1 JOHNSON STREET BRIDGE REPLACEMENT Victoria, BC GEOTECHNICAL INVESTIGATION REPORT Prepared for: City Hall No. 1 Centennial Square Victoria, BC VW 1P Prepared by: Stantec 7 Dominion Street, Suite 5 Burnaby, BC V5G L7 Tel: () -1 Fax: () -75 Project No.: 1559 October 19, 9

2 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Table of Contents TABLE OF CONTENTS 1 Introduction... 1 Site Background Site Description Stereo Air Photo Interpretation... Site Investigation and General Subsurface Conditions....1 Geotechnical Site Investigation.... General Subsurface Conditions Soil Conditions West Abutment/Approach Section Upper Victoria Harbour Section East Abutment/Approach Section..... Bedrock and Groundwater Conditions... 5 Closure... List of Tables Table 1: Provided Stereo Air Photographs... Table : Bedrock and Groundwater Elevation Summary... 5 List of Appendices Appendix A Appendix B Appendix C... Statement of General Conditions... Drawings... Borehole Records October 19, 9 Project No i

3 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Section 1: Introduction 1 INTRODUCTION Stantec, acting in general accordance with the terms of reference provided in our June 1, 9 proposal (proposal no. 15), has completed a geotechnical investigation for the proposed Johnson Street Bridge Replacement Project (the Project) in Victoria, BC. The purposes of the geotechnical investigation were to identify subsurface soil conditions, as well as both current and historical site conditions, in order to provide the City of Victoria with information necessary to develop a preliminary design and alignment for a new bridge. The scope of work for this study consisted of a visual assessment of the site conditions, a review of historical air photographs of the Project site, a geotechnical drilling program, laboratory testing, and preparation of this report. The results of environmental and archaeological site assessments are presented under separate covers. SITE BACKGROUND.1 Site Description For the purposes of this report, the Project site has been divided into three sections: West Abutment/Approach; Upper Victoria Harbour; and, East Abutment/Approach. The existing E&N rail bridge bounds each of these sections to the south and the shorelines of the Harbour are the dividing lines between the sections. The West Abutment/Approach section is bounded to the west by the intersection of Esquimalt Road and Harbour Road, and to the north by a technology park and shipyard. The section slopes up at roughly % from the intersection of Esquimalt and Harbour Roads to the Galloping Goose Recreational Trail. An approximately 7 m wide area located immediately to the east of the Trail is relatively flat and lightly vegetated (i.e., grass covered). This 7 m wide area is approximately.5 m below the elevation of the E&N railway (to the south), and approximately 5.5 m above the average grade of the technology park (to the north). The 7 m wide area and the technology park are separated by a 1.5 m high lock block retaining wall and a cut slope. To the east of the 7 m wide area, the West Abutment/Approach section slopes down to the Upper Victoria Harbour at roughly 1% and is lightly vegetated with a few small trees. The Upper Victoria Harbour section is defined as the area between the east and west shorelines of the Harbour, within approximately m north of the existing E&N rail bridge. Barriers constructed of wooden piles and cross-bracing extend between 1 and 15 m north of the existing bridge piers and define the shipping lane beneath the existing bridge. Several wooden piles are located along the east shoreline and are visible during low tide. Both submerged and buried telephone conduits are known to traverse the Harbour within this section of the alignment. The East Abutment/Approach section is bounded to the east by Store Street (near the intersection of Pandora Avenue), and to the north by an undeveloped land parcel and a heritage building (Janion Building). The western 15 m of this section of the alignment is sand and gravel covered shoreline that slopes up from the Harbour at roughly 1%. To the west of the shoreline is a triangular area that October 19, 9 Project No

4 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Section : Site Background is relatively flat and covered with cobbles, boulders and vegetation (trees and shrubs). We understand that this triangular area is a Riparian Area of Interest. The remainder of this section (to the east of the triangular area) consists of an asphalt paved parking lot. The parking lot is approximately 5.5 m above the triangular area, and the slope between these two areas is at roughly 5% and covered with boulders (rip-rap).. Stereo Air Photo Interpretation Historical slope stability issues and historical shoreline erosion or erosion protection measures were evaluated based on visual site walkovers and a review of stereo air photographs. The stereo air photographs used in our evaluation were provided by the Geographic Information Centre at the University of British Columbia (Vancouver campus), and included the photograph stereo pairs listed below in Table 1. Table 1: Provided Stereo Air Photographs Flight No. Date ME5 9C May 5, 5 15BCB 97 March 1, BCB (unknown month) BC May 7, 19 15BC 5 May 7, 19 BCC 1 August, 197 A1 19 (unknown month) A51 19 (unknown month) The stereo air photographs, in conjunction with multiple visits to the Project site, provide no evidence of the presence of head scarps or slope failures along the east and west shorelines and adjacent parcels of land. Based on our review of the provided stereo air photographs, the West Abutment/Approach section of the proposed bridge alignment appears to be relatively unchanged since 19 in terms of development, topography, and vegetation. The East Abutment/Approach section has remained relatively unchanged since the stereo air photograph taken on May 7, 19. Prior to this date, the previously referenced triangular area (between the shoreline and the parking lot) was used for storage of marine supplies and materials. A wooden pier/dock structure was located beyond the shoreline prior to 19 (the wooden support piles of which remain visible today during times of low tide). The paved extension of Pandora Street (from Store Street to the Johnson Street Bridge) was completed between 197 and 197. October 19, 9 Project No. 1559

5 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Section : Site Investigation and General Subsurface Conditions SITE INVESTIGATION AND GENERAL SUBSURFACE CONDITIONS.1 Geotechnical Site Investigation Stantec completed a preliminary subsurface investigation program that consisted of twelve boreholes distributed across the proposed new bridge alignment. The locations of ten of the boreholes (BH9-1 to BH9-1) were selected by the Owner s Engineer, and adjusted in the field based on site access and environmental restrictions. The locations of the remaining two boreholes (BH9-11 and BH9-1) were selected by Stantec based on site access and findings from the initial phase of the investigation program. Six of the boreholes (BH9-1, BH9- to BH9-1) were completed in the East and West Abutment/Approach sections of the alignment using a truck-mounted drill rig with solid-stem auger capabilities. Four of these boreholes (BH9-1, BH9- to BH9-1) were completed on September, 9 with Sea to Sky Drilling Ltd. (Sea to Sky), while the remaining two boreholes (BH9-11 and BH9-1) were completed on September 1, 9 with Beck Drilling and Environmental Services Ltd. (Beck). These six boreholes were advanced to auger refusal on suspected bedrock, and representative soil samples were collected from the auger flights as drilling proceeded. Borehole BH9-9 was advanced to 15. m below existing site grade but did not terminate on bedrock. As a result, a Dynamic Cone Penetration Test (DCPT) was completed at the location of BH9-9 (with Beck). The DCPT refused on suspected bedrock at a depth of 17. m below existing site grade. The remaining six boreholes (BH9- to BH9-7) were completed from August 1 to September, 9 in Upper Victoria Harbour using a truck-mounted drill rig (operated by Sea to Sky) that was loaded on to a barge (operated by Spectrum Marine Services Inc). These six boreholes were completed to refusal on suspected bedrock using a wash rotary boring system and Standard Penetration Tests (SPTs). Soil samples were collected from the SPTs using a 5 mm diameter splitspoon sampler. The field work was continuously monitored by a Stantec representative, who identified the sample locations, classified the soils, kept a detailed log of each borehole, and observed and recorded pertinent site features. Representative soil samples were collected from the boreholes and brought to the Stantec soils laboratory in Burnaby, BC for further visual identification and classification, and natural water content measurements. The boreholes were carried out at locations shown on Drawing No. 1 (Appendix B). October 19, 9 Project No. 1559

6 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Section : Site Investigation and General Subsurface Conditions. General Subsurface Conditions The subsurface soil strata and groundwater conditions encountered in the boreholes are described in detail on the Borehole Records, with additional and supplementary information provided in this section. All soil descriptions and identifications were made in accordance with ASTM Standard D (Visual Manual Procedure). The detailed borehole logs, along with an explanation of the symbols and terms used in their description, are provided in Appendix C...1 Soil Conditions..1.1 West Abutment/Approach Section In general, the subsurface soil conditions within this section of the proposed bridge alignment consisted of approximately m of fill (clayey silt, sandy silt, and sandstone) over native deposits of brown, silty clay. The native silty clay encountered in this section of the alignment is generally firm to stiff, and transitions to very stiff with depth. The measured water content of the samples of silty clay ranged from 15 to 9%. The silty clay deposit is generally underlain by a.5 to 1 m thick layer of dense/stiff glacial till. The glacial till is, in turn, underlain by suspected bedrock...1. Upper Victoria Harbour Section In general, a layer of very soft, black clayey silt or very loose, grey sand was encountered at the surface of the Harbour bottom. These deposits typically contained some organics and shells, and varied in thickness from 1 to m. The black clayey silt and grey sand is underlain by very thick deposits of grey, silty clay. In-situ Torvane readings indicated that the silty clay deposit is generally very soft to soft; however, firm to stiff silty clay was encountered at depth within several of the boreholes completed in this section of the bridge alignment. Atterberg Limits tests on the samples of silty clay indicate that it is of high plasticity. The measured water content of samples of the silty clay ranged from 1 to 11%. Bedrock was encountered beneath the silty clay in each of the boreholes completed in this section of the bridge alignment. Based on samples collected and observations made during the drilling, the bedrock is grey Gabbro and is slightly fractured/broken at the surface...1. East Abutment/Approach Section Surficial soils in this section of the proposed new bridge alignment consisted of layers of variable fill. The fill within the existing east bridge abutment consists of loose gravelly sand, whereas the fill within the approach area (east of the existing bridge abutment) consisted of firm to stiff silty clay that contained some organics and debris (i.e., broken glass, pieces of brick). A layer of black, coal slag was encountered within the triangular parcel of land (located to the northeast of the existing bridge abutment). The elevation of the base of the fill layers ranges from Elev. 1. m to Elev..1 m (Geodetic). October 19, 9 Project No. 1559

7 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Section : Site Investigation and General Subsurface Conditions The fill is underlain by deposits of loose to medium dense silty sand and stiff, grey silty clay; however, a 75 mm thick layer of soft organic silt was encountered between the fill and silty clay at the location of borehole BH9-9. The silty sand and silty clay is underlain by suspected bedrock... Bedrock and Groundwater Conditions The boreholes for the preliminary subsurface investigation were all terminated on suspected bedrock. Based on the collected samples and observations made during the investigation, the bedrock consists of dark grey Gabbro and is slightly fractured or broken at the surface. The groundwater table was only encountered in the East Abutment/Approach section of the proposed bridge alignment, and only in three of the four boreholes within this section (BH9-, BH9-9, and BH9-11). The depth to the groundwater table will vary from year to year and from season to season, and will depend on many factors including surface and subsurface drainage, precipitation, and the hydrogeology of the area. A summary of the bedrock and groundwater elevations at the twelve borehole locations is provided in Table below. Table : Borehole Bedrock and Groundwater Elevation Summary Ground Surface/Water Elevation (Geodetic) Elevation of Refusal on Suspected Bedrock (Geodetic) Elevation of Groundwater Table (Geodetic) BH9-1.1 m 1. m Not encountered *BH9-1.9 m -1. m --- *BH9-1.9 m -. m --- *BH9-1. m -19. m --- *BH9-5.9 m -.5 m --- *BH9-. m -5. m --- *BH9-7. m -1. m --- BH9-. m -.5 m.7 m BH m -.1 m.9 m BH9-1. m -. m Not encountered BH m -. m 1.9 m BH9-1. m. m Not encountered *Indicates borehole was drilled on a barge in Upper Victoria Harbour. To account for the variation in the tide height throughout the day, the water elevation for the boreholes drilled on the barge in Upper Victoria Harbour (BH9- to BH9-7) was averaged over the duration of the drilling period. October 19, 9 Project No

8 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Section : Closure CLOSURE This report was prepared for the exclusive use of and their agents. Any use of this report or the material contained herein by third parties, or for other than the intended purpose, should first be approved in writing by Stantec. Use of this report is subject to the Statement of General Conditions provided in Appendix A. It is the responsibility of, who is identified as the Client within the Statement of General Conditions, and its agents to review the conditions and to notify Stantec should any of these not be satisfied. The Statement of General Conditions addresses the following: Use of the report Basis of the report Standard of care Interpretation of site conditions Varying or unexpected site conditions Planning, design or construction This report has been prepared by Adam McIntyre, B.A.Sc., EIT and Thomas Crilly, M.Sc., P.Eng. Respectfully submitted, Stantec Consulting Ltd. Original signed by: Adam McIntyre, B.A.Sc., EIT Engineer, Geotechnical Group Original signed by: Thomas Crilly, M.Sc., P.Eng Senior Engineer, Geotechnical Group AM/TC/zn [File Ref: P:\_CMiC Projects\151_to_15\1559 Johnson Street Bridge\C Geotechnical Studies\Report & Letters\ Geotechnical Investigation Report.docx] October 19, 9 Project No. 1559

9 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Appendix A Statement of General Conditions APPENDIX A Statement of General Conditions

10 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Appendix A Statement of General Conditions Statement of General Conditions USE OF THIS REPORT: This report has been prepared for the sole benefit of the Client or its agent and may not be used by any third party without the express written consent of Jacques Whitford Stantec AXYS Limited and the Client. Any use which a third party makes of this report is the responsibility of such third party. BASIS OF THE REPORT: The information, opinions, and/or recommendations made in this report are in accordance with Jacques Whitford Stantec AXYS Limited s present understanding of the site specific project as described by the Client. The applicability of these is restricted to the site conditions encountered at the time of the investigation or study. If the proposed site specific project differs or is modified from what is described in this report or if the site conditions are altered, this report is no longer valid unless Jacques Whitford Stantec AXYS Limited is requested by the Client to review and revise the report to reflect the differing or modified project specifics and/or the altered site conditions. STANDARD OF CARE: Preparation of this report, and all associated work, was carried out in accordance with the normally accepted standard of care in the state or province of execution for the specific professional service provided to the Client. No other warranty is made. INTERPRETATION OF SITE CONDITIONS: Soil, rock, or other material descriptions, and statements regarding their condition, made in this report are based on site conditions encountered by Jacques Whitford Stantec AXYS Limited at the time of the work and at the specific testing and/or sampling locations. Classifications and statements of condition have been made in accordance with normally accepted practices which are judgmental in nature; no specific description should be considered exact, but rather reflective of the anticipated material behavior. Extrapolation of in situ conditions can only be made to some limited extent beyond the sampling or test points. The extent depends on variability of the soil, rock and groundwater conditions as influenced by geological processes, construction activity, and site use. VARYING OR UNEXPECTED CONDITIONS: Should any site or subsurface conditions be encountered that are different from those described in this report or encountered at the test locations, Jacques Whitford Stantec AXYS Limited must be notified immediately to assess if the varying or unexpected conditions are substantial and if reassessments of the report conclusions or recommendations are required. Jacques Whitford Stantec AXYS Limited will not be responsible to any party for damages incurred as a result of failing to notify Jacques Whitford Stantec AXYS Limited that differing site or sub-surface conditions are present upon becoming aware of such conditions. PLANNING, DESIGN, OR CONSTRUCTION: Development or design plans and specifications should be reviewed by Jacques Whitford Stantec AXYS Limited, sufficiently ahead of initiating the next project stage (property acquisition, tender, construction, etc), to confirm that this report completely addresses the elaborated project specifics and that the contents of this report have been properly interpreted. Specialty quality assurance services (field observations and testing) during construction are a necessary part of the evaluation of sub-subsurface conditions and site preparation works. Site work relating to the recommendations included in this report should only be carried out in the presence of a qualified geotechnical engineer; Jacques Whitford Stantec AXYS Limited cannot be responsible for site work carried out without being present.

11 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Appendix B Drawings APPENDIX B Drawings

12

13 Johnson Street Bridge Replacement Project Victoria, BC Geotechnical Investigation Report Appendix C Borehole Records APPENDIX C Borehole Records

14 STRATA PLOT SYMBOLS AND TERMS USED ON BOREHOLE AND TEST PIT RECORDS Gravel & Boulders Sand Silt Clay Low/High Low/High Plasticity Plasticity Till Topsoil Peat Fill Sandstone Siltstone Mudstone Igneous Bedrock Rock Initial water level reading Trace 1-% Some (date) -5% 5-5% Long term water level reading Terminology used for describing soil strata based upon the proportion of individual particle sizes present: less than 1% Adjective (e.g. silty or sandy) And (e.g. silt and sand) The standard terminology to describe cohesionless soils includes the state of packing, as determined by laboratory test or by the Standard Penetration Test 'N' -value: the number of blows of 1 pound (kg) hammer falling inches (7 mm), required to drive a inch (5.mm) O.D. split spoon sampler one foot (5 mm) into the soil. The state of packing approximately relates to the SPT 'N' value as follows: State of Packing Very Loose Loose 'N' Value < -1 Relative Density % < Medium Dense State of Packing 'N' Value Dense Very Dense >5 >5 Relative Density % The standard terminology to describe cohesive soils includes the consistency, which is based on undrained shear strength as measured by insitu vane tests, penetrometer test, unconfined compression tests, or occasionally by standard penetration tests. Consistency Very Soft Undrained Shear Strength kips/sq.ft. kpa <.5 <1.5 'N' Value < Consistency Stiff Undrained Shear Strength kips/sq.ft. kpa 'N' Value -15 Soft Very Stiff Firm Hard >. > > GS... Grab Sample RC... Rock Core NR... No Recovery AS... Auger Sample SS... Split spoon sample (Obtained by performing the Standard Penetration Test) ST... Shelby tube or thin wall tube Ps... Piston Sample UNDIST.. Undisturbed Sample

15 BH9-1 DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. Geodetic.1 m NORTHING EASTING DRILLING METHOD No Solid Stem Auger CO CH 1 5 mm of Asphalt Pavement over 75 mm of Concrete Light brown, silty CLAY, trace sand, trace gravel, very stiff GS 1-1 GS 1-1 Insitu Shear Vane (kpa) Remoulded Shear Vane (kpa) Pocket Penetrometer (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W WL Dynamic Cone Penetration Test, blows/.m Auger refusal on suspected Bedrock at Elev. 1. m Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT - Standard Penetration Test PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Logged by: AM/RI Date: Sept. 1, 9

16 DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. BH9- Geodetic 1.9 m DRILLING METHOD No. NORTHING EASTING Wash Rotary/SPT Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W P W WL Standard Penetration Test, blows/.m AREA UNDER WATER Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT - Standard Penetration Test PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Logged by: AM/RI Date: Sept. 1, 9

17 No DATUM Geodetic NORTHING 59 ELEVATION 1.9 m EASTING 77 Sept., 9 Sea to Sky Drilling Ltd. Wash Rotary/SPT DRILLING CO. BH9- DRILLING METHOD cont'd AREA UNDER WATER Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m Dark grey, sandy, silty CLAY, trace organics, very soft SPT CH firm below Elev. -9. m Dark grey, fractured GABBRO SPT refusal on suspected Bedrock at Elev. -1. m. SPT - SPT Refusal >> Sample Type: GS - Grab Sample SPT - Standard Penetration Test Logged by: AM/RI ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Date: Sept. 1, 9

18 DATUM ELEVATION Sept. 1, 9 Sea to Sky Drilling Ltd. DRILLING CO. BH9- Geodetic 1.9 m DRILLING METHOD No. NORTHING EASTING Wash Rotary/SPT Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W P W WL Standard Penetration Test, blows/.m AREA UNDER WATER Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT - Standard Penetration Test PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Logged by: AM/RI Date: Sept. 1, 9

19 DATUM ELEVATION Sept. 1, 9 Sea to Sky Drilling Ltd. DRILLING CO. BH9- Geodetic 1.9 m NORTHING EASTING DRILLING METHOD No Wash Rotary/SPT cont'd AREA UNDER WATER Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m Black, clayey SILT, some organics, some shells, very soft SPT -1 9 >> MH Grey, silty CLAY, trace shells, very soft NR NR SPT - 97 >> without shells below Elev m SPT >> 1 1 -some sand lenses from Elev m to Elev. -1. m -soft to firm below Elev. -1. m SPT SPT CH Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Logged by: AM/RI Date: Sept. 1, 9

20 DATUM ELEVATION Sept. 1, 9 Sea to Sky Drilling Ltd. DRILLING CO. BH9- Geodetic 1.9 m DRILLING METHOD No. NORTHING EASTING Wash Rotary/SPT cont'd Grey, silty CLAY, trace shells, soft to firm Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m SPT trace fine gravel below Elev. -1. m SPT SPT refusal on suspected Bedrock at Elev. -. m. 5 7 Sample Type: GS - Grab Sample SPT - Standard Penetration Test Logged by: AM/RI ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Date: Sept. 1, 9 9

21 BH9- DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. Geodetic 1. m NORTHING EASTING DRILLING METHOD No Wash Rotary/SPT Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W L Standard Penetration Test, blows/.m AREA UNDER WATER Grey SAND, some silt, some gravel, trace shells, very loose to loose -9 mm of Gravel, trace sand at Elev. -. m SPT -1 NR NR 11 9 SM Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT - Standard Penetration Test PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Logged by: AM/RI Date: Sept. 1, 9

22 BH9- No DATUM Geodetic NORTHING 599 ELEVATION 1. m EASTING 79 Sept., 9 DRILLING CO. Sea to Sky Drilling Ltd. DRILLING METHOD Wash Rotary/SPT cont'd Grey SAND, some silt, some gravel, trace shells, very loose to loose SPT - Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m NR NR 1 Grey, silty CLAY, trace shells, trace sand, soft 11 SPT some sand, without shells below Elev m SPT - SPT SPT CH Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT -7 SPT - Standard Penetration Test Logged by: AM/RI PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Date: Sept. 1, 9

23 BH9- DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. Geodetic 1. m DRILLING METHOD No. NORTHING EASTING Wash Rotary/SPT cont'd Grey, silty CLAY, some sand, soft Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m Bedrock (no sample collected) -- 1 SPT refusal on suspected Bedrock at Elev m Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT - Standard Penetration Test PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Logged by: AM/RI Date: Sept. 1, 9 9

24 BH9-5 DATUM ELEVATION Aug. 1, 9 Sea to Sky Drilling Ltd. DRILLING CO. Geodetic.9 m NORTHING EASTING DRILLING METHOD No Wash Rotary/SPT Insitu Shear Vane (kpa) Remoulded Shear Vane (kpa) Pocket Penetrometer (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W WL Standard Penetration Test, blows/.m AREA UNDER WATER SP Grey SAND, trace silt, trace shells, very loose SPT 5-1 Grey, silty CLAY, very soft SPT 5-9 Sample Type: GS - Grab Sample SPT - Standard Penetration Test Logged by: AM/RI ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Date: Sept. 1, 9

25 BH9-5 No DATUM Geodetic NORTHING 5999 ELEVATION.9 m EASTING 75 Aug. 1, 9 DRILLING CO. Sea to Sky Drilling Ltd. DRILLING METHOD Wash Rotary/SPT cont'd Grey, silty CLAY, very soft Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m SPT 5- SPT >> 9 >> 9 11 CH 1 Atterberg Limits test on sample from Elev. -1. m. WL = 11% = % SPT 5-5 SPT >> 11 >> 9 1 SPT >> SM Grey, silty SAND, some clay, trace gravel, trace shells, loose to medium dense SPT Grey, silty CLAY, soft to firm SPT SPT5-1 Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: 7 Logged by: AM/RI Date: Sept. 1, 9 5

26 DATUM ELEVATION Aug. 1, 9 Sea to Sky Drilling Ltd. DRILLING CO. BH9-5 Geodetic.9 m NORTHING EASTING DRILLING METHOD No Wash Rotary/SPT cont'd Grey, silty CLAY, soft to firm Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m SPT CH SPT Dark grey, fractured GABBRO SPT refusal on suspected Bedrock at Elev. -.5 m. SPT Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT - Standard Penetration Test PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Logged by: AM/RI Date: Sept. 1, 9 9

27 BOREHOLE RECORD BH9- No DATUM Geodetic NORTHING 599 ELEVATION. m EASTING 75 Sept. 1, 9 DRILLING CO. Sea to Sky Drilling Ltd. DRILLING METHOD Wash Rotary/SPT Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m AREA UNDER WATER Black, clayey SILT, some sand, some gravel, some organics, some shells, very soft NR NR 1 7 MH Grey, silty CLAY, trace sand, trace shells, very soft SPT -1 SPT - SPT SPT - Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: 1 Logged by: AM/RI Date: Sept. 1, 9

28 BOREHOLE RECORD BH9- No DATUM Geodetic NORTHING 599 ELEVATION. m EASTING 75 Sept. 1, 9 DRILLING CO. Sea to Sky Drilling Ltd. DRILLING METHOD Wash Rotary/SPT cont'd Grey, silty CLAY, trace sand, trace shells, very soft Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m SPT without sand and shells, firm to stiff below Elev m SPT - SPT SPT CH -soft to firm below Elev m SPT SPT-1 Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: 1 Logged by: 7 AM/RI Date: Sept. 1, 9 5

29 BH9- No DATUM Geodetic NORTHING 599 ELEVATION. m EASTING 75 Sept. 1, 9 DRILLING CO. Sea to Sky Drilling Ltd. DRILLING METHOD Wash Rotary/SPT cont'd 19 Grey, silty CLAY, some clayey silt layers, soft to firm -trace of gravel and sand lenses below Elev m -some clayey silt layers and soft below Elev. -1. m SPT-11 Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) 717 W WL Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa Standard Penetration Test, blows/.m SPT SPT SPT Dark grey, fractured GABBRO 7 -- SPT refusal on suspected Bedrock at Elev. -5. m. SPT-15 7 Sample Type: GS - Grab Sample ST - Shelby Tube Bentonite Backfill Type: SPT - Standard Penetration Test PT - Piston Tube VT - Shear Vane Test Pea Gravel Drill Cuttings Sand Logged by: AM/RI Date: Sept. 1, 9 9

30 BOREHOLE RECORD BH9-7 No DATUM Geodetic NORTHING 5 ELEVATION. m EASTING 75 Aug. 1, 9 DRILLING CO. Sea to Sky Drilling Ltd. DRILLING METHOD Wash Rotary/SPT Insitu Shear Vane (kpa) Remoulded Shear Vane (kpa) Pocket Penetrometer (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W WL Standard Penetration Test, blows/.m AREA UNDER WATER Black, clayey SILT, trace sand, trace gravel, trace organics, trace shells, very soft SPT >> MH NR NR 7 Dark grey, silty CLAY, some shells, very soft 19 SPT 7-19 >> 9 NR NR Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Logged by: AM/RI Date: Sept. 1, 9

31 BOREHOLE RECORD BH9-7 cont'd No DATUM Geodetic NORTHING 5 ELEVATION. m EASTING 75 Aug. 1, 9 DRILLING CO. Sea to Sky Drilling Ltd. DRILLING METHOD Wash Rotary/SPT Grey, silty CLAY, some shells, very soft Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Standard Penetration Test, blows/.m SPT CH -trace sand, without shells below Elev. -9. m SPT stiff below Elev m SPT SPT Bedrock (no sample collected) SPT refusal on suspected Bedrock at Elev. -1. m Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Logged by: AM/RI Date: Sept. 1, 9

32 DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. BH9- Geodetic. m DRILLING METHOD No. NORTHING EASTING Solid Stem Auger FL FL 1 FL FILL - grey Cobbles and Boulders, some crushed gravel, loose to medium dense FILL - black, silty Sand (Coal slag), some wood and gravel, loose FILL - dark brown Wood Waste, loose GS -1 Insitu Shear Vane (kpa) Remoulded Shear Vane (kpa) Pocket Penetrometer (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W WL Dynamic Cone Penetration Test, blows/.m Grey mottled, silty CLAY, trace sand, firm to stiff GS - CH -without sand below Elev. 1. m GS - 1 GS GS SM Grey, silty, gravelly SAND, trace shells, trace clay, loose to medium dense GS - 1 TL Grey glacial TILL (clayey Silt and Sand, some gravel), very stiff GS -7 GS Auger refusal on suspected Bedrock at Elev. -.5 m. Borehole sealed with Bentonite from Elev. 1. m to Elev.. m. 9 Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Logged by: AM/RI Date: Sept. 1, 9

33 BH9-9 DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. Geodetic 9.1 m DRILLING METHOD No. NORTHING EASTING Solid Stem Auger FL 1 FILL - 19 mm minus Clear Crush Gravel, medium dense FILL - brown, gravelly Sand, trace to some silt, trace asphalt, very loose to loose GS 9-1 Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Dynamic Cone Penetration Test, blows/.m FL m of brown, sandy silt with organics at Elev.. m GS 9- GS OL Black, organic SILT, some wood debris, soft Grey, silty CLAY, trace sand, firm GS 9- GS >> 15 -stiff below Elev. 1.5 m 1 GS Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: 1 Logged by: AM/RI Date: Sept. 1, 9

34 BH9-9 DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. Geodetic 9.1 m NORTHING EASTING DRILLING METHOD No Solid Stem Auger cont'd 1 Grey, silty CLAY, trace sand, very stiff to hard GS 9-7 GS 9-5 Insitu Shear Vane (kpa) Remoulded Shear Vane (kpa) Pocket Penetrometer (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W WL Dynamic Cone Penetration Test, blows/.m mm of black Silt, some organics at Elev. -1. m GS CH -without sand below Elev. -. m GS GS GS End of Borehole at Elev. -.1 m. DCPT refusal on suspected Bedrock at Elev. -.1 m. Hole sealed with Bentonite from Elev. 7.9 m to Elev..7 m and from Elev..1 m to Elev..9 m. GS Refusal >> Sample Type: GS - Grab Sample SPT - Standard Penetration Test Logged by: AM/RI ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Date: Sept. 1, 9

35 DATUM ELEVATION Sept., 9 Sea to Sky Drilling Ltd. DRILLING CO. BH9-1 Geodetic. m 1559 No. NORTHING 59 EASTING DRILLING METHOD 775 Solid Stem Auger FL FILL - brown, clayey Silt, trace gravel, soft GS1-1 1 Insitu Shear Vane (kpa) Remoulded Shear Vane (kpa) Pocket Penetrometer (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W WL Dynamic Cone Penetration Test, blows/.m FILL - grey mottled, clayey Silt, firm to stiff 1 FL GS1-15 Light brown, silty CLAY, trace sand, firm to stiff GS1-1 GS1-1 GS CH 1 GS GS1-7 5 TL Light brown, glacial TILL (clayey, sandy Silt, trace gravel), stiff to very stiff GS1-1 9 Auger refusal on suspected Bedrock at Elev. -. m. Hole sealed with Bentonite from Elev. 5.9 m to Elev.. m. Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Logged by: AM/RI Date: Sept. 1, 9

36 DATUM Geodetic ELEVATION.7 m Sept. 1, 9 Beck Drilling Services Ltd. DRILLING CO. BH9-11 NORTHING EASTING DRILLING METHOD No Solid Stem Auger AS FL 1 FL 175 mm of Asphalt Pavement FILL - Grey Sand and Gravel, trace silt, loose to medium dense FILL - black, recycled Asphalt, loose FILL - brown, silty Clay, trace sand, firm to stiff GS11-1 GS11- Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W WL Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa Dynamic Cone Penetration Test, blows/.m FL GS11-1 FL FILL - dark brown Silt, some organics, some wood debris, some gravel, soft GS FILL - brown, silty Clay, trace sand, firm to stiff GS FL GS GS FL FILL - dark brown Silt, some organics, some sand, soft, with brick and glass fragments Blue/grey, silty CLAY, stiff GS11- GS CH GS Grey, glacial TILL (silty Sand, some gravel and clay), dense to very dense Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: GS Logged by: AM/RI Date: Sept. 1, 9

37 DATUM Geodetic ELEVATION.7 m Sept. 1, 9 Beck Drilling Services Ltd. DRILLING CO. BH9-11 DRILLING METHOD No. NORTHING EASTING Solid Stem Auger cont'd Grey, glacial TILL (silty Sand, some gravel and clay), dense to very dense Insitu Shear Vane (kpa) Pocket Penetrometer (kpa) W Remoulded Shear Vane (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa WL Dynamic Cone Penetration Test, blows/.m TL GS Auger refusal on suspected Bedrock at Elev. -. m. Hole sealed with Bentonite from Elev. 5. m to Elev..1 m Sample Type: GS - Grab Sample SPT - Standard Penetration Test Logged by: AM/RI ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Date: Sept. 1, 9

38 BH9-1 DATUM Geodetic ELEVATION. m Sept. 1, 9 Beck Drilling Services Ltd. DRILLING CO. DRILLING METHOD No. NORTHING EASTING Solid Stem Auger FL FILL - Brown, sandy, clayey Silt, stiff GS1-1 Insitu Shear Vane (kpa) Remoulded Shear Vane (kpa) Pocket Penetrometer (kpa) Disturbed Torvane (kpa) 5kPa 1kPa 15kPa kpa W WL Dynamic Cone Penetration Test, blows/.m FL FILL - brown, crushed Sandstone, trace concrete, loose GS1- FL FILL - dark brown, sandy Silt, trace wood, trace shells, medium dense Grey mottled, silty CLAY, some sand, stiff GS1-1 GS1-15 GS GS1-1 5 CH 1 -without sand, very stiff below Elev..9 m GS GS1-7 TL Grey glacial TILL (silty Sand, some gravel, trace clay), dense to very dense Auger refusal on suspected Bedrock at Elev.. m. Hole sealed with Bentonite from Elev. 5.1 m to Elev.. m. GS Sample Type: GS - Grab Sample SPT - Standard Penetration Test ST - Shelby Tube PT - Piston Tube VT - Shear Vane Test Bentonite Pea Gravel Drill Cuttings Sand Backfill Type: Logged by: AM/RI Date: Sept. 1, 9

APPENDIX F GEOTECHNICAL REPORT

APPENDIX F GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 101-2016 Template Version: C420150806 - RW APPENDIX F GEOTECHNICAL REPORT AECOM 99 Commerce Drive 204 477 5381 tel Winnipeg, MB, Canada R3P 0Y7 204 284 2040 fax

More information

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED

More information

Site Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions

Site Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions This is an attempt to create a stand alone self learning module on site investigation. Fasten your seat belts. Sit back, relax and enjoy. 1 2 Site Investigation Some unsung heroes of Civil Engineering

More information

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode INDIRECT METHODS SOUNDING OR PENETRATION TESTS STANDARD PENETRATION TEST (SPT) Reference can be made to IS 2131 1981 for details on SPT. It is a field edtest to estimate e the penetration e resistance

More information

FACTUAL GROUND INVESTIGATION

FACTUAL GROUND INVESTIGATION FACTUAL GROUND INVESTIGATION REPORT COMMERCIAL/INDUSTRIAL REDEVELOPMENT OF LAND AT STEADMAN S WELTON CUMBRIA Web: www.geoenvironmentalengineering.com Telephone: 08456 768 895 Project Ref: 2013-657 Site

More information

CIVL451. Soil Exploration and Characterization

CIVL451. Soil Exploration and Characterization CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

More information

KWANG SING ENGINEERING PTE LTD

KWANG SING ENGINEERING PTE LTD KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters

More information

Geotechnical Investigation Test Report

Geotechnical Investigation Test Report Geotechnical Investigation Test Report Report No. htsc/rcd/ 3457 Dated: - 20/03/2010 Asphalt Standard Penetration Test as per IS 2131 ------------- IS 6403 Soil Job Card No - 1649 Cement Client/Department

More information

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces.

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces. Project No. 208-8719 January, 2009 Ref: 2-8719BR Anthony Hudson - Broadscale Geotechnical Investigation - Proposed Commercial Development - 52 Old Pacific Highway, Pimpama Page 32 iii) Pavements should

More information

How To Design A Foundation

How To Design A Foundation The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural

More information

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Lecture No. # 13 (Refer Slide Time: 00:18) So last class, it was

More information

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns 1. Introduction 1.1 Scope of Work The Asian Disaster Preparedness Centre (ADPC) is implementing the project Seismic Hazard and Vulnerability Mapping for Rangamati, Bandarban and Khagrachari Municipality.

More information

Report. Geotechnical Investigation Proposed Easy Access Upgrade Marrickville Railway Station Station Street, Marrickville, NSW

Report. Geotechnical Investigation Proposed Easy Access Upgrade Marrickville Railway Station Station Street, Marrickville, NSW Pty Ltd ABN 62 084 294 762 Unit 5/39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel : (02) 9679 8733 PO Box 1543, Macquarie Centre. North Ryde, NSW 2113 Fax : (02) 9679 8744 Report Geotechnical Investigation

More information

SNC-Lavalin Inc. Montcalm Wastewater Pumping Station Upgrades - Geotechnical Report. October 2011

SNC-Lavalin Inc. Montcalm Wastewater Pumping Station Upgrades - Geotechnical Report. October 2011 SNC-Lavalin Inc. Montcalm Wastewater Pumping Station Upgrades - Geotechnical Report October 2011 SNC-Lavalin Inc Montcalm Wastewater Pumping Station Upgrades - Geotechnical Report Table of Contents 1.0

More information

patersongroup Geotechnical Investigation Proposed Residential Development 590 Hazeldean Road - Ottawa Prepared For 2118356 Ontario Inc.

patersongroup Geotechnical Investigation Proposed Residential Development 590 Hazeldean Road - Ottawa Prepared For 2118356 Ontario Inc. Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Residential Development 590 Hazeldean Road - Ottawa Archaeological

More information

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:! In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible

More information

Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme

Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme Main Report Deliverable 02 Sub-Surface Properties of Soil Development in Rangamati, Bandarban and Khagrachari Municipality

More information

FREDERICK SHERRELL LTD

FREDERICK SHERRELL LTD FREDERICK SHERRELL LTD CONSULTING ENGINEERING GEOLOGISTS AND GEOTECHNICAL ENGINEERS 66 WEST STREET TAVISTOCK DEVON PL19 8AJ Your Ref: Our Ref: 2962.NS.JR Telephone: 01822 612915 Facsimile: 01822 617394

More information

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 (PREVIEW) SP 36 (Part 2) : 1988 COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 IS 1893 : 1979 (Reaffirmed 1987) CODE OF PRACTICE FOR SUBSURFACE INVESTIGATION FOR FOUNDATIONS 1.1 This code deals

More information

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives In this section you will learn the following Penetrometer Tests Standard penetration test Static cone penetration test Dynamic cone

More information

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013 INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013 Copyright by the authors - Licensee IPA- Under Creative Commons license 3.0 Research article ISSN 0976 4399 Reliability of

More information

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No.

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No. GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES Materials Engineering Report No. 2009-8M (Supersedes Report No. 21) F CHOWDHURY GEOMECHANICS AND STRUCTURAL MATERIALS ENGINEER S REHMAN GEOTECHNICAL

More information

GEOTECHNICAL INVESTIGATION. Adelaide Street Pollution Control Plant Outlet Structure Replacement London, Ontario

GEOTECHNICAL INVESTIGATION. Adelaide Street Pollution Control Plant Outlet Structure Replacement London, Ontario September 2013 GEOTECHNICAL INVESTIGATION Adelaide Street Pollution Control Plant Outlet Structure Replacement London, Ontario Submitted to: Mr. Simon Jeater, C.Tech., Environmental Technician Stantec

More information

c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc.

c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc. Design Manual Chapter 6 - Geotechnical 6B - Subsurface Exploration Program 6B-2 Testing A. General Information Several testing methods can be used to measure soil engineering properties. The advantages,

More information

FINAL REPORT ON SOIL INVESTIGATION

FINAL REPORT ON SOIL INVESTIGATION FINAL REPORT ON SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION AT SS-6B AREA AT HPCL VISAKH REFINERY VISAKHAPATNAM ANDHRA PRADESH J.J. ASSOCIATES(VISAKHAPATNAM) AETP(P) LIMITED #11-6-3, RockDale Layout,

More information

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum Malaysian Civil Engineering Standard Method of Measurement (MyCESMM) CLASS D: SITE INVESTIGATION WORK Measurement covered under other classes: Excavation not carried out for the purpose of soil investigation

More information

Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT

Strength Determination of Tooth-Paste Like Sand and Gravel Washing Fines Using DMT Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT David L. Knott, P.E. and James M. Sheahan, P.E. HDR Engineering, Inc. 3 Gateway Center Pittsburgh, PA 15222-1074 Phone:

More information

Caltrans Geotechnical Manual

Caltrans Geotechnical Manual Cone Penetration Test The cone penetration test (CPT) is an in-situ sounding that pushes an electronic penetrometer into soil and records multiple measurements continuously with depth. Compared with rotary

More information

LABORATORY CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES

LABORATORY CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES Test Procedure for LABORATORY CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES TxDOT Designation: Tex-142-E Effective Date: August 1999 1. SCOPE 1.1 This method is a system for classifying disturbed and

More information

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1: BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN DRA FOR SAFETY D1-1 ANNEX D1 BASIC CONSIDERATIONS

More information

patersongroup Geotechnical Investigation Proposed Multi-Storey Buildings 267 O Connor Street Ottawa, Ontario Prepared For Mastercraft Starwood Group

patersongroup Geotechnical Investigation Proposed Multi-Storey Buildings 267 O Connor Street Ottawa, Ontario Prepared For Mastercraft Starwood Group Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Archaeological Services 267 O Connor Street Ottawa, Ontario Prepared

More information

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: rajuvs_b@yahoo.com

More information

A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil

A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil ISSN: 319-53 (An ISO 39: 00 Certified Organization) A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil Utpal Kumar Das Associate Professor, Department

More information

VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE

VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE 2.0 SITE INVESTIGATION METHODOLOGY The following section summarizes the Site investigation methodology applied during the subsurface investigation and hydrogeological assessment completed at the CRRRC

More information

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration

More information

ENCE 4610 Foundation Analysis and Design

ENCE 4610 Foundation Analysis and Design This image cannot currently be displayed. ENCE 4610 Foundation Analysis and Design Shallow Foundations Total and Differential Settlement Schmertmann s Method This image cannot currently be displayed. Strength

More information

Work Type Definition and Submittal Requirements

Work Type Definition and Submittal Requirements Work Type: Highway Materials Testing Geotechnical Laboratory Testing, Geotechnical Laboratory Testing, Standard Penetration (SPT) & Rock Coring, Cone Penetration Test, Solid Stem Auger Drilling, and Materials

More information

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook, W.A. Georgiou Group Pty Ltd GEOTPERT08050AZ-AH 27 March 2013 EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook,

More information

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer HS-4210_MAN_09.08 product manual HS-4210 Digital Static Cone Penetrometer Introduction This Manual covers the measurement of bearing capacity using the Humboldt Digital Static Cone Penetrometer (DSCP).

More information

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding

More information

G-126 (Continued) MTA Westside Subway Extension Los Angeles, California. Figure: A-2.22c

G-126 (Continued) MTA Westside Subway Extension Los Angeles, California. Figure: A-2.22c LA METRO PBTUNNEL ZONE S:\131 GEOTECH\GINTW\LIBRARY MACTEC JUNE11.GLB G:\PROJECT_DIRECTORIES\43\\61_METRO_WESTSIDE_EXTENSION\6.2.3.1 GEOTECHNICAL DESIGN\3.2 ALL FIELD NOTES\GINT LOG\NEW TEMPLATE MARCH

More information

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...

More information

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION ACCREDITATION SCHEME FOR INSPECTION BODIES TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION Technical Note SI 01: 3 February 2016 The SAC Accreditation

More information

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering

More information

Washington 98102-3699, mike.bailey@hartcrowser.com

Washington 98102-3699, mike.bailey@hartcrowser.com LESSONS LEARNED FROM A STONE COLUMN TEST PROGRAM IN GLACIAL DEPOSITS Barry S. Chen 1, P.E., Member, Geo-Institute and Michael J. Bailey 2, P.E., Member, Geo-Institute ABSTRACT A stone column test program

More information

NOTES on the CONE PENETROMETER TEST

NOTES on the CONE PENETROMETER TEST GE 441 Advanced Engineering Geology & Geotechnics Spring 2004 Introduction NOTES on the CONE PENETROMETER TEST The standardized cone-penetrometer test (CPT) involves pushing a 1.41-inch diameter 55 o to

More information

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003249 General Project Overview This work is located along Trunk Highway (TH) 23, for State Project (SP) 7305-124.

More information

20 ACRE UBATC SITE ( 650' x 1,350') UINTAH BASIN MASTER PLAN VERNAL CAMPUS. Architects Engineers Program and Construction Managers 10.18.

20 ACRE UBATC SITE ( 650' x 1,350') UINTAH BASIN MASTER PLAN VERNAL CAMPUS. Architects Engineers Program and Construction Managers 10.18. 20 ACRE UBATC SITE ( 650' x 1,350') UINTAH BASIN MASTER PLAN VERNAL CAMPUS Architects Engineers Program and Construction Managers 10.18.06 BUILDING MAINTENANCE BUILDING TRADES CLASSROOMS COMMONS/CIRCULATION

More information

Using Combination of SPT, DMT and CPT to Estimate Geotechnical Model for a Special Project in Turkey

Using Combination of SPT, DMT and CPT to Estimate Geotechnical Model for a Special Project in Turkey Using Combination of SPT, DMT and CPT to Estimate Geotechnical Model for a Special Project in Turkey Figen Orhun Onal GE, M.Sc., Site Works Manager, Zemin Etud ve Tasarım A.Ş., Istanbul, figen.orhun@zetas.com.tr

More information

Method Statement FOR. Soil Investigation

Method Statement FOR. Soil Investigation Method Statement FOR Soil Investigation PREPARED BY JUNE 2010 Infratech ASTM CO., LTD. TABLE OF CONTENTS Chapter Title Page Table of Contents..1 List of Appendix... 2 List of Table... 2 List of Figures...

More information

REPORT OF GEOTECHNICAL EXPLORATION BRIDGE STRUCTURE REPORT

REPORT OF GEOTECHNICAL EXPLORATION BRIDGE STRUCTURE REPORT REPORT OF GEOTECHNICAL EXPLORATION BRIDGE STRUCTURE REPORT New Wolf Pen Branch Road Bridge and Temporary Diversion Bridge LSIORBP Section 4 KY 841 Louisville, Jefferson County, Kentucky KSWA Project No.

More information

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Merivale

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Merivale REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale Report

More information

1.0 INTRODUCTION 1 2.0 SCOPE OF WORK 2 3.0 EXECUTION OF FIELD WORK 2 4.0 LABORATORY TESTS 8 5.0 FINDINGS OF THE GEOTECHNICAL INVESTIGATION 9

1.0 INTRODUCTION 1 2.0 SCOPE OF WORK 2 3.0 EXECUTION OF FIELD WORK 2 4.0 LABORATORY TESTS 8 5.0 FINDINGS OF THE GEOTECHNICAL INVESTIGATION 9 REPORT ON GEOTECHNICAL INVESTIGATION FOR LPG MOUNDED STORAGE AT VISAKHA REFINERY, MALKAPURAM, VISAKHAPATNAM (A.P) FOR HINDUSTAN PETROLEUM CORPORATION LIMITED CONTENTS SR.NO. DESCRIPTION PAGE NO. 1.0 INTRODUCTION

More information

FOUNDATION INVESTIGATIONS FOR STRUCTURES

FOUNDATION INVESTIGATIONS FOR STRUCTURES FOUNDATION INVESTIGATIONS FOR STRUCTURES 6 INDEX Page I. Overview of MoDOT Practice 1 A. Geotechnical Organization of MoDOT 1 B. Types of Reports 1 C. Special Investigations 2 II. Policy Manuals 3 A. Materials

More information

23 Royal Avenue London. Geotechnical Assessment Report. Report No. LW25247. September 2014

23 Royal Avenue London. Geotechnical Assessment Report. Report No. LW25247. September 2014 23 Royal Avenue London Geotechnical Assessment Report Report No. LW25247 September 2014 Report prepared for the benefit of: Builtain Ltd Unit 8, Tempo House 15 Falcon Road London SW11 2PJ Document Control

More information

Soil behaviour type from the CPT: an update

Soil behaviour type from the CPT: an update Soil behaviour type from the CPT: an update P.K. Robertson Gregg Drilling & Testing Inc., Signal Hill, California, USA ABSTRACT: An initial application of CPT results is to evaluate soil type and soil

More information

Geotechnical Investigation Report London Street Generating Station Peterborough, Ontario. February 2012

Geotechnical Investigation Report London Street Generating Station Peterborough, Ontario. February 2012 Geotechnical Investigation Report London Street Generating Station Peterborough, Ontario February 2012 Project No. 111-25780-00 February 7, 2012 Mr. Kevin McKeown, Generation Project Manager Peterborough

More information

DYNAMIC CONE PENETRATION TEST INSTRUCTIONAL MANUAL GEOTECHANICAL

DYNAMIC CONE PENETRATION TEST INSTRUCTIONAL MANUAL GEOTECHANICAL DYNAMIC CONE PENETRATION TEST INSTRUCTIONAL MANUAL GEOTECHANICAL J. P. Scientific Instruments 7, Civil Lines, Roorkee-247667 DYNAMIC CONE PENETRATION TEST CONTENTS: PAGE NO. 1.0 INTRODUCTION 03 2.0 PROBLEM

More information

Anirudhan I.V. Geotechnical Solutions, Chennai

Anirudhan I.V. Geotechnical Solutions, Chennai Anirudhan I.V. Geotechnical Solutions, Chennai Often inadequate In some cases, excess In some cases, disoriented Bad investigation Once in a while good ones Depends on one type of investigation, often

More information

Ground investigation and Eurocode 7: A Scottish perspective

Ground investigation and Eurocode 7: A Scottish perspective technical note Ground investigation and Eurocode 7: A Scottish perspective John Taylor, Alan Reid, Roy Simpson, South Lanarkshire Council; Ross Cameron, Paul McLaughlin, BAM Ritchies; Patricia Bryson,

More information

GUIDELINE FOR HAND HELD SHEAR VANE TEST

GUIDELINE FOR HAND HELD SHEAR VANE TEST GUIDELINE FOR HAND HELD SHEAR VANE TEST NZ GEOTECHNICAL SOCIETY INC August 2001 CONTENTS Page 1.0 Introduction 2 2.0 Background 2 3.0 Recommended Practice 3 4.0 Undrained Shear Strength 3 5.0 Particular

More information

Fundamentals of CONE PENETROMETER TEST (CPT) SOUNDINGS. J. David Rogers, Ph.D., P.E., R.G.

Fundamentals of CONE PENETROMETER TEST (CPT) SOUNDINGS. J. David Rogers, Ph.D., P.E., R.G. Fundamentals of CONE PENETROMETER TEST (CPT) SOUNDINGS J. David Rogers, Ph.D., P.E., R.G. Cone Penetration Test CPT soundings can be very effective in site characterization, especially sites with discrete

More information

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils Appendix D.1 Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils General Notes Pertinent to All Testing 1. For infiltration trench (I-1) and basin (I-2) practices, a minimum field

More information

TABLE OF CONTENTS 6. LABORATORY ANALYSIS 6.1 INDEX PARAMETERS 6-1 6.2 PHYSICAL PARAMETERS 6-1 6.3 CHEMICAL PARAMETERS 6-1 7.

TABLE OF CONTENTS 6. LABORATORY ANALYSIS 6.1 INDEX PARAMETERS 6-1 6.2 PHYSICAL PARAMETERS 6-1 6.3 CHEMICAL PARAMETERS 6-1 7. S11187 Lind WWTP - TOC TABLE OF CONTENTS 1. CONTEXT 1.1 PROJECT CONSIDERATIONS 1-1 1.2 LOCATION 1-1 1.3 SCOPE 1-1 2. ENCOUNTERED CONDITIONS 2.1 GEOLOGIC SETTING 2-1 2.2 SURFACE CONDITIONS 2-2 2.3 SUBSURFACE

More information

S OIL C ONSULTANTS LTD

S OIL C ONSULTANTS LTD S OIL C ONSULTANTS LTD Ground Investigation Geotechnical Analysis Environmental Appraisal Tel: 01255 241639 Fax: 0871 528 9424 e-mail: harwich@soilconsultants.co.uk Haven House Albemarle Street Harwich

More information

PILE FOUNDATIONS FM 5-134

PILE FOUNDATIONS FM 5-134 C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics

More information

King Saud University College of Engineering Civil Engineering Department DEFORMATION OF PARTIALLY SATURATED SAND. Sultan Musaed Al-Ghamdi

King Saud University College of Engineering Civil Engineering Department DEFORMATION OF PARTIALLY SATURATED SAND. Sultan Musaed Al-Ghamdi King Saud University College of Engineering Civil Engineering Department DEFORMATION OF PARTIALLY SATURATED SAND By Sultan Musaed Al-Ghamdi Submitted in Partial Fulfillment of The Required For the Degree

More information

Emergency repair of Bridge B421

Emergency repair of Bridge B421 Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)

More information

Testing Procedures. Note: Please refer to Table 2 for a list of completed borings.

Testing Procedures. Note: Please refer to Table 2 for a list of completed borings. Testing Procedures Drilling and Sampling: Standard penetration tests (SPT) were conducted for every ten feet of boring advancement. SPT tests were conducted in accordance with ASTM D1586, using a 140 pound

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices

More information

CHAPTER THREE GEOTECHNICAL INVESTIGATION AND SAMPLING

CHAPTER THREE GEOTECHNICAL INVESTIGATION AND SAMPLING CHAPTER THREE GEOTECHNICAL INVESTIGATION AND SAMPLING 3.0 GENERAL All Geotechnical work performed by an approved consultant for the State of Indiana or Local Agencies, such as any Indiana local municipalities

More information

Preliminary Geotechnical Engineering Report North Park Pond Dam Edinborough Drive Charlotte, North Carolina S&ME Project No.

Preliminary Geotechnical Engineering Report North Park Pond Dam Edinborough Drive Charlotte, North Carolina S&ME Project No. Preliminary Geotechnical Engineering Report Edinborough Drive Charlotte, North Carolina S&ME Project No. 11-1-09 Prepared For: W.K. Dickson & Co., Inc. 70 Corporate Center Drive Raleigh, North Carolina

More information

Geotechnical Testing Methods II

Geotechnical Testing Methods II Geotechnical Testing Methods II Ajanta Sachan Assistant Professor Civil Engineering IIT Gandhinagar FIELD TESTING 2 1 Field Test (In-situ Test) When it is difficult to obtain undisturbed samples. In case

More information

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore

More information

GEOTECHNICAL INVESTIGATION CITY OF HOUSTON SURFACE WATER TRANSMISSION PROGRAM CONTRACT 74A-1 WATERLINE COH WBS NO. S-000900-0109-3 HOUSTON, TEXAS

GEOTECHNICAL INVESTIGATION CITY OF HOUSTON SURFACE WATER TRANSMISSION PROGRAM CONTRACT 74A-1 WATERLINE COH WBS NO. S-000900-0109-3 HOUSTON, TEXAS GEOTECHNICAL INVESTIGATION CITY OF HOUSTON SURFACE WATER TRANSMISSION PROGRAM CONTRACT 74A-1 WATERLINE COH WBS NO. S-000900-0109-3 HOUSTON, TEXAS Reported To: LAN, Inc. Houston, Texas by Aviles Engineering

More information

4.11 Geologic and Soil Resources

4.11 Geologic and Soil Resources 4.11 Geologic and Soil Resources Geology and soils are evaluated as part of an environmental document because conditions in the project area can influence the type and size of a project s structure, the

More information

HAULBOWLINE, CORK STATIC CONE PENETRATION TESTS FACTUAL REPORT

HAULBOWLINE, CORK STATIC CONE PENETRATION TESTS FACTUAL REPORT HAULBOWLINE, CORK STATIC CONE PENETRATION TESTS FACTUAL REPORT CONE PENETRATION TESTS Cone resistance Local friction Porewater pressure Dissipations REPORT NO: RRM CONTRACT NO: GLOVER SITE INVESTIGATIONS

More information

Standard penetration test (SPT)

Standard penetration test (SPT) Standard penetration test (SPT) Evolution of SPT Test methods and standards Influence of ground conditions on penetration resistance SPT energy measurement and corrections for SPT Use of SPT results Profiling

More information

TECHNICAL SPECIFICATION FOR GEOTECHNICAL INVESTIGATION

TECHNICAL SPECIFICATION FOR GEOTECHNICAL INVESTIGATION SHEET 1 OF 50 TECHNICAL SPECIFICATION FOR GEOTECHNICAL INVESTIGATION 1.0 GENERAL 2.0 SCOPE This specification covers the technical requirements for a detailed Geotechnical investigation and submission

More information

WENTWORTHVILLE STATION, WENTWORTHVILLE, NSW

WENTWORTHVILLE STATION, WENTWORTHVILLE, NSW ENVIRONMENTAL INVESTIGATION SERVICES REPORT TO CARDNO (NSW/ACT) PTY LTD ON PRELIMINARY ENVIRONMENTAL SITE ASSESSMENT AND MANAGEMENT PLAN FOR PROPOSED ACCESS UPGRADES AT WENTWORTHVILLE STATION, WENTWORTHVILLE,

More information

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 4.1 Introduction...4-1 4.2 Subsurface Investigation...4-2 4.2.1 Preliminary

More information

load on the soil. For this article s examples, load bearing values given by the following table will be assumed.

load on the soil. For this article s examples, load bearing values given by the following table will be assumed. How Many Piers? By Gary Collins, P.E. A clear-cut guide to helical pier spacing Introduction Helical pier spacing is not an exact science. How many does it take to support a structure adequately or repair

More information

CHAPTER 9 SOIL EXPLORATION 9.1 INTRODUCTION

CHAPTER 9 SOIL EXPLORATION 9.1 INTRODUCTION CHAPTER 9 SOIL EXPLORATION 9.1 INTRODUCTION The stability of the foundation of a building, a bridge, an embankment or any other structure built on soil depends on the strength and compressibility characteristics

More information

Zhou Shengen, 1 Zhang Sumin 2

Zhou Shengen, 1 Zhang Sumin 2 439 CHAPTER 5: SOILS AND FOUNDATIONS EXPLORATION INFORMATION ON THE LIQUEFIED FOUNDATION SOIL IN TANGSHAN AND ITS VICINITY Zhou Shengen, 1 Zhang Sumin 2 Sand boils and waterspouts occurred in an extensive

More information

An Automatic Kunzelstab Penetration Test

An Automatic Kunzelstab Penetration Test An Automatic Kunzelstab Penetration Test Yongyuth Sirisriphet 1, Kitidech Santichaianant 2 1 Graduated student: Faculty of Industrial Education in and Technology. King Mongkut's University of Technology

More information

patersongroup Geotechnical Investigation Proposed Multi-Storey Building 235 King Edward Street Ottawa, Ontario Prepared For June 23, 2015

patersongroup Geotechnical Investigation Proposed Multi-Storey Building 235 King Edward Street Ottawa, Ontario Prepared For June 23, 2015 Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Multi-Storey Building 235 King Edward Street Ottawa, Ontario

More information

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long

More information

Lot 126, Murphy Street

Lot 126, Murphy Street April 2013 GEOTECHNICAL INVESTIGATION Lot 126, Murphy Street Submitted to: Lindsay & Robyn Partridge c/- Charles Wright Architects Pty Ltd PO Box 492 Report Number. 137632049-001-R-Rev0 Distribution: 1

More information

SOILS AND FOUNDATIONS

SOILS AND FOUNDATIONS CHAPTER 18 SOILS AND FOUNDATIONS SECTION BC 1801 GENERAL 1801.1 Scope. The provisions of this chapter shall apply to building and foundation systems in those areas not subject to scour or water pressure

More information

NOTES on the STANDARD PENETRATION TEST

NOTES on the STANDARD PENETRATION TEST GE 441 Advanced Engineering Geology & Geotechnics Spring 2004 NOTES on the STANDARD PENETRATION TEST Origins of the Standard Penetration Test Around 1902 Colonel Charles R. Gow, owner of the Gow Construction

More information

TECHNICAL Summary. TRB Subject Code:62-7 Soil Foundation Subgrades February 2003 Publication No.: FHWA/IN/JTRP-2002/30, SPR-2362

TECHNICAL Summary. TRB Subject Code:62-7 Soil Foundation Subgrades February 2003 Publication No.: FHWA/IN/JTRP-2002/30, SPR-2362 INDOT Research TECHNICAL Summary Technology Transfer and Project Implementation Information TRB Subject Code:62-7 Soil Foundation Subgrades February 3 Publication No.: FHWA/IN/JTRP-2/3, SPR-2362 Final

More information

Cone Penetration Testing in Geotechnical Practice. Tom Lunne Peter K. Robertson John J.M. Powell

Cone Penetration Testing in Geotechnical Practice. Tom Lunne Peter K. Robertson John J.M. Powell Cone Penetration Testing in Geotechnical Practice Tom Lunne Peter K. Robertson John J.M. Powell BLACKIE ACADEMIC & PROFESSIONAL An Imprint of Chapman & Hall London Weinheim New York Tokyo Melbourne Madras

More information

Appendix D: Geotechnical Investigation

Appendix D: Geotechnical Investigation City of Fontana Sierra Lakes Commerce Center Recirculated Draft EIR Appendix D: Geotechnical Investigation FirstCarbon Solutions H:\Client (PN JN)\0144\01440050\EIR\3 RDEIR\01440050 Sec99 99 Appendix Dividers.doc

More information

NEW DEVELOPMENTS AND IMPORTANT CONSIDERATIONS FOR STANDARD PENETRATION TESTING FOR LIQUEFACTION EVALUATIONS. Jeffrey A Farrar M.S.

NEW DEVELOPMENTS AND IMPORTANT CONSIDERATIONS FOR STANDARD PENETRATION TESTING FOR LIQUEFACTION EVALUATIONS. Jeffrey A Farrar M.S. NEW DEVELOPMENTS AND IMPORTANT CONSIDERATIONS FOR STANDARD PENETRATION TESTING FOR LIQUEFACTION EVALUATIONS Jeffrey A Farrar M.S., P E 1 ABSTRACT Standard Penetration Tests (SPT) are often used for evaluating

More information

6.7.6. Report on Ground Investigation Report No. 762402/RVX-6. The Yorkshire and Humber (CCS Cross Country Pipeline) Development Consent Order

6.7.6. Report on Ground Investigation Report No. 762402/RVX-6. The Yorkshire and Humber (CCS Cross Country Pipeline) Development Consent Order O C U M E N T 6.7.6 Report on Ground Investigation Report No. 76242/RVX-6 The Yorkshire and Humber (CCS Cross Country Pipeline) evelopment Consent Order Under Regulation 5(2)(a) of the Infrastructure Planning

More information

TABLE OF CONTENTS. GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES...

TABLE OF CONTENTS. GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES... App. P-2 TABLE OF CONTENTS GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES...4 SITE CONDITIONS... 4 Land Use and Zoning...

More information

CEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests

CEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests PURPOSE: The parameters of the shear strength relationship provide a means of evaluating the load carrying capacity of soils, stability of slopes, and pile capacity. The direct shear test is one of the

More information

Comparison of Continuous Dynamic Probing with the Standard Penetration Test for Highly Weathered Limestone of Eastern Sudan

Comparison of Continuous Dynamic Probing with the Standard Penetration Test for Highly Weathered Limestone of Eastern Sudan Comparison of Continuous Dynamic Probing with the Standard Penetration Test for Highly Weathered Limestone of Eastern Sudan Prof. Dr. Khairul Anuar Kassim Deputy Dean, Research and Graduate Studies, Faculty

More information

Use and Application of Piezocone Penetration Testing in Presumpscot Formation

Use and Application of Piezocone Penetration Testing in Presumpscot Formation Use and Application of Piezocone Penetration Testing in Presumpscot Formation Craig W. Coolidge, P.E. Summit Geoengineering Services, Rockland, Maine ABSTRACT: This paper examines the advantages and limitations

More information

Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair

Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair Eric M. Klein, P. E., Rummel, Klepper & Kahl, LLP, Baltimore, Maryland Kenneth B. Andromalos, P. E., Brayman Environmental,

More information