT Bedrock (no sample collected) SPT refusal on suspected Bedrock at Elev. -1. m Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Logged by: AM/RI Date: Sept. 1, 9
32 DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. BH9- Geodetic. m DRILLING METHOD No. NORTHING EASTING Solid Stem Auger FL FL 1 FL FILL - grey Cobbles and Boulders, some crushed gravel, loose to medium dense FILL - black, silty Sand (Coal slag), some wood and gravel, loose FILL - dark brown Wood Waste, loose GS -1 Insitu Shear Vane (kpa) Remoulded Shear Vane (kpa) Pocket Penetrometer (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W WL Dynamic Cone Penetration Test, blows/.m Grey mottled, silty CLAY, trace sand, firm to stiff GS - CH -without sand below Elev. 1. m GS - 1 GS GS SM Grey, silty, gravelly SAND, trace shells, trace clay, loose to medium dense GS - 1 TL Grey glacial TILL (clayey Silt and Sand, some gravel), very stiff GS -7 GS Auger refusal on suspected Bedrock at Elev. -.5 m. Borehole sealed with Bentonite from Elev. 1. m to Elev.. m. 9 Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Logged by: AM/RI Date: Sept. 1, 9
33 BH9-9 DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. Geodetic 9.1 m DRILLING METHOD No. NORTHING EASTING Solid Stem Auger FL 1 FILL - 19 mm minus Clear Crush Gravel, medium dense FILL - brown, gravelly Sand, trace to some silt, trace asphalt, very loose to loose GS 9-1 Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Dynamic Cone Penetration Test, blows/.m FL m of brown, sandy silt with organics at Elev.. m GS 9- GS OL Black, organic SILT, some wood debris, soft Grey, silty CLAY, trace sand, firm GS 9- GS >> 15 -stiff below Elev. 1.5 m 1 GS Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: 1 Logged by: AM/RI Date: Sept. 1, 9
34 BH9-9 DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. Geodetic 9.1 m NORTHING EASTING DRILLING METHOD No Solid Stem Auger cont'd 1 Grey, silty CLAY, trace sand, very stiff to hard GS 9-7 GS 9-5 Insitu Shear Vane (kpa) Remoulded Shear Vane (kpa) Pocket Penetrometer (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W WL Dynamic Cone Penetration Test, blows/.m mm of black Silt, some organics at Elev. -1. m GS CH -without sand below Elev. -. m GS GS GS End of Borehole at Elev. -.1 m. DCPT refusal on suspected Bedrock at Elev. -.1 m. Hole sealed with Bentonite from Elev. 7.9 m to Elev..7 m and from Elev..1 m to Elev..9 m. GS Refusal >> Sample Type: GS - Grab Sample SPT - Standard Penetration Test Logged by: AM/RI ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Date: Sept. 1, 9
35 DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. BH9-1 Geodetic. m 1559 No. NORTHING 59 EASTING DRILLING METHOD 775 Solid Stem Auger FL FILL - brown, clayey Silt, trace gravel, soft GS1-1 1 Insitu Shear Vane (kpa) Remoulded Shear Vane (kpa) Pocket Penetrometer (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W WL Dynamic Cone Penetration Test, blows/.m FILL - grey mottled, clayey Silt, firm to stiff 1 FL GS1-15 Light brown, silty CLAY, trace sand, firm to stiff GS1-1 GS1-1 GS CH 1 GS GS1-7 5 TL Light brown, glacial TILL (clayey, sandy Silt, trace gravel), stiff to very stiff GS1-1 9 Auger refusal on suspected Bedrock at Elev. -. m. Hole sealed with Bentonite from Elev. 5.9 m to Elev.. m. Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Logged by: AM/RI Date: Sept. 1, 9
36 DATUM Geodetic ELEVATION.7 m Sept. 1, 9 Beck Drilling Services Ltd. DRILLING CO. BH9-11 NORTHING EASTING DRILLING METHOD No Solid Stem Auger AS FL 1 FL 175 mm of Asphalt Pavement FILL - Grey Sand and Gravel, trace silt, loose to medium dense FILL - black, recycled Asphalt, loose FILL - brown, silty Clay, trace sand, firm to stiff GS11-1 GS11- Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W WL Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa Dynamic Cone Penetration Test, blows/.m FL GS11-1 FL FILL - dark brown Silt, some organics, some wood debris, some gravel, soft GS FILL - brown, silty Clay, trace sand, firm to stiff GS FL GS GS FL FILL - dark brown Silt, some organics, some sand, soft, with brick and glass fragments Blue/grey, silty CLAY, stiff GS11- GS CH GS Grey, glacial TILL (silty Sand, some gravel and clay), dense to very dense Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: GS Logged by: AM/RI Date: Sept. 1, 9
37 DATUM Geodetic ELEVATION.7 m Sept. 1, 9 Beck Drilling Services Ltd. DRILLING CO. BH9-11 DRILLING METHOD No. NORTHING EASTING Solid Stem Auger cont'd Grey, glacial TILL (silty Sand, some gravel and clay), dense to very dense Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Dynamic Cone Penetration Test, blows/.m TL GS Auger refusal on suspected Bedrock at Elev. -. m. Hole sealed with Bentonite from Elev. 5. m to Elev..1 m Sample Type: GS - Grab Sample SPT - Standard Penetration Test Logged by: AM/RI ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Date: Sept. 1, 9
38 BH9-1 DATUM Geodetic ELEVATION. m Sept. 1, 9 Beck Drilling Services Ltd. DRILLING CO. DRILLING METHOD No. NORTHING EASTING Solid Stem Auger FL FILL - Brown, sandy, clayey Silt, stiff GS1-1 Insitu Shear Vane (kpa) Remoulded Shear Vane (kpa) Pocket Penetrometer (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W WL Dynamic Cone Penetration Test, blows/.m FL FILL - brown, crushed Sandstone, trace concrete, loose GS1- FL FILL - dark brown, sandy Silt, trace wood, trace shells, medium dense Grey mottled, silty CLAY, some sand, stiff GS1-1 GS1-15 GS GS1-1 5 CH 1 -without sand, very stiff below Elev..9 m GS GS1-7 TL Grey glacial TILL (silty Sand, some gravel, trace clay), dense to very dense Auger refusal on suspected Bedrock at Elev.. m. Hole sealed with Bentonite from Elev. 5.1 m to Elev.. m. GS Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Logged by: AM/RI Date: Sept. 1, 9
APPENDIX F GEOTECHNICAL REPORT
The City of Winnipeg Bid Opportunity No. 101-2016 Template Version: C420150806 - RW APPENDIX F GEOTECHNICAL REPORT AECOM 99 Commerce Drive 204 477 5381 tel Winnipeg, MB, Canada R3P 0Y7 204 284 2040 fax
More informationHow To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska
APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED
More informationSite Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions
This is an attempt to create a stand alone self learning module on site investigation. Fasten your seat belts. Sit back, relax and enjoy. 1 2 Site Investigation Some unsung heroes of Civil Engineering
More informationINDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode
INDIRECT METHODS SOUNDING OR PENETRATION TESTS STANDARD PENETRATION TEST (SPT) Reference can be made to IS 2131 1981 for details on SPT. It is a field edtest to estimate e the penetration e resistance
More informationFACTUAL GROUND INVESTIGATION
FACTUAL GROUND INVESTIGATION REPORT COMMERCIAL/INDUSTRIAL REDEVELOPMENT OF LAND AT STEADMAN S WELTON CUMBRIA Web: www.geoenvironmentalengineering.com Telephone: 08456 768 895 Project Ref: 2013-657 Site
More informationCIVL451. Soil Exploration and Characterization
CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally
More informationKWANG SING ENGINEERING PTE LTD
KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters
More informationGeotechnical Investigation Test Report
Geotechnical Investigation Test Report Report No. htsc/rcd/ 3457 Dated: - 20/03/2010 Asphalt Standard Penetration Test as per IS 2131 ------------- IS 6403 Soil Job Card No - 1649 Cement Client/Department
More informationPavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces.
Project No. 208-8719 January, 2009 Ref: 2-8719BR Anthony Hudson - Broadscale Geotechnical Investigation - Proposed Commercial Development - 52 Old Pacific Highway, Pimpama Page 32 iii) Pavements should
More informationHow To Design A Foundation
The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural
More informationGeotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur
Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Lecture No. # 13 (Refer Slide Time: 00:18) So last class, it was
More informationGeotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns
1. Introduction 1.1 Scope of Work The Asian Disaster Preparedness Centre (ADPC) is implementing the project Seismic Hazard and Vulnerability Mapping for Rangamati, Bandarban and Khagrachari Municipality.
More informationReport. Geotechnical Investigation Proposed Easy Access Upgrade Marrickville Railway Station Station Street, Marrickville, NSW
Pty Ltd ABN 62 084 294 762 Unit 5/39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel : (02) 9679 8733 PO Box 1543, Macquarie Centre. North Ryde, NSW 2113 Fax : (02) 9679 8744 Report Geotechnical Investigation
More informationSNC-Lavalin Inc. Montcalm Wastewater Pumping Station Upgrades - Geotechnical Report. October 2011
SNC-Lavalin Inc. Montcalm Wastewater Pumping Station Upgrades - Geotechnical Report October 2011 SNC-Lavalin Inc Montcalm Wastewater Pumping Station Upgrades - Geotechnical Report Table of Contents 1.0
More informationpatersongroup Geotechnical Investigation Proposed Residential Development 590 Hazeldean Road - Ottawa Prepared For 2118356 Ontario Inc.
Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Residential Development 590 Hazeldean Road - Ottawa Archaeological
More informationINSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!
In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible
More informationChittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme
Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme Main Report Deliverable 02 Sub-Surface Properties of Soil Development in Rangamati, Bandarban and Khagrachari Municipality
More informationFREDERICK SHERRELL LTD
FREDERICK SHERRELL LTD CONSULTING ENGINEERING GEOLOGISTS AND GEOTECHNICAL ENGINEERS 66 WEST STREET TAVISTOCK DEVON PL19 8AJ Your Ref: Our Ref: 2962.NS.JR Telephone: 01822 612915 Facsimile: 01822 617394
More informationCOMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2
(PREVIEW) SP 36 (Part 2) : 1988 COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 IS 1893 : 1979 (Reaffirmed 1987) CODE OF PRACTICE FOR SUBSURFACE INVESTIGATION FOR FOUNDATIONS 1.1 This code deals
More informationModule 1 : Site Exploration and Geotechnical Investigation. Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives
Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives In this section you will learn the following Penetrometer Tests Standard penetration test Static cone penetration test Dynamic cone
More informationINTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013
INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013 Copyright by the authors - Licensee IPA- Under Creative Commons license 3.0 Research article ISSN 0976 4399 Reliability of
More informationGUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No.
GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES Materials Engineering Report No. 2009-8M (Supersedes Report No. 21) F CHOWDHURY GEOMECHANICS AND STRUCTURAL MATERIALS ENGINEER S REHMAN GEOTECHNICAL
More informationGEOTECHNICAL INVESTIGATION. Adelaide Street Pollution Control Plant Outlet Structure Replacement London, Ontario
September 2013 GEOTECHNICAL INVESTIGATION Adelaide Street Pollution Control Plant Outlet Structure Replacement London, Ontario Submitted to: Mr. Simon Jeater, C.Tech., Environmental Technician Stantec
More informationc. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc.
Design Manual Chapter 6 - Geotechnical 6B - Subsurface Exploration Program 6B-2 Testing A. General Information Several testing methods can be used to measure soil engineering properties. The advantages,
More informationFINAL REPORT ON SOIL INVESTIGATION
FINAL REPORT ON SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION AT SS-6B AREA AT HPCL VISAKH REFINERY VISAKHAPATNAM ANDHRA PRADESH J.J. ASSOCIATES(VISAKHAPATNAM) AETP(P) LIMITED #11-6-3, RockDale Layout,
More information1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum
Malaysian Civil Engineering Standard Method of Measurement (MyCESMM) CLASS D: SITE INVESTIGATION WORK Measurement covered under other classes: Excavation not carried out for the purpose of soil investigation
More informationStrength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT
Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT David L. Knott, P.E. and James M. Sheahan, P.E. HDR Engineering, Inc. 3 Gateway Center Pittsburgh, PA 15222-1074 Phone:
More informationCaltrans Geotechnical Manual
Cone Penetration Test The cone penetration test (CPT) is an in-situ sounding that pushes an electronic penetrometer into soil and records multiple measurements continuously with depth. Compared with rotary
More informationLABORATORY CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
Test Procedure for LABORATORY CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES TxDOT Designation: Tex-142-E Effective Date: August 1999 1. SCOPE 1.1 This method is a system for classifying disturbed and
More informationANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY
ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1: BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN DRA FOR SAFETY D1-1 ANNEX D1 BASIC CONSIDERATIONS
More informationpatersongroup Geotechnical Investigation Proposed Multi-Storey Buildings 267 O Connor Street Ottawa, Ontario Prepared For Mastercraft Starwood Group
Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Archaeological Services 267 O Connor Street Ottawa, Ontario Prepared
More informationGeotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples
Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: rajuvs_b@yahoo.com
More informationA study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil
ISSN: 319-53 (An ISO 39: 00 Certified Organization) A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil Utpal Kumar Das Associate Professor, Department
More informationVOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE
2.0 SITE INVESTIGATION METHODOLOGY The following section summarizes the Site investigation methodology applied during the subsurface investigation and hydrogeological assessment completed at the CRRRC
More informationSPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration
More informationENCE 4610 Foundation Analysis and Design
This image cannot currently be displayed. ENCE 4610 Foundation Analysis and Design Shallow Foundations Total and Differential Settlement Schmertmann s Method This image cannot currently be displayed. Strength
More informationWork Type Definition and Submittal Requirements
Work Type: Highway Materials Testing Geotechnical Laboratory Testing, Geotechnical Laboratory Testing, Standard Penetration (SPT) & Rock Coring, Cone Penetration Test, Solid Stem Auger Drilling, and Materials
More informationEARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd
EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook, W.A. Georgiou Group Pty Ltd GEOTPERT08050AZ-AH 27 March 2013 EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook,
More informationproduct manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer
HS-4210_MAN_09.08 product manual HS-4210 Digital Static Cone Penetrometer Introduction This Manual covers the measurement of bearing capacity using the Humboldt Digital Static Cone Penetrometer (DSCP).
More informationGEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1
GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding
More informationG-126 (Continued) MTA Westside Subway Extension Los Angeles, California. Figure: A-2.22c
LA METRO PBTUNNEL ZONE S:\131 GEOTECH\GINTW\LIBRARY MACTEC JUNE11.GLB G:\PROJECT_DIRECTORIES\43\\61_METRO_WESTSIDE_EXTENSION\6.2.3.1 GEOTECHNICAL DESIGN\3.2 ALL FIELD NOTES\GINT LOG\NEW TEMPLATE MARCH
More informationCW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS
December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...
More informationTECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION
ACCREDITATION SCHEME FOR INSPECTION BODIES TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION Technical Note SI 01: 3 February 2016 The SAC Accreditation
More informationEurocode 7 - Geotechnical design - Part 2 Ground investigation and testing
Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering
More informationWashington 98102-3699, mike.bailey@hartcrowser.com
LESSONS LEARNED FROM A STONE COLUMN TEST PROGRAM IN GLACIAL DEPOSITS Barry S. Chen 1, P.E., Member, Geo-Institute and Michael J. Bailey 2, P.E., Member, Geo-Institute ABSTRACT A stone column test program
More informationNOTES on the CONE PENETROMETER TEST
GE 441 Advanced Engineering Geology & Geotechnics Spring 2004 Introduction NOTES on the CONE PENETROMETER TEST The standardized cone-penetrometer test (CPT) involves pushing a 1.41-inch diameter 55 o to
More informationHighway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting
Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003249 General Project Overview This work is located along Trunk Highway (TH) 23, for State Project (SP) 7305-124.
More information20 ACRE UBATC SITE ( 650' x 1,350') UINTAH BASIN MASTER PLAN VERNAL CAMPUS. Architects Engineers Program and Construction Managers 10.18.
20 ACRE UBATC SITE ( 650' x 1,350') UINTAH BASIN MASTER PLAN VERNAL CAMPUS Architects Engineers Program and Construction Managers 10.18.06 BUILDING MAINTENANCE BUILDING TRADES CLASSROOMS COMMONS/CIRCULATION
More informationUsing Combination of SPT, DMT and CPT to Estimate Geotechnical Model for a Special Project in Turkey
Using Combination of SPT, DMT and CPT to Estimate Geotechnical Model for a Special Project in Turkey Figen Orhun Onal GE, M.Sc., Site Works Manager, Zemin Etud ve Tasarım A.Ş., Istanbul, figen.orhun@zetas.com.tr
More informationMethod Statement FOR. Soil Investigation
Method Statement FOR Soil Investigation PREPARED BY JUNE 2010 Infratech ASTM CO., LTD. TABLE OF CONTENTS Chapter Title Page Table of Contents..1 List of Appendix... 2 List of Table... 2 List of Figures...
More informationREPORT OF GEOTECHNICAL EXPLORATION BRIDGE STRUCTURE REPORT
REPORT OF GEOTECHNICAL EXPLORATION BRIDGE STRUCTURE REPORT New Wolf Pen Branch Road Bridge and Temporary Diversion Bridge LSIORBP Section 4 KY 841 Louisville, Jefferson County, Kentucky KSWA Project No.
More informationREPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Merivale
REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale Report
More information1.0 INTRODUCTION 1 2.0 SCOPE OF WORK 2 3.0 EXECUTION OF FIELD WORK 2 4.0 LABORATORY TESTS 8 5.0 FINDINGS OF THE GEOTECHNICAL INVESTIGATION 9
REPORT ON GEOTECHNICAL INVESTIGATION FOR LPG MOUNDED STORAGE AT VISAKHA REFINERY, MALKAPURAM, VISAKHAPATNAM (A.P) FOR HINDUSTAN PETROLEUM CORPORATION LIMITED CONTENTS SR.NO. DESCRIPTION PAGE NO. 1.0 INTRODUCTION
More informationFOUNDATION INVESTIGATIONS FOR STRUCTURES
FOUNDATION INVESTIGATIONS FOR STRUCTURES 6 INDEX Page I. Overview of MoDOT Practice 1 A. Geotechnical Organization of MoDOT 1 B. Types of Reports 1 C. Special Investigations 2 II. Policy Manuals 3 A. Materials
More information23 Royal Avenue London. Geotechnical Assessment Report. Report No. LW25247. September 2014
23 Royal Avenue London Geotechnical Assessment Report Report No. LW25247 September 2014 Report prepared for the benefit of: Builtain Ltd Unit 8, Tempo House 15 Falcon Road London SW11 2PJ Document Control
More informationSoil behaviour type from the CPT: an update
Soil behaviour type from the CPT: an update P.K. Robertson Gregg Drilling & Testing Inc., Signal Hill, California, USA ABSTRACT: An initial application of CPT results is to evaluate soil type and soil
More informationGeotechnical Investigation Report London Street Generating Station Peterborough, Ontario. February 2012
Geotechnical Investigation Report London Street Generating Station Peterborough, Ontario February 2012 Project No. 111-25780-00 February 7, 2012 Mr. Kevin McKeown, Generation Project Manager Peterborough
More informationDYNAMIC CONE PENETRATION TEST INSTRUCTIONAL MANUAL GEOTECHANICAL
DYNAMIC CONE PENETRATION TEST INSTRUCTIONAL MANUAL GEOTECHANICAL J. P. Scientific Instruments 7, Civil Lines, Roorkee-247667 DYNAMIC CONE PENETRATION TEST CONTENTS: PAGE NO. 1.0 INTRODUCTION 03 2.0 PROBLEM
More informationAnirudhan I.V. Geotechnical Solutions, Chennai
Anirudhan I.V. Geotechnical Solutions, Chennai Often inadequate In some cases, excess In some cases, disoriented Bad investigation Once in a while good ones Depends on one type of investigation, often
More informationGround investigation and Eurocode 7: A Scottish perspective
technical note Ground investigation and Eurocode 7: A Scottish perspective John Taylor, Alan Reid, Roy Simpson, South Lanarkshire Council; Ross Cameron, Paul McLaughlin, BAM Ritchies; Patricia Bryson,
More informationGUIDELINE FOR HAND HELD SHEAR VANE TEST
GUIDELINE FOR HAND HELD SHEAR VANE TEST NZ GEOTECHNICAL SOCIETY INC August 2001 CONTENTS Page 1.0 Introduction 2 2.0 Background 2 3.0 Recommended Practice 3 4.0 Undrained Shear Strength 3 5.0 Particular
More informationFundamentals of CONE PENETROMETER TEST (CPT) SOUNDINGS. J. David Rogers, Ph.D., P.E., R.G.
Fundamentals of CONE PENETROMETER TEST (CPT) SOUNDINGS J. David Rogers, Ph.D., P.E., R.G. Cone Penetration Test CPT soundings can be very effective in site characterization, especially sites with discrete
More informationAppendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils
Appendix D.1 Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils General Notes Pertinent to All Testing 1. For infiltration trench (I-1) and basin (I-2) practices, a minimum field
More informationTABLE OF CONTENTS 6. LABORATORY ANALYSIS 6.1 INDEX PARAMETERS 6-1 6.2 PHYSICAL PARAMETERS 6-1 6.3 CHEMICAL PARAMETERS 6-1 7.
S11187 Lind WWTP - TOC TABLE OF CONTENTS 1. CONTEXT 1.1 PROJECT CONSIDERATIONS 1-1 1.2 LOCATION 1-1 1.3 SCOPE 1-1 2. ENCOUNTERED CONDITIONS 2.1 GEOLOGIC SETTING 2-1 2.2 SURFACE CONDITIONS 2-2 2.3 SUBSURFACE
More informationS OIL C ONSULTANTS LTD
S OIL C ONSULTANTS LTD Ground Investigation Geotechnical Analysis Environmental Appraisal Tel: 01255 241639 Fax: 0871 528 9424 e-mail: harwich@soilconsultants.co.uk Haven House Albemarle Street Harwich
More informationPILE FOUNDATIONS FM 5-134
C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics
More informationKing Saud University College of Engineering Civil Engineering Department DEFORMATION OF PARTIALLY SATURATED SAND. Sultan Musaed Al-Ghamdi
King Saud University College of Engineering Civil Engineering Department DEFORMATION OF PARTIALLY SATURATED SAND By Sultan Musaed Al-Ghamdi Submitted in Partial Fulfillment of The Required For the Degree
More informationEmergency repair of Bridge B421
Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)
More informationTesting Procedures. Note: Please refer to Table 2 for a list of completed borings.
Testing Procedures Drilling and Sampling: Standard penetration tests (SPT) were conducted for every ten feet of boring advancement. SPT tests were conducted in accordance with ASTM D1586, using a 140 pound
More informationOhio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices
More informationCHAPTER THREE GEOTECHNICAL INVESTIGATION AND SAMPLING
CHAPTER THREE GEOTECHNICAL INVESTIGATION AND SAMPLING 3.0 GENERAL All Geotechnical work performed by an approved consultant for the State of Indiana or Local Agencies, such as any Indiana local municipalities
More informationPreliminary Geotechnical Engineering Report North Park Pond Dam Edinborough Drive Charlotte, North Carolina S&ME Project No.
Preliminary Geotechnical Engineering Report Edinborough Drive Charlotte, North Carolina S&ME Project No. 11-1-09 Prepared For: W.K. Dickson & Co., Inc. 70 Corporate Center Drive Raleigh, North Carolina
More informationGeotechnical Testing Methods II
Geotechnical Testing Methods II Ajanta Sachan Assistant Professor Civil Engineering IIT Gandhinagar FIELD TESTING 2 1 Field Test (In-situ Test) When it is difficult to obtain undisturbed samples. In case
More informationDesign, Testing and Automated Monitoring of ACIP Piles in Residual Soils
Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore
More informationGEOTECHNICAL INVESTIGATION CITY OF HOUSTON SURFACE WATER TRANSMISSION PROGRAM CONTRACT 74A-1 WATERLINE COH WBS NO. S-000900-0109-3 HOUSTON, TEXAS
GEOTECHNICAL INVESTIGATION CITY OF HOUSTON SURFACE WATER TRANSMISSION PROGRAM CONTRACT 74A-1 WATERLINE COH WBS NO. S-000900-0109-3 HOUSTON, TEXAS Reported To: LAN, Inc. Houston, Texas by Aviles Engineering
More information4.11 Geologic and Soil Resources
4.11 Geologic and Soil Resources Geology and soils are evaluated as part of an environmental document because conditions in the project area can influence the type and size of a project s structure, the
More informationHAULBOWLINE, CORK STATIC CONE PENETRATION TESTS FACTUAL REPORT
HAULBOWLINE, CORK STATIC CONE PENETRATION TESTS FACTUAL REPORT CONE PENETRATION TESTS Cone resistance Local friction Porewater pressure Dissipations REPORT NO: RRM CONTRACT NO: GLOVER SITE INVESTIGATIONS
More informationStandard penetration test (SPT)
Standard penetration test (SPT) Evolution of SPT Test methods and standards Influence of ground conditions on penetration resistance SPT energy measurement and corrections for SPT Use of SPT results Profiling
More informationTECHNICAL SPECIFICATION FOR GEOTECHNICAL INVESTIGATION
SHEET 1 OF 50 TECHNICAL SPECIFICATION FOR GEOTECHNICAL INVESTIGATION 1.0 GENERAL 2.0 SCOPE This specification covers the technical requirements for a detailed Geotechnical investigation and submission
More informationWENTWORTHVILLE STATION, WENTWORTHVILLE, NSW
ENVIRONMENTAL INVESTIGATION SERVICES REPORT TO CARDNO (NSW/ACT) PTY LTD ON PRELIMINARY ENVIRONMENTAL SITE ASSESSMENT AND MANAGEMENT PLAN FOR PROPOSED ACCESS UPGRADES AT WENTWORTHVILLE STATION, WENTWORTHVILLE,
More informationChapter 4 SUBSURFACE INVESTIGATION GUIDELINES
Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 4.1 Introduction...4-1 4.2 Subsurface Investigation...4-2 4.2.1 Preliminary
More informationload on the soil. For this article s examples, load bearing values given by the following table will be assumed.
How Many Piers? By Gary Collins, P.E. A clear-cut guide to helical pier spacing Introduction Helical pier spacing is not an exact science. How many does it take to support a structure adequately or repair
More informationCHAPTER 9 SOIL EXPLORATION 9.1 INTRODUCTION
CHAPTER 9 SOIL EXPLORATION 9.1 INTRODUCTION The stability of the foundation of a building, a bridge, an embankment or any other structure built on soil depends on the strength and compressibility characteristics
More informationZhou Shengen, 1 Zhang Sumin 2
439 CHAPTER 5: SOILS AND FOUNDATIONS EXPLORATION INFORMATION ON THE LIQUEFIED FOUNDATION SOIL IN TANGSHAN AND ITS VICINITY Zhou Shengen, 1 Zhang Sumin 2 Sand boils and waterspouts occurred in an extensive
More informationAn Automatic Kunzelstab Penetration Test
An Automatic Kunzelstab Penetration Test Yongyuth Sirisriphet 1, Kitidech Santichaianant 2 1 Graduated student: Faculty of Industrial Education in and Technology. King Mongkut's University of Technology
More informationpatersongroup Geotechnical Investigation Proposed Multi-Storey Building 235 King Edward Street Ottawa, Ontario Prepared For June 23, 2015
Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Multi-Storey Building 235 King Edward Street Ottawa, Ontario
More informationCHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long
More informationLot 126, Murphy Street
April 2013 GEOTECHNICAL INVESTIGATION Lot 126, Murphy Street Submitted to: Lindsay & Robyn Partridge c/- Charles Wright Architects Pty Ltd PO Box 492 Report Number. 137632049-001-R-Rev0 Distribution: 1
More informationSOILS AND FOUNDATIONS
CHAPTER 18 SOILS AND FOUNDATIONS SECTION BC 1801 GENERAL 1801.1 Scope. The provisions of this chapter shall apply to building and foundation systems in those areas not subject to scour or water pressure
More informationNOTES on the STANDARD PENETRATION TEST
GE 441 Advanced Engineering Geology & Geotechnics Spring 2004 NOTES on the STANDARD PENETRATION TEST Origins of the Standard Penetration Test Around 1902 Colonel Charles R. Gow, owner of the Gow Construction
More informationTECHNICAL Summary. TRB Subject Code:62-7 Soil Foundation Subgrades February 2003 Publication No.: FHWA/IN/JTRP-2002/30, SPR-2362
INDOT Research TECHNICAL Summary Technology Transfer and Project Implementation Information TRB Subject Code:62-7 Soil Foundation Subgrades February 3 Publication No.: FHWA/IN/JTRP-2/3, SPR-2362 Final
More informationCone Penetration Testing in Geotechnical Practice. Tom Lunne Peter K. Robertson John J.M. Powell
Cone Penetration Testing in Geotechnical Practice Tom Lunne Peter K. Robertson John J.M. Powell BLACKIE ACADEMIC & PROFESSIONAL An Imprint of Chapman & Hall London Weinheim New York Tokyo Melbourne Madras
More informationAppendix D: Geotechnical Investigation
City of Fontana Sierra Lakes Commerce Center Recirculated Draft EIR Appendix D: Geotechnical Investigation FirstCarbon Solutions H:\Client (PN JN)\0144\01440050\EIR\3 RDEIR\01440050 Sec99 99 Appendix Dividers.doc
More informationNEW DEVELOPMENTS AND IMPORTANT CONSIDERATIONS FOR STANDARD PENETRATION TESTING FOR LIQUEFACTION EVALUATIONS. Jeffrey A Farrar M.S.
NEW DEVELOPMENTS AND IMPORTANT CONSIDERATIONS FOR STANDARD PENETRATION TESTING FOR LIQUEFACTION EVALUATIONS Jeffrey A Farrar M.S., P E 1 ABSTRACT Standard Penetration Tests (SPT) are often used for evaluating
More information6.7.6. Report on Ground Investigation Report No. 762402/RVX-6. The Yorkshire and Humber (CCS Cross Country Pipeline) Development Consent Order
O C U M E N T 6.7.6 Report on Ground Investigation Report No. 76242/RVX-6 The Yorkshire and Humber (CCS Cross Country Pipeline) evelopment Consent Order Under Regulation 5(2)(a) of the Infrastructure Planning
More informationTABLE OF CONTENTS. GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES...
App. P-2 TABLE OF CONTENTS GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES...4 SITE CONDITIONS... 4 Land Use and Zoning...
More informationCEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests
PURPOSE: The parameters of the shear strength relationship provide a means of evaluating the load carrying capacity of soils, stability of slopes, and pile capacity. The direct shear test is one of the
More informationComparison of Continuous Dynamic Probing with the Standard Penetration Test for Highly Weathered Limestone of Eastern Sudan
Comparison of Continuous Dynamic Probing with the Standard Penetration Test for Highly Weathered Limestone of Eastern Sudan Prof. Dr. Khairul Anuar Kassim Deputy Dean, Research and Graduate Studies, Faculty
More informationUse and Application of Piezocone Penetration Testing in Presumpscot Formation
Use and Application of Piezocone Penetration Testing in Presumpscot Formation Craig W. Coolidge, P.E. Summit Geoengineering Services, Rockland, Maine ABSTRACT: This paper examines the advantages and limitations
More informationUse of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair
Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair Eric M. Klein, P. E., Rummel, Klepper & Kahl, LLP, Baltimore, Maryland Kenneth B. Andromalos, P. E., Brayman Environmental,
More information