AREVA NP Our experiences with Rosatom



Similar documents
Electrical Systems. Emergency Diesel Generator Solutions

Solutions for Nuclear & Renewable Power Generation

AREVA: supply chain network principles and company s vision

Rosatom Investment Projects. Perspective in Europe and in the world

The TVEL Fuel Company of Rosatom CREATING FUTURE TODAY

Application of FPGA-based Safety Controller for Implementation of NPPs I&C Systems Vladimir Sklyar, Technical Director

AES-92 for Belene: The Mystery Reactor

AREVA's Energy Storage Solutions

Russian Nuclear Power Program (past, present, and future) Dr. Igor Pioro Senior Scientist CRL AECL

Olkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011

Akkuyu Nuclear Power Plant the first NPP plant configured on BOO principles

AREVA: Global leader in low-carbon power generation

ŠKODA JS a.s. Praha 7.září Jan Blažek úsek Technika

Jan Zdebor David Pavlis. ŠKODA JS a.s. and its Cooperation with Czech Universities

CONTENTS. International Assistance...Page 31 NRC Programs...Page 46 DOE Programs...Page 65. Overview (with map)...page 84

Join the UK Nuclear Renaissance. Procurement & Quality Process

Piping Systems for Nuclear Power Industry. Prague, October 2011

Totally Integrated Power SIESTORAGE. The modular energy storage system for a reliable power supply.

Public SUMMARY OF EU STRESS TEST FOR LOVIISA NUCLEAR POWER PLANT

Plutonium Watch. Tracking Plutonium Inventories by David Albright and Kimberly Kramer. July 2005, Revised August 2005

Q Q Change Change LFL

AREVA, an unparalleled experience in building nuclear reactors

Teollisuuden Voima Oyj - General Presentation January Ilkka Mikkola Senior Adviser (Former Fuel Manager) Teollisuuden Voima Oyj

Nuclear Safety First POWER

8 Emergency Operating Procedures (EOPs) and Severe Accident Management Guidelines (SAMGs) - Issue 06

Global Nuclear Power Developments Asia Leads The Way

Building New Generation Nuclear Plants Worldwide : AREVA's Experience

AREVA Advanced nuclear power plants

Olkiluoto 3 Project June 2010

A Nuclear New Deal. Jacques Besnainou. President, AREVA Inc. AREVA

AREVA. Solutions for Nuclear & Renewable Power Generation

INVESTING IN A TRANSITIONING SECTOR

An overview of available reactor designs 2012 Jim Thomson

Safety of New Nuclear Power Plants

AREVA is Clean Energy and American Jobs Ohio Manufacturers Association April 28, 2010 Columbus, OH

Best Practices and Approaches to Supply Chain Management

GNS Activities - Solutions for Russian Spent Fuel -

New nuclear project financing Warsaw, June 26, 2013 p. 1

Nuclear Education & Training in France. Support to Newcomer and Expanding Countries

Westinghouse and the AP1000 Offering Great Opportunity for the Czech Republic

Nuclear Power Policy in Russia

February Service Division. Unrestricted Siemens AG All rights reserved.

Volkswagen Financial Services AG

Qualification of In-service Inspections of NPP Primary Circuit Components

Bostik International Presence

Rosatom Integrated NPP Construction Solution

Allianz offers customers an increasing number of Green Solutions

The EPR reactor the reference for New Build

US EPR nuclear technology and market outlook

Nuclear Consultancy & Engineering Services

The World Nuclear Industry Status Report 2014

Long term support solutions for Nuclear Instrumentation & Control

Westinghouse Electric Company Overview

The EPR design: the European reference

NUKEM History or the Roots of NUKEM. Alzenau, August 2013

POWER & RENEWABLE ENERGY SERVICES

GE Grid Solutions. Providing solutions that keep the world energized Press Conference Call Presentation November 12, Imagination at work.

Testing and Utilization of Loviisa Full Scope Apros Model in Engineering and Development Simulator

Appointments within the AREVA group

Building on +60 GW of experience. Track record as of 31 December 2013

Presentation of Grupo ACS. September 2009

Improving regulatory practices through the OECD-NEA Stress Corrosion Cracking and Cable Ageing Project (SCAP)

Bay Zoltán Foundation for Applied Research. Bay Zoltán Foundation for Applied Research

Xantrex Acquisition. July 2008

IAEA-TECDOC-922 XA Performance analysis

Drivers and approach for the design of the EPR reactor

Steven A. Arndt Division of Engineering Office of Nuclear Reactor Regulation

ADDITIONAL INFORMATION ON MODERN VVER GEN III TECHNOLOGY. Mikhail Maltsev Head of Department JSC Atomenergoproekt

Russian approach to organization of international cooperation in the field of nuclear infrastructure (NI)

EOS Services. EOS Services Competent Support in all Areas of Additive Manufacturing

The Status of Nuclear Power in the World Before and After Fukushima

Foreign Obligations Notification Process

PGE - Polish Energy Group. Nuclear power development in Poland - we need decision today. Organisation of the Polish Power Sector After Consolidation

Management of delayed nuclear power plant projects

Swiss media visit to Olkiluoto August 15, 2014

TURKISH NUCLEAR POWER PROGRAMME NUCLEAR ENERGY PROJECT IMPLEMENTATION DEPARTMENT

Introduction to Nuclear Fuel Cycle and Advanced Nuclear Fuels

OCTOBER Russell-Parametric Cross-Sectional Volatility (CrossVol ) Indexes Construction and Methodology

Power Island. Industrial Power Plants. / energy

Power transformers. Generator step-up and system intertie power transformers Securing high-quality AC transmission

PMR. IT outsourcing in Central and Eastern Europe FREE ARTICLE.

POWER & RENEWABLE ENERGY SERVICES

Nuclear Energy of Ukraine - History

SCI/VERKEHR COLOGNE 2008 THE WORLD MARKET FOR ELECTRIC LOCOMOTIVES. Rolling Stock, Procurements, Manufacturers, Market Development

Source Term Determination Methods of the Slovenian Nuclear Safety Administration Emergency Response Team

COMPANY PROFILE. ATOMEX Prague, October 26, KRÁLOVOPOLSKÁ RIA, a.s. strana 1

Siemens Hybrid Power Solutions. Cost and emission reduction by integrating renewables into diesel plants

World Solution Provider

Generic PCSR Sub-chapter 15.4 : Electrical Equipment

A seismic switch. Certified switchgear for nuclear power plants is providing a critical link in the chain

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

FPGA- based technology and systems for I&C of existing and advanced reactors

Fleet Logistics and TÜV SÜD in strategic partnership

Transcription:

AREVA NP Our experiences with Rosatom Atomex Marion Horstmann Vice President Offers and Partnerships Large Projects AREVA Germany Budapest 30 November 01 December, 2015

Content AREVA in Germany Our experience with VVER plants Competencies at AREVA Conclusion AREVA - AL: xx - ECCN: xx - p.2

Content AREVA in Germany Our experience with VVER plants Competencies at AREVA Conclusion AREVA - AL: xx - ECCN: xx - p.3

Front-End Division AREVA Business Groups Executive Board & Committee Nuclear BG Mining BG Front-End BG Reactors & Services BG Back-End BG Renewable Energies Uranium mines exploration and operation activities Conversion and enrichment of the uranium and design of the fuel for the nuclear reactors Design and construction of nuclear reactors Maintenance and modernization of the nuclear power plants Recycling of the used fuel and provider of clean-up and dismantling services Development of wind energy, bio-energy, solar power and hydrogen power solutions Engineering & Projects (E&P) Organization AREVA - AL: xx - ECCN: xx - p.4

Reactors & Services BG Identity Card Key figures 2014 (excl. Large Projects) Order book: 5,498 million Sales: 2,459 million France ~ 52 % Americas ~ 18 % Europe (outside France) ~ 18 % Asia-Pacific ~ 12 % ~ 10,000 employees in > 10 countries France, Germany, USA, Canada, China, Spain, Sweden, Industrial footprint > 20 sites worldwide 6 AREVA/R&S companies located in China 5 Technical Centers in Germany, USA and France AREVA - AL: xx - ECCN: xx - p.5

AREVA GmbH legal structure AREVA NP S.A.S Lingen Berlin 100% Sweden, Helsingborg / Karlskrona AREVA GmbH Spain, Zaragoza Slovakia, Bratislava Erlangen 100% 100% 100% 100% 100% Advanced Nuclear Fuels GmbH DSR Ingenieurgesellschaft mbh AREVA NP Services Spain S.L.U. AREVA NP Uddcomb AB AREVA NP Controls s.r.o. headquarters AREVA - AL: xx - ECCN: xx - p.6

AREVA in Germany: Sales 2014 Sales AREVA GmbH *) in Germany: 1,077 Mio Strong focus on export: New build contribution already today at 100 % export Share Germany 29% Installed Base: 79 % export share Fuel business focuses more and more on export: 58 % in 2014 Share export 71% *) IFRS, incl. subsidiaries AREVA - AL: xx - ECCN: xx - p.7

AREVA: Business in and out of Germany Europe Asia North- / South- America Installed Base: Modernization, Safety Upgrades, Engineering Services, I&C Fuel: Pressurized Water Reactors / Boiling Water Reactors, MOX* / ERU* business New builds: OL 3, FA 3, TSN 1 & 2; upcoming: Hinkley Point D&D: competence center established in Germany while at the same time focusing on projects abroad (UK, Japan) * MOX = Mixed uranium and plutonium OXides * ERU = Enriched Reprocessed Uranium AREVA - AL: xx - ECCN: xx - p.8

Content AREVA in Germany Our experience with VVER plants Competencies at AREVA Conclusion AREVA - AL: xx - ECCN: xx - p.9

Tianwan 1&2 I&C, E In operation Under constr. Model: 230 213 320 2006 RBMK-Radwaste Processing: Kursk, Ignalina Loviisa 1+2 I&C Activities in VVER (1991-2015) Kola 1-4 Components & Services I&C Dukovany 1-4 Components I&C Bohunice 3&4 Comp. & Serv. Modernization I&C, E Paks 1-4 Comp. & Serv. I&C Temelin 1+2 Components Kozloduy 5&6 Comp. & Serv. Modernization I&C, E Mochovce 1+2 Comp. & Serv. Modernization I&C, E Mochovce 1+2 I&C, E Belene 1&2 I&C, E Rovno Components South Ukraine Comp. & Serv. Khmelnitzky 1+2 Comp. & Services Leningrad II/1 I&C Kalinin Components Novovoronezh Comp. & Serv, I&C, E Zaporozhye Comp.& Serv. Modernization Rostov Components Balakovo Components Metsamor Components AREVA - AL: xx - ECCN: xx - p.10

Modernization Projects from 1992-2005 EBO V1 Stepwise Reconstruction in operation since 1979/80 (200 million EURO) Detailed eng. + implem. Basic engineering SE / EBO SE / EBO EMO 1+2 Safety Improvements under construction since 1983 (100 million EURO) 50% of improvements to EUCOM SE / EMO SES Tlmace VUJE RELKO SKODA Siemens VUJE REKON Siemens Siemens EUCOM FRA Skoda Praha E G P VUJE R U S Paks 1-4 New Digital Safety I&C in operation since 1983/87 (20 million EURO) MVMT / Paks Kozloduy 5+6 Upgrade in operation since 1987/89 (25 million EURO for basic eng. plus 250 million EURO for realization incl. 30% local portion) NEK Siemens Hungarian companies Paks Siemens ECK AEE FRA Westinghouse AREVA - AL: xx - ECCN: xx - p.11

NPP Kozloduy 5&6 Modernization project Contract Structure Customer: Supplier: Kozloduy NPP plc European Consortium Kozloduy (ECK) (Siemens AG, Framatome SAS, Atomenergoexport) Overall scope: 42 measures, 60% systems and mechanical components, 40% I&C and Electrical systems with the following objectives: to provide a 100% financing scheme (Euratom, Rosexim, export loans) to meet the safety requirements of Western Europe and to benefit from experiences of the original designers AREVA - AL: xx - ECCN: xx - p.12

Bulgaria, Kozloduy Unit 5&6 (2001-2006) Safety I&C TXS-Coolant overpressure protection system (COP) Electronic for RPV level measurement Non-safety I&C TXP for water treatment facility VVER 320 Radiation monitoring Improvement of emergency power supply and electrical systems Additional DG for important unit consumers (2 x 5,4 MW) Modernization of I&C (TXS) and electrical equipment of emergency DG (6 delivered, 1 DG commissioned) New generator & transformer protection New transformer temperature control New fault recording equipment New protection relays for 6 KV switchgears Partly new MV and LV-switchgears for auxiliary power supply Improvement of fire detection and fighting systems Installation of new diagnostic systems in reactor building AREVA - AL: xx - ECCN: xx - p.13

TELEPERM XS Projects with focus on VVERs 1&2 AREVA - AL: xx - ECCN: xx - p.14

Ongoing Projects in VVER plants China: Tianwan 3+4, I&C and EDG for VVER 1000 Customer CNNC / JNPC NI Designer: Atomstroyexport; CI Designer: CNPE (subsidiary of CNNC) Duration: 2011 2018 Scope: I&C 140 TXS Cabinets, Electrical Systems, Field Equipment, H2- Monitoringsystem; Consortium with Siemens / SPPA Unit 5 Russia Fleet: Safety-I&C in VVER domestic with partner VNIIAES New Build Project Novovoronezh II-1 12/2009 12/2014 New Build Project Leningrad II-1 07/2010 12/2014 Modernization on KOLA 3+4 01/2011 08/2014 New Build Project Baltic 1&2: (U2 susp.) 07/2012 12/2015 New Build Project Leningrad II-2 03/2014 06/2016 New Build Project Novovoronezh II-2 06/2014 09/2016 Slovakia: Mochovce 3&4, I&C for VVER 440 Customer Slovenske Elektrarne Duration: 2010 2017 Scope: I&C 200 TXS Cabinets, Power Suply Consortium with Siemens * DCS Distributed Control System AREVA - AL: xx - ECCN: xx - p.15

Our experience with VVER plants We have been working, supplying and cooperating under various contractual schemes for different VVER plants Bohunice, Mochovce, Paks, Kozloduy, Tianwan, NPP 2006 (NW-II, LNPP-II) We may provide staff with Competences at VVER plants related to Engineering, Procurement, Construction, After sales service Ability to create Synergies between Russian and Western Technology. Knowing Russian culture and language Who also participated in the International Framework, e.g.: IAEA program for safety review of VVER, others EU - TACIS/PHARE other support programs: SAR, NDT, diagnostic, r/a waste treatment, on-site assistance, training centre Ukraine AREVA - AL: xx - ECCN: xx - p.16

Content AREVA in Germany Our experience with VVER plants Competencies at AREVA Conclusion AREVA - AL: xx - ECCN: xx - p.17

Installed Base Business Division A comprehensive portfolio Recurring Activities Modernization New plants equipment Outage Services Non Destructive Examinations Special repairs Lifetime Extension studies Power uprates I&C, electrical systems Heavy and mobile components replacement Safety improvement solutions I&C Electrical systems Containment systems Diagnosis & monitoring

Our New Plants Equipment Which is already licensed in Finland, UK, France Emergency power supplies Waste treatment systems Containment Products Diagnose and Monitoring Reactor Coolant Pumps Suppliers qualification Equipment qualification Safety and non safety I&C Core & field instrumentation / radiation monitoring AREVA - AL: xx - ECCN: xx - p.19

Other support for New Build Plants Electrical systems Licensing & safety studies Consulting for new nuclear codes requirements Design support, e.g. for APC, seismic, cooling in dessert, HVAC in accordance to requested codes and standards AREVA - AL: xx - ECCN: xx - p.20

From Design to Commissioning Design & construction of nuclear facilities Upgrade, modernization & dismantling of existing facilities Technical support to R&D of nuclear facilities Installation and Commissioning Support of systems and nuclear facilities AREVA - AL: xx - ECCN: xx - p.21

AREVA Competence in Nuclear Code Application AREVA actively maintains its KTA involvement AREVA holds and maintains various certificates, providing relevant code knowledge YVL, GOST Where ever we perform we adapt to the nuclear codes and regulations These are part of AREVA s expertise portfolio AREVA - AL: xx - ECCN: xx - p.22

AREVA in Germany Our experience with VVER plants Competencies at AREVA Conclusion AREVA - AL: xx - ECCN: xx - p.23

What do we have: Operations with Rosatom affiliates for more than 20 years Summary Significant VVER know-how and references in Russia and abroad Personnel is fluent in Russian language Last time focus was more on the I&C, but we see additional cooperation areas. What we can contribute to make your projects even more successful: Engineering competencies, know-how and products, esp. BNI, I&C and electrical systems Available supply chain in many countries Country-specific licensing know-how And many others AREVA - AL: xx - ECCN: xx - p.24

Editor and Copyright [Date]: AREVA GmbH Paul-Gossen-Straße 100 91052 Erlangen, Germany. It is forbidden to reproduce the present publication in its entirety or partially in whatever form without prior consent. Legal action may be taken against any infringer and/or any person breaching the aforementioned prohibitions. Subject to change and error without notice. Illustrations could be similar. The statements and information in this brochure are for advertising purpose only and do not constitute an offer of contract. They shall neither be construed as a guarantee of quality or durability, nor as warranties of merchantability and fitness for a particular purpose. These statements are based on information that was available to us at the date of publication. Only the content of the individual contracts shall be authoritative for type, quantity and properties of goods and services. AREVA - AL: xx - ECCN: xx - p.25

Backup: Technology AREVA - AL: xx - ECCN: xx - p.26

VVER References (1) TELEPERM XS I&C Since late 1990ies, AREVA is a reference supplier of the following I&C equipment for VVER NPPs: Reactor safety and I&C systems for NPPs in Europe and China: Mochovce 3&4 and Bohunice 3&4, Slovakia Loviisa 1&2, Finland Paks 1-4, Hungary Tianwan 1&2, China AREVA is the only supplier of safety I&C equipment for NPPs with VVER reactors of AES-2006 design: Leningrad NPP-2 Novovoronezh NPP-2 Baltic NPP Kola NPP (units 3&4)

VVER References (2) PAR Passive hydrogen removal systems Excellent performance of PAR systems is confirmed by over 15 years of their application at NPPs with Russian-design reactors: Europe Dukovany 1-4, Temelin 1&2 (Czech Republic) Kozloduy 3-6 (Bulgaria) Paks 1-4 (Hungary) Mochovce 1&4 and Bohunice 3&4 (Slovakia) Rovno (Ukraine) Russia and China Kalinin and Rostov (Russia) Tianwan 1&2 (China)

VVER References (3) Monitoring and diagnostic equipment AREVA offers unique monitoring and diagnostic technologies for the basic reactor components. Systems developed by AREVA are applied worldwide, including VVER NPPs: Valve diagnostic systems (ADAM and SIPLUG): Smolensk and Balakovo, Russia Zaporozhie, Ukraine Vibration monitoring system (SÜS): Novovoronezh, Kola and Balakovo, Russia Mochovce and Bohunice, Slovakia Dukovany, Czech Republic Loose parts monitoring system (LPMS/KÜS): Novovoronezh, Kola and Balakovo, Russia Mochovce and Bohunice, Slovakia Dukovany, Czech Republic Kozloduy, Bulgaria Leakage monitoring system (FLÜS): Kalinin, Kola and Novovoronezh, Russia Mochovce and Bohunice, Slovakia Kozloduy, Bulgaria Fatigue monitoring system (FAMOS) Kalinin, Russia Mochovce, Slovakia Kozloduy, Bulgaria

NDT equipment Since early 1980ie, AREVA supplies various non-destructive testing systems both to NPPs and to reactor manufacturer plants: Country, NPP VVER References (4) Ultrasonic testing Eddycurrent testing SG manipulators, etc. Loviisa, Finland Paks, Hungary Dukovany, Czech Republic Vitcovice, Czech Republic Bohunice, Slovakia Tianwan, China Rovno, Ukraine Kola, Russia ZIO, Russia Novovoronezh, Russia Balakovo, Russia

Backup: VVER Reference / проекты ВВЭР (6) NPP Belene 2007- (canceled) Main Contractor Atomstroyexport Sub-supplier AREVA with Siemens (~25%) Safety and operational I&C Reactor Protection System (RTS, ESFAS) Reactor Limitation System Reactor Control System (ARM) Post Accident Monitoring System Passive Heat Removal Activation Plant Process Instrumentation Main and Emergency Control rooms Full Scale Simulator Auxiliary & emergency power supply MV-switchgears (6 kv) LV-switchgears (400 V) Uninterruptable power supply (batteries, inverters, converters) Power supply cables and I&C cables High frequency monitoring system Generator & transformer protection, generator excitation Heating-Ventilation-Air Conditioning / Hydrogen Recombiners D.Reichenbach 19.07.2014 - AREVA GmbH Proprietary - RESTRICTED AREVA - AREVA - AL: xx - ECCN: xx - p.31