ROOF INSPECTION REPORT



Similar documents
Larry Haight's Residential Roofing Co, Inc NE 95th Street Redmond, Washington Phone: (425) Fax: (425)

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

HomeGuard. Roof Inspection Report

APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET

Asphalt Shingle Application Requirements

SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION

Shingle Installation Guide

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Roof Inspection Report

Preventing Ice Dams on Roofs

Residential Roofing Guide

Roof Inspection Report

What Every Homeowner Should Know About Replacing a Roof

C. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.

How To Replace A Roofing System In Florida

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

TARRANT COUNTY DETAIL STANDARDS

REPLACE YOUR ROOF TO VISUALLY INSPECT YOUR ROOF REGULARLY SO YOU CAN DISCOVER PROBLEMS WHILE THEY ARE STILL MINOR AND CAN BE REPAIRED.

Shingle Roofing: What s below the surface is important

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

Vision Home Inspection

Detached accessory structures that contain no conditioned floor area are exempt.

CHAPTER 7: Building Systems ROOFING SYSTEMS

Inspection Item COMMENTS

SITE INSPECTION CHECKLIST

HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX

If you are a web registered user of ArlingontPermits.com you may also request an inspection at:

Roof. Walking on roofs

ROOFS - Guidance for Repair, Maintenance and Replacement

The Wo rd. Shingle Warranties - Getting Real

Materials and Colors

Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below.

What makes DECRA Roofing Systems unique?

Rooftop Matters Benchmark Report. Executive Summary

Mark Cramer Inspection Services, Inc.

Bituminous Sheet Flat Roofs: Their repair and maintenance

I NI NP R Inspected Items

CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS

TABLE OF CONTENTS" SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE 7"

COMPREHENSIVE PROPERTY INSPECTIONS

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

Installation Manual for STANDING SEAM ROOFING

Home Inspection Report

ROOF INVESTIGATION SURVEY

Roofing Signs that Your Roof Needs Repair/Replacement

Water Management & Damage Prevention:

A.C.E. Home Inspection Service St. Peters, MO (636)

Please read the entire document before purchasing and installing any of these products

Maintenance & Inspection Guide

Inspecting to a higher standard.

Roof Condition Analysis

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS

HomeSpec REPORT SUMMARY

Insured: John Smith Home: (555) Property: 1234 Avenue D Wapakoneta, OH 45895

PEPPER VINER HOMES WARRANTY GUIDELINES

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT

Property Inspection Report

SANITARY SEWER SPECIFICATIONS

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

A. B. MARTIN. Roofing Supply, llc. Roofing & Siding Hardware Lumber. Metal Roofing. The Six Myths of.

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

RECOATING AND RENEWING SPF ROOFING SYSTEMS

Roof Repair Project Report. Fairbank Complex 40 Fairbank Road Sudbury, Massachusetts. February 14, RBA Project No

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

!!! !!!! !!! !!! !!! !!! !!!!!!!!! Table of Contents! Section 1: Most Common Types of Flat Roofing! Section 2: Better Understand Your Flat Roof!

The Uniform Building Inspection Report Condensed

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

Commercial Roof Inspection Form

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09

4-Point Inspection Personal Lines (Edition 9/2012)

CHAPTER 5 ASPHALT-SHINGLE ROOFING

How To Choose A Roofing Shingle

Chapter 9: INSTALLING ROOFING

Total Home Inspection Checklist

Safeguarding our clients interests. Active Roof Leaks

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

How To Compare Roofing Material

GUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.

Property Condition Assessment

Delaney-Vogel School

A comfortable house is a great source of happiness. - Sydney Smith. Home Maintenance Guide

Prestige Home Inspection LLC

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

Self-Stick Roofing Solutions

Roof Inspection. Summary Report

HEB 38 BLANCO AND WEST AVENUE FLUID APPLIED EPDM RUBBER ROOF RECOVERY SYSTEM APPLICATION

FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS

INSPECTION PROPERTY ADDRESS: Fort Bend County, Texas

October 5, 2015 Dear Client,

Structure Survey Findings:

Home Warranty Inspection Report

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

Colorado State University. Durrell Center Roof Repair

Transcription:

ROOF INSPECTION REPORT Date: October 9, 2012 Requesting Firm: FIRST CHOICE INSPECTIONS Santiago Salazar Address: 447 Chilberg Court, San Jose, CA 95133 Phone #: 408-771-7563 Roof Inspected At: 1465 Gerlach Drive, San Jose 1. Name of Inspector: Cary Milichichi 2. Type of Roof Inspected: Residential 3. Date of Inspection: October 8, 2012 4. Type of Roof Material: Dimensional Composition 5. Pitch or Slope of Roof Deck: 4:12 6. Approximate Age of Material: 20+ Years PRESENT CONDITION NOTED: 7. Main Body of Roof: Failed 8. Roof Flashings: Poor 9. Roof Connections: Poor 10. Outlets & Drains: Poor 1

Roof Inspected At: 1465 Gerlach Drive, San Jose REMARKS & RECOMMENDED TREATMENT: This roof is a Class A Fire Rated Dimensional Composition roof; it was likely a 25 year grade. It is installed over a layer of original composition. This roof is showing the classic signs of being worn out. The protective colored granules are dislodging from the shingles; Photo A. The inner mat is exposed as the asphalt and granules are not there to protect the shingle from the destructive ultra violet rays; Photo B. The shingles are fracturing; Photo C. This is the result of the shingles drying out. There are the typical problems that could be repaired if the roof had life remaining; Photo D, shows torn shingles. The back of the chimney is clogged with debris, this could be cleared. However the roof is showing all the signs of having reached its maximum life. We recommend the roof be replaced. The lack of ventilation and the existing roof being left in place while the new roof was installed likely played a part in the failure of this roof. Gutters: The gutter line has a mix of heavily rusted gutters which are full of debris; Photos E&F. There is a partial PVC gutter at the left hand side of the roof; Photo G. These are in poor condition. A portion of the gutter edge has no gutters. We recommend the entire gutter edge have new pre-painted seamless gutters and downspouts installed. Note: There are several areas of visible dry-rot; Photo H. We recommend the home inspectors report be referenced. Please see attached Estimate for re-roofing specifications and recommendations. 2

Roof Inspected At: 1465 Gerlach Drive, San Jose I hereby authorize Timberline Roofing Solutions, Inc. to perform the work as specified in this report: Signature of Owner/Agent/Buyer Print Name Date of Acceptance Phone Number E-mail Address Title Company ESCROW INFORMATION Address City Phone # Fax # E-mail Close of Escrow Escrow # Escrow Officer Roof Inspection Fee: Paid by First Choice Inspections Roof Repair Cost: N/A 3

Roof Inspected At: 1465 Gerlach Drive, San Jose *The purpose of this roof inspection is to determine type, age, life expectancy and corrective work if needed. This is a visual inspection, some types of roofs such as built-up roof systems can have hidden leaks and we accept no liability for such conditions. We do not inspect for dry-rot or structural deficiencies; if information on these items is needed, the appropriate inspector should be contacted. If we detect any such items, it will be noted only if it will affect the performance of the roof system. Slight deflection or bowing is common to most roofs and we do not offer any opinion on this, excepting if in our opinion it would affect roof life. In accord with the above mentioned items, this roof inspection report cannot be subject to a warranty. This report does not include coverings for patios/sheds, solar units or other fixtures if any on property. Full disclosure of any and all known leaks is imperative and must be provided, failure to disclose known leaks prior to or upon inspection could result in voiding all or part of stated workmanship warranty. Gutters and drains are an important part of roof function, however they in themselves constitute a separate component of the structure and we accept no responsibility for their function. We can offer opinions as to the performance and condition of gutters and drains, and how they affect the roof function and life expectancy. Gutter inspections performed along with our standard roof inspection are a visual inspection; generally, it is to evaluate the basic function; we cannot always determine if any or all seams, end caps or miters may leak or not. In most cases, we would not be able to determine how the gutters are pitched as they generally follow the eave lines. Settling and roof deflection may change the gutter line after they are installed and as they settle. The only way to determine these factors would be to perform a water test filling gutters with water; this testing could take many hours depending on the size of the home. An additional fee for this type of water testing would be determined on a house to house basis, depending on access and linear feet of gutters (prices could range from $100.00 to $250.00) and even then there are factors that may make a repair impossible to warranty. Offering a full warranty would only apply to gutter systems installed by Timberline Roofing Solutions. Warranty Statement: If the above noted work is completed by Timberline Roofing Solutions, Inc. we will warranty this roof against leakage for a period of one year. If a leak should occur within one year we will repair the leak at no cost to the buyer provided that: 1) the leak was not caused by abuse; 2) payment is not in default; 3) the leak was not a result of a manufacturer s defect; 4) the leak was not caused by work performed by others; 5) the leak is in an accessible area (not under solar units, H.V.A.C. units or other fixtures on the roof); 6) the leak is not the result of inadequate protection neglected by the original manufacturer s specifications (i.e. lack of felt underlayments on some tile applications, etc.). Limits: Timberline Roofing Solutions, Inc. is not responsible to perform roofing work stated in other opinions. Our warranty states the roof is water-tight and not that is free of material and/or application flaws. Our warranty does not include problems regarding any gutter or drainage system present. Our warranty does not include damage caused by excessive wind conditions and/or others acts of nature. Timberline Roofing Solutions, Inc. is not responsible for interior water damage caused by leakage. 4

Rusro

October 9, 2012 ESTIMATE Santiago Salazar First Choice Inspections 408-771-7563 RE: 1465 Gerlach Drive, San Jose Roof Material: CertainTeed Dimensional Lifetime Composition; Landmark (formerly 30-Year) Specifications for application of Laminated Composition: 1. Remove existing roof layers and dispose of all debris. 2. Nail down or remove all protruding nails. 3. Install ASTM 36 /30 lb. felt underlayment. 4. Install new vents and pipe flashings, this includes two new low profile attic vents and a ridge vent system. 5. Install new composition roof material with approved fasteners. 6. Install high profile Ridglass to all hip/ridge areas. 7. All exposed sheet metal will be coated with a rust-resistant paint for added protection. 8. Roof and surrounding grounds will be cleaned and all roofing debris will be removed from premises. Material Warranty: The roof will be installed according to the Manufacturer s Specifications with their Lifetime Limited Material Warranty. Workmanship Warranty: This roof installation is guaranteed for a period of Ten (10) Years. Permits & Licenses: We will be responsible for all necessary building permits. Amount of Estimate: $9,685.00 = Landmark Install new seamless aluminum or steel gutters with six downspouts: $1,665.00 Submitted By: Cary Milichichi 1

JOB NOTES Note 1: The above listed specifications are typical and in accord with all visual components of re-roofing. Any extra or special requirements imposed by the City Inspection Department as to hidden problems such as but not limited to inadequate flashings, inadequate chimney flashings/saddles, inadequate drainage, dry-rot, additional requirements for Title 24, etc.; will be an additional cost and will be performed on a Time and Materials basis. Note 2: In order to obtain manufacturer validation on your new roof system for the purpose of your warrantee, attic ventilation is needed. There are many ways to ventilate an attic. Included in your Estimate are two new low profile eyebrow vents and a ridge vent system. Note 3: Grounds will be thoroughly cleaned each day. Dust and debris may filter into the garage. Please cover items that may be affected. Driveway and grounds will be cleaned at the end of each day (we use dump trucks and haul away debris daily), there will be no dump boxes or debris boxes on your property). Note 4: The existing chimney saddles and saddle counter-flashing will be wire brushed; soldered corners will be inspected and sealed. All metal will be primed and painted with a rust prohibitive paint. If the saddle is un-useable, the homeowner will then be notified. To remove top and bottom saddles and brick mounted counter-flashing system and install a complete new system would be an additional $495.00 per chimney. Dry-Rot: Any dry-rot found will be handled on a time and materials basis, the hourly rate is $89.00 per man hour, plus the cost of materials. All change orders will be agreed upon before work begins. Scope of work is approximately 3 to 4 working days, depending on weather and working conditions. Submitted By: Cary Milichichi 2