1 The future of construction contract management in the digital age Abstract This essay will discuss the future of construction management in the digital age. Building Information Management (BIM) will form the focus of the essay and it will begin with an introduction to the concept of BIM. The essay will then touch on the benefits of BIM, including how it can enhance collaborative working. It will briefly discuss the extent to which BIM has a positive effect on both Architect and Client, and critically analyse its impact on the future role of the architect. This will be followed by a section which describes BIM issues that will need to be overcome for both architect and client. Finally, it will discuss the key issues identified as arising from the increased use of BIM in the procurement of public buildings.
2 Contents 1. Introduction 2. The Benefits of BIM to Architect and Client 3. BIM and the Future Role of the Architect 4. Issues to Overcome: for Client and Architect 5. BIM and the Procurement of Public Buildings 6. Conclusion 7. Bibliography
3 Introduction Building Information Modelling (BIM) is a digital software system that has taken the construction industry by storm. BIM is not just 3D modelling. 4D (time-scheduling/life-cycle analysis) and 5D (cost-estimating/capital planning), are also included which serve as a common, centralised repository for all life-cycle building related information. 1 BIM has been described as CAD on steroids 2, however, BIM is not just technology...it is a method of working that will enable and hasten the move towards truly collaborative working for the industry. The National Institute of Building Sciences (NIBS) describes BIM as: a fundamentally different way of creating, using, and sharing building lifecycle data 3. BIM should be thought of as a holistic method of working; including the model, and the information contained within the model. It can be utilised from project inception through to delivery, hand-over and occupation, even through to deconstruction. The use of BIM is thought to reduce waste associated with the construction industry by up to 50% 4. Last year, Paul Morrell the Governments chief construction advisor, introduced an ambitious target of all appropriate projects being procured using a 3D collaborative environment by Morrell did suggest that the target would include all projects over the value of 5m but all appropriate suggests that the government have realised that not all projects are deemed appropriate or even possible to be procured using BIM. This could be for a number of reasons which shall be discussed later. There are a number of obstacles to overcome in the future with regard to an industry wide adoption of BIM as well as questions that need to be asked about how the construction industry, 75% of which operate in 2D, can implement this new way of working and achieve the government targets. 1 The National Institute of Building Sciences (NIBS) 2 Klimt, Mark (2011) Copyright and liability must be tackled before BIM can reach its full potential [accessed 3rd October 2011] 3 Waterhouse, Richard (RIBA Enterprises Chief), 17 th May 2011, proceedings of Morrell: BIM to be mandatory for all 5m+ public projects 4 Richards, Mervyn (2011) Webinar: What is BIM? The Business Imperatives [shown online: [accessed 1 st October 2011] 5 Morrell, Paul (23 rd June 2011) BIM to be rolled out to all projects by / article [accessed 21st September 2011]
4 The Benefits of BIM to Architect and Client The positive effect of BIM on the construction industry as a whole is almost unquestionable, To BIM or not to BIM is not so much the question, but there are a number of issues which need to be overcome. Benefits include: Improved collaborative working: BIM is thought to define a framework of collaborative working in line with that outlined in BS1192:2007 6, An accurate 3D model: Current statistics suggest that waste from 2D drawings equates to a 25% increase in building cost. This waste is a result of uncoordinated drawings causing erroneous clashes between design team information and consequently mistakes on site. It is estimated that an accurate 3D model can actually reduce costs by upto 50% 7. Increased efficieny: with greater collaboration comes increased design clarity which can improve the speed of project execution, reducing cost to the architect who may otherwise have to absorb the cost of rectifying confusion amongst the design team therefore slowing progress. A better building : efficiencies and shared information will result in building specifications which are tried and tested, new specifications developed within the model can predict likely outcomes, and successful components that have already been constructed and used by the design team on previous projects can be loaded into the model. The model can also be used to predict operational performance and running costs. 6 BS 1192: 2007 Collaborative Production of Architectural, Engineering and Construction Information. Code of Practice 7 Richards, Mervyn (2011) Webinar: What is BIM? The Business Imperatives [shown online: [accessed 1 st October 2011]
5 BIM and the Future Role of the Architect BIM will enhance the role of the architect as design leader. It seems that the role of BIM Manager could suit the architect. The BIM manager requires a technical know-how across all aspects of the project and would give the architect an even greater power/negotiation authority to ask for information from other members of the design team in order for them to progress with their design. Without certain information, such as the position and sizes of structural members, the architect might be unable to progress the model, therefore the architect/bim Manager would be in a perfectly reasonably position to ask for this information. This encourages collaborative working. The negative side to this could be that the structural engineer might be relied upon too much and design innovation might be disrupted. However, in truly collaborative fashion, this would not be an issue. As BIM manager, or simply the design team member responsible for co-ordination of the model, the architect will be more liable for design clashes if problems arise. Architects are leading the way with BIM; it is the architects learning the software first, therefore initially there is an added pressure on the architect to perform and make sure that the model is being utilised correctly. Until contracts are organised and BIM Manager s roles are properly defined, BIM is likely to add pressure on the architect 8. 8 The importance of the BIM Manager in a Firm 10 th October 2011]
6 Issues to Overcome: for Client and Architect For all the benefits that BIM has to offer, there are significant issues which the industry will need to overcome. Copyright and Liability An industry that is traditionally driven by separate disciplines and characterised by a blame culture, must accept that through greater collaboration and information sharing across the design team, a degree of control will be lost. Mark Klimt highlights this in a recent article for the AJ: where various different design elements produced by separate consultants are fed into a composite model, and then adapted, authorship will become blurred. 9 It is for this reason that it has been suggested that agreements could be drawn up in advance of a contract between all team members. This would reflect the designer s copyright of basic components, the clarification that the owner will need to own the model and its information when the project is complete and the acceptance by all members that the model cannot be used elsewhere without agreement of each member. Kamran Moazami, Head of Engineering Design at WSP, agreed in a recent Webinar on BIM 10, that the construction industry will need to accept that a much freer exchange of information is required. It is also likely that liability to all parties will increase with BIM. Collaborative working will make it more difficult for individual consultants to show where their involvement ended 11. Again, this will need to be accepted as a consequence of integrated working. When to BIM? The use of BIM early on in the design process could hinder creativity. BIM software is information hungry and it can be difficult to decipher how much information is required at each stage. As firms develop in-house component libraries, this will become much more efficient. Initially however, a clear strategy is required in order to distinguish between an RIBA Stage B model for example, and a Stage D. Traditionally, the level of information would be quite different. 9 Klimt, Mark (2011) Copyright and liability must be tackled before BIM can reach its full potential [accessed 3rd October 2011] 10Moazami, Kamran (2011) Webinar: What is BIM? The Business Imperatives [shown online: [accessed 1 st October 2011] 11 Klimt, Mark (2011) Copyright and liability must be tackled before BIM can reach its full potential [accessed 3rd October 2011]
7 The question that architects need to answer is at what point do you start the BIM model? Too early and you might run the risk of suppressing creativity and innovation, but too late and BIM becomes totally inefficient. Distribution of Design Fees and Risk If existing fee scales are adhered to, the design team may run the risk of too much input before the client has committed to pay. As the model is likely to require more information earlier on in the process, clients are actually likely to receive more for their money at each stage up until construction. It is likely that at Stage C sign off, the model now includes more information that is normally required at this stage. The risk to the architect and rest of the design team, is that if the project were to discontinue, they would not be paid for the work already invested in the model. Therefore, the design team, especially architects, need to revaluate their fee scales. A truly integrated model Another question to ask is: are all members of the design team willing to work from the same drawing? The aim of BIM is to prevent the duplication of drawings and therefore prevent waste during the design stages, but all disciplines must work together in order that there drawings are universally acceptable across the design team and potentially to the Contractor also. There is a great need for standardisation across the building model, suggesting that the team will need to revisit BS1192:2007. This standardisation would benefit the client, as contractors may offer more competitive tenders if they know accurate 3D representation exists. The Model; a vested interest? Persuading certain members of the design team to invest their time early on and throughout the design process for the benefits of the model could prove difficult and the responsibility of this is likely to fall on the architect/design leader. Architects will benefit from the model during the design stage and during building occupancy as they are more likely to offer services such as post occupancy evaluation and want to better understand how their designs are performing/ how they can improve. MEP engineers will have an interest in how the building performs, as they will have a liability that this is close to predicted in terms of energy efficiency and services. The BIM model can provide a platform for this analysis once the building is in operation. Structural Engineers however, may not see the benefits of the model past handover. Once their information has been supplied and the building has been constructed, they may see the model as a liability.
8 Software Monopolies Revit, Autodesk is fast becoming an extremely popular BIM platform. BIM could run the risk of creating a monopolised software industry resulting in expensive products and lack of choice when it comes to building modelling. In terms of interoperability between software, Autodesk is still un-collaborative. It has been suggested that Morrell has missed an opportunity to gather the BIM software players together in order to improve data interoperability before handing them the UK construction industry on a plate Day, Martyn, The Trouble with BIM, [accessed 8 th October 2011]
9 BIM and the Procurement of Public Buildings The government targets set for 2016, that all appropriate public projects will use BIM, affirms a certain confidence in the widespread use of the method across the industry. Morrell believes that the use of BIM will reduce cost and add long-term value to the development and management of built assets in the public sector. Reducing cost might be incentive enough for any client, however when it comes to public buildings, this cost reduction will be even more advantageous. It is thought that via increased collaboration, better coordination of drawings, the sharing of information, better predictability of building performance and an integrated supply chain, the government can save on the cost of public buildings. BIM not only reduces costs by increasing collaboration between the design team, but it will provide the public client with the ability to manage their occupation of the building using the information model, utilised as part of the Building Management System. This is a particular incentive to public clients as the likelihood is that the building will be owner occupied for the duration of the buildings life. Local Authority Architectural Departments using private architectural practices for architectural services up to Stage D+ will be able more easily share information if the same software is used. Information could also be shared more easily on government projects and standardised design elements could be utilised between different local authorities. BIM models may provide a greater transparency on public sector projects, allowing Councils to easily check specifications and where money has been spent. This could also aid Government Supply Chains. It is also possible to use BIM models to estimate costs (the 5D use) more accurately than estimations from 2D drawings and also better predict how the building is likely to perform in operation (4D). Both of these would be seen as great benefits for public procurement. In the Government s Construction Strategy Paper however, the focus is on 3D modelling. It is important that they do not fail to recognise the capabilities of 4D and 5D BIM. Larger firms are more likely to be able to afford the initial capital expenditure to train staff up in BIM software. With regards to tendering, BIM might add more controversy to argument that current procurement methods favour larger, bullish architecture practices, booting smaller companies out of the market.
10 Conclusion In conclusion, To BIM or not to BIM 13, is not the question. Architects have accepted that BIM is the future, but how, when and what to adopt is for individual firms to decide. The issues that have been mentioned in this essay, mainly involving collaboration, are ideas which have been debated for years, holding the industry back and maintaining its blame culture characterisation. If BIM pushes collaboration to the forefront, then this is no bad thing. As potential BIM Manager, BIM enhances the Architect s role as design leader. As the efficiencies of the models improve and in-house libraries of components grow, the architect can begin to make their services more profitable. In the future, as the cost to build is reduced through increased efficiencies and reduction of waste via BIM, the proportion of total project cost spent on professional fees could be redistributed. If BIM is to require more information from the design team, especially the architect, then they should be rewarded for their efforts. As a final thought, the idea that BIM is a one stop solution is a Utopian vision, compared to what current systems are capable of. 14 This vision sees plans, sections, elevations, the quantities, the renderings, the costings and even perhaps the energy certification all produced in harmony from one model. The whole single building model (SBM) is really only available in a dream. An architectural BIM model is really quite different from a construction BIM model. If BIM Utopia is to become reality, collaboration needs to stretch beyond the design team, to the Contractor, the Client as well as the software manufacturers. BIM will not happen without commitment from all involved, and clients will have to be patient and appreciate that almost the entirety of the construction industry is out of their comfort zone. 13 Murray, Christine, BIM will keep architects linked in, 12 th May Day, Martyn, The Trouble with BIM
11 Bibliography Day, Martyn, The Trouble with BIM, [accessed 8 th October 2011] Klimt, Mark (2011) Copyright and liability must be tackled before BIM can reach its full potential [accessed 3rd October 2011] Moazami, Kamran (2011) Webinar: What is BIM? The Business Imperatives [shown online: [accessed 1 st October 2011] The importance of the BIM Manager in a Firm 10 th October 2011] BS 1192: 2007 Collaborative Production of Architectural, Engineering and Construction Information. Code of Practice 1 Constructing Excellence in the Building Environment [accessed 1 st October 2011] Richards, Mervyn (2011) Webinar: What is BIM? The Business Imperatives [shown online: [accessed 1 st October 2011] The National Institute of Building Sciences (NIBS) Waterhouse, Richard (RIBA Enterprises Chief), 17 th May 2011, proceedings of Morrell: BIM to be mandatory for all 5m+ public projects Morrell, Paul (23 rd June 2011) BIM to be rolled out to all projects by / article [accessed 21st September 2011]
NBS and the BIM Toolkit. Stefan Mordue, Architect & NBS Business Solutions Consultant RIBA Enterprises
NBS and the BIM Toolkit Stefan Mordue, Architect & NBS Business Solutions Consultant RIBA Enterprises Overview NBS and RIBA Enterprises UK Government BIM and construction strategy NBS portfolio Summary
A PASSION FOR QUALITY A QUEST FOR PERFECTION
A PASSION FOR QUALITY A QUEST FOR PERFECTION Bespoke maintainable software, carefully designed, and artistically implemented WE SOFTWARE DEVELOPMENT www.geeks.ltd.uk all of these clients wanted... PERFORMANCE
BIM An Introduction. 16 th April 2012 Engineers Ireland
BIM An Introduction 16 th April 2012 Engineers Ireland Agenda Brian Lahiff - Introduction James Duggan - Civil John Casey - Structural Michael Downey - MEP BIM An Introduction Brian Lahiff Thomas Garland
Draft guidelines and measures to improve ICT procurement. Survey results
Draft guidelines and measures to improve ICT procurement Survey results Europe Economics Chancery House 53-64 Chancery Lane London WC2A 1QU Tel: (+44) (0) 20 7831 4717 Fax: (+44) (0) 20 7831 4515 www.europe-economics.com
BUILDING A STRATEGY FOR BIM
BUILDING A STRATEGY FOR BIM A Roadmap for Clients Graham Jones Chair, Davis Langdon BIM Steering Group Building a Strategy for BIM: A roadmap for Clients Introduction Conditions for Success Why? What How?
EXTENT OF THE ARCHITECT S LIABILITY ON A BIM PROJECT
03 06 EXTENT OF THE ARCHITECT S LIABILITY ON A BIM PROJECT BY PATRICK PERRY AND LAURA COATES BUILDING DESIGN WHITEPAPERS 33 6.1 COLLABORATION AND RISK The use of bim on a construction project raises issues
Royal Institute of British Architects. Procurement policy. Building teams achieving value
Royal Institute of British Architects Procurement policy Building teams achieving value November 2001 RIBA Procurement Policy The RIBA is committed to construction procurement that: R provides the best
Project Governance A N T I C I P A T I N G A N A U D I T
Project Governance A N T I C I P A T I N G A N A U D I T Public sector Project Management characteristics Multi-million rand projects Often National interest projects Subject to intense scrutiny Uncertainty
A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL AND MECHANICAL ENGINEERING DEPARTMENT OF ARUP TURKEY
ISTANBUL TECHNICAL UNIVERSITY FACULTY OF ARCHITECTURE DEPARTMENT OF DESIGN COMPUTING BIM 2037 / BUILDING INFORMATION MODELS INSTRUCTOR: Salih OFLUOĞLU A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL
BIM Pilot Getting Started Guide. For Construction Professionals. next
BIM Pilot Getting Started Guide For Construction Professionals Moving to BIM can seem like a daunting task. This guide provides a simple framework that helps you get started putting BIM into practice in
European Commission Green Public Procurement (GPP) Training Toolkit - Module 1: Managing GPP Implementation. Joint procurement.
European Commission Green Public Procurement (GPP) Training Toolkit - Module 1: Managing GPP Implementation Joint procurement Fact sheet Toolkit developed for the European Commission by ICLEI - Local Governments
Talent Management 2020
Talent Management 2020 Future perspectives and scenarios CORNERSTONE WHITEPAPER INTRODUCTION Human Resources (HR) departments not only provide many internal services, such as recruitment, support and development
Action Plan towards Open Access to Publications
OOAAction Plan Draft Version, 17.01.2013 Action Plan towards Open Access to Publications endorsed during the 2 nd Annual Global Meeting, 27 29 May 2013, Berlin / Germany Assuming that providing research
CURRICULUM for Diploma of Technology in Project Management
CURRICULUM for Diploma of Technology in Project Management Revised 1 April 2011 Table of contents 1. Introduction 2. The purpose of the programme 3. Programme duration 4. Programme title 5. Admission requirements
Building the Asset Information Model
Building the Asset Information Model BIM: Let s Get Started Contractors Survey https://www.surveymonkey.com/s/nfbbim Hypothesis: Government as a client can derive significant improvements in cost, value
1. TERMS OF REFERENCE 1 2. INTRODUCTION 2 3. ACTION ITEMS 7 4. SUPPORTING COMMENTS ON THE ACTION ITEMS 11 5. LAWYERS AND LEGAL ADVICE 19
Table of contents Page 1. TERMS OF REFERENCE 1 2. INTRODUCTION 2 3. ACTION ITEMS 7 4. SUPPORTING COMMENTS ON THE ACTION ITEMS 11 5. LAWYERS AND LEGAL ADVICE 19 6. MODIFICATION TO THE COMCARE WEBSITE 24
What is effective Design Management?
What is effective Design Management? Design Management is becoming increasingly recognised as critical to the success of complex construction projects. However, the role of the Design Manager is poorly
How To Design A Bim Project
BIM Virtual Construction & Integrated Project Delivery Randy LaNear BIM Manager Barnhart - Heery Synonyms & Related Terms Integrated Practice Integrated Project Delivery Virtual Building (Environment)
MANAGING DIGITAL CONTINUITY
MANAGING DIGITAL CONTINUITY Project Name Digital Continuity Project DRAFT FOR CONSULTATION Date: November 2009 Page 1 of 56 Contents Introduction... 4 What is this Guidance about?... 4 Who is this guidance
Change Management. What Business Benefits Can I Expect?
Change Management Effective change management is an essential ingredient to the successful implementation of technology-based projects that are made possible by Superfast Broadband. Change Management Effective
Feasibility Analysis of Initiating Building Information Modeling (BIM) for HVAC systems by General Contractors
Feasibility Analysis of Initiating Building Information Modeling (BIM) for HVAC systems by General Contractors Hussein Abaza, Ph.D. Southern Polytechnic State University, 1100 South Marietta Parkway, Marietta
WHITE PAPER. From Building Information Management to Facilities Management
October 2011 WHITE PAPER. Management to Facilities Management A look at the benefits to be found by fostering the links between Building Information Modelling (used by the construction industry) and Computer
CPIx on Line. Pre-Contract Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date:
CPIx on Line Pre-Contract Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date: Document No: Date: April 2013 Revision: v2.0 Status: For review
LIABILITIES FOR DESIGN DEFECTS IN A COLLABORATIVE, INTEGRATED DIGITAL AGE. A presentation on the UK experience By Karen Gough, Barrister
LIABILITIES FOR DESIGN DEFECTS IN A COLLABORATIVE, INTEGRATED DIGITAL AGE A presentation on the UK experience By Karen Gough, Barrister 1 1 BUILDING INFORMATION What is BIM? MODELLING essentially value
BT EDUCATION & LOCAL GOVERNMENT. Strategic Sourcing. Transforming Procurement in Local Government
BT EDUCATION & LOCAL GOVERNMENT Strategic Sourcing Transforming Procurement in Local Government Transforming the way things get done Strategic Sourcing: Value through joined-up purchasing BT is working
Legal, Contractual Considerations with BIM 360 Review
PAK/902/11 February 2016 Rev02 Philip King, Hilson Moran CIBSE BIM Steering Group - 360 Review Legal, Contractual Considerations with BIM 360 Review BIM is now extensively used in the design, construction
Info sheet : Considering labour standards in the procurement process
Info sheet : Considering labour standards in the procurement process In line with the EU procurement rules and the Government s value for money principle, contracting authorities can take steps to consider
BIM Strategy for NHSScotland
BIM Strategy for NHSScotland Professor Bimal Kumar and Graham Hayne GCU BIM Partnership School of Engineering and Built Environment Glasgow Caledonian University Agenda Introduction to BIM GCU BIM Partnership
Design quality and the private finance initiative
Design quality and the private finance initiative This paper sets out CABE s perspective on the ability of the private finance initiative (PFI) to deliver well-designed public buildings, and considers
BUSINESS GUIDE Change Management
BUSINESS GUIDE Change Management. Change Management Effective change management is an essential ingredient to the successful implementation of new systems. When new systems are introduced, to improve the
A Guidance Note to. Conditions of Contract for Consultancy Services (2005)
A Guidance Note to Conditions of Contract for Consultancy Services (2005) This Guidance Note is based on a document prepared by the Auckland Region Contract Group, and verified by ACENZ, in February 2005.
The PMO as a Project Management Integrator, Innovator and Interventionist
Article by Peter Mihailidis, Rad Miletich and Adel Khreich: Peter Mihailidis is an Associate Director with bluevisions, a project and program management consultancy based in Milsons Point in Sydney. Peter
218 Chapter 11. Conclusions. Therefore, this thesis aims to contribute to improving productivity of SMEs through DM and Project Communication.
218 Chapter 11. Conclusions 11. Conclusions 11.1. General conclusions The final objective of whatever research is to improve the knowledge and provide tools to improve it. In whatever company and in whatever
CONCODE Guide to contract strategies for construction projects in the NHS STATUS IN WALES ARCHIVED
CONCODE Guide to contract strategies for construction projects in the NHS 1995 STATUS IN WALES ARCHIVED For queries on the status of this document contact [email protected] or telephone 029 2031 5512
BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value. Professor Mustafa Alshawi
BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value Professor Mustafa Alshawi Improving Project Performance Current Project Portfolio 1.83 B UAED ($500M) Award Winning
Ubertas Cloud Services: Service Definition
Ubertas Cloud Services: Service Definition February 2013 Innovation. Power. Trust. Contents 1. About Ubertas... 2 Our Company... 2 Our Approach to Service Delivery... 2 Our Partner Network & the UK Cloud
MSc in Construction Management (Cycle 2, level 4)
(Cycle 2, level 4) is a 2 year full-time graduate study program of 120 ECTS credits (4 semesters, 30 ECTS each semester). Students generally take 90 ECTS in specialized courses and a 30 ECTS thesis. In
Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering
Building Information Modelling (BIM); How it Improves Building Performance R.P. Kumanayake Lecturer, Department of Civil Engineering R.M.P.S. Bandara Lecturer, Department of Mechanical Engineering Faculty
What is world class commissioning?
...? series New title The NHS and HTA Supported by sanofi-aventis What is world class commissioning? Michael Sobanja Dip HSM Dip IoD Cert HE FRSM Chief Executive, NHS Alliance For further titles in the
ITIL Managing Digital Information Assets
ITIL Managing Digital Information Assets Shirley Lacy, ConnectSphere Frieda Midgley, Digital Continuity Project Judith Riley, Digital Continuity Project Nigel Williamson, Digital Continuity Project White
White paper: Information Management. Information is a strategic business asset are you managing it as such?
White paper: Management Tieto 2013 is a strategic business asset are you managing it as such? White paper: Management Tieto 2013 Management the right decisions and actions at the right time based on correct
Human Resources. Values for Working Together and Professional Behaviours
Human Resources Values for Working Together and Professional Behaviours A message from the Vice-Chancellor The new Human Resources Strategy, Working Together: A Strategy for Success, in tandem with the
Procurement Strategy 2013-2017 Delivering Social Value for our Community
Procurement Strategy 2013-2017 Delivering Social Value for our Community Making Bath & North East Somerset an even better place to live, work and visit 1 Picture courtesy of Bath & News Media Group Our
NICE Implementation Collaborative Concordat
NICE Implementation Collaborative Concordat Foreword Innovation has always been at the heart of the NHS. Access to innovative medicines, technologies, devices, diagnostics and treatments has transformed
Document management concerns the whole board. Implementing document management - recommended practices and lessons learned
Document management concerns the whole board Implementing document management - recommended practices and lessons learned Contents Introduction 03 Introducing a document management solution 04 where one
Simplification of work: Knowledge management as a solution
Simplification of work: Knowledge management as a solution Second line optional lorem ipsum B Subhead lorem ipsum, date quatueriure 2 Content 4 Simplification of work: Knowledge management as a solution
aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608
aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608 NCSA 01 Competency Based Assessment in Architecture THE
Getting the benefits that PLM has promised for years
www.pwc.com Getting the benefits that PLM has promised for years Management Consulting Operations Getting the benefits that PLM has promised for years Unfortunately, product lifecycle management (PLM)
GENERIC CORE MANAGEMENT CRITERIA (CMC) AND STANDARDS (SELECT WHICH ONES ARE APPLICABLE)
ANNEXURE B GENERIC CORE MANAGEMENT CRITERIA (CMC) AND STANDARDS (SELECT WHICH ONES ARE APPLICABLE) CRITERIA Description Generic Stards for Fully Effective Performance 1. Strategic Provides a vision, sets
A Beginner s guide to Bridging Finance
A Beginner s guide to Bridging Finance Tel: 023 8045 6999 bridging-booklet-v4.008022016 Contents Introduction What is a bridging loan? How do bridging loans work? Why are people using them? When would
BCS THE CHARTERED INSTITUTE FOR IT. BCS HIGHER EDUCATION QUALIFICATIONS BCS Level 6 Professional Graduate Diploma in IT SOFTWARE ENGINEERING 2
BCS THE CHARTERED INSTITUTE FOR IT BCS HIGHER EDUCATION QUALIFICATIONS BCS Level 6 Professional Graduate Diploma in IT SOFTWARE ENGINEERING 2 EXAMINERS REPORT Friday 2 nd October 2015 Answer any THREE
BIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am
BIM: FOR PROJECT MANAGERS ANA BAKER BRANDON GARRETT 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am 1 2 3 4 BIM Overview BIM Level of Development Evolution of the Drawing Process BIM Workflow
Managing a tender process for Applicant Tracking Systems
Managing a tender process for Applicant Tracking Systems A White Paper on best practice By Mark Moore, MCIPS and Chris Keeling, CIPD, Jobtrain Ltd Managing a tender process for Applicant Tracking Systems
Service Catalog Management: A CA Service Management Process Map
TECHNOLOGY BRIEF: SERVICE CATALOG MANAGEMENT Catalog : A CA Process Map JULY 2009 Enrico Boverino SR PRINCIPAL CONSULTANT, TECHNICAL SALES ITIL SERVICE MANAGER ITAC CERTIFIED Table of Contents Executive
Market Intelligence Survey
2 INTRODUCTION Market Intelligence Survey Editor s introduction Welcome to the market intelligence survey carried out by Supply Management magazine and Expense Reduction Analysts. We asked 360 procurement
Benefit from integrating your management systems. Start now with PAS 99, BSI s world-class framework
Benefit from integrating your management systems Start now with PAS 99, BSI s world-class framework Improve efficiency by integrating your management systems with PAS 99. The more management systems you
The Economics of the Cloud: A View from the Field
The Economics of the Cloud: A View from the Field Executive summary By Paul Lidbetter Enterprise Architect Cloud computing is being hailed as the biggest change in business IT since client/server. But
Government Shared Services: A Strategic Vision - July 2011
Government Shared Services: A Strategic Vision - July 2011 INTRODUCTION When the Coalition Government came to office it was a stated priority to reduce the deficit and ensure critical front-line services
The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy.
Senior Project Manager Job Description Reference: 102014/51 Job Title: Senior Project Manager Purpose of Role: The University is committed to providing an environment conducive to high quality teaching
Mark Scheme. Business Studies BUSS4. (Specification 2130) Unit 4: The Business Environment and Change
General Certificate of Education (A-level) January 2013 Business Studies BUSS4 (Specification 2130) Unit 4: The Business Environment and Change Mark Scheme Mark schemes are prepared by the Principal Examiner
PROJECT MANAGEMENT INNOVATION BASED ON BUILDING INFORMATION MODELING
PROJECT MANAGEMENT INNOVATION BASED ON BUILDING INFORMATION MODELING CHANGHUA LI Hefei University, Office of Science and Technology, China [email protected] LEON PRETORIUS University of Pretoria, Department
AVEVA NET Accesses and Manages the Digital Asset. Executive Overview... 3. Project Risk: Inaccessible, Unreliable Information... 4
ARC WHITE PAPER By ARC Advisory Group JUNE 18, 2013 AVEVA NET Accesses and Manages the Digital Asset Executive Overview... 3 Project Risk: Inaccessible, Unreliable Information... 4 AVEVA NET Focuses on
Verification of need. Assessment of options. Develop Procurement Strategy. Implement Procurement Strategy. Project Delivery. Post Project Review
Who should read this fact sheet? Many construction clients are not regular purchasers of construction work. This fact sheet is an introduction to construction procurement for occasional clients with a
Aggregation. Is bigger always better?
Aggregation Is bigger always better? Contents Purpose of this guidance 1 What is aggregation? 2 When should aggregation be considered? 4 Why use aggregation? 6 Some practical considerations 8 Further reading
BIM a driver for change
icccbe 2010 Nottingham University Press Proceedings of the International Conference on Computing in Civil and Building Engineering W Tizani (Editor) BIM a driver for change Alastair Watson Institute for
Data Communications Company (DCC) price control guidance: process and procedures
Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: [email protected] Overview: The Data and Communications Company (DCC) is required
Global Mobility Outsourcing
Vodafone Global Enterprise Global Mobility Outsourcing Whitepaper Vodafone Global Enterprise The bottom line: By 2012, the number of mobile workers is expected to reach one billion worldwide (Source IDC,
E LEARNING STRATEGY 1. INTRODUCTION
E LEARNING STRATEGY 1. INTRODUCTION The aim of this strategy is to describe how the Trust can develop a progressive approach towards the continued application of e learning to ensure maximum use of this
New Business Models in Construction
New Business Models in Construction Results of the Finnish BIM Survey 2013 CIB BIM & IDDS Seminar, Tokyo 1.11.2013 Dipl. Ing. Helena Soimakallio, M. Sc. (CE), B. Sc. (BA), M. aff. ASCE Managing Director
REVIEW OF CORPORATE SERVICES HR BUSINESS CASE
REVIEW OF CORPORATE SERVICES HR BUSINESS CASE 1. The Strategic Case for Integration The alignment with Council strategies 1.1 The Lewes Change Management Programme (CMP) outlines the need to redesign the
Outsourcing. Knowledge Summary
Knowledge Summary Outsourcing P&SM professionals should have the knowledge and skills required to manage the outsourcing process and to advise colleagues of the most appropriate solution to obtain best
Asset Factory is a software service that allows you to manage the value, costs, risks and performance of your property, people and supply chain
Asset Factory is a software service that allows you to manage the value, costs, risks and performance of your property, people and supply chain assets. It is simple to use and provides instant reporting
For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems
BAFE Scheme: SP203-3 Version 1: July 2008 Amendment No: 1 Fire Protection Industry Scheme, Reference SP203 Part 3 For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression
services NEW ZEALAND INSTITUTE OF ARCHITECTS INCORPORATED GUIDE TO ARCHITECTS SERVICES
1 e services NEW ZEALAND INSTITUTE OF ARCHITECTS INCORPORATED GUIDE TO ARCHITECTS SERVICES 01 contents 02 guide to architects services 03 architecture in new zealand 04 an architect s skills 05 an architect
Pulling it all together: Integrated Solutions for Governance, Risk and Compliance
Customer Practice Profile Pulling it all together: Integrated Solutions for Governance, Risk and Compliance The business case for a new enterprise approach to GRC Integrated solutions for Governance, Risk
Help to Buy. House Builder and Developer Participation Guidance. July 2014. Page 1 of 15
Help to Buy House Builder and Developer Participation Guidance July 2014 Page 1 of 15 Contents Ministerial Foreword page 3 Introduction... page 4 Help to Buy overview... page 5 Help to Buy registration...
A Beginner's Guide To. Bridging Finance
A Beginner's Guide To Bridging Finance Contents Introduction What is a bridging loan? How do bridging loans work? When would someone need a bridging loan? What properties can bridging loans be used on?
, Head of IT Strategy and Architecture. Application and Integration Strategy
IT Strategy and Architecture Application DOCUMENT CONTROL Document Owner Document Author, Head of IT Strategy and Architecture, Enterprise Architect Current Version 1.2 Issue Date 01/03/2013 VERSION CONTROL
Cloud Business Case: A View from the Field
Cloud Business Case: A View from the Field By Paul Lidbetter Enterprise Architect Having problems explaining to your executive board why you want to move to cloud computing? Microsoft s Enterprise Strategy
2014 North American Building Automation Systems 2013 North American SSL Certificate Customer Value Leadership Award Product Leadership Award
2013 2014 INSERT COMPANY LOGO HERE 2014 North American Building Automation Systems 2013 North American SSL Certificate Customer Value Leadership Award Product Leadership Award Frost & Sullivan 1 We Accelerate
How value attribution will shape the future of affiliate marketing
How value attribution will shape the future of affiliate marketing November 2013 By Matt Swan, Client Strategist, Affiliate Window The latest white paper from Affiliate Window s Strategy and Business Intelligence
Abstract: BIM: A Technological Advancement in the Field of Architecture. Introduction:
BIM: A Technological Advancement in the Field of Architecture Abstract: BIM (Building Information Modeling), an innovative parametric software has seen widespread use in architecture design firms worldwide.
Recruitment Outsourcing:
Recruitment Outsourcing: Look Before You Leap The Benefits & Pitfalls of Recruitment Process Outsourcing (RPO) Introduction The outsourcing of administratively intensive HR functions is not new, and for
Revit MEP. Autodesk Navisworks
What is BIM? Autodesk BIM is an intelligent model-based process that helps owners and service providers achieve business results by enabling more accurate, accessible, and actionable insight throughout
Collaborative Project Management Made Simple
Collaborative Project Management Made Simple Construction businesses in the building, energy, and infrastructure sectors find Viewpoint For Projects to be an ideal fit. That s because all team members
BIM BASICS AIRAH PRESENTATION SERIES. Mark Jacobson National BIM Operations Manager AE Smith & Son
BIM BASICS AIRAH PRESENTATION SERIES Mark Jacobson National BIM Operations Manager AE Smith & Son Presentation Content What will be covered Common terms and software utilised A basic overview of BIM workflows
Olilo's AEC Design Services. SrinSoft Inc, Partners of
Olilo's AEC Design Services SrinSoft Inc, Partners of Olilo provides design services that include design and analysis, cost estimation, 3D modeling, 2D drafting, conversion from 2D to 2D, quantity take-off,
Adding up or adding value?
Get up to speed Building Better Finance Functions Adding up or adding value? Making business partnering work whatwouldyouliketochange.com Contents Adding up or adding value? 3 The strategic value of business
CEN/BT/WG 215 N 045 4 th draft BUSINESS PLAN
CEN/BT/WG 215 N 045 4 th draft BUSINESS PLAN CEN/TC XXX Building Information Modelling (BIM) CEN/TC XXX Business Plan Date:2014-09-16 Version: Draft #7 Page: 1 EXECUTIVE SUMMARY Business Environment [to