1 Site visit to the University of Nottingham Jubilee Campus Peter Heaslip. Chris Bruce, John Lawlor, Paul Horan 25 February 2003

2 Original Campus Map University Park

3 Existing University Park The main campus, apart from south-west corner, was an open expansive campus on an undulating suburban landscaped space of 330 acres, situated about 2 miles from Nottingham, built from a number of older substantial estates and houses. The southwest corner was quite densely built on with an assortment of buildings, dating from the sixties, including a tower block of 13 stories. The original university buildings are cut stone Edwardian edifices. The Campus is not integrated with the local community in a physical sense. There is a public park directly in front of the original university buildings. There is a large internal integrated campus built around the extensive student residences. Students seem to have little need to leave at all. The university also owns a farm of 100 acres near Nottingham where biology and agricultural research takes place.

4 Nottingham - fact file Student Population - 28,000 6 Faculties Turnover GBP 280m

5 Jubilee Campus University strategic plan called for a major expansion of student numbers in a number of areas, notably business and computer science. The decision was made to preserve the existing campus and instead to start a new campus on an adjacent site. The Vice Chancellor, Sir Colin Campbell, was the main driver behind the project and has been there for about 6 years. Funding was available from the University s reserve and the rest of the capital required was borrowed. The University involved local residents from the start with information leaflets and meetings throughout the project. The Jubilee Campus was originally 20 acres of brown field site, around 95% coverage was a former Raleigh factory.

6 Jubilee Campus

7 Site Occupying 20 acres within a mile of the existing University Park on the western edge of the City of Nottingham, the site has expanded to 60 acres with the University hoping for a further 60. The Jubilee Campus, comprising a new lake, landscaping and main buildings were the former Raleigh factory. The University acquired the Factory and its ancillary buildings and yards in 1995 and immediately bought the meagre landscape belt buffering it to the adjoining housing.

8 Design (buildings) The design incorporates a lake running the full length of the site, creating a focal point for the development, as well as providing a visual link to the existing University Park campus. The main departmental and teaching buildings, together with postgraduate hall of residence, are arranged along the edge of the lake, and the Learning Resource Centre is located on an island platform in the lake. A broad walkway runs the length of the lake edge, connecting the buildings and providing the main pedestrian thoroughfare for the campus. The total area of new building is 23,000m 2

9 Design (landscape) The University developed an exacting environmental brief for the project. In the design of the landscape, great care was taken to ensure the optimum use of an existing belt of mature trees at the far edge of the lake; this area is reinforced by further planting to encourage wildlife and ecological diversity within the heart of the City of Nottingham, lying on the limit of an existing wildlife corridor.

10 Accommodation The Business School The School of Computer Science & IT The Schools of Education & Continuing Education Central Teaching Facility Central Catering Facility Learning Resource Centre Halls of Residence

11 Architecture Teaching blocks: The overall height is three stories. The main teaching building consists of wings, housing each school, connected at the back by circular stair towers. The wings are separated and interconnected by full height atria or open courtyard.

12 Architecture The wings are separated and interconnected by full height atria or open courtyards. Atria are treated as non-habitable from heating etc, but solar, leakage and some local heating from patio heaters makes them useable all year round.

13 Central Facilities The Central Teaching Facility is similar in plan, but with a wider atria, providing a ground floor central covered piazza, with banks, retail outlets and facilities for the Students Union. A three-tiered lecture theatre in the form of an inverted cone arises in the centre of the atrium, accommodating three lectures.

14 Learning Resource Centre The Learning Resource Centre visually floats on the lake providing a focal point for the whole of the Campus. It contains the library and a 24-hour access computer laboratory. The building has been designed again as an inverted cone, with the internal floor spiralling outward to the top.

15 Halls Of Residence Two halls of residence for undergraduates are single person bedroom units with common rooms and bar facilities, providing a total of 600 places. The undergraduate halls are 2 storey incorporate internal courtyard gardens and large areas of public space. It was noticeable that there was a lower specification as the building s were showing their ware and tare already. There is a hall of residence for postgraduate students providing 150 places.

16 Structure Designed to meet exacting functional, quality and environmental requirements, the academic buildings are constructed of reinforced concrete and clad in glass with the three-storey sloping glass atria and open courtyard gardens. Internally there are light-weight partitions. The only negative comment from the university is that the acoustic rating should be increased in future. They are therefore very flexible both internally and with the external skin. In contrast, the halls of residence are constructed from pre-cast concrete clad in a more traditional red brick. Full height windows feature in all upper floors

17 Furniture Careful selection in the design and use of furniture was notable with the integration into the partitioning system. Academic staff desks faced the wall to give a huge sense of space in small offices along with a large area of glazing. Regulations It was very noticeable that the Architects had achieved relaxation in the regulations, untreated timber panelling in the stairs and open balustrades.

18 Services and Building Environment All of the buildings on the Jubilee Campus are designed to match and surpass the University s environmental brief. Attaining the objective of providing a comfortable working, learning and teaching space, together with achieving high energy efficiency, required the total integration of design development to make the buildings work. The architects and the engineers, Ove Arup and Partners, developed many innovative energy efficient solutions for ventilation, lighting, heating, and cooling of the buildings. In recognition of this, the University and the design team applied for, and were successful in obtaining, an EC Thermie grant which helped to further develop the systems and techniques in order to bring the whole system closer to the ultimate goal of a zero-energy system. This involved the addition of photovoltaic cells to provide sufficient energy to drive ventilation fans; modifications to the air intake plant to reduce the energy requirement: the addition of windcatchers to the air outlets to improve the draw-through of the exhaust air, and modifications to improve the penetration of daylight into the buildings to reduce the necessity for artificial lighting.

19 Procurement An architectural competition to develop a masterplan was staged by the University in collaboration with the Royal Institute of British Architects. The carrot for the winner was to design initially 50% of the masterplan. The designs proposed by the architectural practice, Michael Hopkins and Partners, were the unanimous choice of the panel of judges. The plan is little changed in its final form. Each entrant received an honorarium of GBP 10,000. Addition fees for advisory consultants to the University were approximately GBP 200,000.

20 Timescale Site purchased 1995 Architect Appointed January 1997 Contractor Commences Works July 1997 Practical Completion September 1999

21 Timescale The Architects were awarded the design in January,1997 The construction management contract was awarded to Bovis Europe in July The buildings opened in September,1999, The construction was undertaken by approximately 45 separate trade contractors. I assume site clearing was done before the appointment of Bovis.

22 Value The overall value of the Jubilee Campus project is 50 million. ( 80.m) The construction value for the main Jubilee Campus area is set at GB 25.5 million 40.6.m) (1999). The construction value for the undergraduate halls of residence is an additional GB 9 million. ( 14.3.m) The university stressed throughout the design process that value for money was critical. The design philosophy was set by the budget cost and if necessary the schedule of accommodation suffered to achieve targets. The Estates Office will retort they got what they could afford and if it was wrong or could be improved they would do it next time but it would have to suffice at the moment. In total 40,0000 m 2 were built on approx 20 acres. The site has since expanded to 60 acres. The original design concepts have been continued in a new building built independently on the campus for an independent centre for the training of secondary school principals, showing how an attractive site can leverage related activities. Other developments for the university itself are on-going.

23 Estates Management The Estates Office has a staff of 600. The Director has three other directors and a qualified technical staff. They handle their own security, cleaning and ground maintenance. They run conferences without accommodation at profit. An independent project manager was recruited from private industry to handle the Jubilee campus project internally. Acknowledgements: Thanks to Chris Jagger, Head of Estates, for his hospitality, time, and willingness to answer all questions.

Commerzbank Head Office. Frankfurt am Main

Commerzbank Head Office. Frankfurt am Main Commerzbank Head Office Frankfurt am Main 2 Commerzbank Head Office Conception The Commerzbank head-office building not only adds an impressive feature to Frankfurt s skyline. Viewed from close quarters

More information

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf Discovery Hall reflects its dynamic program and dramatic site, as well as the collaborative and student-centered spirit of

More information

South Australian Health and Medical Research Institute (SAHMRI) Adelaide, Australia

South Australian Health and Medical Research Institute (SAHMRI) Adelaide, Australia South Australian Health and Medical Research Institute (SAHMRI) Adelaide, Australia 675 research staff 25,000m 2 gross floor area 9 pc2 research modules 100% wet lab enabled Public space with cafe, retail

More information

Design Essentials. Stockland Residential Communities 1 st January 2014

Design Essentials. Stockland Residential Communities 1 st January 2014 Design Essentials Stockland Residential Communities 1 st January 2014 WELCOME TO THE DESIGN ESSENTIALS The Design Essentials form part of your Contract of Sale and assist when designing your home and landscape.

More information

The Zig Zag Building Victoria Street, London, SW1

The Zig Zag Building Victoria Street, London, SW1 The Zig Zag Building Victoria Street, London, SW1 The Zig Zag Building Victoria Street, London, SW1 Client: Land Securities Scope: Lead Design Architectural Services (CMT & Novated) Type: Offices, Retail,

More information

HurlinghamRetailPark. Aerial view of site. Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park.

HurlinghamRetailPark. Aerial view of site. Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park. HurlinghamRetailPark Aerial view of site Welcome Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park. Londonewcastle, a specialist residential developer, has been

More information

05 AREA/SITE SPECIFIC GUIDELINES

05 AREA/SITE SPECIFIC GUIDELINES 05 AREA/SITE SPECIFIC GUIDELINES Site 1 - Glass Yard The leisure centre that is currently located on this site should move to a more central location in the town centre close to the existing public squares.

More information

GREENACRE OFF GORING ROAD F CRAYS POND F OXFORDSHIRE

GREENACRE OFF GORING ROAD F CRAYS POND F OXFORDSHIRE GREENACRE OFF GORING ROAD F CRAYS POND F OXFORDSHIRE GREENACRE OFF GORING ROAD F CRAYS POND F OXFORDSHIRE Woodcote - 1 mile F Reading - 6 miles F Pangbourne on Thames - 3 miles F Oxford - 21 miles F Henley

More information

Freehold Serviced Office Investment Opportunity

Freehold Serviced Office Investment Opportunity Part of the ESS Office Portfolio Freehold Serviced Office Investment Opportunity Ferneberga House Business Centre Alexandra Road, Farnborough GU14 6DQ On the instructions of Geoffrey Paul Rowley and Philip

More information

PERMISSION A GUIDE FOR EXTENDING A DETACHED OR SEMI-DETACHED HOUSE

PERMISSION A GUIDE FOR EXTENDING A DETACHED OR SEMI-DETACHED HOUSE PLANNING PERMISSION A GUIDE FOR EXTENDING A DETACHED OR SEMI-DETACHED HOUSE Introduction Foreword by Councilor Dave Smith - Chair of the Planning & Highways Committee. Planning Permissions B Owners of

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020

More information

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses. The Townhouses Park View Place A A Compass House A T T T Royal Wharf Gardens Endeavour House T A A Thameside House T Sienna House A A A A T Apartments Townhouses River Thames Compass House Compass House

More information

Oliver House. 51-53 City Road, EC1. Design & Access Statement Addendum Oliver House

Oliver House. 51-53 City Road, EC1. Design & Access Statement Addendum Oliver House 51-53 City Road, EC1 01 Introduction 02 Revised Plans 03 Revisions to height & appearance 04 Summary Statement 01 Introduction 01 Introduction This document forms an addendum to the previous Design &

More information

R&S. August 2014 Prepared by RandS Associated Srl. 1. Introduction

R&S. August 2014 Prepared by RandS Associated Srl. 1. Introduction Building Engineer UK Registration Board n.075077h Design and Access Statement for Application for Planning Permission for demolition of a garage and construction of an extension to an existing Victorian

More information

Sergison Bates architects. 90 Masterplan for landscape and urban housing, Newham, London

Sergison Bates architects. 90 Masterplan for landscape and urban housing, Newham, London 90 Masterplan for landscape and urban housing, Newham, London 1 Client Barratt East London / London Development Agency Project duration: 005-1 Contract value: 10 million Gross internal area: 71,000m Housing

More information

ENTRY FORM. DVASE 2013 Excellence in Structural Engineering Awards Program

ENTRY FORM. DVASE 2013 Excellence in Structural Engineering Awards Program ENTRY FORM DVASE 2013 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $2M Buildings Over $100M Buildings $2M-$10M Other Structures Under $5M Buildings

More information

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site. 1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises

More information

Liberal Arts & Science Building

Liberal Arts & Science Building Liberal Arts & Science Building Doha, Qatar Architect: Client: Arata Isozaki & i-net + Cat / Isozaki, Kojima, Akamatsu Qatar Foundation for Education, Science & Community Built Area: 36 363 m² Cost: US$

More information

University of Washington Foster School of Business. Seattle, Washington

University of Washington Foster School of Business. Seattle, Washington University of Washington Foster School of Business Seattle, Washington University of Washington Foster School of Business LMN PACCAR Hall Phase I of the University of Washington Michael G. Foster School

More information

Wenatchee Valley College Music and Arts Center Wenatchee, Washington 27, 696 SF

Wenatchee Valley College Music and Arts Center Wenatchee, Washington 27, 696 SF Wenatchee Valley College Music and Arts Center Wenatchee, Washington 27, 696 SF The MAC is a shared facility for the Music and Art programs, providing much-needed studio space for Art, and state-of-the-art,

More information

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010 EFA PSBP Natural Ventilation Strategy Introduction The Baseline Designs Project will provide scheme design details for a number of Primary and Secondary School Exemplars. For the purposes of setting a

More information

New College. School Of Divinity.

New College. School Of Divinity. THE UNIVERSITY OF EDINBURGH. New College. School Of Divinity. A GUIDE TO ACCESS AND FACILITIES. Address New College. School of Divinity. University Of Edinburgh. 1 Mound Place. Edinburgh. E,H,1, 2,L,U,.

More information

LONDON ROAD SEVENOAKS

LONDON ROAD SEVENOAKS WELCOME TO THE BERKELEY HOMES EXHIBITION Train Station Gr anv i ll e Dar tford Road Lo ad Ro nd on ad Ro Eard SITE Th ed riv e ley R oad on R oad A 224 Gord Pem b rok e Roa d Site Location Since the submission

More information

New Waterloo. Transforming the Elizabeth House site

New Waterloo. Transforming the Elizabeth House site New Waterloo Transforming the Elizabeth House site 02 Transforming Elizabeth House 03 Transforming Elizabeth House Transforming Elizabeth House This booklet has been produced by Chelsfield and London &

More information

More flexibility an impressive advantage.

More flexibility an impressive advantage. More flexibility an impressive advantage. Are you looking for new premises for your company, which will offer you the greatest flexibility for the future? Do you want a location with expansion potential,

More information

New Jersey City University Gilligan Student Union Center

New Jersey City University Gilligan Student Union Center New Jersey City University Gilligan Student Union Center The RBA Group worked with New Jersey City University in a major renovation of their Gilligan Student Union building. We were contracted to reassess,

More information

GE Transportation Energy Storage Plant

GE Transportation Energy Storage Plant Concordia College Offutt School of Business Princeton Theological Seminary Library SUNY Maritime Academic Building Massachusetts College of Liberal Arts Center for Science & Innovation GE Transportation

More information

Design and Access Statement. 141-145 Earls Court Road London SW5 9RH

Design and Access Statement. 141-145 Earls Court Road London SW5 9RH J U L I A N A R E N D T A S S O C I A T E S 1 7 a P i n d o c k M e w s L i t t l e V e n i c e L o n d o n W 9 2 P Y F + 4 4 2 0 7 2 8 6 9 9 0 1 Design and Access Statement T + 4 4 2 0 7 2 8 6 9 9 9 1

More information

Glossop Design & Place Making Strategy

Glossop Design & Place Making Strategy Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance

More information

Access onto roof from Center Block

Access onto roof from Center Block 2 2 Tap 4 Tank 3 3 4 5 5 6 4 1 Services PV panels Forth floor structure (later additions) Rooflights Access / Walkways Access onto roof from Center Block muf architecture/art LLP 4.3 Roof alterations and

More information

john jay college of criminal justice

john jay college of criminal justice AIA NEW YORK CHAPTER 2013 DESIGN AWARDS ARCHITECTURE john jay college of criminal justice NEW YORK, NEW YORK FULL PROJECT NARRATIVE John Jay College of Criminal Justice s new building provides all the

More information

Sector Design Concepts

Sector Design Concepts Section C Sector Design Concepts C7 Sector 7 Great North Road Underpass 6 6 6 C7. Existing situation Sector 7 refers to the cut and cover section of the project linking the northern end of the deep tunnels

More information

Bohlin Cywinski Jackson Architecture Planning Interior Design

Bohlin Cywinski Jackson Architecture Planning Interior Design Bohlin Cywinski Jackson Architecture Planning Interior Design Dental School Experience Dental School Experience Overview Bohlin Cywinski Jackson has provided services to six dental schools: the University

More information

Case Study: Mixed Use Redevelopment of Advocate s Close, Edinburgh

Case Study: Mixed Use Redevelopment of Advocate s Close, Edinburgh Case Study: Mixed Use Redevelopment of Advocate s Close, Edinburgh Occupying an historic site within the heart of Edinburgh s Old Town, the Advocate s Close development successfully creates a vibrant new

More information

Campus Masterplan 2012 2022

Campus Masterplan 2012 2022 Campus Masterplan 2012 2022 Campus Masterplan Campus Masterplan The University of Manchester is to invest 1 billion over the next ten years to create a world-class campus for our staff and students. The

More information

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2015-0183 TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2015-0183 TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015 AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE 2015-0183 TO PLANNED UNIT DEVELOPMENT APRIL 9, 2015 The Planning and Development Department hereby forwards

More information

Concepts. Products. Service. 30 Crown Place, London EC2

Concepts. Products. Service. 30 Crown Place, London EC2 Concepts Products Service 30 Crown Place, London EC2 1 Project Report 30 Crown Place, London EC2. Bold design makes this a striking addition to the London skyline. Occupying an important site close to

More information

CITY COUNCIL PACKET MEMORANDUM

CITY COUNCIL PACKET MEMORANDUM CITY COUNCIL PACKET MEMORANDUM DOCUMENT: Final Plan and Final Plat SUBJECT: City Center Lenexa The Domain at City Center CONTACT PERSON: Beccy Yocham, Director of Community Development DATE: December 3,

More information

King Post Wall Information

King Post Wall Information King Post Wall Information DAWSON-WAM specialise in the installation of piled retaining wall systems including steel sheet piling, concrete piled walls and king post walls. This document is our guide to

More information

BUILT PEDAGOGY C. T. HSU HAS BEEN FORTUNATE DURING OUR 23 YEARS OF PRACTICE TO HAVE BEEN INVOLVED IN SUCCESSFUL PROJECTS ON FOUR CONTINENTS

BUILT PEDAGOGY C. T. HSU HAS BEEN FORTUNATE DURING OUR 23 YEARS OF PRACTICE TO HAVE BEEN INVOLVED IN SUCCESSFUL PROJECTS ON FOUR CONTINENTS BUILT PEDAGOGY C. T. HSU HAS BEEN FORTUNATE DURING OUR 23 YEARS OF PRACTICE TO HAVE BEEN INVOLVED IN SUCCESSFUL PROJECTS ON FOUR CONTINENTS WE WORK WITH SOME OF THE BEST CONSULTANTS AND CLIENT GROUPS,

More information

Office Profile. Ariel Greis Design

Office Profile. Ariel Greis Design Office Profile About Us is a design focused and award winning architecture and planning practice based in London. We have a diverse range of skills and abilities with a proven record in residential, cultural,

More information

DESIGN GUIDELINES FOR UTILITY METERS D.C. HISTORIC PRESERVATION REVIEW BOARD

DESIGN GUIDELINES FOR UTILITY METERS D.C. HISTORIC PRESERVATION REVIEW BOARD DESIGN GUIDELINES FOR UTILITY METERS D.C. HISTORIC PRESERVATION REVIEW BOARD Introduction Utility meters are a necessary component for any building. When older buildings were originally provided with utility

More information

BOMA BESt Assessment Overview

BOMA BESt Assessment Overview BOMA BESt Assessment Overview BOMA Building Environmental Standards OFFICE Module August 2013 The Voice of the Commercial Real Estate Industry in Canada The Building Owners and Managers Association of

More information

UNIVERSITY OF WARWICK BUILDING COMMITTEE. Minutes of the Meeting held on 5 June 2008

UNIVERSITY OF WARWICK BUILDING COMMITTEE. Minutes of the Meeting held on 5 June 2008 UNIVERSITY OF WARWICK BUILDING COMMITTEE Minutes of the Meeting held on 5 June 2008 Present: In Attendance: Apologies were received from: Sir John Temple (Chair), Professor S. Bassnett, Mr. T. Callow,

More information

How To Develop A School

How To Develop A School Today we have a responsibility to perpetuate these wonderful schools for future generations. Our vision for 2020. An exciting direction for the future development and continued success of our schools.

More information

WINDSOR GARDENS VOCATIONAL COLLEGE REDEVELOPMENT

WINDSOR GARDENS VOCATIONAL COLLEGE REDEVELOPMENT PP 283 FINAL REPORT WINDSOR GARDENS VOCATIONAL COLLEGE REDEVELOPMENT 484TH REPORT OF THE PUBLIC WORKS COMMITTEE Published pursuant to section 17(7) & (8) P tamentaty C-onentitter1991 Second Session, Fifty-Second

More information

DESIGN AND ACCESS STATEMENT PLANNING APPLICATION. 25 Gilston Road, SW10 9SJ June 2015

DESIGN AND ACCESS STATEMENT PLANNING APPLICATION. 25 Gilston Road, SW10 9SJ June 2015 DESIGN AND ACCESS STATEMENT PLANNING APPLICATION 25 Gilston Road, SW10 9SJ June 2015 CONTENTS 1.0 INTRODUCTION 2.0 SITE & CONTEXT 2.1 SITE CONTEXT 2.2 CONSERVATION AREA 3.0 BACKGROUND 3.1 RELEVANT PLANNING

More information

Office campus at Princeton Forrestal Center. Research and development facilities of the future. a development by

Office campus at Princeton Forrestal Center. Research and development facilities of the future. a development by COLLEGE PARK III OFFICE CAMPUS AT PRINCETON FORRESTAL CENTER Office campus at Princeton Forrestal Center Research and development facilities of the future. a development by S O U T H R I D G E A S S O

More information

Sapa Building System, first time at BAU

Sapa Building System, first time at BAU 1/9 Sapa Building System, first time at BAU Sapa Building System will exhibit at the BAU fair Munich on January 14-19 2013 for the first time. Sapa Building System is pleased to be associated with the

More information

FAQ // COOPERATIVE STUDENT HOUSING

FAQ // COOPERATIVE STUDENT HOUSING FAQ // COOPERATIVE STUDENT HOUSING IS A HOUSING CO-OP LIKE A TRADITIONAL RESIDENCE HALL? Not at all! Besides being a dedicated housing project for students, it will become obvious from the answers to questions

More information

Stunning Rural Location Three Reception Rooms Galleried Landing. Five Double Bedrooms Countryside Views Energy Efficiency Rating : D

Stunning Rural Location Three Reception Rooms Galleried Landing. Five Double Bedrooms Countryside Views Energy Efficiency Rating : D Stunning Rural Location Three Reception Rooms Galleried Landing Five Double Bedrooms Countryside Views Energy Efficiency Rating : D Claxton Mill, Claxton, Norwich, NR14 7UG Guide Price 460,000 Reference

More information

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Commercial, Professional Office, and Public Facility Developments Purpose This Guide offers examples to clarify and explain the

More information

REFERENCES-COMMERCIAL. Montgomery County Community College. 60,000 Sq. Ft. Montgomery County Community College 12,000 Sq. Ft.

REFERENCES-COMMERCIAL. Montgomery County Community College. 60,000 Sq. Ft. Montgomery County Community College 12,000 Sq. Ft. Montgomery County Community College West Campus Expansion 60,000 Sq. Ft. Warehouse adaptive reuse of the former Vaughn Knitting Mill, a major architectural component of Pottstown s Industrial Heritage.

More information

28.0 Development Permit Area #2 (Neighbourhood District)

28.0 Development Permit Area #2 (Neighbourhood District) 28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character

More information

Droveway ARCHITECTURAL SERVICES. Disability Access Audit. Sample Gospel Hall. 22 September 2005. For

Droveway ARCHITECTURAL SERVICES. Disability Access Audit. Sample Gospel Hall. 22 September 2005. For 22 September 2005 Disability Access Audit For Droveway ARCHITECTURAL SERVICES Droveway House 11 Lilac Avenue, Streetly Sutton Coldfield West Midlands B74 3TH Tel : 0121 352 0150 www.droveway.co.uk Page

More information

Passive house rehabilitation of post war residential building in Zug, Switzerland

Passive house rehabilitation of post war residential building in Zug, Switzerland Passive house rehabilitation of post war residential building in, Switzerland Owner: Erbengemeinschaft Ducret Architect: Miloni & Partner, Wettingen Energy concept designer: Zurfluh & Lottenbach, Luzern

More information

P r o j e c t C a s e S t u d y

P r o j e c t C a s e S t u d y P r o j e c t C a s e S t u d y Mangrove Place Project: Mangrove Place Start Date: 2009 Completion Date: Ongoing Location: Al Reem Island, Abu Dhabi, UAE Industry: Residential Developer: Luxury Real Estate

More information

A-Z of Campus Services over the Christmas and New Year Period 2015

A-Z of Campus Services over the Christmas and New Year Period 2015 A-Z of Campus Services over the Christmas and New Year Period 2015 This listing outlines the changes to the Campus Services teams operating hours, service provisions and closures over the Christmas and

More information

BROWNSVILLE STRUCTURES STUDY. July 2012. Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208

BROWNSVILLE STRUCTURES STUDY. July 2012. Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208 BROWNSVILLE STRUCTURES STUDY July 2012 Prepared by LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208 TABLE OF CONTENTS I. SUMMARY OF BUILDING ANALYSIS.. 1 II. INDIVIDUAL BUILDING

More information

How To Build A Luxury Apartment Complex In London

How To Build A Luxury Apartment Complex In London Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking

More information

Holistic Approach in Delivering Government Buildings The Low Carbon Concept

Holistic Approach in Delivering Government Buildings The Low Carbon Concept International Conference on Planning for Low Carbon Cities 22 May 2009 Holistic Approach in Delivering Government Buildings The Low Carbon Concept Ir. HO Sai-king, Assistant Director (Building Services),

More information

Table of Contents. I Introduction 2. II Definitions & Area Calculation 2. III Room Numbering 7. IV Appendix A 9

Table of Contents. I Introduction 2. II Definitions & Area Calculation 2. III Room Numbering 7. IV Appendix A 9 Table of Contents I Introduction 2 II Definitions & Area Calculation 2 III Room Numbering 7 IV Appendix A 9 I. Introduction A. Purposes The purposes of this document are to: B. Benefits 1. Clarify and

More information

Department for Communities and Local Government

Department for Communities and Local Government Department for Communities and Local Government Permitted development for householders Technical Guidance April 2014 Department for Communities and Local Government Please note: This technical guidance

More information

THE UNIVERSITY OF EDINBURGH. ECA Evolution House.

THE UNIVERSITY OF EDINBURGH. ECA Evolution House. THE UNIVERSITY OF EDINBURGH. ECA Evolution House. A GUIDE TO ACCESS AND FACILITIES. Address: ECA Evolution House, 78 West Port, Edinburgh, E,H,1 2,L,E. Telephone number: 0131 651 5800. Campus map link:

More information

Cody Park One of Ark s high integrity data centre campus sites

Cody Park One of Ark s high integrity data centre campus sites UKC COMMERCIAL Cody Park One of Ark s high integrity data centre campus sites Ark is a privately held company that design, build, operate and finance third party data centre solutions tailored to meet

More information

BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010

BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010 Building Control Charnwood Borough Council Southfield Road Loughborough LE11 2TN BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010 Page 1 of 6 PURPOSE: This Guidance

More information

A MOST VALUABLE DAIRY FARM EXTENDING TO 156 ACRES WITH MILK QUOTA SINGLE PAYMENT ENTITLEMENTS AND PLANNING CONSENT FOR AGRICULTURAL WORKERS DWELLING

A MOST VALUABLE DAIRY FARM EXTENDING TO 156 ACRES WITH MILK QUOTA SINGLE PAYMENT ENTITLEMENTS AND PLANNING CONSENT FOR AGRICULTURAL WORKERS DWELLING FREEHOLD WITH VACANT POSSESSION A MOST VALUABLE DAIRY FARM EXTENDING TO 156 ACRES WITH MILK QUOTA SINGLE PAYMENT ENTITLEMENTS AND PLANNING CONSENT FOR AGRICULTURAL WORKERS DWELLING KNOWN AS HOME FARM THE

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

Hole In One. Freehold 425,000 + VAT SOLE SELLING RIGHTS REF: NW-315821. Forest Drive, Lytham, St Annes, Lancashire FY8 4QF

Hole In One. Freehold 425,000 + VAT SOLE SELLING RIGHTS REF: NW-315821. Forest Drive, Lytham, St Annes, Lancashire FY8 4QF Hole In One Forest Drive, Lytham, St Annes, Lancashire FY8 4QF Freehold 425,000 + VAT Lancashire Freehold Densely populated residential area Lounge bar. Dining room & Public bar Private flat Site area

More information

Program Summary: 10,000 square foot contemporary library addition and restoration of historic house for community use

Program Summary: 10,000 square foot contemporary library addition and restoration of historic house for community use Program Summary: 10,000 square foot contemporary library addition and restoration of historic house for community use Program Statement: This branch library in the Broadmoor neighborhood of New Orleans

More information

Adaptive strategies for office spaces in the UK climate

Adaptive strategies for office spaces in the UK climate International Conference Passive and Low Energy Cooling 631 Adaptive strategies for office spaces in the UK climate I. Gallou Environment & Energy Studies Programme, Architectural Association Graduate

More information

University s Capital Development Plan - Summary Of PowerPoint

University s Capital Development Plan - Summary Of PowerPoint Capital Development Plan: 2013-18 1. Introduction 1.1 Significant capital expenditure has continued across the entire University, both in terms of new build and major refurbishment of the existing estate.

More information

Those present were thanked for attending and were advised that West Yorkshire Police valued their comments and input to the proposals presented.

Those present were thanked for attending and were advised that West Yorkshire Police valued their comments and input to the proposals presented. Leeds Divisional Headquarters and Custody Facility Community Consultation Meeting 30th January 2012 7:00pm Reaney Suite, Leeds United FC, Elland Road Stadium, Leeds Twenty seven members of the public attended

More information

2.50 Retirement villages - section 32 evaluation for the Proposed Auckland Unitary Plan

2.50 Retirement villages - section 32 evaluation for the Proposed Auckland Unitary Plan 2.50 Retirement villages - section 32 evaluation for the Proposed Auckland Unitary Plan 1 OVERVIEW AND PURPOSE...2 1.1 Subject Matter of this Section...2 1.2 Resource Management Issue to be Addressed...2

More information

Section 13 Urban Residential Zones

Section 13 Urban Residential Zones Section 13 Urban Residential Zones 13.1 RU1 Large Lot Housing RU1c Large Lot Housing with Carriage House RU1h Large Lot Housing (Hillside Area) RU1hc Large Lot Housing (Hillside Area) with Carriage House

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines A. Offices a. Office buildings should be built to the minimum required setback. b. Surface parking should be located towards the

More information

Administrative Policy Title: Scheduling Policy, Classroom and Other Spaces, CU Denver Buildings/Spaces

Administrative Policy Title: Scheduling Policy, Classroom and Other Spaces, CU Denver Buildings/Spaces Administrative Policy Title: Scheduling Policy, Classroom and Other Spaces, CU Denver Buildings/Spaces Source: Chancellor s Office Prepared by: Technology Support Services Approved by: Roderick Nair, Ph.D.

More information

Project & Building Consultancy

Project & Building Consultancy Project & Building Consultancy Clients Representative Contract Administration Defect Analysis Development Management Development Consultancy Development Monitoring Dilapidations Employers Agent Expert

More information

At the completion of this guide you should be comfortable with the following:

At the completion of this guide you should be comfortable with the following: This guide provides instructions and best practices for deployment of the Yealink W52P IP DECT phones and repeaters RT10, which is intended for qualified technicians (or administrator) who will deploy

More information

FOR SALE / TO LET ASTON HOUSE SCHOOL, 10 MONTPELIER ROAD, EALING, LONDON W5 2QP

FOR SALE / TO LET ASTON HOUSE SCHOOL, 10 MONTPELIER ROAD, EALING, LONDON W5 2QP FOR SALE / TO LET ASTON HOUSE SCHOOL, 10 MONTPELIER ROAD, EALING, LONDON W5 2QP LOCATION Ealing is an affluent, attractive and vibrant West London suburb approximately 8 miles to the west of Central London,

More information

BROWN & McRAE 33 KNOCKIE ROAD TURRIFF AB53 4BG LAWYERS ESTATE AGENTS NOTARIES PUBLIC. www.brown-mcrae.co.uk

BROWN & McRAE 33 KNOCKIE ROAD TURRIFF AB53 4BG LAWYERS ESTATE AGENTS NOTARIES PUBLIC. www.brown-mcrae.co.uk BROWN & McRAE www.brown-mcrae.co.uk turriff@brown-mcrae.co.uk LAWYERS ESTATE AGENTS NOTARIES PUBLIC 10 High Street Turriff Aberdeenshire AB53 4DS Tel: 01888 568950 Fax: 01888 563031 Anderson House 9 11

More information

June 7, 2010 Page 1 of 5

June 7, 2010 Page 1 of 5 Page 1 of 5 Functional Programming [Prepared by Justin Saly, MRAIC; Edited by Alberta Association of Architects] The following information is supplemental to the information provided in section 2.3.4 in

More information

Councillor R. Hollingworth has requested that this application be considered by the Committee, rather than being determined under delegated powers.

Councillor R. Hollingworth has requested that this application be considered by the Committee, rather than being determined under delegated powers. Name of Applicant Type of Certificate Proposal Map/Plan Policy Plan Date Mr Timothy D. Hosking A Proposed extension to form bespoke living accommodation for disabled family member (As augmented by information

More information

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The

More information

case studies Safely applied, Environmentally creative and effective engineering solutions

case studies Safely applied, Environmentally creative and effective engineering solutions Safely applied, Environmentally creative and effective engineering solutions T: 02392 435050 @: eng@itdconsultants.co.uk www.itdconsultants.co.uk case studies Churchill House Main Features: A 1.5m refurbishment

More information

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design

More information

Vegetated Roofs (Green Roofs) Combined with Photovoltaic Panels

Vegetated Roofs (Green Roofs) Combined with Photovoltaic Panels Event: MON-A08 - Solar Panels and Green Roofs Fully Integrated 1 Vegetated Roofs (Green Roofs) Combined with Photovoltaic Panels Solar Garden Roof and Sun-Root System SESSION DESRIPTION Discover a new

More information

Dairy Farm, 2 London Road, Halesworth.

Dairy Farm, 2 London Road, Halesworth. Dairy Farm, 2 London Road, Halesworth. Recently renovated, one of Halesworth s most important Grade II* Listed houses situated close to the town centre. Dairy Farm, 2 London Road, Halesworth, IP19 8LH

More information

FREEHOLD INVESTMENT/DEVELOPMENT OPPORTUNITY 12-27 SWAN YARD HIGHBURY CORNER, LONDON, N1

FREEHOLD INVESTMENT/DEVELOPMENT OPPORTUNITY 12-27 SWAN YARD HIGHBURY CORNER, LONDON, N1 FREEHOLD INVESTMENT/DEVELOPMENT OPPORTUNITY 12-27 SWAN YARD HIGHBURY CORNER, LONDON, N1 INVESTMENT/DEVELOPMENT SUMMARY UNIQUE CONTEMPORARY OFFICE BUILDING FOR SALE EXCELLENT LOCATION IN THE HEART OF ISLINGTON

More information

BLOCK 400 PLANNED COMMUNITY DISTRICT

BLOCK 400 PLANNED COMMUNITY DISTRICT BLOCK 400 PLANNED COMMUNITY DISTRICT Newport Center December 1983 Newport Beach, California Ordinance 88-119 Adopted December 12, 1988 Amendment No. 672 Resolution No. 95-115 Adopted October 9, 1995 Amendment

More information

kaneggroup Building Services LEISURE & COMMERCIAL

kaneggroup Building Services LEISURE & COMMERCIAL kaneggroup Building Services LEISURE & COMMERCIAL About us Kane Group are dedicated to solving our clients most complex challenges and transforming their projects into a working reality. We have an excellent

More information

TARRANT COUNTY FAMILY LAW CENTER Fort Worth, Texas

TARRANT COUNTY FAMILY LAW CENTER Fort Worth, Texas Fort Worth, Texas RELEVANT FEATURES Courthouse design relies on contemporary and traditional influences to create a building appropriate to its urban setting. Courtrooms and lobby areas receive direct,

More information

Chapter 19.45 O-R-D OFFICE RESEARCH PARK AND DEVELOPMENT ZONE. 19.45.010 Purpose of provisions. Title 19 ZONING. 19.45.010 Purpose of provisions.

Chapter 19.45 O-R-D OFFICE RESEARCH PARK AND DEVELOPMENT ZONE. 19.45.010 Purpose of provisions. Title 19 ZONING. 19.45.010 Purpose of provisions. Title 19 ZONING Chapter 19.45 O-R-D OFFICE RESEARCH PARK AND DEVELOPMENT ZONE 19.45.010 Purpose of provisions. 19.45.020 Design and site plan approval. 19.45.030 Permitted uses. 19.45.040 Conditional uses.

More information

RESIDENTIAL DRIVEWAYS

RESIDENTIAL DRIVEWAYS RESIDENTIAL DRIVEWAYS If you have specific questions or want to confirm your plans, our staff is available to assist in person, by telephone, or by e-mail. City of St. Petersburg Division of Development

More information

Little Oak, Norton Grange Little Kineton, Warwickshire

Little Oak, Norton Grange Little Kineton, Warwickshire Little Oak, Norton Grange Little Kineton, Warwickshire Little Oak, Norton Grange, Little Kineton, Warwick CV35 0DP Situated ½ mile from Kineton, 11 miles from Stratford-upon-Avon, Warwick, Leamington Spa

More information

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: THE COMMUNITY DEVELOPMENT AGENCY OF THE CITY OF ORD JULY 2014 A. STATEMENT

More information

General Advice. 2 front extensions

General Advice. 2 front extensions Introduction This advice leaflet has been produced to help in the planning of your house extension, by identifying the main points to consider, in order to achieve an acceptable proposal. This leaflet

More information

WILTON CENTRE THE HOME OF BUSINESS & SCIENCE

WILTON CENTRE THE HOME OF BUSINESS & SCIENCE WILTON CENTRE THE HOME OF BUSINESS & SCIENCE Unique Office Space to Let Welcome to the Unique Place for Business. Does your current space or the space you are looking at have: Offices from 2 desks to 500

More information