Commerzbank Head Office. Frankfurt am Main



Similar documents
All Weather Hall. Efficient, multipurpose & quick to build

How To Build A Luxury Apartment Complex In London

Circular No : URA/PB/2004/29-CUDD Fax: Our Ref : DC/ADMIN/CIRCULAR/PB_04 Date : 6 Sep 2004

Site visit to the University of Nottingham Jubilee Campus

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf

BROWNSVILLE STRUCTURES STUDY. July Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation The Building Regulations 2010

South Australian Health and Medical Research Institute (SAHMRI) Adelaide, Australia

Sapa Building System, first time at BAU

Certification: Building Plans Examiner. Exam ID: B3

SIKA AT WORK THE KAENG KRACHAN ELEPHANT HOUSE AT ZURICH ZOO

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R Lecturer: Jim Cahill

Schedule B to By-law Part A Fees Payable for Permits

Adaptive strategies for office spaces in the UK climate

Schedule B to By-law

Facility Assessment for East Main Street, Huntley, IL

Projects. Cultural centre in Jinan. Europaconcorsi Beta. Grand Theatre. JINAN, China. Publications Jinan Cultural Centre

- 5 - Table1. Maximum Compartment Volumes

Room for your success

The Zig Zag Building Victoria Street, London, SW1

Challenging the possibilities

Green House, Hungary

IEA SHC Task 47 Renovation of Non-Residential Buildings towards Sustainable Standards

4B The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

Miami Science Museum DoE Modelling Grant. Light Planning. 19 December 2008 Concept Design

EAST LYME HIGH SCHOOL

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

Laying the First Course. 1. Excavate the site and construct the footing.

Liberal Arts & Science Building

Planning Information. Passenger and Freight Elevators.

MILTON HALL BCO AWARDS 2014 THE WORKSPACE CONSULTANTS LLP

Standards Committee T echnical Technical Conference

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

Ping An: Insurance and Tall Buildings

Cable Building HABS No. ILL East Jackson Boulevard at Wabash Avenue Chicago Cook County Illinois

ModuSec. Secure and efficient IT room solutions Composite Panel Systems Compared. Panel Systems are not all the same!

110 BISHOPSGATE, EC2

BEC 2012 Vs BEC Summary of Major Amendments

A few good reasons to have a conservatory. The conservatory structure

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Hunter College school of Social Work Thesis Proposal

Table of Contents. I Introduction 2. II Definitions & Area Calculation 2. III Room Numbering 7. IV Appendix A 9

50 St Mary Axe London EC3

FACTORS AFFECTING ENERGY CONSUMPTION OF BUILDINGS

DESIGN OF NATURAL VENTILATION WITH CFD CHAPTER SEVEN. Qingyan Chen. difficult to understand and model, even for simple

New Waterloo. Transforming the Elizabeth House site

Rufus Block 19. Project # DRB Recommendation Meeting #1 May 21, 2013

VERTICAL DESIGN OPTImAL ACOUSTICS

Cambridge House, Henry Street, Bath BA1 1UR

Office building Laan op Zuid Rotterdam. van den Oever, Zaaijer & Partners architecten

Basel.Projects. REHAB Basel Basel, Switzerland Herzog and De Meuron clinic, health care

...signed by Premium Projects.

Designer s NOTEBOOK DESIGN ECONOMY, PART 3

ARCHITECTURE THAT INSPIRES

GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER

Shaping Whanganui. Have your say, korero mai

ARTS. presented by: TOM SHERRY HAMILTON ANDERSON ASSOCIATES

HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER May 2015

Klosterenga, Oslo, Norway, page - 1

Building skin and energy efficiency in a hot climate with particular reference to Dubai, UAE

ModuSec. Secure and efficient IT room solutions. Turnkey Modular Construction Fast clean build to any size or shape

Building Condition Assessment: West Lexington Street Baltimore, Maryland

RESIDENTIAL WOOD DECKS

MUSEUM (+) HOTEL. a dependance of the Kröller-Müller Museum and a museum hotel

Tall Building Form Generation by Parametric Design Process

Acoustical Design for Concert Hall in the Science and Art Centre of Xiamen University

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

Improving thermal insulation of concrete sandwich panel buildings

Far East SOHO Business edition at No. 100 Peck Seah Street fully sold in two days

IFE Level 4 Certificate in Fire Science and Fire Safety (HL)

St Vincent s University Hospital New Clinical Block Dublin, Ireland. 500 Bed Acute University Teaching Hospital Main Clinical Block

Oliver House City Road, EC1. Design & Access Statement Addendum Oliver House

Building Condition Assessment: North Howard Street Baltimore, Maryland

THE STAR, DARLING HOTEL AND SPA PYRMONT, NSW. Associate Director, Taylor Thomson Whitting Ltd, Sydney, Australia

Technical handbook Panel Anchoring System

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, , ]

Relieve the pressure with PYRAN S

How To Build The Burj Dubai Tower

Bornholms Kunstmuseum

Architecture Design: The Bank a Convention Center for Alexandria

COMPLEX THE. Adding Value to Business and Quality of Life

Fordham University Lincoln Center Campus

Subtropical Cities September Design for Energy Efficiency in Commercial Buildings in Queensland

Hoesch Matrix System individuell. ThyssenKrupp Steel Europe Thinking the future of steel

CATALOGO PRODOTTI PORTONI INDUSTRIALI COIBENTATI

Special Use Commercial Properties

DEPLOSUN REFLECTORS. Carrer dels Vergós, Barcelona Spain Tel: (+34) Fx: (+34)

Norwegian Tax Authority - Oslo Norway

Climotion ensures a better climate. Better comfort and lower costs in all buildings. Bosch Energy and Building Solutions

Location Amenities HVAC Parking Technology Security and Life Safety Elevators Ownership and Management

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

Transcription:

Commerzbank Head Office Frankfurt am Main

2 Commerzbank Head Office Conception The Commerzbank head-office building not only adds an impressive feature to Frankfurt s skyline. Viewed from close quarters as well, the building is more than merely another high-rise bank. Visitors enter the almost 259m-high tower from Kaiserplatz by means of stairs covered by a glass roof. This entrance blends harmoniously with the adjacent perimeter buildings. On the first floor, a generous plaza with an integrated restaurant welcomes bankers and the public alike at weekends as well. Here, the observant visitor already senses the central architectural idea of combining transparency and functionality in a balanced manner.

Conception 3 Above the lobby leading off the plaza, an atrium allowing daylight to penetrate rises through all the floors, creating a bright, friendly atmosphere. The nine sky gardens the building s green lungs can be used by employees as communication and recreation areas. This is made possible by an innovative conception produced by the architects Foster and Partners. The central core that is usual in high-rise buildings was replaced by a 160m-high atrium and the technical risers were accommodated in the three corners of the building.

4 Commerzbank Head Office Architecture New high-rise generation The floor plan of the new tower is an equilateral triangle with rounded corners and slightly convex sides. The floors of the building and the cores at the three corners are organised around the central atrium. Each floor has three wings, two of which serve as office space; the third forms part of one of the 4-storey-high gardens. The tower makes an open and transparent impression thanks to the atrium, which is also triangular in shape; natural light and the nine gardens give it its slender appearance. A unique frame construction enhances this impression by spanning the gardens, that are more than 34m wide, without the use of columns. The foundations of the tower are also exceptional. In order to prevent settlement, it rests on 111 reinforced concrete piles which were driven up to 48.5m deep into the Frankfurt ground.

Architecture 5 Design of the tower The stepped top of the building makes a strong visual im - pact even from a distance. The guiding principle, developed with the city of Frankfurt, was to create a striking symbol for the banking district. Facade For substantial energy-saving and natural ventilation, the building is enclosed in a two-layer facade which is similarly unique up to now in high-rise construction. The outer skin has slots through which fresh air is able to enter the cavity between the layers. The windows of the inner facade, even those on the highest floors, may be opened, ensuring that natural ventilation is possible right up to the 50 th floor. The windows on the atrium side can also be opened.

6 Commerzbank Head Office Sky Gardens Lord Norman Foster envisaged the gardens as being more than mere decoration. In fact, the generous gardens are a fundamental element in his conception. In spiral form, nine sky gardens rise up the tower three each facing eastwards, southwards and westwards. Botanically, the vegetation reflects the geographical orientation.

Sky Gardens 7 Eastward-facing: Asian vegetation Southward-facing: Mediterranean vegetation Westward-facing: North American vegetation The gardens provide the inner offices with plenty of daylight. In addition, they can be used by employees for communication purposes and for breaks; they create a feeling of openness and space and form part of the sophisticated system of natural ventilation.

8 Commerzbank Head Office Services The building services are designed to meet the needs of employees, while attaining a high degree of energy efficiency. This is achieved by means of an intelligent building management system, which ensures that ventilation, heating and cooling are all optimal, yet also allows em ployees to regulate their working environment individually. Light The planning team set great store by making the best possible use of daylight. As a result, the transparency of the building and the glass partition walls between offices and corridors provide all workplaces with high daylight values.

Services 9 Climate control The building is cooled by a water-filled chilled ceiling system instead of the normal, problematic air-conditioning system. The rooms are heated by conventional convectors. Employees are able to control the temperature in their office individually within a given range. Ventilation On roughly three-quarters of the days in a year, employees can regulate ventilation themselves by opening or closing the windows individually. Only under extreme weather conditions does the building management system activate the ventilation equipment.

Facts and Figures Gross floor area Tower 85,503m 2 Basements 12,724m 2 Car-park 9,579m 2 Perimeter buildings shops 2,171m 2 apartments 4,025m 2 Kaiserstrasse 18 1,719m 2 Auditorium 2,626m 2 Plaza catering 1,264m 2 Public plaza 1,125m 2 Total 120,736m 2 Height excluding antenna 259m with antenna 300m Car-parking spaces 300 Bicycle-parking spaces approx. 200 Levels in tower Entrance hall Offices Technical equipment 3 levels 45 levels 14 levels

Main usable area 52,700m 2 (excluding apartments and car park) Gross volume, total 538,000m 3 Workplaces 2,800 Construction phase May 1994 May 1997 Tower foundation Load-bearing piles 111 Large piles Ø 1.8m/1.5m Length: max. 48.5m Raft: Thickness: 2.20 4.50m Shell and core Basements Tower superstructure Reinforced concrete torsion frame Steel frame with Vierendeel frame system

Commerzbank AG Head Office Group Communications Brand Management Kaiserplatz Frankfurt am Main www.commerzbank.com Postal address 60261 Frankfurt am Main Tel. +49 69 136-20 info@commerzbank.com