CPIx on Line. Pre-Contract Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date:

Similar documents
CPIx on Line. Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Supporting the HMG Construction Strategy.

Specification for information management for the capital/delivery phase of construction projects using building information modelling

BIM Strategy for NHSScotland

Employer s Information Requirements Version Core Content and Guidance Notes

BUILDING INFORMATION MODEL (BIM) PROTOCOL

OUTLINE SCOPE OF SERVICES FOR THE ROLE OF INFORMATION MANAGMENT

PGN 03/15 Building Information Modelling (BIM)

Project manager services

BUILDING A STRATEGY FOR BIM

A Practical Approach to BIM April 23 rd 2015

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

White Paper Microsoft SharePoint for Engineering Document Management and Control

LIABILITIES FOR DESIGN DEFECTS IN A COLLABORATIVE, INTEGRATED DIGITAL AGE. A presentation on the UK experience By Karen Gough, Barrister

Practical Strategy and Workflow for Large Projects: A Realistic Solution

From COBie to Asset Management

CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR

The Role of the BIM Coordinator

The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy.

HULLEY & KIRKWOOD CONSULTING ENGINEERS LIMITED BIM PROJECT EXECUTION PLAN FOR [PROJECT TITLE] Date

Legal, Contractual Considerations with BIM 360 Review

McLaren FusionLive. Comprehensive SaaS Solution for Construction Document Project Collaboration

and 2010: rprise Increasingly, must ation, es, partners, s intelligence.

Building Information Modelling and collaborative construction

The Asset Information Model using BIM

RIBA Plan of Work 2013: Consultation document. You are invited to complete the online questionnaire by 12 August 2012.

Cadac Organice. Morten Fritsch Nordic Manager

How To Get The Construction Industry To Adopt Building Information Modelling

Building the Asset Information Model

BIM: The Legal and Contractual Risks and How to Deal With Them. May Winfield Kennedys LLP

Home Repair and Maintenance Contract

Internal Audit Report. Chief Executive s Unit. Review of Contract Management

Building Information Modelling Principles for Building envelopes

Building Information Modelling

CITY COLLEGE OF SAN FRANCISCO (CCSF) Building Information Modeling (BIM) Standards for Design-Bid Build Projects. CCSFBIMS Version 1.

The Performance Gap. Is there a performance gap and if so is there a solution? Rob Manning. BSc(Hons) CEng FCIBSE. BIS BIM Core Team.

Project Charter. Project Sponsor: Prepared By: S. Vassilatos

Contents Page. Introduction p.3. Winning Work p. 5. Design p.15. Mobilisation and Delivery p P a g e

SharePoint for Engineering Document Management & Control

PBAPCSA. Project Bank Account Documentation. Project Bank Account

PAS :2014. Specification for information management for the operational phase of assets using building information modelling

Synchronous Building Information Model-Based Collaboration in the Cloud: a Proposed Low Cost IT Platform and a Case Study

EXTENT OF THE ARCHITECT S LIABILITY ON A BIM PROJECT

PAS :2014. Specification for information management for the operational phase of assets using building information modelling

PAS Specification for information management for the operational phase of assets using building information modelling

Procurement requirements for reducing waste and using resources efficiently

SURVEY. and the Digital Plan of Works. Guidance from

BIM, Legal & Procurement BIM IN PRACTICE

What is effective Design Management?

LANSING COMMUNITY COLLEGE TLC BUILDING SERVER ROOM UPGRADES SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.

ITS specification Handover and commissioning process (ITS-10-01)

LACCD Building Information Modeling Standards For Design-Bid Build Projects

Collaborative production of architectural, engineering and construction information Code of practice

Program Management Professional. PgMP

Microsoft Solutions for Security. Delivering the Windows Server 2003 Security Guide

Moving from BS to ISO The new international standard for business continuity management systems. Transition Guide

A guide to appointing an architect

Industry Solutions Construction Project Collaboration and Document Control Solutions for the Construction Sector

How To Insure When Using Level 2 Building Information Modelling

CIOBCONTRACT FOR USE WITH COMPLEX PROJECTS AGREEMENT FIRST EDITION 2013

Project Management Handbook "To Understand the Causes of Things"

Quality Management. Use of the APEGBC Seal. Guidelines. Association of Professional Engineers and Geoscientists of British Columbia

BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value. Professor Mustafa Alshawi

Bentley Systems Launches AssetWise Initiative for Operating and Sustaining Infrastructure Assets

BIM: FOR PROJECT MANAGERS CSI Southwest Region Conference Program 1B 8:45am 11:00am

Engineering Procedure

IT service management

RIBA Plan of Work 2013 Overview

EMPLOYING QUINQUENNIAL ARCHITECTS/SURVEYORS AND OTHER

Cross-discipline design deliverables for BIM Phase 1 report Strategy Document

The Fast Track Project Glossary is organized into four sections for ease of use:

PROJECT MANAGEMENT PROCESS for MAJOR CAPITAL PROJECTS

BIM Management Plan Template

Foreword. Version Parties to the COBIM project

BIM GUIDE. Developed for

Certificate in Building Information Modelling (BIM) - Project Management

SMS0045 Construction Health and Safety Policy and Procedures

ABC COMPANY Extended Accounting System (EAS) Project Charter Sample

PEOPLESOFT STRATEGIC SOURCING

rehau commercial support dedicated support services for architects and specifiers Building Solutions Automotive Industry

Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

BIM An Introduction. 16 th April 2012 Engineers Ireland

Understanding the New ISO Management System Requirements

PeopleSoft Strategic Sourcing

Difference Between Non-perpetual (Periodic) and Perpetual Inventory

TfNSW Standard Requirements TSR T Technical Management

03. Leveraging the Relationship between BIM and Asset Management

School of Computing and Technology

NZS 3910:2013. Conditions of contract for building and civil engineering construction NZS 3910:2013. New Zealand Standard

Welcome to the Eastwood Harris Pty Ltd Primavera P6 Version 7 COST MANAGEMENT WITH EXPENSES

Createmaster Ltd, Paul Street, London EC2A 4LB

Olswang and the Chartered Institute of Building in conjunction with Construction Manager magazine. Construction CPD day speakers and talks

Transcription:

CPIx on Line Pre-Contract Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date: Document No: Date: April 2013 Revision: v2.0 Status: For review

Document Control Sheet Rev. Status Page Nos. Amendment Date By V2.0 For review Document Update to MR V1 document 15 April 2013 DC Authored by: Mervyn Richards David Churcher Paul Shillcock David Throssell MR1 Consulting Ltd Hitherwood Consulting Ltd Operam Skanska Ltd 2013 CPIc Incorporating Avanti, BS1192:2007, PAS1192-2:2013 and the Construction Project Information Xchange Protocol (CPIx) <date of publication> 2 Generic Document (company Name)

Publishing and liability Copyright All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without prior written permission of the author/publishers. Published by the Construction Project Information committee Royal Institute of British Architects Royal Institution of Chartered Surveyors UK Contractors Group Institution of Civil Engineers Chartered Institution of Building Services Engineers Chartered Institute of Architectural Technologists Chartered Institute of Building <date of publication> 3 Generic Document (company Name)

The Pre-Contract Building Information Modelling Execution Plan (BEP) Preface The pre-contract BEP is prepared by the supplier to demonstrate his proposed approach, and the capability, capacity and competence of his firm and his supply chain to meet the Employers Information Requirements. It will also list all agreed elements as outlined in the Brief, BS1192:2007, PAS1192-2:2013, the CPIx Protocol and the contract documents. This BEP is structured in accordance with PAS1192-2:2013. Project Team Representatives and Roles Company Name Representative and Authorised Responsible Agent Role Document Authority This project plan has been agreed by the representatives of the project team as listed above with the authority of their parent companies to accept this document for the stated project and use. <date of publication> 4 Generic Document (company Name)

Contents 1 PROJECT INFORMATION... 6 2 INFORMATION REQUIRED BY THE EIR... 7 2.1 PLANNING OF WORK AND DATA SEGREGATION... 7 2.2 CO-ORDINATION AND CLASH DETECTION... 7 2.3 COLLABORATION PROCESS... 7 2.4 HEALTH AND SAFETY/CDM MANAGEMENT... 7 2.5 COMPLIANCE PLAN... 7 3 PROJECT IMPLEMENTATION PLAN... 8 4 PROJECT GOALS FOR COLLABORATION AND INFORMATION MODELLING... 9 5 MAJOR PROJECT MILESTONES... 10 6 PROJECT INFORMATION MODEL (PIM) DELIVERY STRATEGY... 11 List of Tables TABLE 1 PROJECT INFORMATION... 6 TABLE 2 PROPOSED SOFTWARE VERSIONS... 8 TABLE 3 PROPOSED EXCHANGE FORMATS FOR MODELS AND DRAWINGS... 8 TABLE 4 SUPPLIER RESOURCE SUMMARY... 8 TABLE 5 PROCESSES FOR COLLABORATION AND INFORMATION MODELLING... 9 TABLE 6 CLASH RENDITION VIEWER... 9 TABLE 7 AUTHORISATIONS FOR SECURITY, EXTRANET AND DOCUMENT DISTRIBUTION... 9 TABLE 8 MAJOR PROJECT MILESTONES... 10 TABLE 9 STRATEGY FOR INFORMATION DELIVERY... 11 <date of publication> 5 Generic Document (company Name)

1 Project Information Table 1 Project information Project Name Project Address Project Number (Clients Project Number or reference) Contract Form Project Description (EIR) May be an additional document, please reference. Project Brief and CDM requirements Project Deliverable as defined in the EIR and COBie project templates (see also the CPIx Protocol) May be an additional document, please reference. <date of publication> 6 Generic Document (company Name)

2 Information required by the EIR PAS1192-2:2013 Clause 5.3 defines the minimum contents of the Employers Information Requirements. The following subsections of the BEP respond to the parts of the EIR specifically requesting bidders proposals. It is important to remember that the information provided by the supplier in the pre-contract BEP should be sufficient enable the employer to review the supplier s proposed approach, capability, capacity and competence. Further detail will need to be added to the pre-contract BEP once the supplier has been selected and appointed this is covered in a separate CPIx document. 2.1 Planning of work and data segregation Required in response to the EIR by PAS1192-2 Clause 5.3 a) 3). The planning of work and data segregation aspects of the project are described in the later parts of this pre-contract BEP. 2.2 Co-ordination and clash detection Required in response to the EIR by PAS1192-2 Clause 5.3 a) 4). This section of the pre-contract BEP contains the bidders proposals for managing the coordination process. The requirements for co-ordination are stated in PAS1192-2 Clause 9.4. 2.3 Collaboration process Required in response to the EIR by PAS1192-2 Clause 5.3 a) 5). This is described in Section 4. 2.4 Health and safety/cdm management Required in response to the EIR by PAS1192-2 Clause 5.3 a) 6). This section of the pre-contract BEP contains the bidders proposals for using BIM and the Common Data Environment to support the management of health and safety and CDM requirements. 2.5 Compliance plan Required in response to the EIR by PAS1192-2 Clause 5.3 a) 10). This section of the pre-contract BEP contains the bidders proposals for managing the coordination process. See Section 2.2, above. <date of publication> 7 Generic Document (company Name)

3 Project Implementation Plan This section of the BEP covers the requirements of PAS1192-2 Clause 6.2 a). The PIP confirms the capability of the supply chain. The PIP consists of the following completed CPIx documentation: Supply chain capability summary form, which summarises the contents of Supplier building information management assessment form(s) Supplier IT assessment form(s) Supplier resource assessment form(s) These are available as separate templates on the CPIx website and these forms, once completed, should be incorporated into or appended to this pre-contract BEP. Where CAD software versions and exchange formats for model and drawing files have not been specified in the Employers Information Requirements, then the PIP shall summarise the proposals being made see templates in Tables 2 and 3. Table 2 Proposed software versions Company Database CAD software Version Format Comments Table 3 Proposed exchange formats for models and drawings Models Drawings Final drawing format Schedules or spreadsheets DWG DGN DWF PDF IFC Other The supplier resource being proposed for the project can also be summarised as per the example in Table 4. Table 4 Supplier resource summary Supplier Discipline Resource numbers Levels of competence Years of Experience Names of individuals <<name 1>> Qualified Architect 2 RIBA, CAD/BIM, Specification Author Architectural Technologist (CIAT) Architectural Technician <<name 2>> Qualified Structural Engineer 3 CIAT, CAD/BIM Trained 5 Certificate of CAD or Model Competence 3 MIStructE, Etc <date of publication> 8 Generic Document (company Name)

4 Project goals for collaboration and information modelling This section of the BEP covers the requirements of PAS1192-2 Clause 6.2 b). The project goals for collaboration and information management, and the supplier s proposals for meeting these, must be included in the BEP or appended to it. Where specific technical solutions are to be proposed for known or suspected issues concerning collaboration or information modelling, then these should be summarised in the following Tables 5, 6 and 7. Table 5 Processes for collaboration and information modelling Company Solution Network Database File based Comments Table 6 Clash rendition viewer Agreed clash rendition viewer Version Table 7 Authorisations for security, extranet and document distribution Company Authorised Manager Authority (Upload, download, change Access/Distribution) <date of publication> 9 Generic Document (company Name)

5 Major project milestones This section of the BEP covers the requirements of PAS1192-2 Clause 6.2 c). The proposed major project milestones relating to information delivery during the project should be summarised in the following Table 8. Table 8 Major project milestones Start Date Design Completion Detail Design Completion + Fabrication Construction As Constructed Models, Documents and Data Handover. Only the major milestones are listed. A more detailed and co-ordinated Master Information Delivery Plan and Project Plan must be developed and agreed with the stakeholders following contract award and included in the post-contract award BEP. <date of publication> 10 Generic Document (company Name)

6 Project information model (PIM) delivery strategy This section of the BEP covers the requirements of PAS1192-2 Clause 6.2 d). The delivery of the Project information model (PIM) must be considered and stated as a project strategy document, appended to this pre-contract BEP, under the headings listed in Table 9. This should include the deliverables, accuracy and completeness of the design at each stage. Table 9 Strategy for information delivery Brief Concept Definition Design Build & Commission Handover & Closeout In use <date of publication> 11 Generic Document (company Name)