WATER & SEWER LINE REPLACEMENT PROJECT Downtown Tempe Neighborhoods

Similar documents
Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

Special Specification 7021 Water Main and Sewer Line Replacements

SECTION 5: SANITARY SEWER SYSTEM DESIGN

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY08 SEWER POINT REPAIRS BID TABULATION

Kansas City s Overflow Control Program

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective

Emerging Technologies in Wastewater Collection Systems

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP

Township of Enniskillen. Asset Management Plan

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS

Bridges & Culverts Condition by Quantity

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

City of Largo Environmental Services Department Environmental Control Program th Avenue North Clearwater, FL Phone: (727)

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

Director of Utilities. Manager. Distribution Supervisor. Utilities Analyst. Account Clerk. Water. Conservation Specialist.

City of Mill Valley Sewer Capital Improvement Plan

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

City of Cape Coral, Florida FY Proposed Operating Budgets

Sewer Rehabilitation Design Requirements

How to Do a Water & Sewer System Inventory - Capital Improvements Plan

CHAPTER 8 CIVIL DESIGN

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

CD i -STREETS- Detail #

Let Us Give Utilities the Respect that they Deserve.

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe

SECTION 5 DRAFTING STANDARDS


Bidding and Contract Requirements:

M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

Technical Memorandum Cost Criteria for 2010 System Capacity Plan

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Water and Sewer Utilities

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

APPENDIX D. (Standard Notes and Signature Blocks)

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

Director of Utilities. Manager. Regulatory Compliance Supervisor. Distribution Supervisor. Utilities Analyst. Account Clerk. Water

SECTION GRAVITY SANITARY SEWERS

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

B.S. in Environmental Engineering, minor in Chemistry, Oregon State University, Corvallis, Oregon, 2001

Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City Wide Program

SECTION SUPPORT OF EXCAVATION

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

Contracting Opportunities Vendor Day May 17, 2011

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

WATER, SEWER AND TRAFFIC IT S ALL ABOUT THE FLOW

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains

Altoona Water Authority. Infrastructure Overview

North San Jose Neighborhoods Planning Taskforce

APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY

Ohio RCAP Methodology for Asset Management / CMOM Demonstration Projects

PMS Reflex Blue C Mining PMS 8401C

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies:

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

CIVIL ENGINEERING ASSOCIATE, 7246

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.

SECTION 603 SANITARY SEWER FORCE MAINS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

WATER / WASTEWATER & POWER PROJECTS LAST 5 YEARS. No of Staff Provided by BCE. Overall Project Value (SR)

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

OVERVIEW OF SIDE SEWER REQUIREMENTS

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

UNIT PRICE LIST January 2009

SECTION SHEETING, SHORING AND BRACING

Request for Proposal #

Asset Management: A Financial Perspective

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE

BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/WATER OPERATIONS

STANDARD SPECIFICATIONS SECTION INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

CITY OF PLACERVILLE ENGINEERING DIVISION

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction

UTILITIES OPERATIONS AND MAINTENANCE MANAGER

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN

Force Main Condition Assessment: New Technologies & Case Studies

SECTION 810 SEWER LINE CLEANING

Terms of Reference. Aqaba Water and Wastewater Utility Asset Valuation

SANITARY SEWER SPECIFICATIONS

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

CITY OF MELISSA MANUAL FOR THE DESIGN OF WATER AND SANITARY SEWER LINES

PWSA Development Services Lessons Learned: A Development Case Study

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

2.1 Development of Risk-Based Asset Management Framework

Beechmont Park Project

Sanitary Sewer Master Plan

Transcription:

WATER & SEWER LINE REPLACEMENT PROJECT Downtown Tempe Neighborhoods NEIGHBORHOOD MEETING Wednesday, February 10, 2016 6:00 7:00 p.m. Childsplay, 900 S. Mitchell Drive, Tempe, AZ

Neighborhood Meeting Welcome, Goals and Introductions Marilyn DeRosa City of Tempe Deputy Director - Water Utilities Division

Neighborhood Meeting Welcome, Goals and Introductions Overview of WUD CIP Project Development Project Specifics Ongoing Communications Contacts Questions

Neighborhood Meeting Project Development Philip Brown, P.E. City of Tempe Sr. Civil Engineer Water Utilities Division

Water Utilities Division 5-Year Capital Improvements Plan Wastewater Collection System 12% Wastewater Mechanical Stations 5% Regional Wastewater Treatment Plant 18% Flood Irrigation 1% Water Treatment Plants 7% Water Resources 3% Administration Buildings 1% Billing & Customer Service 7% SCADA 1% Wells 7% Pumping & Reservoirs 8% Potable Water Transmission & Distribution System 30%

Pipeline Criticality Size: 6 48 (sewer) 66 (water) Location: Depth: Neighborhood cul-de-sac 4 ft. Railways, waterways, freeways, hospitals, major commercial, etc. 30 ft.

TEMPE WATER UTILITIES DIVISION GIS MAP

Project Prioritization Public Health & Safety Asset Preservation Capacity Expansion Level of Use Regulatory Obligations Risk of Deferral Operating budget impact

Neighborhood Meeting Project Specifics Ken Halloran, P.E. City of Tempe Sr. Civil Engineer Engineering Division

Neighborhood Meeting Sanitary Sewer Replacement Maple - Ash Neighborhood Waterline Replacement and Sanitary Sewer Replacement/Rehabilitation Farmer Avenue From Broadway Rd to 1 st Street to Mill Ave

Neighborhood Meeting Typical Street Section showing: Sanitary Sewer, Water, and other Underground Utilities Work Locations Sewer Line Design Water Line Design Tentative Construction Schedules What to expect to see during construction

TYPICAL STREET SECTION: SANITARY SEWER, WATER and OTHER UNDERGROUND UTILITIES Causes of pipe failure: System exceeded its useful life. Natural deterioration. Cracked/broken pipe. Root intrusion. Corrosive flows/gases. Faulty connections. Poor construction. Flood Irrigation and/or Storm Drain (Exaggerated)

OVERALL PROJECT MAP New Water Line project by City of Tempe W University Dr New Sewer Line project by City of Tempe New Gas Line project by Southwest Gas

MAPLE-ASH NEIGHBORHOOD SANITARY SEWER REPLACEMENT LOCATION

DESIGN PLAN and PIPE PROFILE DESIGN Sanitary Sewer Key points: Design - Nearly 3 years from initial survey to final design. A gravity flow Sanitary Sewer system. 4,000 LF of Vitrified Clay Pipe (VCP). 75 Service connect.; homes/business. 20 Manholes. 200 LF of Flood Irrigation pipe. 12,000 SY of Pvmt Slurry Seal. Utilize temporary sewer tanks, 250 gal, in lieu of by pass-by piping. JOC construction in lieu of Low Bid.

DESIGN PLAN Utilities highlighted Design cost approximately $140,000. Construction cost approximately $1.9M.

TENTATIVE CONSTRUCTION SCHEDULE Southern Pacific Railroad Ash Avenue Maple Avenue

SANITARY SEWER uses VITRIFIED CLAY PIPE

FARMER AVENUE WATER LINE & SANITARY SEWER REPLACEMENT & REHABILITATION LOCATION

DESIGN PLAN and PIPE PROFILE DESIGN Water Line Key points: Design About 1½ years to complete final design. A pressurized Water system. 9,000 LF of Ductile Iron Pipe (DIP). 150 Water service taps to homes & businesses. 21 Fire Hydrants. 1,000 LF of Sanitary Sewer pipe. 29,000 SY of Pvmt Slurry Seal. JOC construction in lieu of Low Bid.

DESIGN PLAN Utilities highlighted Design cost approximately $195,000. Construction cost approximately $3.2M.

TENTATIVE CONSTRUCTION SCHEDULE

WATERLINE uses DUCTILE IRON PIPE

POTHOLING

PAVEMENT SAWCUTTING

EXCAVATION

TRENCH

TRENCH SHORING

INSIDE TRENCH

EXISTING UTILITIES

SMALL SEWER CONNECTION

PLACING WATER PIPE

NEW FIRE HYDRANT

WATER SERVICE CONNECTION

WATER LINE UNDER EXISTING UTILITIES

WATER LINE IN TRENCH

TRENCH BACKFILL

TRENCH PLATES

TRENCH PAVING

FINISHED WATER VALVE

FINISHED MANHOLE

PAVEMENT SLURRY SEAL

Neighborhood Meeting Neighborhood Contact Laura Kajfez City of Tempe Neighborhood Services Specialist

Stay connected Look for postcard updates Sign up for email updates Facebook posts to neighborhoods pages Project Hotline: 480.898.4110 City webpage: www.tempe.gov/downtown-neighborhoods-water-sewer

Project Contacts City of Tempe Neighborhood Services Laura Kajfez 480-350-2840 Laura_Kajfez@tempe.gov City of Tempe Construction Manager Jerome Guzman 480-250-5110 Jerome_Guzman@tempe.gov Hunter Contracting Project Manager Erik Paulsen 480-892-0521 erikp@huntercontracting.com CWCE Construction Manager Cliff Williams 602-677-4351 cliff@cwceinc.com

Neighborhood Meeting Questions?

Neighborhood Meeting THANK YOU FOR ATTENDING! From YOUR PROJECT TEAM