Cross-discipline design deliverables for BIM Phase 1 report Strategy Document
|
|
|
- Phoebe Knight
- 10 years ago
- Views:
Transcription
1 Phase 1 report Strategy Document David Churcher, Hitherwood Consulting Mervyn Richards, MR1 Consulting Page 1 of 49
2 Contents 1 Introduction BIS BIM Strategy Paper Purpose of this document and its target audience Alignment of existing plans of work Document and data management Alignment of plans of work Plans of work and project process maps Design deliverable stages ( data drops ) Working Party Strategy Paper proposals Data drops based on analysis of plans of work Summary of deliverables defined by existing plans of work The next steps in defining cross-discipline design deliverables Appendix A Initial definition of data drops during capital works Data Drop 1 mid-way through Preparation stage Data Drop 2 mid-way through the Design Development stage Data Drop 3 end of Production Information stage Data Drop 4 end of the Manufacture Installation and Construction stage Data Drop 5 end of the Post Practical Completion stage Appendix B Tabulation of deliverables from separate plans of work B.1 ACE Detailed Design and MEP Performance Design B.2 BSRIA Design Framework B.3 TfL CGAP and TfL CIMM B.4 Network Rail GRIP B.5 London Underground PMF B.6 RIBA Plan of Work (Multi-Disciplinary Services) and Job Book B.7 TfL SPEARMINT Appendix C Tabulation of drawing definitions Figures Figure 1 Push and pull of BIM implementation... 3 Figure 2 BS1192:2007 Common Data Environment linking to project and asset databases... 5 Figure 3 Updated version of BS1192:2007 process for document and data management... 6 Figure 4 Alignment of existing plans of work (BIS original and amended version from Hitherwood Consulting)... 8 Figure 5 Data drops and data management processes from Working Party Strategy Paper Tables Table 1 Suggested contents for CAPEX and OPEX guides Page 2 of 49
3 1 Introduction 1.1 BIS BIM Strategy Paper The BIM Working Party Strategy Paper published by BIS in June 2011 has set out the UK Government s strategy for adopting building information modelling across a large proportion of public sector capital construction projects by The Government s reason for proposing the adoption of BIM is to reduce the cost of capital projects by improving the design and construction process for buildings and infrastructure. The agreed strategy for adopting BIM is a twintrack approach as is illustrated in Figure 1. Public sector client pull will come from clearly stated client requirements for the industry to provide BIM data at various points during the design and construction process. An initial suggestion of these requirements is included in Appendix 9 of the BIM Strategy Paper. This pull will be complemented by supply chain push coming from leading edge members of the supply chain improving their competitiveness by increasing the efficiency of their design and construction processes. Figure 1 Push and pull of BIM implementation Diagram courtesy of Mervyn Richards. 1.2 Purpose of this document and its target audience This Strategic Response document reports on initial work funded by BIS and the Construction Project Information committee that has started looking at the practicalities of defining a single set of data drops during design and construction across both building and civil engineering projects. This is based on an assessment of the existing state of alignment between the various plans of work that have been defined by different design disciplines or client groups. This document sets out the findings of this initial work and also suggests some follow- Page 3 of 49
4 on work to complete the definition of a common set of data drops that will reflect as much of current plans of work as is practicable. This document is aimed primarily at public sector clients, to explain to them the kind of guidance that will be prepared over coming months. However, it is also relevant to private sector clients, for use on their own projects, and to the supply chain to explain what their clients will be expecting from them in the future. 2 Alignment of existing plans of work Successful implementation of building information modelling across a multidisciplinary design and construction team requires that any definition of design deliverables for a project using BIM is appropriate and relevant to each design discipline. This means that the deliverables are defined as far as is possible to align with the existing plans of work used by each discipline. 2.1 Document and data management This alignment between different design disciplines should also mean that the management of project data and documentation through the mechanism described in BS1192:2007 is easier to apply, since it will help different designers to reach compatible stages of their design work at the same time. Figure 2 shows the BS1192:2007 common data environment of WIP-Shared-Published-Archive linking to project and asset databases which can be viewed through 2-d and 3-d browser tools. The ultimate outputs from the data management process would still need to include drawings for construction and installation on site. Page 4 of 49
5 Figure 2 BS1192:2007 Common Data Environment linking to project and asset databases Mervyn Richards, MR1 Consulting Ltd. A modified version of the BS1192:2007 process for co-ordinating ordinating design work between different members of the project team is shown in Figure 3. This extends the original BS1192:2007 process is to include the explicit step of sub- contractor Work in Progress design. This links from the Published Documentation area, which is the information handed over to the main contractor, back into the Shared area. This was always implicit in the original process but has now been made much more visible. A second change in the revised process is to include the links through the COBie protocol into Client Side Validation and Operations. Page 5 of 49
6 Figure 3 Updated version of BS 1192:2007 process for document and data management Page 6 of 49
7 2.2 Alignment of plans of work Figure 4 shows two versions of an alignment of the existing plans of work. The version at the top of the figure is the diagram included in the BIS BIM Working Group strategy paper. The version at the bottom of Figure 4, shows the alignment based on a detailed examination of the different plans of work, and also includes two other frameworks not includes in the original the ACE Agreement stages and the BSRIA Design Framework. The plans of work have been shown only from a design development point of view. This means that any stages related to contractor selection have been omitted, primarily RIBA Plan of Work stages G and H. The RIBA Plan of Work itself acknowledges that Stages G and H do not necessarily come directly between Stages F and J, depending on the procurement route. This also means that TfL CGAP Gates C and D appear at the same point, since these two gates mark the start and end of contractor selection. In addition, the LU PMF and the TfL CIMM plans of work include activities that are prior to CIC Stage 1/RIBA Stage A, and also activities that go beyond CIC Stage 6/RIBA Stage L, and these have been shown in the revised plan of work alignment. OGC Gateway 5 (Benefits realisation) is a recurring gateway during the life of the facility/project, but only the first pass is shown in the figure. The conclusion from this more detailed analysis is that there is only one point where all the plans of work align. This is at the completion of CIC Stage 6, which is variously designated as Project Close, Post Practical Completion, Completion. This takes into account the fact that the standard ACE services conclude at practical completion (end of CIC Stage 5), unless extended by optional services. There are several points at which many of the plans of work align: Mid-point of CIC Stage 1/BSRIA Proforma 1 which ties in with end of RIBA Stage A, ACE Appraisal Stage, GRIP Stage 1, CIMM/Spearmint/PMF Stage 1 and OGC/CGAP Gate 1. End of CIC Stage 1, which aligns with most other plans of work except GRIP where Stage 2 carries over slightly into CIC Stage 2. End of CIC Stage 5, which aligns with every other plan of work except TfL CGAP There is no clear alignment of many plans of work between the start of CIC Stage 2 and the end of CIC Stage 4, which is when most of the project design is taking place. For example: OGC, GRIP and CIC align at the end of Gate 2, Stage 3 and Stage 2 respectively LU PMF and TfL CIMM align at the end of their Stages 3 and also with the end of RIBA Stage D, but other plans do not (except ACE and BSRIA which also align with RIBA Stage D) GRIP Stage 4 aligns with the end of CIC Stage 3 and RIBA Stage E (which therefore also align with ACE and BSRIA). Page 7 of 49
8 Figure 4 Alignment of existing plans of work (BIS original and amended version from Hitherwood Consulting) Page 8 of 49
9 Information about the OGC gateways was drawn from other alignment studies rather than from the source definitions of the gateways. The detailed analyses of the plans of work are included in Appendix B. 2.3 Plans of work and project process maps The differences between existing plans of work have probably arisen because of their different focuses. There is no inherent reason why a plan of work for the rail industry should align neatly with a plan of work for building. Apart from the technical differences, there are also very wide variations in the amount of detail in the various plans of work. The BSRIA Design Framework for Building Services and the RIBA Architect s Job Book are probably the most detailed explanations of design activities and deliverables. In general, plans of work do not just concern themselves with deliverables. Many of them give detail on the design activities that lead to deliverables and some indicate how design activities link together in process diagrams. There is also a fundamental difference in the way that different plans of work approach the project process. Some, such as RIBA and CIC, define a project in terms of the work content within each stage of the project. Others, such as OGC or CGAP, define a project in terms of the audit gateways it has to pass through to progress. There also seems to be a major difference between building oriented plans of work that acknowledge that some design work continues after construction has started, and infrastructure oriented plans of work which imply that all design is completed when the project goes out to tender. Finally, there are other plans of work that have not been included here, such as the Salford Process Protocol, but which could be included in a more detailed analysis if this was believed to be helpful to the industry and its clients. 3 Design deliverable stages ( data drops ) 3.1 Working Party Strategy Paper proposals The Government s Construction Client Group BIM Working Party Strategy Paper proposes some data drops during the design and construction stages of a project. These are points at which the client requires defined deliverables from the project team. The Working Party strategy paper proposed four data drops as indicated in Figure 5. One of the objectives of this Strategy Document is to confirm the number and timing of these data drops and to propose content for them based on an initial review of the plans of work and on the COBie2 templates. From this initial analysis the document then sets out a more detailed plan for refining and finalising the descriptions of these data drops together with exemplar illustrations of what a compliant Building Information Model would contain at each of these points. Page 9 of 49
10 Figure 5 Data drops and data management processes from Working Party Strategy Paper The BIM Working Party Paper identifies further data drops during the operation and maintenance of the facility, but these are not considered further here. Following completion and publication of the CAPEX data drop deliverables, it is expected that a similar exercise will be undertaken to define OPEX data drop deliverables. 3.2 Data drops based on analysis of plans of work Based on the analysis of existing plans of work, summarised above, the following BIM data drops are suggested for clients to check on the progress of their project teams against pre-determined deliverables. These are described in more detail in Appendix A, including reference to client deliverables and the appropriate COBie2 references. DD1 Mid-way through CIC Stage 1 (Preparation). At this point the deliverables are about supporting the project appraisal and the client s requirements, and feeding into estate-wide strategic considerations. Page 10 of 49
11 DD2 Mid-way through CIC Stage 3 (Design Development). At this point the deliverables are an outline design of the selected technical solution suitable either for continued development within the existing design team or for handing over to a contractor for design and build proposals. This data drop would also test the Guaranteed Maximum Price coming from the main contractor. DD3 Towards the end of CIC Stage 4 (Production Information). At this point the deliverables are a detailed and coordinated design suitable for issuing for tender to a contractor who would need to have minimal design input, or for ratifying a developed D&B design before construction and installation works start. This data drop would test the prices coming back from the contractor supply chain. DD4 At the end of CIC Stage 5 (Manufacture Installation and Construction). At this point the deliverables relate to the handing back of the facility to the client, completed apart from rectification of defects. This data drop tests that the essence of the brief has been achieved. DD5 At the end of CIC Stage 6 (Post Practical Completion). At this point the deliverables are focused on supporting the operation and maintenance of the facility. This data drop is also the first of the OPEX data drops. 3.3 Summary of deliverables defined by existing plans of work Deliverables from the building information model can be divided into two broad types: graphical information and non-graphical information. Graphical information is generated from the 3-d model and may be viewed as 3d or 2d representations on screen or printed onto paper (analogous to traditional drawings). A collation of current drawing definitions, from various references, is included at Appendix C. Non-graphical information is generated from the database underlying the 3-d model by querying the data held within or attached to the objects in the model. The results are analogous to documentation such as materials schedules, bills of quantities, etc. The various plans of work already define some of these graphical and nongraphical deliverables in different levels of detail, and this is a starting point for defining the level of detail and the level of information expected within a building information model at a particular project stage. Summaries of these levels of detail and information are included in the Data Drop definitions in Appendix A. Page 11 of 49
12 4 The next steps in defining cross-discipline design deliverables This initial work has shown that it should be feasible to define a set of BIM deliverables that align across the design disciplines, with relatively small amounts of amendment to the separate plans of work. The deliverables are defined in two stages CAPEX deliverables that focus on the initial design and construction processes and OPEX deliverables that focus on the facility operation and management processes. This aligns with the development of BS1192: Parts 2 and 3 which will cover CAPEX and OPEX respectively. Table 1 Suggested contents for CAPEX and OPEX guides CAPEX guide (design, procurement, construction and commissioning) OPEX guide (handover, operation and maintenance) Terms and references Terms and references Managing collaboration processes Managing collaboration processes Managing information libraries Managing information libraries Managing models through information status Managing models through information status Information owners and their responsibilities Information owners and their responsibilities Classification of objects Classification of objects Geospatial referencing Geospatial referencing Capturing information from the brief The impact of different FM strategies The impact of different procurement processes Data input processes Data input processes Required deliverables during operation Required client deliverables Deliverables for end of life Optional project team deliverables Health and safety file information Commissioning processes COBie2 handover information In the meantime, the suggested data drops described in Appendix A can be used by clients and their project managers to ask for project deliverables in such a way as to be broadly consistent with the emerging collective response to the BIS BIM Strategy document. Doubtless there will be some need to tailor the generic requirements given here for particular types of projects, but this interim strategic guidance should provide both the client and the supply sides of the industry with an 80%-satisfactory starting point. David Churcher, Hitherwood Consulting Ltd for CPIC and BIS December Page 12 of 49
13 Appendix A capital works Initial definition of data drops during These data drops have been defined based on early analysis of the design discipline plans of work, the COBie2 templates and the client data requirements indicated by the BIS Working Group considering BIM deliverables, chaired by Nigel Fraser. Data Drop 1 mid-way through Preparation stage Alignment with existing plans of work RIBA Plan of Work/Job Book end Stage A : Appraisal CIC Scope of Services mid-stage 1 : Preparation BSRIA Design Framework mid-pro-forma 1 Network Rail GRIP end Stage 1 : Output Definition TfL CGAP Gate A : Commence TfL SPEARMINT end Start up TfL CIMM end Stage 1 : Start up LU Project Management Framework end Stage 1 : Output definition Proposed design deliverables The completed Project Brief based on: information from the client/project sponsor about project need, constraints associated with project funding, long-term operating cost, project timing, environmental assessment, technical compliance initial studies and surveys to collect information about the proposed development, usage scenarios, site locations, energy strategy, operation and maintenance strategy. Proposed level of development and level of information in a Building Information Model A model used to visualise the finished project in its surroundings, with possible elevation, plan and section treatments. Information in the model describes the performance outcomes. Objects are generic visualisations only whose main purpose is to convey scale and style to stakeholders whilst acknowledging that engineering development may require significant changes. COBie2 cross references Contact worksheet created Facility worksheet created for each site/option being considered (classified to Uniclass Table D or E) Document worksheet created to list clients project brief and initial studies and surveys Page 13 of 49
14 Data Drop 2 mid-way through the Design Development stage Alignment with existing plans of work RIBA Plan of Work/Job Book end Stage D : Design Development CIC Scope of Services mid-stage 3 : Design Development BSRIA Design Framework end Pro-forma 3 Network Rail GRIP Part-way Stage 4 : Single Option Selection TfL CGAP Between Gate B : Single Option Selection and Gate C : Pre-tender TfL SPEARMINT Part-way Initiation TfL CIMM end Stage 3 : Procure/Design LU Project Management Framework end Stage 3 : Concept design Proposed design deliverables The signed-off Design Brief relating to the chosen single solution. Elemental cost plan. Occupation/coming-into-use plan. Performance specifications suitable for going out to tender to design and build contractors. All design information from other solutions is archived but accessible if required. Plans, sections, elevations and perspectives showing proposed architectural form and quality, sketches of engineering systems showing design principles, rule of thumb calculations, structural design includes primary structure and allows for dead and live loadings. Proposed level of development and level of information in a Building Information Model A model to convey the design concept for the chosen solution, with generic objects at a low level of definition such as rectangular solids indicating overall size envelope and any required access space. Information attached to objects is focused on performance specifications and system connections in line with the design philosophy. Objects for non-changeable components are low or medium level manufacturer objects. COBie2 cross references Facility worksheets for rejected options archived Floor worksheet created to describe each floor in the design with Name, Category, Description and Elevation columns completed Space worksheet created to describe each room/space in the design with Name, Category, Floor, Description, UsableHeight, GrossArea and NetArea columns completed (classified to Uniclass Table F or G) Zone worksheet created if appropriate to collect Spaces into zones within the facility, with Name, Category, SpaceNames and Description columns completed Document worksheet extended to list the design brief, cost plan, occupation plan, performance specification, data-drop BIM model Page 14 of 49
15 Data Drop 3 end of Production Information stage Alignment with existing plans of work RIBA Plan of Work/Job Book end Stage F1 : initial Production Information CIC Scope of Services towards end Stage 4 : Production Information BSRIA Design Framework end Pro-forma 5 Network Rail GRIP end Stage 5 : Detailed Design TfL CGAP Gate C : Pre-tender TfL SPEARMINT end Initiation TfL CIMM part-way Stage 4 : Develop/Build LU Project Management Framework end Stage 4 : Detailed design Proposed design deliverables Completed design, detailed and coordinated, suitable for construction, manufacture and installation. All technical specifications, detailed design and coordinated working drawings (based on provisional plant selections where these are likely to be refined by the contractor/supply chain). Simulations of operational energy use, operational vehicle & people movements, emergency situations (fire, smoke, evacuation). Proposed level of development and level of information in a Building Information Model A model showing the detailed and co-ordinated design, with all physical clashes resolved based on selection of generic objects where future contractor s proposals are permitted or high-level manufacturer objects where such proposals are not permitted. Information attached to objects conveys detailed engineering parameters, dimensions, weights, system connections, materials where relevant. COBie2 cross references Type worksheet created to describe the pre-traditional-tender choices of fitted and movable components in the design, with Name, Category, Description, AssetType columns completed (classified to Uniclass Table G, H, J or K as appropriate). The Manufacturer and ModelNumber columns will be completed for any asset where equal and approved substitution by the contractor will not be permitted. Component worksheet created to place instances of the assets defined in the Type worksheet in particular spaces in the facility, with Name, TypeName, Space and Description columns completed. System worksheet created to collect particular components from the Component worksheet into systems (for example heating, electrical, plumbing), with Name, Category, ComponentNames columns completed. Document worksheet extended to include references to: product data sheets for all specified components; technical specifications; all drawings. Page 15 of 49
16 Data Drop 4 end of the Manufacture Installation and Construction stage Alignment with existing plans of work RIBA Plan of Work/Job Book end Stage K : Construction CIC Scope of Services end Stage 5 : Manufacture Installation and Construction BSRIA Design Framework end Pro-forma 6 Network Rail GRIP end Stage 7 : Hand Back TfL CGAP Between Gate D : Contract Award and Gate E : Project Close TfL SPEARMINT end Delivery TfL CIMM end Stage 4 : Develop/Build LU Project Management Framework end Stage 5 : Delivery Proposed design deliverables Facility with Practical Completion achieved. As-built drawings, operation and maintenance manuals, log-books and user guides for facilities managers and occupiers. Proposed level of development and level of information in a Building Information Model A model showing the facility as delivered at practical completion, incorporating any changes made to the co-ordinated design during construction and installation. Information attached to objects focuses on describing the components and elements actually installed, references to service and maintenance manuals. COBie2 cross references Type worksheet extended to include all fitted and movable components delivered at Practical Completion (classified to Uniclass Table G, H, J or K as appropriate). Component worksheet extended to include all instances of assets from the Type worksheet. System worksheet extended to include final fitted components in each system in the facility. Document worksheet extended to include references to: data sheets from all actual components installed; as-built drawings; commissioning certificates; operation and maintenance manuals; migration plans. Page 16 of 49
17 Data Drop 5 end of the Post Practical Completion stage Alignment with existing plans of work RIBA Plan of Work/Job Book end Stage L : Post Practical Completion CIC Scope of Services end Stage 6 : Post Practical Completion BSRIA Design Framework end Pro-forma 7 Network Rail GRIP end Stage 8 : Project Closeout TfL CGAP Gate E : Project Close TfL SPEARMINT end Close TfL CIMM end Stage 5 : Deliver/Close LU Project Management Framework end Stage 6 : Project Close Proposed design deliverables Facility with initial and early-stage occupation completed. As-built drawings, operation and maintenance manuals, log-books and user guides for facilities managers and occupiers, all amended according to any fine-tuning of building systems or any rectification of construction defects. Proposed level of development and level of information in a Building Information Model A model showing the facility as amended by any early-stage occupation finetuning, suitable for onward operation and facility management. COBie2 cross references Spare worksheet created to describe all spare part sets required for the installed components, with Name, Category, TypeName and Suppliers columns completed. Resource worksheet created to describe all resources needed for maintenance works (materials, tools and training), with Name, Category and Description columns completed. Job worksheet created to describe all the maintenance tasks needed to operate and maintain the facility, with Name, Category, Status, TypeName, Description, Duration, StartDate, Frequency, FrequencyUnit, TaskNumber, Priors, ResourceNames columns completed. Page 17 of 49
18 Appendix B Tabulation of deliverables from separate plans of work B.1 ACE Detailed Design and MEP Performance Design Stage 1 : Preparation CIC Scope of Services Client Brief (from client at start of Stage) Initial studies and information for preparation of business case (from team) Strategic Brief (from team) ACE Schedule of Services (Detailed Design) C&S (Part a) and MEP (Part b) unless noted Appraisal Stage Initial statement of requirements (from client at start of Stage) Requirements for site staff (from consultant) Strategic Briefing Stage Information reasonably available on existence and extent of public services (from consultant) C&S: Site limitations due to topography, previous uses, contamination (from consultant) C&S: Limitations due to road/transport access during construction and thereafter (from consultant) Comments on physical site restrictions affecting the engineering options (from consultant) C&S: Desk study of site [possibly include geotechnical investigation from Outline Proposals Stage] (from consultant) Initial recommendations on technical viability of the works (consultant in collaboration with other consultants) ACE Schedule of Services (Performance Design) only applies to MEP (Part c) Appraisal Stage Initial statement of requirements (from client at start of Stage) Requirements for site staff (from consultant) Strategic Briefing Stage Information reasonably available on existence and extent of public services (from consultant) Comments on physical site restrictions affecting the engineering options (from consultant) Initial recommendations on technical viability of the works (consultant in collaboration with other consultants) Page 18 of 49
19 Stage 2 : Concept Strategic Brief (from client at start of Stage) Initial proposals on design, technical and budget viability (from team) Initial Design Programme and Construction Programme (from team) Desk Study relating to site (from team) Primary functional requirements and design criteria (from team) and initial cost estimate (from QS) Schedules of floor areas (from team) Strategy for use, cleaning, maintenance and subsequent construction (from team) Design options (from team) Preliminary design information/concept design model for preferred option [sketches, design notes, drawings, performance specifications to describe scope, scale, form & character of works] (from team) Concept report and initial cost plan (from team) Outline Proposals Stage C&S: Geotechnical investigation of site (advised by consultant) Topographical or dimensional surveys of site, surveys of adjacent sites (advised by consultant) Consultation with local authority on matters of principle regarding design of works (from consultant) Alternative outline solutions (from consultant) Develop client s brief into full brief for the works (consultants in consultation with others) Advice, sketches, reports, outline specifications for outline proposals (from consultant) MEP: Approximate costs based on unit volume or area (from consultant) Outline Proposals Stage Topographical or dimensional surveys of site, surveys of adjacent sites (advised by consultant) Consultation with local authority on matters of principle regarding design of works (from consultant) Alternative outline solutions (from consultant) Develop client s brief into full brief for the works (consultants in consultation with others) Advice, sketches, reports, outline specifications for outline proposals (from consultant) Sketches, drawings, specifications, calculations for preparation of cost plan (consultant and others) Sketch drawings showing structural planning requirements of services (from consultant) Preliminary schedules of power, heating and cooling loads (from consultant) Analyse preliminary heat gains/losses for initial sizing of HVAC systems/plant (from fabric/envelope thermal performance standards) Outline specifications and sketch drawings (from consultant) Documentation and drawings for tender (from consultant) Page 19 of 49
20 Stage 3 : Design Development Setting out dimensions (from design lead) Develop design approach to achieve required quality, is co-ordinated within the team, and conforms to Project Definition (from team) Updated cost plan and initial cash flow forecasts (from QS) Design options for elements of the work (from team) Strategy for use, cleaning, maintenance (from team) Calculations to verify and facilitate design development (from team) Finalise design criteria (from team) Value management (from team) Define critical construction details, tolerances (from team) Design development drawings/model [detailed form function & character of works primary components in overall size and typical detail GAs, sections, elevations, details to show design intent] (from team) Outline specifications for components of works [performance and quality] (from team) Design Development Report [drawings + specifications or model] (from team, approved by client) Detailed Proposals Stage Programme for whole of design and construction (in liaison with other consultants) Detailed proposals (from consultant) Sketches, drawings, specifications, calculations for preparation of cost plan (consultant and others) MEP: Sketch drawings showing structural planning requirements of services (from consultant) MEP: Preliminary schedules of power, heating and cooling loads (from consultant) MEP: Analyse preliminary heat gains/losses for initial sizing of HVAC systems/plant (from fabric/envelope thermal performance standards) Final Proposals Stage MEP: Calculations, schematic drawings, schedules, specifications for final proposals (from consultant) C&S: Calculations, drawings, schedules, specifications for final proposals (from consultant) Co-ordinating the design into the overall works MEP: Builders work information (from consultant) MEP: Revised cost estimate based on unit volumes or unit areas (from consultant) Integrate any specialist sub-consultant/contractor requirements into the works (from consultant) MEP: Pre-tender documents and drawings and quotations Detailed Proposals Stage Monitor evolution of system design from specification and sketch drawings (consultant of contractor) Final Proposals Stage <<No specific deliverables>> Page 20 of 49
21 Stage 4 : Production Information Develop production information (from team) Value management (from team) Integrate specialist/supplier design & requirements into Project Definition (from team) Define structural support builders work (from team) Drawings/model and calculations including info from suppliers & specialists (from team) Submissions to statutory authorities (from team) Production information drawings/model and schedules [sufficient for construction or preparation of manufacturing and installation drawings] (from team) Drawings with dimensions from setting out information (from design lead, and team) Detailed specifications for components of the works [performance, quality, operating and maintenance requirements] (from team) Stage 5 : Manufacture, Installation and Construction Information Co-ordinated manufacture and installation drawings, integrated with manufacture and installation drawings (from team) for equipment (from consultant) Production Information Stage C&S: Calculations, drawings, schedules, specifications for tender documentation (from consultant) Calculations and details related to statutory submissions excluding planning approval, and for MEP excluding building regulations (from consultant) MEP: Detailed design drawings (from consultant) C&S: Further drawings, including reinforced concrete GA drawings and non-standard details, excluding coordination drawings, temporary works designs/drawings, shop and fabrication drawings (from consultant) MEP: Specifications [Mobilisation is part of Stage 4 in CIC, but part of Construction/Completion in ACE] Mobilisation Construction and Completion Stage MEP: Installation drawings (from contractor/sub-contractor with consultant information where needed, consultant checks for compliance with design intent/performance criteria) MEP: Proposals for commissioning and testing (from Production Information Stage Monitor production of Co-ordination and Installation drawings (consultant of contractor) Mobilisation Construction and Completion Stage Examine results of commissioning and testing (from consultant) Record defects (consultant in conjunction with site staff) Page 21 of 49
22 Building Log Book (from team) O&M manuals/model, record drawings and schedules of design criteria (from team) Initial information for health and safety file (from team) Stage 6 : Post Practical Completion Finalise health and safety file (from team) contractor/sub-contractor, consultant reviews) MEP: Record drawings and O&M manuals (prepared by contractors and commented on by consultant) C&S: Detailed designs, shop fabrication drawings, standard details, bar bending schedules and specifications (from contractor/sub-contractor and examined by consultant for conformity with design, structural adequacy, compliance with performance criteria) Record of defects (from consultant) [Completion is Stage 6 in CIC but part of Mobilisation/Construction in ACE] B.2 BSRIA Design Framework CIC Scope of Services Stage 1 : Preparation Client Brief (from client at start of Stage) Initial studies and information for preparation of business case (from team) Strategic Brief (from team) Stage 2 : Concept Strategic Brief (from client at start of Stage) Initial proposals on design, technical and budget viability (from team) BSRIA Design Framework Proforma 1 : Appraisal and Design Brief Design Brief (usually led by lead consultant) Plan for initial occupation period Initial review of an existing health and safety file Proforma 2 : Concept Initial recommendations for development of an operating and maintenance strategy Energy strategy studies [generic thermal modelling] Page 22 of 49
23 Initial Design Programme and Construction Programme (from team) Desk Study relating to site (from team) Primary functional requirements and design criteria (from team) and initial cost estimate (from QS) Schedules of floor areas (from team) Strategy for use, cleaning, maintenance and subsequent construction (from team) Design options (from team) Preliminary design information/concept design model for preferred option [sketches, design notes, drawings, performance specifications to describe scope, scale, form & character of works] (from team) Concept report and initial cost plan (from team) Stage 3 : Design Development Setting out dimensions (from design lead) Develop design approach to achieve required quality, is co-ordinated within the team, and conforms to Project Definition (from team) Updated cost plan and initial cash flow forecasts (from QS) Design options for elements of the work (from team) Strategy for use, cleaning, maintenance (from team) Calculations to verify and facilitate design development (from team) Finalise design criteria (from team) Value management (from team) Define critical construction details, tolerances (from team) Design development drawings/model [detailed form function & character of works Programme for design activities Building services philosophies for heating/cooling, electrical and public healthreport on building services issues including desk study on matters affecting design options and adequacy of utilities supplies Information for early-stage life-cycle cost studies Outline performance specifications for mechanical, electrical and public health services if required depending on procurement strategy Outline cost plan for building services based on floor area/building type/system assumptions Proforma 3 : Design Development Indicative mechanical/public health plant and riser sizes and electrical plant locations Sketch drawings for preferred preliminary design Sketch schematic drawings for preferred preliminary design Programme information on design and construction issues Energy statement for planning submission Report on building services issues Performance specifications for m&e services if required by procurement route Proforma 4 : Technical Design Strategy for fire safety Initial overall spatial coordination Essential performance requirements of systems [nominal capacities, range of Page 23 of 49
24 primary components in overall size and typical detail GAs, sections, elevations, details to show design intent] (from team) Outline specifications for components of works [performance and quality] (from team) Design Development Report [drawings + specifications or model] (from team, approved by client) Stage 4 : Production Information Develop production information (from team) Value management (from team) Integrate specialist/supplier design & requirements into Project Definition (from team) Define structural support builders work (from team) Drawings/model and calculations including info from suppliers & specialists (from team) Submissions to statutory authorities (from team) Production information drawings/model and schedules [sufficient for construction or preparation of manufacturing and installation drawings] (from team) Drawings with dimensions from setting out information (from design lead, and team) Detailed specifications for components of the works [performance, quality, operating and maintenance requirements] (from team) operating duties] Initial schedule of cast-in/formed builders work openings that are structurally significant Information for detailed life-cycle cost studies Refined cost plan for building services Detailed schematic drawings Technical drawings [conveying spatial allocation in risers and floor/ceiling voids and horizontal distribution routes] Proforma 5 : Production Information Detailed design drawings Builders work information Materials and workmanship specifications Equipment schedules Review of maintainability of plant and equipment [adequate working space and access] Draft construction programme Detailed cost plan Detailed specifications (if relevant) Coordinated working drawings Final coordinated reflected ceiling plans Schedules to cross reference cables to containment systems Commissioning specification Page 24 of 49
25 Proforma 6 (part) : Mobilisation Final installation details and wiring diagrams Installation drawings Builders work details Shop and fabrication drawings Stage 5 : Manufacture, Installation and Construction Information Co-ordinated manufacture and installation drawings, integrated with manufacture and installation drawings (from team) Building Log Book (from team) O&M manuals/model, record drawings and schedules of design criteria (from team) Initial information for health and safety file (from team) Stage 6 : Post Practical Completion Finalise health and safety file (from team) Proforma 6 (part) : Construction Record drawings Log books Planned preventative maintenance schedules Operation and maintenance manuals Commissioning report Schedules of spare parts required and tools required Building Users Guide Proforma 7 : Post Practical Completion Outturn cost analysis As constructed calculations for Part L and EPC B.3 TfL CGAP and TfL CIMM CIC Scope of Services TfL CGAP TfL CIMM Deliverables Stage 1 : Preparation Stage 1 : Start up Page 25 of 49
26 Client Brief (from client at start of Stage) Project brief containing initial scope and objectives (prepared by project manager) Outline business case User requirements (required business functionality) Performance, endurance and resilience requirements not related to user functional requirements Estimates of project cost and timing Gate A : Project commencement Definition of the problem Value for money appraisal Development funding affordable from budget Implementation funding affordable from business plan Stage 1 : Preparation (continued) Initial studies and information for preparation of business case (from team) Strategic Brief (from team) Stage 2 : Define requirements Business case quantifying the cost/benefit analysis Project Initiation Document (developed from Project Brief) Agreed procurement strategy High level design of options Project options appraisal Gate B : Single option selection Identification and examination of a range of options Single technical option selected providing best value for Page 26 of 49
27 money Feasibility of technical solution has been proven Funding allocated within budget and business plan for development and implementation respectively Stage 2 : Concept Strategic Brief (from client at start of Stage) Initial proposals on design, technical and budget viability (from team) Initial Design Programme and Construction Programme (from team) Desk Study relating to site (from team) Primary functional requirements and design criteria (from team) and initial cost estimate (from QS) Schedules of floor areas (from team) Strategy for use, cleaning, maintenance and subsequent construction (from team) Design options (from team) Preliminary design information/concept design model for preferred option [sketches, design notes, drawings, performance specifications to describe scope, scale, form & character of works] (from team) Concept report and initial cost plan (from team) Stage 3 : Design Development Setting out dimensions (from design lead) Stage 3 : Procure/Design Detailed design for the technical infrastructure Detailed design to deliver user functionality First draft of support arrangements in service Page 27 of 49
28 Develop design approach to achieve required quality, is co-ordinated within the team, and conforms to Project Definition (from team) Updated cost plan and initial cash flow forecasts (from QS) Design options for elements of the work (from team) Strategy for use, cleaning, maintenance (from team) Calculations to verify and facilitate design development (from team) Finalise design criteria (from team) Value management (from team) Define critical construction details, tolerances (from team) Stage 3 : Design Development (continued) Design development drawings/model [detailed form function & character of works primary components in overall size and typical detail GAs, sections, elevations, details to show design intent] (from team) Outline specifications for components of works [performance and quality] (from team) Design Development Report [drawings + specifications or model] (from team, approved by client) Stage 4 : Production Information Develop production information (from team) Stage 4 : Develop/Build Detailed designs and specifications Page 28 of 49
29 Value management (from team) Integrate specialist/supplier design & requirements into Project Definition (from team) Define structural support builders work (from team) Drawings/model and calculations including info from suppliers & specialists (from team) Submissions to statutory authorities (from team) Production information drawings/model and schedules [sufficient for construction or preparation of manufacturing and installation drawings] (from team) Drawings with dimensions from setting out information (from design lead, and team) Detailed specifications for components of the works [performance, quality, operating and maintenance requirements] (from team) Gate C : Pre-tender Procurement strategy agreed Technical risks assessed and mitigated Market testing Consents achieved Gate D : Contract award Supplier management processes in place Supplier selected on basis of best value for money Page 29 of 49
30 Stage 5 : Manufacture, Installation and Construction Information Co-ordinated manufacture and installation drawings, integrated with manufacture and installation drawings (from team) Building Log Book (from team) O&M manuals/model, record drawings and schedules of design criteria (from team) Initial information for health and safety file (from team) Stage 6 : Post Practical Completion Finalise health and safety file (from team) Stage 4 : Develop/Build (continued) New software developed Performance, endurance, resilience and integration tests conducted Migration plans developed Developed service model Developed handover/migration plan Stage 5 : Deliver/Close Consent to operate obtained Contracts arranged for support and operation End of project report Lessons Learned report Gate E : Project close Benefits achieved and reported Project transferred to Operations All funding issues closed out All statutory obligations complied with Stage 6 : Benefits realisation Measured benefits detailed against expectations (hard e.g. cost, headcount and soft e.g. image) Page 30 of 49
31 B.4 Network Rail GRIP Stage 1 : Preparation Client Brief (from client at start of Stage) CIC Scope of Services Initial studies and information for preparation of business case (from team) Strategic Brief (from team) Stage 2 : Concept Strategic Brief (from client at start of Stage) Initial proposals on design, technical and budget viability (from team) Initial Design Programme and Construction Programme (from team) Desk Study relating to site (from team) Primary functional requirements and design criteria (from team) and initial cost estimate (from QS) Schedules of floor areas (from team) Strategy for use, cleaning, maintenance and subsequent construction (from team) Stage 1 : Output Definition Network Rail GRIP Definition of the problem including success criteria (from Sponsor) Timescale, cost & quality constraints, including phasing requirements (from Sponsor) Stage 2 : Pre-feasibility Description of asset condition Potential options to deliver the Development Remit/Sponsor s Brief Definition of options Evaluation of capital and operating costs Sensitivity analysis Outline business case for each option Stage 2 : Pre-feasibility (continued) Description of proposed technical solution with maintenance & performance effects and requirements and development timetable Stage 3 : Option Selection Maps, drawings, site survey, geotechnical investigations, asset data and preliminary designs Operational facility diagrams [e.g. signalling scheme sketch] Operational modelling and calculations Evaluation of technical options [construction and staging, risks and hazards, costs, project programme] Page 31 of 49
32 Design options (from team) Preliminary design information/concept design model for preferred option [sketches, design notes, drawings, performance specifications to describe scope, scale, form & character of works] (from team) Concept report and initial cost plan (from team) Stage 3 : Design Development Setting out dimensions (from design lead) Develop design approach to achieve required quality, is co-ordinated within the team, and conforms to Project Definition (from team) Updated cost plan and initial cash flow forecasts (from QS) Design options for elements of the work (from team) Strategy for use, cleaning, maintenance (from team) Calculations to verify and facilitate design development (from team) Finalise design criteria (from team) Value management (from team) Define critical construction details, tolerances (from team) Description of technical and construction solution Risk assessment on programme and construction proposals Evaluation of revised staging and construction strategy options Assessment of functional specification on future maintenance Baseline asset management plan Recommendation for the Project Design Specification Effect of functional specification on operation and control Control and control technology requirements Option selection report [definition & feasibility, maintenance/performance/operation & control strategies, constructability/safety/environmental assessments, signalling schemes sketch] Validated Project Design Specification Stage 4 : Single Option Development Developed Technical Workscopes showing packages of work (maybe large schemes only) Scheme Designs (to RIBA Stage D) for each workscope Construction Plan [detailed cost estimate, project schedule, risk assessment, risk management plan, contingency estimate, assumptions log, issues log] Asset Management Plan [includes project methodology, commissioning processes, sign-off processes for coming-into-use, acceptance criteria, maintenance strategy, need for Pre-Works Survey] Operations Management Plan [includes migration plan, training plan] Reference Design [all the above] (end of stage deliverable) Page 32 of 49
33 Design development drawings/model [detailed form function & character of works primary components in overall size and typical detail GAs, sections, elevations, details to show design intent] (from team) Outline specifications for components of works [performance and quality] (from team) Design Development Report [drawings + specifications or model] (from team, approved by client) Stage 4 : Production Information Develop production information (from team) Value management (from team) Integrate specialist/supplier design & requirements into Project Definition (from team) Define structural support builders work (from team) Drawings/model and calculations including info from suppliers & specialists (from team) Submissions to statutory authorities (from team) Production information drawings/model and schedules [sufficient for construction or preparation of manufacturing and installation drawings] (from team) Drawings with dimensions from setting out information (from design lead, and team) Detailed specifications for components of the works [performance, quality, operating and maintenance requirements] (from team) Stage 5 : Manufacture, Installation and Construction Information Co-ordinated manufacture and installation drawings, integrated with manufacture and installation drawings (from team) Building Log Book (from team) O&M manuals/model, record drawings and schedules of design criteria (from team) Initial information for health and safety file (from team) Stage 5 : Detailed Design Completed Design [cross-checked to Reference Design] Issued Design for Construction [endorsed by contractor s Responsible Engineers in relevant disciplines] Notification of Asset Change for maintenance of new or existing assets (during project?) Stage 6 : Construction, Test and Commission Temporary works designs Site work method statements [including emergency plans] Inspection Certificates [including list of defects] Defects Record Test Certificates for signalling, civil & track engineering infrastructure, track Page 33 of 49
34 infrastructure Practical Completion Certificate Record of Conformance to Design Stage 6 : Post Practical Completion Finalise health and safety file (from team) Stage 7 : Scheme Hand Back Project Acceptance Certificate Notice of completion of making good defects Stage 8 : Close Out Notice of completion of making good defects B.5 London Underground PMF CIC Scope of Services Stage 1 : Preparation Client Brief (from client at start of Stage) Initial studies and information for preparation of business case (from team) Strategic Brief (from team) Stage 1 : Output Definition London Underground PMF Business case and draft of project requirements Project Execution Plan including appointment of key roles, high level assessment of technical approvals required, outline plan of timeline/whole life costs/resources High level procurement strategy Risk management strategy External stakeholder management and communications plan Stage 2 : Feasibility The developed procurement strategy (recommended approach, key options considered, compliance with EU and TfL policies) Options evaluation and selection of preferred option including sensitivity analysis Page 34 of 49
35 Stage 2 : Concept Strategic Brief (from client at start of Stage) Initial proposals on design, technical and budget viability (from team) Initial Design Programme and Construction Programme (from team) Desk Study relating to site (from team) Primary functional requirements and design criteria (from team) and initial cost estimate (from QS) Schedules of floor areas (from team) Strategy for use, cleaning, maintenance and subsequent construction (from team) Design options (from team) Preliminary design information/concept design model for preferred option [sketches, design notes, drawings, performance specifications to describe scope, scale, form & character of works] (from team) Concept report and initial cost plan (from team) Stage 3 : Design Development Setting out dimensions (from design lead) Develop design approach to achieve required quality, is co-ordinated within the team, and conforms to Project Definition (from team) Updated cost plan and initial cash flow forecasts (from QS) Design options for elements of the work (from team) Strategy for use, cleaning, maintenance (from team) where appropriate Verification Activity Plans (to monitor performance of suppliers activity) Stage 3 : Concept Design Safety Case Stakeholder consultation Detailed plans to minimise disruption to operations and customer service Technical risks identified and evaluated. Assessed as to whether they should be mitigated by further design development, handed to the supplier to manage or retained as a client responsibility Conceptual Design Statement including technical approvals required for implementation Consents Plan developed Procurement Plan setting out key options considered, key responsibilities, comparison with similar projects For Design and Build projects audit trail demonstrating compliance with EU procurement rules Contract Management Strategy Page 35 of 49
36 Calculations to verify and facilitate design development (from team) Finalise design criteria (from team) Value management (from team) Stage 3 Design Development (continued) Define critical construction details, tolerances (from team) Design development drawings/model [detailed form function & character of works primary components in overall size and typical detail GAs, sections, elevations, details to show design intent] (from team) Outline specifications for components of works [performance and quality] (from team) Design Development Report [drawings + specifications or model] (from team, approved by client) Stage 4 : Production Information Develop production information (from team) Value management (from team) Integrate specialist/supplier design & requirements into Project Definition (from team) Define structural support builders work (from team) Drawings/model and calculations including info from suppliers & specialists (from team) Submissions to statutory authorities (from team) Production information drawings/model and schedules [sufficient for construction or preparation of manufacturing and installation drawings] (from team) Drawings with dimensions from setting out information (from design lead, and team) Detailed specifications for components of the works [performance, quality, operating Stage 4 : Detailed Design Further development of items started during Stage 3: Stakeholder consultation Detailed plans to minimise disruption to operations and customer service Technical risks identified and evaluated Consents Plan Procurement Plan Contract Management Strategy For Design then Build projects audit trail demonstrating compliance with EU procurement rules Stage 5 : Delivery starts after CGAP Gate C (Pre-tender) and includes Gate D (Contract award) and RIBA Stage J (Mobilisation) Page 36 of 49
37 and maintenance requirements] (from team) Stage 5 : Manufacture, Installation and Construction Information Co-ordinated manufacture and installation drawings, integrated with manufacture and installation drawings (from team) Building Log Book (from team) O&M manuals/model, record drawings and schedules of design criteria (from team) Initial information for health and safety file (from team) Stage 6 : Post Practical Completion Finalise health and safety file (from team) Stage 5 : Delivery (continued) Testing/UAT, commissioning Delivery into service, deliver training Execute VAP Resolution of snagging items Completion of health and safety information and maintenance information Stage 6 : Project close Handover plan, including anticipated future benefits Final project close report, including final accounts settled with all suppliers Stage 7 : Benefits Realisation Post-implementation review B.6 RIBA Plan of Work (Multi-Disciplinary Services) and Job Book CIC Scope of Services RIBA Plan of Work RIBA Job Book Stage 1 : Preparation Client Brief (from client at start of Stage) Initial studies and information for preparation of business case (from team) Stage A : Appraisal Initial statement of requirements (from client at start of Stage) Site appraisal and surveys for each site (from team) Stages A-B Feasibility report addressing client s requirements [environmental assessment, options, recommendations, possibly conceptual drawings & diagrams] Page 37 of 49
38 Strategic Brief (from team) Stage 2 : Concept Strategic Brief (from client at start of Stage) Initial proposals on design, technical and budget viability (from team) Initial Design Programme and Construction Programme (from team) Desk Study relating to site (from team) Primary functional requirements and design criteria (from team) and initial cost estimate (from QS) Schedules of floor areas (from team) Strategy for use, cleaning, maintenance and subsequent construction (from team) Design options (from team) Preliminary design information/concept design model for preferred option [sketches, design notes, drawings, performance specifications to describe scope, scale, Design studies for each option (from team) Selection of preferred solution (from client) Outline planning submission Outline business case for preferred solution (from client and team) Stage B : Design Brief Draft and final Design Brief (draft from client, comments from team, final from client) Stage C : Concept Design Brief [from client at start of Stage) Concept Design (outline proposals for structural and building services systems and outline specifications] (from team) Initial cost plan (from QS) Procurement route (from team) Propose options for occupation and FM (from team) Define targets for O&M capital/revenue spend, energy use, environmental performance (from team) Cost appraisal (suitable for a cost strategy) Condition report on fabric of existing building Proposals suitable for outline planning application Final Design Brief (see Job Book pp63, for contents list) Stage C Partially developed Project Brief Outline proposals sufficient to allow client to comprehend, comment and approve [diagrammatic analysis of requirements, use of site, functional and circulation arrangements, massing, construction and environmental methods] Estimate of construction cost sufficient to allow cost plan to be prepared [element cost, cost per m2, % of whole] D&B Employers Requirements [ functional nature of building(s), schematic layouts, room data sheets, equipment schedules, special programme requirements ] D&B Contractors Proposals [ A3 site layout/floor plans/elevations/principal sections, foundation & structure GA, mechanical duct/pipe layouts & schematics, electrical floor layouts ] Page 38 of 49
39 form & character of works] (from team) Concept report and initial cost plan (from team) Stage 3 : Design Development Setting out dimensions (from design lead) Develop design approach to achieve required quality, is co-ordinated within the team, and conforms to Project Definition (from team) Updated cost plan and initial cash flow forecasts (from QS) Design options for elements of the work (from team) Strategy for use, cleaning, maintenance (from team) Calculations to verify and facilitate design development (from team) Finalise design criteria (from team) Value management (from team) Define critical construction details, tolerances (from team) Design development drawings/model [detailed form function & character of works primary components in overall size and typical detail GAs, sections, elevations, details to show design intent] (from team) Outline specifications for components of works [performance and quality] (from team) Design Development Report [drawings + specifications Stage D : Design Development Elemental cost plan (from QS) Develop design [services space requirements, preliminary room layouts, means of escape, fire compartments] (from team) Develop occupation and FM strategies Project Brief (signed off by all) Detailed planning application Stage E : Technical Design Final layouts [positions for integration of services terminals, ceiling layouts, major builders work for services] including sizing of all structural elements and sizing of all services elements and components (from team) Update cost plan and cash flow projection (from QS) Technical Designs and specifications [sufficient to coordinate all components and elements] (from team and frozen) Stage D Project Brief Detailed proposals [co-ordinated design intentions, site layout, planning/spatial arrangements, elevations, construction & environmental systems, buildability] Firm cost plan and cash flow forecast Proposals sufficiently developed to allow full planning application Design development presentation [orthographic plans, elevations, cross sections, perspectives, model (physical or computer) to show architectural quality, form, colour, landscape setting, building details, interior arrangements, spaces, furniture] Stage E Detail design drawings Specification notes on materials and workmanship (prescriptive or performance) Full Plans submission for Building Regulations approval Non-production information (e.g. for dealings with landlords, tenants, funders, 3 rd parties) D&B Employers Requirements [detail design information] Page 39 of 49
40 or model] (from team, approved by client) Stage 4 : Production Information Develop production information (from team) Value management (from team) Integrate specialist/supplier design & requirements into Project Definition (from team) Define structural support builders work (from team) Drawings/model and calculations including info from suppliers & specialists (from team) Submissions to statutory authorities (from team) Production information drawings/model and schedules [sufficient for construction or preparation of manufacturing and installation drawings] (from team) Drawings with dimensions from setting out information (from design lead, and team) Detailed specifications for components of the works [performance, quality, operating and maintenance requirements] (from team) Stage 5 : Manufacture, Installation and Construction Information Co-ordinated manufacture and installation drawings, integrated with manufacture and installation drawings (from team) Stage F : Production Information Co-ordinated production information [location drawings/gas, assembly drawings, component drawings, schedules, specifications, calculations] (from team) Update cost plan (from QS) Building services information [schematic drawings, detailed design drawings, co-ordination drawings, builders work and fixing schedules, specifications, design criteria and calculations] (from services engineer) Stage J : Mobilisation Complete outstanding production information [review info from sub-contractors, specialists] (from team) Stage K : Construction to Practical Completion Further production information [contractor s proposals, method statements, installation/shop drawings, builders work details, manufacturer s data] (from team) Building Users Guide [principles of design & construction, furniture etc, security, access, local D&B Contractors Proposals [design development drawings extent depends on 1 or 2 stage D&B] Stage F Production information [location, component & assembly drawings, drawn schedules, BoQ/spec/ schedules of work] Information for issue to specialist sub-contractors and suppliers Non-production information (e.g. for dealings with landlords, tenants, funders, 3 rd parties) Stage J Drawings, schedules etc for contract issued which comply with SMM rules [Block Plan, Site Plan, plans, sections & elevations, information about ground water level, trial pits, features retained, live under/overground services, Component drawings, Dimensioned drawings as part of BoQ] Stage K Further information for the contractor As built drawings, manuals and maintenance information Maintenance programme information Page 40 of 49
41 Building Log Book (from team) O&M manuals/model, record drawings and schedules of design criteria (from team) Initial information for health and safety file (from team) Stage 6 : Post Practical Completion Finalise health and safety file (from team) controls for lighting/heating/cooling, energy & water efficiency] (from team) Commissioning and test procedures (from services engineer) Building Owner s Manual (from team) Stage L : Post Practical Completion Final account (from QS) Recalculate capital and revenue target costs (from QS) Identify actual capital costs (from QS) Handover information [commissioning, testing, precompletion checks, handover meeting Stage L Certificate of Making Good of Defects Final Certificate EPC Building User Guide Results of feedback study with client or building users B.7 TfL SPEARMINT CIC Scope of Services TfL SPEARMINT Stage 1 : Preparation Client Brief (from client at start of Stage) Stage 1 : Preparation (continued) Initial studies and information for preparation of business case (from team) Strategic Brief (from team) Stage 1 : Start-up Statement of requirements development of the Brief Overview of available options to establish broad project viability Stage 2.1 : Initiation (preliminary) Identification of the single option Development of business case Page 41 of 49
42 Development of project plan Development of Project Initiation Document Stage 2 : Concept Strategic Brief (from client at start of Stage) Initial proposals on design, technical and budget viability (from team) Initial Design Programme and Construction Programme (from team) Desk Study relating to site (from team) Primary functional requirements and design criteria (from team) and initial cost estimate (from QS) Schedules of floor areas (from team) Strategy for use, cleaning, maintenance and subsequent construction (from team) Design options (from team) Preliminary design information/concept design model for preferred option [sketches, design notes, drawings, performance specifications to describe scope, scale, form & character of works] (from team) Concept report and initial cost plan (from team) Stage 3 : Design Development Setting out dimensions (from design lead) Develop design approach to achieve required quality, is co-ordinated within the team, and conforms to Project Definition (from team) Updated cost plan and initial cash flow forecasts (from QS) Design options for elements of the work (from team) Stage 2.2 : Initiation (detailed) Definition of project scope (e.g. specifications, performance criteria) Project design Project costing Page 42 of 49
43 Strategy for use, cleaning, maintenance (from team) Calculations to verify and facilitate design development (from team) Finalise design criteria (from team) Value management (from team) Define critical construction details, tolerances (from team) Design development drawings/model [detailed form function & character of works primary components in overall size and typical detail GAs, sections, elevations, details to show design intent] (from team) Outline specifications for components of works [performance and quality] (from team) Design Development Report [drawings + specifications or model] (from team, approved by client) Stage 4 : Production Information Develop production information (from team) Value management (from team) Integrate specialist/supplier design & requirements into Project Definition (from team) Define structural support builders work (from team) Drawings/model and calculations including info from suppliers & specialists (from team) Submissions to statutory authorities (from team) Production information drawings/model and schedules [sufficient for construction or preparation of manufacturing and installation drawings] (from team) Drawings with dimensions from setting out information (from design lead, and team) Detailed specifications for components of the works [performance, quality, operating Page 43 of 49
44 and maintenance requirements] (from team) Stage 2.3 : Initiation (procurement) Selected contractor (comes between CGAP Gates C and D) Stage 5 : Manufacture, Installation and Construction Information Co-ordinated manufacture and installation drawings, integrated with manufacture and installation drawings (from team) Building Log Book (from team) O&M manuals/model, record drawings and schedules of design criteria (from team) Initial information for health and safety file (from team) Stage 6 : Post Practical Competion Finalise health and safety file (from team) Stage 3 : Delivery Delivery of all objectives in the Project Initiation Document Handover to operational/support teams Stage 4 : Close End of project report including lessons learned Page 44 of 49
45 Appendix C Tabulation of drawing definitions Buildings (architecture)(defns taken from RIBA Plan of Work or Working Drawings Handbook, Styles & Bichard) Concept design proposal Includes outline proposals for structural and building services systems and outline specifications. Outline proposals show the design sufficiently developed for the client to comprehend, comment on and approve the proposals. A diagrammatic analysis of requirements, use of site, solutions to functional and circulation problems, relationship of spaces, massing, construction and environmental methods may be included. Includes Location block plan. Design Development proposals Drawings prepared as part of these proposals include: Orthographic plans at all levels Elevations and cross sections Perspectives etc to give a realistic view of the building exterior Computer-generated visual images or analytical diagrams Models at this stage include: Presentation model to show architectural quality, form and colour, landscape setting Building/Engineering Services (defns taken from BSRIA BG6) Sketch Line diagrams and layout indicating basic proposals, locations of main items of plant, routes of main pipes, air ducts and electrical distribution in such detail as to illustrate the incorporation of the engineering services within the project as a whole and with respect to any zoning. Structural/Civil Engineering (defns based on PSA Drawing Practice Manual or Standard Method of Detailing Structural Concrete) Page 45 of 49
46 Detail model of building part or particular feature Interior arrangement models to show spaces, arrangements, furniture layouts etc Computer generated models Other graphical information may include computer animations Drawn information for Stage E Site layouts, general arrangement plans, elevations and sections, draft assembly drawings, draft component drawings. Elemental information: Substructure excavation, foundations, floors beds (?), pile foundations Structure (primary) external walls, internal walls, floors and galleries, stairs and ramps, roofs, frames Structure (secondary) external wall openings, internal wall openings, floor openings, balustrades, suspended ceilings, roof openings Structure (finishes) external wall finishes, internal wall finishes, floor finishes, stair finishes, ceiling finishes, roof finishes Services (piped and ducted) refuse disposal, drainage, hot and cold water, gases, Sketch schematic Line diagrams indicating main items of plant and their interrelationships in such detail as to illustrate the incorporation of the engineering services within the project as a whole. Detailed schematic Line diagrams describing the interconnection of components in a system showing the engineering principles. The main features of a schematic drawing should be as follows: The drawings should include all the functional components that make the system work, such as ducts, pipes, cables, busbars, plant items, fans, valves, dampers, control devices, strainers, terminals, electrical switchgear and components, security and fire sensors and control equipment Symbols and line conventions should be in accordance with a recognised standard or a supplied legend The drawings should be labelled with appropriate pipe, duct, busbar and cable sizes, pressures and flow rates (but may be subject to adjustment) The drawings should indicate components which Sub-structure plan Layout of foundation works (footings, pads, piles, ground beams) with respect to architecture or ground features, with key sections Drainage plan Layout of drain runs, manholes with invert levels at key points Roof plan Layout of roof members with spacing dimensions, and key sections Page 46 of 49
47 refrigeration, space heating, ventilation and air conditioning Services (electrical) power, lighting, communications, transport, security Fittings (fixtures and loose equipment) circulation, general room, culinary, sanitary, cleaning, storage External substructure, structure, finishes, services, fittings. Reflected ceiling plan Drawing showing the high-level details at each level: Position of light fittings, fire and security sensors, HVAC terminal units (grilles, diffusers) and extracts Arrangement of ceiling tiles/grid with respect to fittings, walls and partitions Tender drawing Development of general arrangement plans, have a sensing control or measurement function The major components indicated on the schematic drawing should be identified for cross-referencing purposes. Technical drawing A drawing showing the extent of the services installations. The main features should be as follows: Plan layouts should be to a scale of at least 1:100 Show the extent and type of service terminals visible within the occupied space Show approximate locations of horizontal and vertical service runs Show plant and distribution system sizes, particularly those affecting spatial allocation, while acknowledging that these may need some adjustment and refinement [at later design stages] Pipework and electrical containment should be represented by single line payouts. Ductwork should be represented by either double line or single line layouts as required to demonstrate that the routes indicated are feasible. Symbols and line conventions in accordance with a recognised standard or a legend. Detailed design drawing A drawing showing the intended locations of plant Reinforced concrete drawings A set of drawings and schedules detailing: Page 47 of 49
48 elevations and sections, component and assembly drawings that are co-ordinated with the bill of quantities. Production information drawings General arrangement drawings: Strip sections at all points round building elevation where treatment changes, providing all important vertical dimensions and references to assembly details Assembly drawings illustrating entire range of external wall conditions (door and window heads and sills, footing/ground floor junctions, eaves and parapet details), internal wall openings and junctions Component drawings giving dimensioned elevations Sub-component drawings showing construction details items and service routes in such detail as to indicate the design. The main features are as follows: Plan layouts should be to a scale of at least 1:100. Plant areas should be to a scale of at least 1:50, and should be accompanied by crosssections The drawing will not indicate the precise position of services, but it should be feasible to install the services within the general routes indicated. It should be possible to produce coordinated working drawings or installation drawings without major re-routing of the services. Co-ordinated working drawings Drawings showing the interrelationships of two or more engineering services and their relation to the structure and building fabric. The main features are as follows: Plan layouts should be to a scale of at least 1:50 and be accompanied by cross-sections to a scale of at least 1:20 for all congested areas. The drawing should make allowance for installation working space and space to facilitate commissioning and maintenance The drawings should be spatially co-ordinated and there should be no physical clashes between the system components when installed. Critical dimensions, datum levels and invert levels should be provided. The spaces between pipes and duct runs shown The layout of steel reinforcement (separate sheets for top and bottom reinforcement in slabs) Sections and plans showing coordination of reinforcement in congested areas (column/slab/beam junctions) Bending schedules for reinforcement Structural steelwork drawings A set of drawings and schedules detailing: The layout and arrangement of steelwork (beams and columns) Sections and plans showing fixing details at junctions and details at beam/slab junctions Page 48 of 49
49 Construction drawing on the drawing should make allowance for the service at its widest point. Insulation, standard fitting dimensions and joint widths should have been allowed for The drawing should indicate positions of main fixing supports where they have significance to the structural design or spatial constraints. Installation drawing A drawing based on the detailed design drawing or co-ordinated working drawing with the primary purpose of defining that information needed by the tradesmen on site to install the works. The main features should be as per co-ordinated working drawings, plus: Allowances should be made for inclusion of all supports and fixings necessary to install the works The drawing should make allowance for installation details provided from manufacturers drawings Allowances should be made for plant and equipment. This includes any alternatives to the designer s original specified option that have been chosen. Page 49 of 49
RIBA Plan of Work 2013: Consultation document. You are invited to complete the online questionnaire by 12 August 2012.
RIBA Plan of Work 2013: Consultation document The RIBA is undertaking a comprehensive review of the RIBA Plan of Work. This document sets out the reasons and the rationale behind that review as well as
CPIx on Line. Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Supporting the HMG Construction Strategy.
CPIx on Line Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date: Document No: Date: March 2013 Revision: R1 Status: Published
DIRECTORATE OF ESTATES & FACILITIES
DIRECTORATE OF ESTATES & FACILITIES PROCEDURE AND INFORMATION MANUAL EPM PM4 Client Representative (University Project Manager) for Capital Projects Scope of Services Document Originated: April 2006 By:
BUILDING INFORMATION MODEL (BIM) PROTOCOL
BUILDING INFORMATION MODEL (BIM) PROTOCOL 2013 Standard Protocol for use in projects using Building Information Models The CIC acknowledges the technical input and leadership provided by the BIM Task Group
BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011
BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT Notice No.... 2011 NOTICE IN TERMS OF THE COUNCIL FOR THE BUILT ENVIRONMENT ACT, 2000 (ACT NO. 43 OF 2000) The Council for the Built Environment has under
Building the Asset Information Model
Building the Asset Information Model BIM: Let s Get Started Contractors Survey https://www.surveymonkey.com/s/nfbbim Hypothesis: Government as a client can derive significant improvements in cost, value
Delivery Management Guidelines Delivery Process 2 - Project Management
Delivery Management Guidelines Delivery Process 2 - Project Management Version control Version 9-1 Date 2010-10-18 Status Approved The IDMS Prov Infr Strat DP1: Portfolio Management DP1-1 Infrastructure
Project Management Handbook 2014. "To Understand the Causes of Things"
Management Handbook 2014 "To Understand the Causes of Things" AMENDMENT RECORD This document has been issued and amended as follows: - Isu. Rev. Reason for Issue / revision Date Issued to Team Stakeholders
CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS
CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS 1. GENERAL PROVISIONS. 1.2 DEFINITIONS Where the words
Employer s Information Requirements Version 07 28.02.13. Core Content and Guidance Notes
Employer s Information Requirements Version 07 28.02.13 Core Content and Guidance Notes Employer s Information Requirements - Guidance notes version 07: 28.02.13 Contents 1.0 Employer s Information Requirements
TfNSW Standard Requirements TSR T Technical Management
Template Applicable to: Transport Projects Quality Management System Status: Division: Approved Transport Projects Version: 5.0 Desksite No.: 3455797_1 Date of issue: 1 July 2014 Effective date: 1 July
The Performance Gap. Is there a performance gap and if so is there a solution? Rob Manning. BSc(Hons) CEng FCIBSE. BIS BIM Core Team.
The Performance Gap. Is there a performance gap and if so is there a solution? Rob Manning. BSc(Hons) CEng FCIBSE. BIS BIM Core Team. The performance gap are construction customers getting the assets
Part 1 Checklist. Feasibility 2. Investigation 9. Design 18. Construction 26
Part 1 Checklist Process Page 2 9 Design 18 26 Page 1 FEASIBILITY 1. Establishment 1.1 Establishment Recognise problem, need or opportunity. Formulate goal and objectives. Prepare project charter. Obtain
Gateway review guidebook. for project owners and review teams
Gateway review guidebook for project owners and review teams The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.
This manual is proprietary and no part thereof shall be copied without written authorisation from the company Ref: Quality Manual.ind Issue: June 2009 INDEX 1 Amendment Status 2 Controlled Distribution
Transport for London. Projects and Planning Panel
Agenda Item 4 Transport for London Projects and Planning Panel Subject: TfL Pathway Date: 8 May 2013 1 Purpose 1.1 At its meeting of 8 January 2013 the Panel asked for further information about Pathway,
Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series
Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
OUTLINE SCOPE OF SERVICES FOR THE ROLE OF INFORMATION MANAGMENT
OUTLINE SCOPE OF SERVICES FOR THE ROLE OF INFORMATION MANAGMENT first edition 2013 The CIC acknowledges the technical input and leadership provided by the BIM Task Group in support of the production of
Project Charter. Project Sponsor: Prepared By: S. Vassilatos
Project Charter The Northumbria Building Centre A. General Information Project Title: The Northumbria Building Centre Project Manager: Mr. Alan Dunn Project Client: The Northumbria Building Centre Trust
SMS0045 Construction Health and Safety Policy and Procedures
SMS0045 Construction Health and Safety Policy and Procedures March 2015 Version 8 Please note that for projects utilising a CDM Co-ordinator under the transitional arrangements of CDM 2015 (between 6 April
Specification for information management for the capital/delivery phase of construction projects using building information modelling
Incorporating Corrigendum No. 1 Specification for management for the capital/delivery phase of construction projects using building modelling Publishing and copyright The BSI copyright notice displayed
aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608
aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608 NCSA 01 Competency Based Assessment in Architecture THE
Facility management briefing checklist
Facility management briefing checklist The checklist has been prepared as a complementary document to BS 8536:2010 Facility management briefing. Code of practice. BS 8536 is a standard for facility designers,
CONTRACT MANAGEMENT FRAMEWORK
CONTRACT MANAGEMENT FRAMEWORK August 2010 Page 1 of 20 Table of contents 1 Introduction to the CMF... 3 1.1 Purpose and scope of the CMF... 3 1.2 Importance of contract management... 4 1.3 Managing contracts...
NFSA Project Management Guidelines
NFSA Project Management Guidelines Project Management Guide Purpose of this Guide This Guide outlines the NFSA Project Management Guidelines, and includes: NFSA Project Life Cycle Governance Roles and
The Transport Business Cases
Do not remove this if sending to pagerunnerr Page Title The Transport Business Cases January 2013 1 Contents Introduction... 3 1. The Transport Business Case... 4 Phase One preparing the Strategic Business
Procurement requirements for reducing waste and using resources efficiently
Guidance for building and civil engineering projects Procurement requirements for reducing waste and using resources efficiently Model procurement wording for clients and contractors to cut waste on construction
Revit MEP. Autodesk Navisworks
What is BIM? Autodesk BIM is an intelligent model-based process that helps owners and service providers achieve business results by enabling more accurate, accessible, and actionable insight throughout
The Asset Information Model using BIM
AIM - PAS 1192:3:2014 The Asset Information Model using BIM Figure 1 PAS1192-2 and PAS1192-3 by: Rob Manning BIS BIM Task Group Introduction In this article we look at how the approach outlined in document
PROJECT MANAGEMENT PROCESS for MAJOR CAPITAL PROJECTS
PROJECT MANAGEMENT MANUAL PROJECT MANAGEMENT PROCESS for MAJOR CAPITAL PROJECTS FOR ESTATE MANAGEMENT November 2012 PMM REV1.4 CONTENTS INTRODUCTION PROJECT MANAGEMENT PROCESS FLOWCHARTS STAGE ZERO 0.0
PROJECT MANAGEMENT GUIDELINES NATIONAL TRANSPORT AUTHORITY
PROJECT MANAGEMENT GUIDELINES FOR PROJECTS FUNDED BY THE NATIONAL TRANSPORT AUTHORITY (UP TO 20 MILLION IN VALUE) december 2011 Table of Contents Section A 1. Introduction 4 1.1 Purpose 4 1.2 Applicability
Retained Fire Fighters Union. Introduction to PRINCE2 Project Management
Retained Fire Fighters Union Introduction to PRINCE2 Project Management PRINCE2 PRINCE stands for: PRojects IN Controlled Environments and is a structured method which can be applied to any size or type
2301.1 Scope: Communications and Electronic Systems addressed in this section include:
Chapter 23 COMMUNICATIONS / ELECTRONIC SYSTEMS SECTION 2301 - GENERAL 2301.1 Scope: Communications and Electronic Systems addressed in this section include: 1. Fire Alarm System 2. Telecommunication and
Cost Management Guidelines for. 1 September 2010
Cost Management Guidelines for Public Transport Investment Projects 1 September 2010 Table of Contents Foreword iv 1. Introduction 1 1.1 Purpose Of The Guidelines 1 1.2 Applicability 1 1.2.1 Conventionally
RIBA Plan of Work 2013 Overview
RIBA Plan of Work 2013 Overview Foreword First developed in 1963, for half a century the RIBA Plan of Work has been the definitive UK model for the building design and construction process, also exercising
GUIDELINES FOR AUGUST 1995
GUIDELINES FOR ELECTRICAL ENGINEERING SERVICES AUGUST 1995 PUBLISHED BY: PROFESSIONAL ENGINEERS AND GEOSCIENTISTS OF NEWFOUNDLAND & LABRADOR (PEGNL) P.O. Box 21207, St. John's, NL A1A 5B2 Telephone: (709)
Consultancy Services Proposal
Consultancy Services Proposal August, 2007 ISO 9001 : 2000 CERTIFIED www.genivar.com 5858 Côte-des-Neiges Rd, 4 th Floor, Montreal, Quebec, Canada, H3S 1Z1 Telephone: (1) 514 340-0046 Fax: (1) 514 340-2847
The Gateway Review Process
The Gateway Review Process The Gateway Review Process examines programs and projects at key decision points. It aims to provide timely advice to the Senior Responsible Owner (SRO) as the person responsible
How To Write A Contract
Government Gazette Staatskoerant REPUBLIC OF SOUTH AFRICA REPUBLIEK VAN SUID-AFRIKA Vol. 582 Pretoria, 4 December Desember 2013 No. 37102 N.B. The Government Printing Works will not be held responsible
Non-binding Calculation Recommendation
Non-binding Calculation Recommendation Performance Profile for Interior Design 0/12 Non-binding Calculation Recommendation CONTENTS Page 1. Scope... 2 2. Principles of the processing time. 2 3. Processing
CPIx on Line. Pre-Contract Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date:
CPIx on Line Pre-Contract Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date: Document No: Date: April 2013 Revision: v2.0 Status: For review
FIRE ALARM AND DETECTION SYSTEMS SECTION 16721
PART 1 - GENERAL 1.01 WORK INCLUDED FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 A. Provide a complete fully addressable, power limited, fire detection and evacuation system. The system shall be connected
Legal, Contractual Considerations with BIM 360 Review
PAK/902/11 February 2016 Rev02 Philip King, Hilson Moran CIBSE BIM Steering Group - 360 Review Legal, Contractual Considerations with BIM 360 Review BIM is now extensively used in the design, construction
Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA
Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA 7471 Travel agency and tour operator services Services rendered for passenger travel by
DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA
Appendix 2c DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA Review of Programme and Project Management Framework- Strategic Land and Property DISTRIBUTION LIST Audit Team David
Benefits realisation. Gate
Benefits realisation Gate 5 The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and Planning, January 2010. The Queensland
Enterprise Architecture Governance Procedure
Governance Procedure Adrian Hollister Head of Strategy and Craig Douglas Architect 26 February 2014 Version Control Version Date Detail Contributor 0.1 26/2/2014 Initial Document CJD 0.2 14/3/2014 Amended
Do not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room.
APM Introductory Certificate in Project Management Exam paper Candidate Reference Number Date of Exam Location of the Exam General Notes Time allowed 1 hour Answer all 60 multiple choice questions Use
2.6 Select a. procurement route. cabe. Contents
2.6 Select a procurement route 2.6.1 Procurement routes Procurement is the purchasing of products, work and services. It is more important than its unglamorous name suggests and plays a major part in any
Design Development Quality Management Phase Checklist Project Phase Checklist Series
Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass
Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce
Maturity Model March 2006 Version 1.0 P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value Added product which is outside the scope of the HMSO
Purpose: Content: Definition: Benefits: outputs outcomes benefits Business Case dis-benefit Key Responsibilities: Approach: Executive Developed
Key Learning Points The Swirl Logo is a trade mark of the AXELOS Limited. Is used by the Project Board throughout the project to verify its continued viability:- Is the investment in this project still
Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000
Project Management Project Management Public Private Partnership Guidance Note 7 14 April 2000 Guidance Note 7 14 April 2000 Project Management Contents Section Page I INTRODUCTION...1 SCOPE AND PURPOSE
What is effective Design Management?
What is effective Design Management? Design Management is becoming increasingly recognised as critical to the success of complex construction projects. However, the role of the Design Manager is poorly
GUIDELINES FOR THE MANAGEMENT OF PUBLIC TRANSPORT INVESTMENT PROJECTS DELIVERED BY CONVENTIONAL PROCUREMENT
GUIDELINES FOR THE MANAGEMENT OF PUBLIC TRANSPORT INVESTMENT PROJECTS DELIVERED BY CONVENTIONAL PROCUREMENT Guidelines for the Management of Public Transport Investment Projects delivered by Conventional
Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK
Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK Facility Services Project Management Methodology Framework 1 - Executive Summary The purpose of this document is to introduce the University community
Project Management Guidebook
METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple
Develop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
Data Communications Company (DCC) price control guidance: process and procedures
Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: [email protected] Overview: The Data and Communications Company (DCC) is required
Building and Planning
Description of Services Building and Planning 2012 Danish Association of Consulting Engineers The Danish Association of Consulting Engineers (FRI) and the Danish Association of Architectural Firms (DANSKE
Project manager services
Corporate Professional Local Project manager services For use with the RICS Standard form of consultant s appointment and RICS Short form of consultant s appointment The mark of property professionalism
A guide to appointing an architect
A guide to appointing an architect and to being a good client Hurditch Architecture, 24 Botallack, St Just, Penzance, Cornwall, TR19 7EP Page 1 of 7 RIBA Chartered Architects Architects act 1997 In the
Business Continuity Policy and Business Continuity Management System
Business Continuity Policy and Business Continuity Management System Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain
HULLEY & KIRKWOOD CONSULTING ENGINEERS LIMITED BIM PROJECT EXECUTION PLAN FOR [PROJECT TITLE] Date
HULLEY & KIRKWOOD CONSULTING ENGINEERS LIMITED BIM PROJECT EXECUTION PLAN FOR [PROJECT TITLE] Head Office Watermark Business Park 305 Govan Road Glasgow G51 2SE (t): 0141 332 5466 (f): 0870 928 1028 (e):
2012 BIM Guidelines and Standards (Rev. 00) University at Albany
A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested
All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
Project Execution Guidelines for SESAR 2020 Exploratory Research
Project Execution Guidelines for SESAR 2020 Exploratory Research 04 June 2015 Edition 01.01.00 This document aims at providing guidance to consortia members on the way they are expected to fulfil the project
Superseded by T MU AM 04001 PL v2.0
Plan T MU AM 04001 PL TfNSW Configuration Management Plan Important Warning This document is one of a set of standards developed solely and specifically for use on the rail network owned or managed by
Civil Engineering and Architecture (CEA) Detailed Outline
Civil Engineering and Architecture (CEA) Detailed Outline Unit 1: Overview of Civil Engineering and Architecture (23 days) Lesson 1.1: History of Civil Engineering and Architecture 1. Many features of
WHITE PAPER IT SERVICE MANAGEMENT IT SERVICE DESIGN 101
WHITE PAPER IT SERVICE MANAGEMENT IT SERVICE DESIGN 101 Prepared by: Phillip Bailey, Service Management Consultant Steve Ingall, Head of Service Management Consultancy 60 Lombard Street London EC3V 9EA
REQUEST FOR PROPOSAL WAYFINDING AND SIGNAGE CONSULTANT
REQUEST FOR PROPOSAL WAYFINDING AND SIGNAGE CONSULTANT Objective 1) The Wayfinding and Signage (W&S) Consultant shall develop a wayfinding and signage solution for the interior of Terminal One (only the
Capital Works Management Framework
POLICY DOCUMENT Capital Works Management Framework Policy for managing risks in the planning and delivery of Queensland Government building projects Department of Public Works The concept of the asset
Asset Management Policy March 2014
Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and
BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value. Professor Mustafa Alshawi
BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value Professor Mustafa Alshawi Improving Project Performance Current Project Portfolio 1.83 B UAED ($500M) Award Winning
Guidelines for FEASIBILITY STUDY
Guidelines for FEASIBILITY STUDY INTRODUCTION This document describes the best practices to be followed during the preparation of a Feasibility Study for the Facilities Development of an upstream asset.
Procurement Strategy and Contract Selection
GUIDELINE Capital Works Management Framework Procurement Strategy and Contract Selection The suite of Capital Works Management Framework documents is available online www.hpw.qld.gov.au: The Capital Works
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) Copyright: Australian Institute of Project Management Document Information Document
From COBie to Asset Management
BIM Prospects Conference: From COBie to Asset Management 27 th March 2015 - RIBA, London Jeff Stephens, Head of BIM [email protected] 1 Experiences creating COBie data for Asset Management
GUIDANCE NOTE 1.1.1 Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities
GUIDANCE NOTE 1.1.1 Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities Office of Government Procurement Building Control (Amendment) Regulations 2014 Procurement
Departmental Business Continuity Framework. Part 2 Working Guides
Department for Work and Pensions Departmental Business Continuity Framework Part 2 Working Guides Page 1 of 60 CONTENTS Guide to business impact analysis...3 Guide to business continuity planning...7 Guide
Volume II- Project Development Processes
Volume II- Project Development Processes This section outlines the procedures that are expected of capital projects at The University of Chicago. These requirements supplement the planning procedures required
Rail Network Configuration Management
Division / Business Unit: Function: Document Type: Enterprise Services Engineering Procedure Rail Network Configuration Management Applicability ARTC Network Wide SMS Publication Requirement Internal /
A STRUCTURED METHODOLOGY FOR MULTIMEDIA PRODUCT AND SYSTEMS DEVELOPMENT
A Structured Methodology for Multimedia Product and Systems Development A STRUCTURED METHODOLOGY FOR MULTIMEDIA PRODUCT AND SYSTEMS DEVELOPMENT Cathie Sherwood and Terry Rout School of Computing and Information
The Asset Management Landscape
The Asset Management Landscape Second Edition ISBN 978-0-9871799-2-0 Published March 2014 www.gfmam.org The Global Forum on Maintenance and Asset Management The Global Forum on Maintenance and Asset Management
December 21, 2012. The services being procured through the proposed amendment are Hosting Services, and Application Development and Support for CITSS.
Justification for a Contract Amendment to Contract 2012-01: Interim Hosting and Jurisdiction Functionality for the Compliance Instrument Tracking System Service (CITSS) December 21, 2012 Introduction WCI,
EUROPASS DIPLOMA SUPPLEMENT
EUROPASS DIPLOMA SUPPLEMENT TITLE OF THE DIPLOMA (ES) Técnico Superior en Proyectos de Edificación TRANSLATED TITLE OF THE DIPLOMA (EN) (1) Higher Technician in Construction Projects --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
Interim Terms of Reference for Consultancy Services
Interim Terms of Reference for Consultancy Services Design for the Centre of Excellence in Biomedical Engineering at the University of Rwanda, College of Medicine and Health Sciences, Nyarugenge Campus
CONSTRUCTIBILITY REVIEWS: CASE STUDY OF BID DOCUMENT ERRORS AND OMISSIONS
BY: KEN PRUETT, PROJECT MANAGER, PINNACLEONE The specific objective of a Constructibility Review should be to minimize or eliminate potential change orders and delay claims during construction by ensuring
The South African Council for the Project and Construction Management Professions (SACPCMP)
The South African Council for the Project and Construction Management Professions (SACPCMP) Registration Rules for Professional Construction Mentors in terms of Section 18(1) (c) of the Act, 2000 (Act