Nepean River Bridge. The NSW Government is building a new pedestrian and cyclist bridge over the Nepean River to connect Penrith and Emu Plains.



Similar documents
5 ALTERNATIVE SOLUTIONS AND EVALUATION

Public Information & Public Scoping Meeting

WELCOME TO OUR EXHIBITION

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014

3.1 Historical Considerations

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Construction Management Plan (CMP) Application

3 Tappan Zee Bridge Rehabilitation Options

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS. Paper prepared for the REAAA Conference in Japan, 4 9 September 2000

Design of Bridges. Introduction. 3 rd to 4 th July Lecture for SPIN Training at the University of Dar es Salaam

1,045 m length of the Deh Cho Bridge

21 Plumbers Row, London, E1 1EQ

Predictive Modeling of Bridges

4 Alternatives and Design Evolution

1. The purpose of this report is to seek a formal response to each of the recommendations contained in the Peoples Panel Report.

Newmarket Level Crossing Project. - Survey Results. Newmarket Level Crossing Survey January 2015, July 2015 rev.

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER

FINAL SECTION OF COASTAL PROTECTION RIVER DODDER PART 8 PROPOSALS London Bridge and New Bridge

CITY OF TRAIL MEMORANDUM

MPO Staff Report MPO Technical Advisory Committee: March 13, 2013 MPO Executive Board: March 20, 2013

Alternatives Evaluation Overview

REHABILITATION PACKAGE 1-a

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis

Why build the Silvertown Tunnel?

PROJECT AGREEMENT FOR MENINDEE LAKES PROJECT MANAGEMENT

POSITION DESCRIPTION

Review of Punt Road. Public Acquisition Overlay. Background Report

HIGHWAYS ASSET MANAGEMENT STRUCTURES TEAM GUIDANCE NOTE SMT/GN/03/10 TECHNICAL APPROVAL

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

Truss. are both simple and A Matsuo Example continuous trusses. The

5.14 Floodplains and Drainage/Hydrology

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

Audit of a WorkCover Site

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

Key Words: Flood Reconstruction, Resource Contracts, Coal Seam Gas, Contract Management, Project Management, Relationship Contracting

DECISION/DIRECTION NOTE

Project Management Manual

Construction Traffic Management Plan

Chapter Summary. 5 options were shortlisted; one for comprehensive refurbishment of the existing hospital and four new build variants

Section below clarifies which chapter should be consulted for different types of structure.

Guide on public notification of certain development applications

REVIEW OF AS SCOPE AND GENERAL PRINCIPLES

Construction Traffic Management Plan

Cathkin Relief Road Planning Statement

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

IMPACT DAMAGE RESISTANT WALL SYSTEMS

specified contract works and legal liability proposal

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

Chaudière Crossing Bridge Rehabilitation

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

The purpose of this document is to provide a framework for ConnectGroups in dealing with privacy considerations.

Ch a p t e r 5. Bridges Decks and Boardwalks

Granger Bay Boulevard and Green Point Roundabout

COST EFFECTIVE APPROACHES FOR PRESCRIBED DAM ASSET MANAGEMENT

23.1 RENEWABLE ENERGY

J. David Rogers Natural Hazards Mitigation Center University of Missouri-Rolla

Business Continuity. Best practice in Business Continuity planning and Disaster Recovery Queensland and Brisbane CBD floods recovery 2011

Position Description Manager, Health, Safety and Environment Services

Introduction. Two storey & first floor rear extensions. two storey rear 1

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

The City of Corner Brook. Request for Proposals Marketing Consultant

CHARTER OF PATIENT RIGHTS

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Householder Applications: Supplementary Planning Guidance GENERAL POINTS

VICTORIA. Diploma Financial Planning DFP 1 Financial Advice DFP 2 Life Insurance DFP 3 Superannuation WORKSHOP DATES. 1 & 2 December 2015

Traffic Management Plan - Depot Procedure

Construction Traffic Management Plan

data centre construction

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.

Maximum speed. Stop and Give way to Manually operated temporary No entry for give way traffic on STOP and GO signs vehicular traffic major road

Street and Reserve Trees Policy

PRIVACY POLICY. comply with the Australian Privacy Principles ("APPs"); ensure that we manage your personal information openly and transparently;

Design Principle Social Inclusion

Aging sewer pipes buried in the Bow River bed, from the foot of Muskrat Street to Glen Avenue must be replaced A raised crossing pipes crossing over

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM

CSXT Emergency Response for May 2010 Flood Repairs

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project.

Does your new building

BCPay. Alternative payment process when Online Banking is experiencing Operational Disruptions. Product Disclosure Statement

CONCEPTUAL REHABILITATION ALTERNATIVE

Ordinary Meeting of Council 13 August

Safe & Sound Bridge Terminology

Vertex BD. Leading Software Solution for Cold Formed Steel Construction

Appendix 8 Providing Pre-construction information and check list (Regulations 10)

Cotton Australia Module Restraint Guide 2012 Edition

Alphington sewer replacement

For personal use only

VICTORIA. Diploma Financial Planning 9 & 10 May WORKSHOP DATES. 12 October & 13 October DFP 1 Financial Advice 14 & 15 October DFP

QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012

Development Type - Retirement Accommodation

PLANNING POLICY 3.3.5

Delineation. Section 4 Longitudinal markings

Transcription:

Nepean River Bridge May 2016 The NSW Government is building a new pedestrian and cyclist bridge over the Nepean River to connect Penrith and Emu Plains. The new bridge will provide a safe crossing for pedestrians and cyclists over the Nepean River and improve connections to existing and future shared paths, including the Great River Walk. The project was approved in November 2014, and in December 2014 Roads and Maritime Services started early site preparation work which involved the demolition of the remaining derelict building on the Log Cabin site at Memorial Avenue, Penrith. Over the past 15 months, we have carried out the detailed design of the bridge and invited construction tenders to build the bridge. Roads and Maritime has contracted Seymour Whyte Constructions Pty Ltd to build the bridge. Construction work to build the bridge is due to start in mid-late 2016 and is expected to take about two years to complete, weather permitting. Nepean River Bridge design view from Emu Plains looking towards Penrith

Benefits The new bridge will: Provide a safe pedestrian and cyclist connection between Penrith City Centre and Emu Plains Be a destination and create opportunities for people to engage with the river Optimise views of the Nepean River and Victoria Bridge Respect the historic setting and place of the area Minimise impacts on rowers and other river users by providing a large main span over the river Provide a crossing that is flood free, comfortable and safe to use. Key features The main span of the bridge is a large triangular steel truss providing a slender and unique design Three canopies will be incorporated along the bridge to provide shade for people including at the terrace, mid span balcony and towards the eastern abutment There is only one pier within the river to minimise impact on the rowing community and other river users Nepean River Bridge location map 31.5 METRES The ochre colour for the structure is influenced by the surrounding natural and built environment. 25.5 MET Relocation of overhead power lines The existing Endeavour Energy overhead high voltage electrical lines crossing the river will need to be relocated further downstream as part of the work. Detailed information on the relocation is included in an addendum Review of Environmental Factors which is available on the project website: www.rms.nsw.gov.au/projects/sydney-west. TO EMU PLAINS ABUTMENT A PIER 1 Nepean River Bridge elevation NEPEAN RIVER BANK PIER 2 PIER 1 TO EMU PLAINS ABUTMENT A Nepean River Bridge plan SOP3

Key New pedestrian and cycle bridge TRES 200 METRES TERRACE CANOPY CANOPY CANOPY TO PENRITH MINIMUM 13.5 METRES ABOVE NORMAL WATER LEVEL PIER 2 ABUTMENT B NEPEAN RIVER BANK BALCONY AND CANOPY BALCONY TO PENRITH TERRACE DECK AND CANOPY BALCONY AND CANOPY NEPEAN RIVER ABUTMENT B

Changes during detailed design of the bridge A curved design was considered during the concept design and environmental assessment phase of the project. During the detailed design phase of the project, the design of the bridge has been revised and now incorporates a straight triangular truss with a gentle vertical curve. The straight truss bridge option will still provide a large span, generous width and unique structure that will be an attractive landmark for the area. The straight option significantly reduces the cost and will provide: A more efficient structural design which reduces the amount of steel needed by 20 per cent Less complex fabrication with less welding and more similar pieces of steel A simplified construction methodology because it will reduce bridge self-weight loads A reduction in risks during the construction of the bridge Environmental benefits by reducing the energy required to build the structure as a smaller amount of steel would be needed and this in turn reduces the carbon footprint. The estimated cost of the bridge design was originally prepared in 2012 at strategic stage and was based on a preliminary concept design. As the design was developed the complexity of the project became better understood, and the estimated cost of the bridge is now $49 million. The key factors that contributed significantly to a higher than previous cost estimate were the complex nature of the long span structure and associated construction methodology, as well as the relocation of overhead high voltage electrical lines crossing the river. The new straight truss bridge option has helped to keep the overall cost down. Nepean River Bridge straight design Nepean River Bridge curved design Nepean River Bridge straight design Nepean River Bridge curved design

Construction methodology We have chosen a construction methodology that is safe and minimises disruption to river users and the local community. This methodology is seen as cost effective when compared against other potential construction methodologies. The bridge will be assembled on site on the eastern side of the river and will be progressively moved across to the western side. Temporary piers will be installed while the bridge is being moved to its final position. We have included elevation drawings to show the construction methodology. Key Movement of truss in stages Temporary piers Temporary pedestrian hoarding over Great River Walk SITE ASSEMBLY, FABRICATION AND PROTECTIVE TREATMENT YARD C L PIER 1 C L PIER 2 C BEARINGS L ABUT B MEMORIAL AVE LAUNCH DIRECTION Stage 1 LAUNCH DIRECTION Stage 2 LAUNCH DIRECTION Stage 3 Stage 4

Fast facts Main span length 200 metres Overall bridge deck length 257 metres Overall length of shared path 455 metres Truss width 8 metres Truss height 13.5 metres Number of support structures two abutments and two piers Steel tonnage of truss 485 tonnes Steel tonnage of deck 155 tonnes. Australian shared path bridge comparisons Once built, the Nepean River Bridge will have the largest main span for a shared path bridge in Australia. Similar shared path bridges in Australia include: Goodwill Bridge over Brisbane River in Queensland Longest main span: 102 metres, length: 450 metres Kurilpa Bridge over Brisbane River in Queensland Longest main span: 128 metres, length: 470 metres Pedestrian bridge over Swan River in Western Australia Longest main span: 160 metres, length: 400 metres. Background Community members campaigned for a safer crossing over the Nepean River for pedestrians and cyclists as the current path on Victoria Bridge has no barrier between the narrow footpath and road traffic. During the strategic stage and concept development, a clip on shared path as well as a stand-alone pedestrian and cyclist bridge directly next to Victoria Bridge on the southern side were investigated. A structural feasibility study was completed in 2010, which determined the Victoria Bridge would not have sufficient structural capacity to accommodate a clip on shared path structure. An adjoining bridge next to Victoria Bridge would adversely affect flooding and impact on the heritage structure. The final location of the bridge was pushed further south away from Victoria Bridge to avoid hazards and other local constraints. These included heritage, access to and around property and the submarine high pressure gas mains on the southern side of the bridge which supplies Blue Mountains residents with gas. In mid-2012 a number of community information sessions were held to assess the best location for a new crossing of the river. Six crossing locations were ranked against key criteria identified during the community consultation workshops including safety, function, cost and community. The location south of Victoria Bridge was considered the most safe and appropriate. The preferred bridge design and location was chosen following extensive community consultation, as it best addressed environmental, engineering and community constraints. What happens next? Construction is expected to start in mid-late 2016 and the new bridge should be open by mid 2018, weather permitting. Roads and Maritime will continue to keep the community informed about this project. Further information For further information about the project, please contact the Nepean River Bridge project team on: 1800 733 084 nepeanbridge@rms.nsw.gov.au Nepean River Bridge Project, Roads and Maritime Services, PO Box 973, Parramatta NSW 2124 www.rms.nsw.gov.au/projects/ sydney-west/ You can also email the project team and ask to be added to the stakeholder list to ensure you receive up-to-date information about the project. If you need help understanding this information, please contact the Translating and Interpreting Service on 131 450 and ask them to call us on 1300 761 923. May 2016 RMS 16.185 Privacy Roads and Maritime Services ( RMS ) is subject to the Privacy and Personal Information Protection Act 1998( PPIP Act ) which requires that we comply with the Information Privacy Principles set out in the PPIP Act. All information in correspondence is collected for the sole purpose of assisting in the assessment of this proposal. The information received, including names and addresses of respondents, may be published in subsequent documents unless a clear indication is given in the correspondence that all or part of that information is not to be published. Otherwise RMS will only disclose your personal information, without your consent, if authorised by the law. Your personal information will be held by RMS at 27 Argyle Street, Parramatta NSW 2150. You have the right to access and correct the information if you believe that it is incorrect.