1 Application of FPGA-based Safety Controller for Implementation of NPPs I&C Systems Vladimir Sklyar, Technical Director Seminar FPGA-based I&C Systems in Nuclear Applications February 4, 2015, Energiforsk, Sweden

2 Agenda Company Radiy at a glance FPGA-based Safety Platform RadICS Licensing of NPPs FPGA-based I&C Applications NPPs FPGA-based I&C applications designed Radiy 2

3 Company Radiy at a glance 3

4 Radiy Quick Facts 920 employees, 200 engineers, headquartered in Kirovograd, Ukraine Annual turnover: 100 million Euros Main profile: FPGA-based I&C systems for NPPs 20 years in servicing the NPP industry in the Ukraine 17 years in providing FPGA-based systems to the NPP industry in the Ukraine 7 years in providing FPGA-based systems to the NPP industry in Bulgaria All in-house processes (vertical structure): design, procurement, manufacturing, testing, installation 4

5 I&C modernization projects Customized solutions and products Working closely with customer in each project phase Accommodates outage schedules with minimum installation time Long-term technical support, spare parts, warranties Licencing support, adapting to national licensing processes Using pre-certified or standardized universal components (RadICS platform) to easy regulatory approval Working with local partner companies, subcontractors, and service providers 5

6 I&C modernization projects (continued) Turn-key projects: Complete replacement of systems Long-term technical support and maintenance Small-scale stand-alone applications Reverse engineering or re-engineering Like-for-like solutions Form, fit and function (FFF) solutions One-time development and applications 6

7 Complete I&C systems installed in operating NPPs in Ukraine and Bulgaria Reactor Trip System (RTS), Engineered Safety Features Actuation System (ESFAS), Reactor Power Control and Limitation System (RPCLS), Rod Control System (RCS), Switchgear and Electrical Distribution Systems, Nuclear Island Control System, and Turbine Island Control System. 7

8 FPGA-based Safety Platform RadICS 8

9 Radiy products evolution Started development and supply of the equipment for NPP I&C systems First generation of equipment for NPP I&C systems Second generation of equipment for NPP I&C systems Third generation of equipment for NPP I&C systems Replacement of obsolete NPP I&C modules FPGA-based I&C systems for NPP FPGA-based I&C platform for NPP SIL3 certified FPGA-based I&C platform for NPP 9

10 RadICS Platform: HW configuration Sets of modules, chassis and their cabinets are produced and tested 10

11 SIL3 in single channel configuration 11

12 RadICS platform benefits SIL3 Certificate is a warranty of the highest safety requirements implementation RadICS-based systems have been implemented in Ukraine, Bulgaria and Argentina FPGA technology benefits: Diversity with PLC-based equipment Transparency, parallelism, and determinism of design High speed performance Absence of system software and high level of cybersecurity Obsolescence resistance 12

13 Licensing of NPPs FPGAbased I&C Applications 13

14 Radiy s experience in licensing of FPGA-based applications Since 1998: safety and safety-related I&C systems for Ukrainian NPPs (IEC and IAEA standards set with national requirements) : Bulgaria, 6 ESFAS for Kozloduy NPP (IEC and IAEA standards set), Safety Class 2 (Category A) safety systems : RadICS platform SIL3 certification (IEC 61508), exida was a Certification Authority : Canada, Argentina, Window Annunciators, Pump Motor Speed Measuring Devices, Category A functions safety systems (IEC 61508, IEC 61226, IEC 61513) 2015: EdF, I&C Test Platform for R&D project (IEC 61226, IEC 61508, IEC 61513, IEC 60880, IEC 62566), licensing case study for Category A functions FPGA-based systems Since 2009: Radiy has been represented in IEC TC45A Instrumentation, control and electrical systems of nuclear facilities and has participated in standards development Analysis of national regulatory requirement of Finland, France, Slovakia, Hungary and other Since 2015: Preparation to QMS certification against 10CFR50, Appendix B and introducing Radiy to U.S. NRC 14

15 RadICS Platform: Modules connection into the chassis 15

16 Safety Life Cycle based on pre-qualified platform (IEC 62566) HPD requirements specification Verification HPD Hardware Description Language (HDL) based Programmable Device HPD aspects of system validation HPD design Verification HPD aspects of system integration Verification HPD implementation Verification 16

17 V&V technics Documents Review Failure and Mode Effect Analysis (FMEA) Static Code Analysis and Code Review HDL Code Functional Testing Logic Level Simulation, Timing Simulation and Static Timing Analysis (for FPGA Electronic Design) Reports Review of Synthesis, Place and Route, Bitstream Generation (for FPGA Electronic Design) Fault Insertion Testing (FIT) for the platform level Integration Testing, Validation Testing 17

18 Supporting life cycle processes and Project Management Activities Safety Case Functional Safety Management Functional Safety Audits Requirement Tracing Personnel Management Documentation Management Action Tracking Configuration Management and Change Control Tools Selection and Evaluation Security Management and Assessment 18

19 Equipment Qualification IEC 60780:1998 ed.2.0 Nuclear power plants - Electrical equipment of the safety system - Qualification IEC :2013 ed.7.0 Environmental testing - Part 1: General and guidance IEC 60980:1989 ed.1.0 Recommended practices for seismic qualification of electrical equipment of the safety system for nuclear generating stations IEC 62003:2009 ed.1.0 Nuclear power plants - Instrumentation and control important to safety - Requirements for electromagnetic compatibility testing IEC x. Electromagnetic compatibility (EMC) - Part 4: Testing and measurement techniques 19

20 Qualified Environmental Limits for RadICS Platform 20

21 NPPs FPGA-based I&C applications designed by Radiy 21

22 ESFAS modernization project for Kozloduy-5,6 General information Kozloduy NPP 2 VVER-1000 SOFIA Modernization of 2 sets of Power Supply equipment for Rod Control System for Units 5,6 ( ) Modernization of 6 Engineering Safety Actuation Systems (ESFAS) for Units 5,6 ( ) Modernization of 10 switchgears sets (RTZO cabinets) of ESFASs and of Nuclear and Conventional Island Control Systems for Units 5,6 ( ) 22

23 ESFAS modernization project for Kozloduy-5,6 Main targets of refurbishment Increase safety of the NPP Peculiarities of FPGA from the point of view of licensing (2) Increase NPP availability Assure long-term operationability Improve human-machine interface for control, diagnostic and maintenance Improve of electrical and physical separation between safety divisions Assure lifetime service and maintenance Comply with regulatory requirements Assure fast implementation of modernization project Assure minimization of on-site premises reconfiguration 23

24 ESFAS modernization project for Kozloduy-5,6 General schedule of modernization project 24

25 ESFAS modernization project for Kozloduy-5,6 (Kozloduy NPP, Unit 6, 1st ESFAS) I&C INSTALLATION 19 th of September st Day 24th of September th Day 25th of September th Day 28th of September th Day 25

26 ESFAS modernization project for Kozloduy-5,6 (Kozloduy NPP, Unit 6, 1st ESFAS) I&C INSTALLATION 3rd of October th Day 26

27 Control Rooms Window Annunciators for Embalse NPP (Argentina) based on RadICS platform 27

28 Pump Motor Speed Measuring Devices for Embalse NPP (Argentina) based on FPGAs 28

29 Radiy s contract with EdF The subject of the contract is leasing of the Radiy s I&C test platform The hardware of I&C test platform includes a cabinets, power supply modules, platform chassis and modules (LM, DIM, AIM, DOM, AOM) and test equipment (National Instruments) Services include application design and implementation onto the platform, installation the platform at the EdF site, training and technical assistance The project duration is 3 years with an option to extend the duration of the lease on a yearly basis for a maximum of 3 additional years 29

30 I&C system of IEA-R1 Research Reactor, IPEN-CNEN institute (Sao Paulo, Brazil) IEA-R1 Open-pool Reactor built by Babcock-Wilcox and commissioned in 1957, 2-5 MW power, is currently operating with 3.5 MW power The contract scope includes turnkey modernization of five neutron flux measurement channels with appropriate control logic section and HMI Equipment list includes two Signal Processing Cabinets, Computer Cabinet and Operator Panel Contract performance time is

31 Conclusions FPGA technology provides a chain of benefits for Nuclear Applications There are FPGA-based safety and non-safety solutions fit to be installed at NPPs Since 1990s there are a lot of success stories in FPGA-based nuclear applications licensing, installation, and operation 31

32 Thank you for your attention! Research & Production Corporation Radiy 29, Geroyiv Stalingrada Street, Kirovograd 25006, Ukraine

FPGA- based technology and systems for I&C of existing and advanced reactors

FPGA- based technology and systems for I&C of existing and advanced reactors International Conference on Opportunities and Challenges for Water Cooled Reactors in the 21st Century Vienna, Austria, 27 30 October 2009 FPGA- based technology and systems for I&C of existing and advanced

More information

MDEP Generic Common Position No DICWG 02

MDEP Generic Common Position No DICWG 02 MDEP Generic Common Position No DICWG 02 Related to: Digital Instrumentation and Controls Working Group activities COMMON POSITION ON SOFTWARE TOOLS FOR THE DEVELOPMENT OF SOFTWARE FOR SAFETY SYSTEMS 1

More information

IAEA 2015 INTERNATIONAL CONFERENCE ON COMPUTER SECURITY IN A NUCLEAR WORLD

IAEA 2015 INTERNATIONAL CONFERENCE ON COMPUTER SECURITY IN A NUCLEAR WORLD IAEA 2015 INTERNATIONAL CONFERENCE ON COMPUTER SECURITY IN A NUCLEAR WORLD A NEW IEC STANDARD FOR CYBERSECURITY FOR NUCLEAR POWER PLANTS: IEC 62645 - REQUIREMENTS FOR SECURITY PROGRAMS FOR COMPUTER-BASED

More information

Announcement of a new IAEA Co-ordinated Research Programme (CRP)

Announcement of a new IAEA Co-ordinated Research Programme (CRP) Announcement of a new IAEA Co-ordinated Research Programme (CRP) 1. Title of Co-ordinated Research Programme Design and engineering aspects of the robustness of digital instrumentation and control (I&C)

More information

Steven A. Arndt Division of Engineering Office of Nuclear Reactor Regulation

Steven A. Arndt Division of Engineering Office of Nuclear Reactor Regulation Current and Future Use of IEEE and IEC Consensus Standards in the Regulation of Digital Instrumentation and Control Systems in the Nuclear Power Industry Steven A. Arndt Division of Engineering Office

More information

Long term support solutions for Nuclear Instrumentation & Control

Long term support solutions for Nuclear Instrumentation & Control Long term support solutions for Nuclear Instrumentation & Control...ensuring the long-term safety and availability of your I&C systems. 02 LONG TERM SUPPORT SOLUTIONS Maintaining the safe and reliable

More information

AN APPLICATION STUDY FOR THE CLASS IE DIGITAL CONTROL AND

AN APPLICATION STUDY FOR THE CLASS IE DIGITAL CONTROL AND - 39 - AN APPLICATION STUDY FOR THE CLASS IE DIGITAL CONTROL AND MONITORING SYSTEM m,,,.,.., HIROYUKIFUKUMITSU Nuclear Power Plant Department, EISC MITSUBISHI ELECTRIC CORPORATION Kobe, Japan XA9846493

More information

Human Factors in Design and Construction Regulatory Perspective

Human Factors in Design and Construction Regulatory Perspective Further needs in the Area of management systems Safety culture, leadership and preoperational stages of nuclear projects Human Factors in Design and Construction Regulatory Perspective Technical Meeting,

More information

Nuclear Consultancy & Engineering Services

Nuclear Consultancy & Engineering Services Insert a caption to go with the photograph in here ITER, France Wednesday, 14 December 2011 Nuclear Consultancy & Engineering Services T H E N U C L E A R A T K I N S A S S Y S T E M A L L I A N C E CONSTRUCTION

More information

IEC 61508 Functional Safety Assessment. Project: K-TEK Corporation AT100, AT100S, AT200 Magnetostrictive Level Transmitter.

IEC 61508 Functional Safety Assessment. Project: K-TEK Corporation AT100, AT100S, AT200 Magnetostrictive Level Transmitter. 61508 SIL 3 CAPABLE IEC 61508 Functional Safety Assessment Project: K-TEK Corporation AT100, AT100S, AT200 Magnetostrictive Level Transmitter Customer: K-TEK Corporation Prairieville, LA USA Contract No.:

More information

Cyber Security Design Methodology for Nuclear Power Control & Protection Systems. By Majed Al Breiki Senior Instrumentation & Control Manager (ENEC)

Cyber Security Design Methodology for Nuclear Power Control & Protection Systems. By Majed Al Breiki Senior Instrumentation & Control Manager (ENEC) Cyber Security Design Methodology for Nuclear Power Control & Protection Systems By Majed Al Breiki Senior Instrumentation & Control Manager (ENEC) 1. INTRODUCTION In today s world, cyber security is one

More information

RADIATION MONITORING SYSTEMS

RADIATION MONITORING SYSTEMS RADIATION MONITORING SYSTEMS Area monitors Process monitors In-line, Adjacent-to-Line monitors Local/remote processors, Data Acquisition Systems NUPIC Certified, NRC Approved Vendor Wide Range Sensitivity

More information

Electrical Systems. Emergency Diesel Generator Solutions

Electrical Systems. Emergency Diesel Generator Solutions Electrical Systems Emergency Diesel Generator Solutions AREVA Competence in Emergency Power Supply Emergency Diesel Generators (EDGs) Business Areas e Modernization of existing EDGs p Customer support

More information

Nuclear Power Plant Electrical Power Supply System Requirements

Nuclear Power Plant Electrical Power Supply System Requirements 1 Nuclear Power Plant Electrical Power Supply System Requirements Željko Jurković, Krško NPP, [email protected] Abstract Various regulations and standards require from electrical power system of the

More information

IAEA-TECDOC-1328 Solutions for cost effective assessment of software based instrumentation and control systems in nuclear power plants

IAEA-TECDOC-1328 Solutions for cost effective assessment of software based instrumentation and control systems in nuclear power plants IAEA-TECDOC-1328 Solutions for cost effective assessment of software based instrumentation and control systems in nuclear power plants Report prepared within the framework of the Technical Working Group

More information

Achieving Functional Safety with Global Resources and Market Reach

Achieving Functional Safety with Global Resources and Market Reach Achieving Functional Safety with Global Resources and Market Reach 0A 0B Burner management systems Combustion controls Electric vehicle components (on-board, off board) Electrosensitive equipment Elevator

More information

Design Feature and Prototype Testing Methodology of DHIC s Nuclear I&C System

Design Feature and Prototype Testing Methodology of DHIC s Nuclear I&C System IAEA-CN-164-7S03 Design Feature and Prototype Testing Methodology of DHIC s Nuclear I&C System K.H. Kim, S.Y. Baeg, S.A. Kim, S.J. Lee, S.P. Yoon, C.Y Park Doosan Heavy Industries & Construction, Changwon,

More information

Development and Application of POSAFE-Q PLC Platform

Development and Application of POSAFE-Q PLC Platform Development and Application of POSAFE-Q PLC Platform MyeongKyun Lee a, SeungWhan Song a, DongHwa Yun a a POSCO ICT Co. R&D center, Korea Techno-complex 126-16, 5-ka, Anam-dong, Sungbuk, Seoul, Republic

More information

AP1000 European 18. Human Factors Engineering Design Control Document

AP1000 European 18. Human Factors Engineering Design Control Document 18.2 Human Factors Engineering Program Management The purpose of this section is to describe the goals of the AP1000 human factors engineering program, the technical program to accomplish these goals,

More information

7.0 Instrumentation and Controls

7.0 Instrumentation and Controls 7.0 Instrumentation and Controls 7.1 Introduction Chapter 7 describes the instrumentation and controls (I&C) systems for the U.S. EPR. The description of the I&C systems includes system classifications,

More information

ELECTROTECHNIQUE IEC INTERNATIONALE 61508-3 INTERNATIONAL ELECTROTECHNICAL

ELECTROTECHNIQUE IEC INTERNATIONALE 61508-3 INTERNATIONAL ELECTROTECHNICAL 61508-3 ª IEC: 1997 1 Version 12.0 05/12/97 COMMISSION CEI ELECTROTECHNIQUE IEC INTERNATIONALE 61508-3 INTERNATIONAL ELECTROTECHNICAL COMMISSION Functional safety of electrical/electronic/ programmable

More information

Nuclear Power Station Control and Instrumentation Safety Systems Architecture An Overview

Nuclear Power Station Control and Instrumentation Safety Systems Architecture An Overview Nuclear Power Station Control and Instrumentation Safety Systems Architecture An Overview Jim Thomson, v.2 1. Introduction 1.1. Why are the architectures of safety systems different in nuclear, oil and

More information

Chernobyl and Fukushima Lessons for Nuclear Power Plants Instrumentation and Control Systems

Chernobyl and Fukushima Lessons for Nuclear Power Plants Instrumentation and Control Systems Mikhail Yastrebenetsky PhD, Dr. Sc., Prof. Honored Scientist of Ukraine State Scientific and Technical Center for Nuclear and Radiation Safety Chernobyl and Fukushima Lessons for Nuclear Power Plants Instrumentation

More information

Jan Zdebor David Pavlis. ŠKODA JS a.s. and its Cooperation with Czech Universities

Jan Zdebor David Pavlis. ŠKODA JS a.s. and its Cooperation with Czech Universities Jan Zdebor David Pavlis ŠKODA JS a.s. and its Cooperation with Czech Universities History 1859 - foundation of the primary ŠKODA company 1956 - initiation of ŠKODA's nuclear programme 1974 - start of the

More information

I&C Status in France & Recommendations to IAEA

I&C Status in France & Recommendations to IAEA I&C Status in France & Recommendations to IAEA IAEA TWG-NPPIC Meeting 22-24 May 2013 Vienna Patrick SALAUN EDF R&D Contents 1. I&C projects at EDF NPPs The 900 MW series 3 rd Ten-Yearly Outage 4 th Ten-Yearly

More information

Piping Systems for Nuclear Power Industry. Prague, October 2011

Piping Systems for Nuclear Power Industry. Prague, October 2011 Piping Systems for Nuclear Power Industry Prague, October 2011 Introduction of the company Leading Czech supplier of piping systems for power engineering 60 years of experience in the field of power industry

More information

Hardware in the Loop (HIL) Testing VU 2.0, 182.117, WS 2008/09

Hardware in the Loop (HIL) Testing VU 2.0, 182.117, WS 2008/09 Testen von Embedded Systems Hardware in the Loop (HIL) Testing VU 2.0, 182.117, WS 2008/09 Raimund dkirner Testing Embedded Software Testing the whole system including the physical environment is not possible

More information

Nuclear Power Plant Instrumentation and Control in MEXICO

Nuclear Power Plant Instrumentation and Control in MEXICO 25 th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumentation and Control (TWG -NPPIC) Nuclear Power Plant Instrumentation and Control in MEXICO Dr. Francisco Javier Ramírez-Jiménez

More information

ALS Configuration Management Plan. Nuclear Safety Related

ALS Configuration Management Plan. Nuclear Safety Related Westinghouse Non-Proprietary Class 3 Advanced Logic System 6002-00002-NP, Rev. 10 Function Author Nuclear Safety Related July 2014 APPROVALS Name and Signature Anthony C. Pagano* Integrated Process Lead,

More information

AREVA: supply chain network principles and company s vision

AREVA: supply chain network principles and company s vision AREVA: supply chain network principles and company s vision Virginie MOUCQUOT-LAIHO AREVA Finland Communications Director & Vice Country Manager Oulu, Finland 18.09.2012 1 AREVA & nuclear industry The

More information

Applying NQA-1 Requirements for Computer Software Used in Nuclear Facilities ASME 2014 Small Modular Reactors Symposium April 17, 2014

Applying NQA-1 Requirements for Computer Software Used in Nuclear Facilities ASME 2014 Small Modular Reactors Symposium April 17, 2014 Applying NQA-1 Requirements for Computer Software Used in Nuclear Facilities ASME 2014 Small Modular Reactors Symposium April 17, 2014 Presented by: Norman P. Moreau, PE, CSQE, CQA President and Principal

More information

Building New Generation Nuclear Plants Worldwide : AREVA's Experience

Building New Generation Nuclear Plants Worldwide : AREVA's Experience Building New Generation Nuclear Plants Worldwide : AREVA's Experience Philippe Guay Senior Vice President, New Builds Offers AREVA 37 th WNA Symposium 12-14 September 2012 LONDON Projects status The value

More information

WordPerfect Document Compare Summary

WordPerfect Document Compare Summary WordPerfect Document Compare Summary Original document: P:\RG 1.206 draft\c.iii.5.wpd Revised document: @PFDesktop\:MyComputer\C:\Documents and Settings\dlc3.NRCDOMAIN\Application Data\NRC\ADAMSDesktop\Cache\ML0706300310.wpd

More information

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).

More information

ELECTRICAL AND I&C EQUIPMENT OF A NUCLEAR FACILITY

ELECTRICAL AND I&C EQUIPMENT OF A NUCLEAR FACILITY ELECTRICAL AND I&C EQUIPMENT OF A NUCLEAR FACILITY 1 Introduction 5 2 Scope of application 6 3 Requirement specification, selection, and procurement of electrical and I&C equipment and cables 7 3.1 General

More information

ABB PSPS Erich Steinmann; Generator control-2013

ABB PSPS Erich Steinmann; Generator control-2013 ABB PSPS Erich Steinmann; Generator control-2013 GENERATOR CONTROL THE MODULAR SOLUTION FOR GENERATORS To make sure that power is efficiently converted into electric energy, it is necessary to supervise

More information

FMEDA and Proven-in-use Assessment. Pepperl+Fuchs GmbH Mannheim Germany

FMEDA and Proven-in-use Assessment. Pepperl+Fuchs GmbH Mannheim Germany FMEDA and Proven-in-use Assessment Project: Inductive NAMUR sensors Customer: Pepperl+Fuchs GmbH Mannheim Germany Contract No.: P+F 03/11-10 Report No.: P+F 03/11-10 R015 Version V1, Revision R1.1, July

More information

Management of delayed nuclear power plant projects

Management of delayed nuclear power plant projects IAEA-TECDOC-1110 Management of delayed nuclear power plant projects INTERNATIONAL ATOMIC ENERGY AGENCY The IAEA does not normally maintain stocks of reports in this series. However, electronic copies The

More information

Instrumentation and Control. TELEPERM XS System Overview

Instrumentation and Control. TELEPERM XS System Overview Instrumentation and Control TELEPERM XS System Overview TELEPERM XS System Overview Overview 5 I&C solutions based on TELEPERM XS 6 Safety I&C systems 6 Comprehensive I&C based on SPPA-T2000 and TELEPERM

More information

Power Generation Service Life Cycle Management for Power Plants

Power Generation Service Life Cycle Management for Power Plants Power Generation Service Life Cycle Management for Power Plants Power Generation Service is protecting your Investment by Step-wise Evolution and Updating of Instrumentation, Control and Electrical Systems.

More information

Cyber Security and the Canadian Nuclear Industry a Canadian Regulatory Perspective

Cyber Security and the Canadian Nuclear Industry a Canadian Regulatory Perspective Cyber Security and the Canadian Nuclear Industry a Canadian Regulatory Perspective Terry Jamieson Vice-President Technical Support Branch Canadian Nuclear Safety Commission August 11, 2015 www.nuclearsafety.gc.ca

More information

Alain Nifenecker - General Electric Manager Controls Engineering

Alain Nifenecker - General Electric Manager Controls Engineering GE Energy Benefits of Integrating a Single Plant-Wide Control System Into a Standard Plant Design Philosophy Authors: Luis Cerrada Duque - Empresarios Agrupados Director of I&C Department Charles Weidner

More information

Final Element Architecture Comparison

Final Element Architecture Comparison Final Element Architecture Comparison 2oo2 with diagnostics: Lower False Trip Rate and High Safety Project: Safety Cycling Systems Architecture Review Customer: Safety Cycling Systems, L.L.C. 1018 Laurel

More information

SAFETY SOFTWARE QUALITY ASSURANCE FUNCTIONAL AREA QUALIFICATION STANDARD. DOE Defense Nuclear Facilities Technical Personnel

SAFETY SOFTWARE QUALITY ASSURANCE FUNCTIONAL AREA QUALIFICATION STANDARD. DOE Defense Nuclear Facilities Technical Personnel DOE STANDARD NOT MEASUREMENT SENSITIVE DOE STD 1172-2003 December 2003 SAFETY SOFTWARE QUALITY ASSURANCE FUNCTIONAL AREA QUALIFICATION STANDARD DOE Defense Nuclear Facilities Technical Personnel U.S. Department

More information

Foreign Obligations Notification Process

Foreign Obligations Notification Process Foreign Obligations Notification Process Santiago Aguilar Nuclear Regulatory Commission 1 Agreements for Peaceful Nuclear Cooperation Current agreements with the IAEA, 21 countries, and Taiwan. The agreements

More information

A Perspective on Draft Embedded Digital RIS. Ron Jarrett Tennessee Valley Authority Embedded Digital Devices Workshop October 9, 2014 NRC

A Perspective on Draft Embedded Digital RIS. Ron Jarrett Tennessee Valley Authority Embedded Digital Devices Workshop October 9, 2014 NRC A Perspective on Draft Embedded Digital RIS Ron Jarrett Tennessee Valley Authority Embedded Digital Devices Workshop October 9, 2014 NRC What does the RIS mean to a Utility? This is an important RIS from

More information

Best Practices and Approaches to Supply Chain Management

Best Practices and Approaches to Supply Chain Management Best Practices and Approaches to Supply Chain Management ATOMEX Forum 2012 Moscow 12.12. 14.12.2012 AF-Consult Switzerland Ltd Jan Kocourek 1 Objectives Provide information available regarding both the

More information

Preliminary validation of the APROS 3-D core model of the new Loviisa NPP training simulator

Preliminary validation of the APROS 3-D core model of the new Loviisa NPP training simulator Preliminary validation of the APROS 3-D core model of the new Loviisa NPP training simulator Anssu Ranta-aho, Elina Syrjälahti, Eija Karita Puska VTT Technical Research Centre of Finland P.O.B 1000, FI-02044

More information

Selecting Sensors for Safety Instrumented Systems per IEC 61511 (ISA 84.00.01 2004)

Selecting Sensors for Safety Instrumented Systems per IEC 61511 (ISA 84.00.01 2004) Selecting Sensors for Safety Instrumented Systems per IEC 61511 (ISA 84.00.01 2004) Dale Perry Worldwide Pressure Marketing Manager Emerson Process Management Rosemount Division Chanhassen, MN 55317 USA

More information

Safety Requirements Specification Guideline

Safety Requirements Specification Guideline Safety Requirements Specification Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:[email protected] -1- Summary Safety Requirement

More information

International Training Course on Preventive and Protective Measures against Insider Threats at Nuclear Facilities PROSPECTUS

International Training Course on Preventive and Protective Measures against Insider Threats at Nuclear Facilities PROSPECTUS J0-TR-45632 International Training Course on Preventive and Protective Measures against Insider Threats at Nuclear Facilities Funded through the IAEA s Nuclear Security Fund PROSPECTUS Title: Place: International

More information

Olkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011

Olkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011 Olkiluoto 3 Project AREVA Suppliers Day Warsaw October 4, 2011 Virginie MOUCQUOT-LAIHO AREVA OL3 Project Management Office & Communications Manager AREVA Reactor & Services - New Builds EPR Project Fleet

More information

We drive Aurix to success Aurix Services for Automotive & Industrial

We drive Aurix to success Aurix Services for Automotive & Industrial Building a safe and secure embedded world We drive Aurix to success Aurix Services for Automotive & Industrial > Services HITEX: An Preferred Design House (PDH) Questions about? Ask us Aurix Services for

More information

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN. Organization responsible for the review of instrumentation and controls

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN. Organization responsible for the review of instrumentation and controls U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN NUREG-0800 BRANCH TECHNICAL POSITION 7-14 GUIDANCE ON SOFTWARE REVIEWS FOR DIGITAL COMPUTER-BASED INSTRUMENTATION AND CONTROL SYSTEMS REVIEW RESPONSIBILITIES

More information

IEC 61508 Functional Safety Assessment. ASCO Numatics Scherpenzeel, The Netherlands

IEC 61508 Functional Safety Assessment. ASCO Numatics Scherpenzeel, The Netherlands IEC 61508 Functional Safety Assessment Project: Series 327 Solenoid Valves Customer: ASCO Numatics Scherpenzeel, The Netherlands Contract No.: Q09/04-59 Report No.: ASC 09-04-59 R003 V1 R3 61508 Assessment

More information

A seismic switch. Certified switchgear for nuclear power plants is providing a critical link in the chain

A seismic switch. Certified switchgear for nuclear power plants is providing a critical link in the chain A seismic switch Certified switchgear for nuclear power plants is providing a critical link in the chain Renato Piccardo, Annunzio Regantini, Davide Cattaneo, Luciano Di Maio A nuclear power plant must

More information

CORDEL Cooperation in Reactor Design Evaluation and Licensing

CORDEL Cooperation in Reactor Design Evaluation and Licensing CORDEL Cooperation in Reactor Design Evaluation and Licensing Greg KASER Senior Project Manager African Utility Week Nuclear Focus Day Cape Town 12 May 2014 World Nuclear Association (WNA) Cooperation

More information

8 Emergency Operating Procedures (EOPs) and Severe Accident Management Guidelines (SAMGs) - Issue 06

8 Emergency Operating Procedures (EOPs) and Severe Accident Management Guidelines (SAMGs) - Issue 06 8-1 8 Emergency Operating Procedures (EOPs) and Severe Accident Management Guidelines (SAMGs) - Issue 06 Table of contents 8 Emergency Operating Procedures (EOPs) and Severe Accident Management Guidelines

More information

Failure Modes, Effects and Diagnostic Analysis

Failure Modes, Effects and Diagnostic Analysis Failure Modes, Effects and Diagnostic Analysis Project: Plant-STOP 9475 Company: R. STAHL Schaltgeräte GmbH Waldenburg Germany Contract No.: STAHL 13/04-027 Report No.: STAHL 13/04-027 R024 Version V1,

More information

ISO 26262 Introduction

ISO 26262 Introduction ISO 26262 Introduction Prof. Christian Madritsch 2012 Table of Contents Structure of ISO 26262 Management of Functional Safety Product Development System Level Product Development Hardware Level Product

More information

Long Term Operation R&D to Investigate the Technical Basis for Life Extension and License Renewal Decisions

Long Term Operation R&D to Investigate the Technical Basis for Life Extension and License Renewal Decisions Long Term Operation R&D to Investigate the Technical Basis for Life Extension and License Renewal Decisions John Gaertner Technical Executive Electric Power Research Institute Charlotte, North Carolina,

More information

How to Obtain CODIS. Tim Zolandz. FBI Laboratory (703) 632-8473

How to Obtain CODIS. Tim Zolandz. FBI Laboratory (703) 632-8473 1 How to Obtain Tim Zolandz (703) 632-8473 FBI Laboratory Agenda Mission / History International Status and Initiatives How to Obtain Software A look ahead to 7.0 Mission 3 Combined DNA Index System blends

More information

Rosatom Investment Projects. Perspective in Europe and in the world

Rosatom Investment Projects. Perspective in Europe and in the world ROSATOM Rosatom Investment Projects Perspective in Europe and in the world Ivo Kouklík Vice-President, Rusatom Overseas June 13, 013 Rauma PRESENTATION CONTENT ROSATOM - Introduction ROSATOM Investment

More information

Introduction into IEC 62304 Software life cycle for medical devices

Introduction into IEC 62304 Software life cycle for medical devices Introduction into IEC 62304 Software life cycle for medical devices Christoph Gerber 4. September 2008 SPIQ 9/5/2008 1 Agenda Current Picture Regulatory requirements for medical device software IEC 62304

More information

FACTS Customer Service. Your uptime insurance ABB FACTS Care

FACTS Customer Service. Your uptime insurance ABB FACTS Care FACTS Customer Your uptime insurance ABB FACTS Care FACTS provides more stability and quality in existing and new power networks, with minimal environmental impact. With a complete solutions portfolio,

More information

ISO 26262:2011 Functional Safety Assessment Report. Texas Instruments Richardson, TX USA. Project: TDA2X ADAS SoC. Customer:

ISO 26262:2011 Functional Safety Assessment Report. Texas Instruments Richardson, TX USA. Project: TDA2X ADAS SoC. Customer: ISO 26262:2011 Functional Safety Report Project: TDA2X ADAS SoC Customer: Texas Instruments Richardson, TX USA Contract No.: Q13/09-037 Report No.: TI 13-09-037 R002 Version V1, Revision R1, January 23,

More information

Functional Safety Management of the development process of safety related programmable electronic systems at Jaquet Technology Group

Functional Safety Management of the development process of safety related programmable electronic systems at Jaquet Technology Group Functional Safety Management of the development process of safety related programmable electronic systems at Jaquet Technology Group Document type: Certification Report Client: Jaquet Technology Group

More information

Effective Compliance. Selecting Solenoid Valves for Safety Systems. A White Paper From ASCO Valve, Inc. by David Park and George Wahlers

Effective Compliance. Selecting Solenoid Valves for Safety Systems. A White Paper From ASCO Valve, Inc. by David Park and George Wahlers Effective Compliance with IEC 61508 When Selecting Solenoid Valves for Safety Systems by David Park and George Wahlers A White Paper From ASCO Valve, Inc. Introduction Regulatory modifications in 2010

More information

STEP 3 ELECTRICAL SYSTEMS ASSESSMENT OF THE WESTINGHOUSE AP1000 DIVISION 6 ASSESSMENT REPORT NO. AR 09/019-P

STEP 3 ELECTRICAL SYSTEMS ASSESSMENT OF THE WESTINGHOUSE AP1000 DIVISION 6 ASSESSMENT REPORT NO. AR 09/019-P Health and Safety Executive NUCLEAR DIRECTORATE GENERIC DESIGN ASSESSMENT NEW CIVIL REACTOR BUILD STEP 3 ELECTRICAL SYSTEMS ASSESSMENT OF THE WESTINGHOUSE AP1000 DIVISION 6 ASSESSMENT REPORT NO. AR 09/019-P

More information

ASSESSMENT OF THE ISO 26262 STANDARD, ROAD VEHICLES FUNCTIONAL SAFETY

ASSESSMENT OF THE ISO 26262 STANDARD, ROAD VEHICLES FUNCTIONAL SAFETY ASSESSMENT OF THE ISO 26262 STANDARD, ROAD VEHICLES FUNCTIONAL SAFETY Dr. Qi Van Eikema Hommes SAE 2012 Government/Industry Meeting January 25, 2012 1 Outline ISO 26262 Overview Scope of the Assessment

More information

The Status of Nuclear Power in the World Before and After Fukushima

The Status of Nuclear Power in the World Before and After Fukushima The Status of Nuclear Power in the World Before and After Fukushima Mycle Schneider International Consultant on Energy and Nuclear Policy, Paris, France Institute for Sustainable Development, Contact:

More information

AREVA NP Our experiences with Rosatom

AREVA NP Our experiences with Rosatom AREVA NP Our experiences with Rosatom Atomex Marion Horstmann Vice President Offers and Partnerships Large Projects AREVA Germany Budapest 30 November 01 December, 2015 Content AREVA in Germany Our experience

More information

NEI 06-13A [Revision 0] Template for an Industry Training Program Description

NEI 06-13A [Revision 0] Template for an Industry Training Program Description NEI 06-13A [Revision 0] Template for an Industry Training Program Description NEI 06-13A [Revision 0] Nuclear Energy Institute Template for an Industry Training Program Description ACKNOWLEDGEMENTS This

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, DC 20555-0001. June 16, 2011

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, DC 20555-0001. June 16, 2011 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, DC 20555-0001 June 16, 2011 NRC INFORMATION NOTICE 2011-12: REACTOR TRIPS RESULTING FROM WATER INTRUSION INTO

More information

Cisco 2-Port OC-3/STM-1 Packet-over-SONET Port Adapter

Cisco 2-Port OC-3/STM-1 Packet-over-SONET Port Adapter Data Sheet Cisco 2-Port OC-3/STM-1 Packet-over-SONET Port Adapter To meet the continual need for increased router features and performance, Cisco Systems introduces its newest packetover-sonet (POS) port

More information

Service for grinding applications Protect and optimize your drive systems

Service for grinding applications Protect and optimize your drive systems Service for grinding applications Protect and optimize your drive systems A service portfolio for all your needs Drive system for grinding applications ABB has been manufacturing variablespeed drive systems

More information

Professional services. Full service for your automation tasks. We automate your success.

Professional services. Full service for your automation tasks. We automate your success. Professional services Full service for your automation tasks We automate your success. Professional Services Summary Our services Comprehensive Project-oriented Jetter AG provides professional services

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions The exida Certification Program Functional Safety (SIL) Cyber-Security V2 R3 June 14, 2012 exida Sellersville, PA 18960, USA, +1-215-453-1720 Munich, Germany, +49 89 4900 0547

More information

Failure Modes Taxonomy for

Failure Modes Taxonomy for Nuclear Safety NEA/CSNI/R(2014)16 February 2015 www.oecd-nea.org Failure Modes Taxonomy for Reliability Assessment of Digital Instrumentation and Control Systems for Probabilistic Risk Analysis Unclassified

More information

ABB Drives. User s Manual. Pulse Encoder Interface Module RTAC-01

ABB Drives. User s Manual. Pulse Encoder Interface Module RTAC-01 ABB Drives User s Manual Pulse Encoder Interface Module RTAC-0 Pulse Encoder Interface Module RTAC-0 User s Manual 3AFE 64486853 REV A EN EFFECTIVE:.5.00 00 ABB Oy. All Rights Reserved. Safety instructions

More information

AN ANALYSIS OF TECHNICAL SECURITY CONTROL REQUIREMENTS FOR DIGITAL I&C SYSTEMS IN NUCLEAR POWER PLANTS

AN ANALYSIS OF TECHNICAL SECURITY CONTROL REQUIREMENTS FOR DIGITAL I&C SYSTEMS IN NUCLEAR POWER PLANTS http://dx.doi.org/10.5516/net.04.2012.091 AN ANALYSIS OF TECHNICAL SECURITY CONTROL REQUIREMENTS FOR DIGITAL I&C SYSTEMS IN NUCLEAR POWER PLANTS JAE-GU SONG *, JUNG-WOON LEE, GEE-YONG PARK, KEE-CHOON KWON,

More information

COMPUTER SYSTEMS IN THE OPERATION, MAINTENANCE AND TECHNICAL SUPPORT OF LOVIISA NPS

COMPUTER SYSTEMS IN THE OPERATION, MAINTENANCE AND TECHNICAL SUPPORT OF LOVIISA NPS COMPUTER SYSTEMS IN THE OPERATION, MAINTENANCE AND TECHNICAL SUPPORT OF LOVIISA NPS Markku Tiitinen Imatran Voima Oy, Loviisa NPS P.O.Box 23, SF-07901 LOVIISA, Finland Fax +358 15 550 4435 Keywords: computers,

More information

IEC 61508 Overview Report

IEC 61508 Overview Report IEC 61508 Overview Report A Summary of the IEC 61508 Standard for Functional Safety of Electrical/Electronic/Programmable Electronic Safety-Related Systems exida Sellersville, PA 18960, USA +1-215-453-1720

More information

Schedule 2t. Additional terms for Fast Trade - Online Ordering

Schedule 2t. Additional terms for Fast Trade - Online Ordering 1. SERVICE DESCRIPTION Fast Trade is a high quality bandwidth service specifically designed for customers who require extremely low latency and low packet loss on links between two Network Termination

More information

We decided that we would build IFS Applications on standards so our customers would not be locked into any particular technology. We still do.

We decided that we would build IFS Applications on standards so our customers would not be locked into any particular technology. We still do. IFS Applications for Shipbuilding 2 ifs shipbuilding OUR SOLUTION S DNA When we first set out to create IFS Applications over 25 years ago, our goal was to make the most usable business solution on the

More information

Safety Integrated. SIMATIC Safety Matrix. The Management Tool for all Phases of the Safety Lifecycle. Brochure September 2010. Answers for industry.

Safety Integrated. SIMATIC Safety Matrix. The Management Tool for all Phases of the Safety Lifecycle. Brochure September 2010. Answers for industry. SIMATIC Safety Matrix The Management Tool for all Phases of the Safety Lifecycle Brochure September 2010 Safety Integrated Answers for industry. Functional safety and Safety Lifecycle Management Hazard

More information

Solutions for Nuclear & Renewable Power Generation

Solutions for Nuclear & Renewable Power Generation Solutions for Nuclear & Renewable Power Generation Integrated Business Model Luc Oursel AREVA CEO AREVA has become the undisputed global leader in low carbon power generation solutions through its unique

More information

Nuclear Energy of Ukraine - History

Nuclear Energy of Ukraine - History Nuclear Energy of Ukraine - History 1950-s Uranium Industry was started 1962 Ministry of Energy and Electrification of Ukraine was established(ukraine a Republic of Soviet Union) 1965 Unique Energy System

More information

Understanding Safety Integrity Levels (SIL) and its Effects for Field Instruments

Understanding Safety Integrity Levels (SIL) and its Effects for Field Instruments Understanding Safety Integrity Levels (SIL) and its Effects for Field Instruments Introduction The Industrial process industry is experiencing a dynamic growth in Functional Process Safety applications.

More information

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Nuclear Power in Pakistan Nuclear Power Plants Capacity (MWe) Year of Commissioning In

More information

Cut down your costs, increase your productions efficiently with the knowledge of PLC s Siemens technology. SITRAIN TM THAILAND Page 1 of 14

Cut down your costs, increase your productions efficiently with the knowledge of PLC s Siemens technology. SITRAIN TM THAILAND Page 1 of 14 Training Center Digital Factory and Process Industries & Drives 1. Introduction 2. Course content 3. Course Schedule 4. Terms and Condition 5. Registration Channel Page 1 of 14 1. Introduction SITRAIN

More information

DC Cook Plant Process Computer Replacement Project

DC Cook Plant Process Computer Replacement Project DC Cook Plant Process Computer Replacement Project 2013 Scientech User s Symposium Robert Ammon / Scientech Greg Mashak / DC Cook August 2013 Project Organizations DC Cook (Utility) Hurst Technology (Utility

More information

Online Vibration Monitoring

Online Vibration Monitoring Brandon DeVier My Background 1992 B.S. Physics 3 years with Predict Technologies 13 years with DLI Engineering Online Vibration Monitoring Systems Experience Online Systems Product Manager 3 years planning,

More information

Testing and Utilization of Loviisa Full Scope Apros Model in Engineering and Development Simulator

Testing and Utilization of Loviisa Full Scope Apros Model in Engineering and Development Simulator IYNC 2010 Cape Town, South Africa, 12 18 July 2010 Paper No. 237 Testing and Utilization of Loviisa Full Scope Apros Model in Engineering and Development Simulator Jussi Näveri, Topi Tahvonen 1, Petri

More information