CDM@CDG 2010. User Forum EUROCONTROL s Brussels HQ. 18 January 2011 CDM@CDG



Similar documents
A -- irport C -- ollaborative D -- ecision M -- aking. Erik Sinz, DFS Business Unit Tower

SUMMARY. This information paper summarises the status of Airport CDM Trial s and Implementation. RECOMMENDATION

Brussels Airport, a roadmap to A-CDM implementation

A-CDM from an airport perspective Oslo Airport

Integrated surface management Herve Drevillon (DSNA) Airport safety support tools for pilots, vehicle drivers and controllers Nicolas Leon (DSNA)

A day in the life of an aircraft operator

LOCAL OPERATING PROCEDURES (LOP) LANDVETTER TWR (ESGG)

Equipping Our Human Resources to work in a regional framework Towards Global ATFM Delivering ATM Ops Performance via Regional Network Collaboration

AIR TRAFFIC FLOW MANAGEMENT (ATFM)

The Mayor of London s Submission:

Overview of NM and CDM

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

Adapting to air traffic growth in Europe

How To Manage A Plane With A-Cdm

ATFM Line of Action 7 Consistency between Airport Slots, FPL and ATFM Slots

FAST. Future Airport STratégies. INO WORKSHOP Bretigny, 1st December Contact: Isabelle laplace M3 SYSTEMS,

DGAC & Aviation crisis management

AGENDA. Need for PENS Business Case PENS Governance Current PENS Users

You ll soon be arriving in Paris, thank you for choosing our airport for your arrival. This briefing was made to make your arrival as flawless and

ATFM STATUS REPORT: SOUTH AFRICA

EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL EUROCONTROL EXPERIMENTAL CENTRE CDM STOCKHOLM ARLANDA WP1. EEC Note No.

Use of Free Software in European Air Traffic Flow Management

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

Integration of Drones in Civil Airspace

AeroMACS Briefing / Update

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

AN AIRCRAFT TAXI SIMULATION MODEL FOR THE UNITED PARCEL SERVICE LOUISVILLE AIR PARK. W. Swain Ottman Angela C. Ford Gregory R.

Departures to the south from Runways 16L and 16R.

Traffic Flow Management. December 2010

Training program for S2 (TWR) rating

Airport Detailed Operational Description (DOD) Step 1 Yearly Update 2013

Network Manager Annual Report 2012

The Total Economic Value. Its application to the Single European Sky 2nd Reference Period

ATFCM OPERATING PROCEDURES FOR FLOW MANAGEMENT POSITION

Workpackages. This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage.

TAMS Validation Concept Document

LONDON SOUTHEND AIRPORT CLASS D CONTROLLED AIRSPACE GUIDE

Advanced Data Link Infrastructure Solution for Next Generation of Air Traffic Management

SWIM Connect SWIM Partnerships: Collaboration with the FAA s Decision Support Service (DSS) Programs 3:00 PM. Federal Aviation Administration

Aircraft De-icing at Leipzig/Halle Airport - Standard Deicing Setup - Titel des Dokuments.

Airport Charges and Handling Fees. AIRPORT DEBRECEN Kft.

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

WP2.2.2 Benefit Assessment

A presentation of the NM19.5 to Externals via video-conference took place on the 16 th of September 2015.

ATFCM USERS MANUAL. Network Operations

Malmi - Helsinki City International Airport. Malmi operators development plan

The SESAR programme: Making air travel safer, cheaper and more efficient

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT

ARN D4-1 Concept of Operations Arlanda Airport

The CREDOS Project. Human Machine Interface Design

CS5 EAIMS Call For Interest Technical annexe

SES Safety and ATM/ANS Regulations - EASA activities related to MET services

Press release from Siemens, Barco, Inform, ATRiCS, DLR and Stuttgart Airport

REVIEW OF AIP SUPPLEMENT. (Presented by Singapore) Attached is a copy of the AIP SUPP for review by the Meeting.

Optimisation and Prioritisation of Flows of Air Traffic through an ATM Network

Economic impact of airport: the Roissy Charles de Gaulle airport example

Modeling of Pre-Tactical Airline Decision Processes to enable Performance Based Airport Management

Collaborative Departure Queue Management

Key Performance Indicators for Performance-Based Airport Management from the perspective of airport operations

Automatic Dependent Surveillance Broadcast (ADS-B)

Annual Work Programme December Page 1 of 66

Glossar Matrix FRA / A-CDM Abbreviations

ATIS/VOLMET Flex ATIS/VOLMET/DATALINK and Clearance

THE GLOBAL AIRLINE INDUSTRY

Central Airspace Management Unit World Cup 2010 Experience (South Africa) Presented by: Armando de Olim Acting Pool Manager: ATFM

Airline Schedule Development

- Aircraft landing fees for the Paris - Orly and Paris - Charles-de-Gaulle airports:

Airport Performance Measurement

A Flight Bodo Mo i Rana with Wideroe of Norway

Jargon Buster. Amadeus APIS ASK ATA ATC ATD. BA2Buy BAA BABS. Agents Discount Tickets (AD75 - pay 25% of fare)

[EN 026] Developing key performance indicators for airports

years in the community

Austrian Participation in SESAR. Frequentis SESAR Head Negotiator: Johannes Gio Prinz

Airport Modelling: Capacity Analysis of Schiphol Airport in 2015

EUROCONTROL Training Activities 2013

Pilot Briefing for Helsinki-Vantaa Real Flight Event

Probabilistic 2-Day Forecast of Runway Use

AIRPORT CHARGES DEBRECEN INTERNATIONAL AIRPORT DEB / LHDC

United Arab Emirates Division of IVAO Rev. 1.1 May 13, 2016 Dubai Pilot Guide. Page 1 of 16. Dubai Pilot Guide. Dubai_PilotGuide_rev.1.1.

EUROCONTROL. Paving the way towards UAS ATM integration. Mike Lissone

SESAR. Luftfahrttechnologie - Auftaktveranstaltung zum 7. EU-Forschungsrahmenprogramm Wien, 4 Dezember 2006

Global Data Center. Worldwide Aircraft Communications and Flight Support Services

FedEx HUD/EFVS Update Aviation New Technology Workshop June 7th, 2012, Beijing, China

Price list Swedavia s Conditions of Use and Airport Charges. Valid for aircraft with an authorised MTOW exceeding 5,700 kg.

EDINBURGH AIRPORT CONSULTATIVE COMMITTEE.

Safety Risk Impact Analysis of an ATC Runway Incursion Alert System. Sybert Stroeve, Henk Blom, Bert Bakker

CIVIL AVIATION REQUIREMENTS SECTION 4 AERODROMES & AIR TRAFFIC SERVICES SERIES X PART IV 17 th OCTOBER 2007 EFFECTIVE : FORTHWITH

Airport Guide to Greenland

USE OF GROUND BASED WEATHER RADAR DATA IN AIR TRAFFIC MANAGEMENT PROCEDURES

How To Improve The Performance Of Anatm

*This information brochure has been issued pursuant to provisions of EC 261/2004 Regulation of the European Parliament and European Union Council.

AVIATION TRAINING ACADEMY

London Luton Airport Document PPO5 Procedures for Requesting Prior Permission to Operate Version issued 25 th February 2009

Aircraft Noise Control at London Luton Airport. August 2015

Comparison of Air Traffic Management-Related Operational Performance: U.S./Europe

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India

Congestion and Air Transport: a challenging phenomenon

Transcription:

2010 CDM@CDG User Forum EUROCONTROL s Brussels HQ 18 January 2011

CDG AIRPORT OVERVIEW Surface area :3200 ha 4 RWYs : East / West 80 km Taxiways 8 ILS CAT 3 Statistic 2009 Airport trafic: 525 000 ops (ARR/DEP) Approach trafic 606 000 ops (with Le Bourget) 60 million pax Peak day: 1773 ops / 2091 ops (App) Peak hour : 120 ops Capacity: ARR 69 / DEP 75 Weather conditions: Low Visibility Procedures (LVP) in progress less than 4% of time About 200 Airline Operators at CDG. Few snowy days (except last winter: 25 days) User Forum Eurocontrol s Brussels HQ 2

CDM PROGRAMME STRUCTURE CDM@CDG team organisation CDM Steering committee ADP P Hardel Air France L Barthélémy ADP Aéroports de Paris Programme Team DSNA M Georges AIR FRANCE CDP ADP Dir Prog CDM@CDG CDP DSNA / CDG DSNA CDG et DTI Weather Forecast Dpt CDP Air France Airlines Operators committee EUROCONTROL CFMU other CDMs SESAR WP User Forum Eurocontrol s Brussels HQ 3

CDM@CDG Activities Work already done and work still in progress 2004 2005 2006 2007 2008 2009 2010 2011 Program structuring Program activities Information sharing / Operational collaboration implementation Adverse conditions De-icing, Snow / LVP / Thunderstorms Capacity optimisation Nominal situation Collaborative- Pre Departure Sequence Program activities Achievements Steering group Program CDM Cell CDM web site Snow procedure Weather forecast information CDM@CDG Team program Approach Supervisors Achievements CDM Briefing And Debriefing Twice a Day LWO 2009 KPIs CDM monthly meeting LVP procedure LWO 2010 C-PDS V0 ED process De-icing procedure and process CDM procedures C-PDS V1 Airport CDM C-PDS V2 Projects Achievements User Forum Eurocontrol s Brussels HQ 4

C-PDS: :communication plan 2009 CPDS Communication 05/2010 10/2010 Evaluations preparation phase 07/2010 10/2010 Operational Evaluations 11/ 2010 CPDS commissioning Information broadcasting Airlines Operators / Handlers training Airport training 14 datasheets of information Steering committee meeting Areronautical information publication AOC / Handlers meetings Web site CDM & local Publications ATC training CDM cell support Evaluations analysis feedback AOC meeting Enlarged steering committee meeting For each evaluation CPDS commissioning 15/11/2010 User Forum Eurocontrol s Brussels HQ 5

C-PDS 2010 Planning From March to June 2010: Locally sequenced mode tests From 21st of June to 10th of October 2010 7 technical and operational evaluations with DMAN A collaborative success with CFMU, users, airport provider, ANSP (at least 50 people involved) From 6th of July to 21st of October 2010 6 PDS technical and operational evaluations with Eurocontrol / CFMU From 9th of November to 15th of November 2010 Locally sequenced mode (last tests) 16th of November PDS / DMAN Commissioning Change management / Aeronautical publications / Communication plan/ Feed back User Forum Eurocontrol s Brussels HQ 6

CDG C-PDS Presentation C-PDS DMAN Capacity Runway Pressure Configuration QFU PDS DPIs CFMU TOBT TSAT TOBT TSAT TSAT AO / Handler / Pilots CDM Web Site User Forum Eurocontrol s Brussels HQ 7

Pre-departure sequence - Principles The Pre-departure Sequence calculation is based on an Off-Block Time (TSAT) calculation that takes into account airport, aircraft operators and CFMU constraints Principle for the Pre-departure Sequence calculation Entry data Result TOBT 1 1 TOBT given by AO/Handler. SOBT by default + Variable taxi-time (Stand/runway in use table) 24-hour moving horizon calculation Take-Off sequence calculation Deduced Take-Off Time Algorithm First Scheduled / First Served (based on SOBT) CFMU Slot Runway capacity 2 Maximum waiting time at runway 2 TSAT - Variable taxi-time (Stand/runway in use table) Optimized Take-Off Time Runway configuration/ Runway in use 2 2 ATC input This calculation applies to all the flights in normal and adverse conditions User Forum Eurocontrol s Brussels HQ 8

C-PDS process CDM@CDG Airlines Handlers SOBT PDS OPERATOR (ADP) CTOT TOBT PDS TSAT START UP CLEARANCE TOBT - 10mn DELIVERY POSITION PUSH BACK TSAT APRON or GOUND POSITION COHOR CFMU DMAN User Forum Eurocontrol s Brussels HQ 9

PDS HMI CDM@CDG This view is available on the website and on the airport network (handlers, users ) User Forum Eurocontrol s Brussels HQ 10

Departure Manager DMAN HMI This view is available on the delivery controller position 09:40:17 TSAT These 2 flights are In waiting list, ready but not yet allowed to start up because of their TSAT The flight is within TSAT tolerance, it s time to allow start up User Forum Eurocontrol s Brussels HQ 11

Departure Manager DMAN HMI / Supervisor This view is available on the tower supervisor position North RWY capacity Pressure and Capacity configuration window South RWY capacity User Forum Eurocontrol s Brussels HQ 12

C-CPDS Indicators: Performances KPIs To monitor the C-PDS, we analyse C-PDS indicators, and CDG performances KPIs CPDS indicators (Followed by the operational & CDM program team) TTOT & Taxi-Time Quality PDS delay (TSAT SOBT/TOBT) TOBT quality TTOT Quality PDS Delay CDG performances KPIs (Followed by the steering committee) Slot adherence (ATOT CTOT) Peak capacity utilization Punctuality Taxi time Slot adherence Taxi-Time We can also produce any new KPI, if necessary. User Forum Eurocontrol s Brussels HQ 13

C-PDS benefits CDM@CDG 25,00 20,00 15,00 Tuesdays Taxitime between 7 am and 2 pm since the 1st of July 2010 Tuesday Taxitime between 7am and 2pm C-PDS reduces taxi-time (13%) and holding time at the runway (40%) at CDG. Average 2 minutes 10,00 5,00 C-PDS improve Airport slot adherence (> 90%) 0,00 06/07/2010 13/07/2010 20/07/2010 27/07/2010 03/08/2010 10/08/2010 17/08/2010 24/08/2010 31/08/2010 07/09/2010 14/09/2010 21/09/2010 28/09/2010 Unimpended taxitime Additional taxitime TaxiTime target 05/10/2010 12/10/2010 Evaluation Operational Adherence to ATFM Slots 19th October 2010: C-PDS Operational trials with CFMU ops 7 hours sequenced 257 flights / 119 flights with CFMU slot Adverse conditions: national strike Gap < -5 mi n ==> too earl y Gap between -5 and 10 ==> OK Gap > 10 mi n ==> Too late 3% 3% Tuesday adherence slot between 7am and 2pm: 94% 94% User Forum Eurocontrol s Brussels HQ 14

C-PDS Kpi CDM@CDG Taxi time with and without PDS (2009 vs 2010) Days Winter 2009 Winter 2010 Nominal 16,5 minutes (12,2 + 4,3 min hazards) 16,3 minutes (12,5 + 3,8 min hazards) LVP 19,7 minutes (12,4 + 7,3 min hazards) 18,8 minutes (12,9 + 5,9 min hazards) De-icing 26,1 minutes (13 + 13,1 min hazards) 24,8 minutes (13 + 11,8 min hazards) Hazards = threshold waiting time, de-icing time. BENEFIT WITH TAXI TIME User Forum Eurocontrol s Brussels HQ 15

INFORMATION SHARING Airline Operators, Ground Handlers CDM Website H24 sharing information Teleconferences + CDM cell Snow, Thunderstorms On request Frequent contributors: AOC Fedex Europ Airpost Singapour Airlines Post ops 13h30 Airport activity at D Day Forecast for D+1 Pre ops 19h00 Daily CDM actors Main partners ATC ADP AFR Météo France CDM Management Regular airport activities check KPI Monthly Director s Steering Board Information sharing between operational staff Common actions operational staff and services CDM@CDG teamproggramme User Forum Eurocontrol s Brussels HQ 16

CDM CELL We have set-up real time information channels to achieve an efficient common awareness of the platform situation and of the weather forecasts APP TWR Airline operators CDM CELL Airport Provider (ADP) Weather forecast Control Center (ACC) ATC (DSNA) CFMU Web site CDM@CDG User Forum Eurocontrol s Brussels HQ 17

CDM@CDG WEB SITE Airport Status https://www.cdmcdg.net Departure Traffic real-time indicators shared by all the users with the CDM@CDG website. Weather Forecast Departure Traffic User Forum Eurocontrol s Brussels HQ 18

Thank you for your attention! Any questions? User Forum Eurocontrol s Brussels HQ 19