Cleveland Clinic Drawing Standards. Version 2.2



Similar documents
A ROAD MAP FOR YOUR CODE, SMOKE BARRIER & SMOKE PARTITION REQUIREMENTS

Page 4 of 17. Committee Input NFPA 101 Coordinate Smoke detector versus smoke alarm terminology.

Fire Barriers & Fire Stopping

FIRE-RESISTANCE-RATED CONSTRUCTION

FIRE-RESISTANCE-RATED CONSTRUCTION

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS

Excerpts from the Canadian National Building Code (NBC)

NC Rehab Code Case Study Cheerwine Building January 17, 2002; rev 4/12/02

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC CALIFORNIA BUILDING CODE 199

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

Table of Contents. I Introduction 2. II Definitions & Area Calculation 2. III Room Numbering 7. IV Appendix A 9

Fire Alarm System Plans Review Checklist Property location Date of Review

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

FIRE AND SMOKE PROTECTION FEATURES

Certification: Building Plans Examiner. Exam ID: B3

Sample Drawing Package for One and Two Family Dwelling Applications

How To Build A Two Hour Firewall In Calgary

Indiana Building Rehabilitation Standard

NFPA SELECT SIGNIFICANT CHANGES

FIRE AND SMOKE PROTECTION FEATURES

M E M O R A N D U M. To: Partnership for Safer Buildings Date: 21 March 2003

Wyoming State Capitol Building Restoration and Modernization

Healthcare Engineering. Code Summary Report

Product Guide Specification

The 60 minute Fire Rated Application Explained

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

February 2014 Alberta Fire Code Page 1 of 5. Fire Safety and Hand Hygiene in Healthcare Facilities

University of Northern Iowa Design Documents Standards. October 2014

Building Codes Update: The 2009 International Fire Code and the Apartment Industry

UPP Residential Services Fire Risk Assessment

Health Care Facilities

Fire Alarm Submittal Requirements and Acceptance Testing

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011

2012 IBC & 2012 NFPA 101 Significant Means of Egress Changes. Questions Design Occupant Load Means of Egress Capacity Determination

Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet

SCHOOL FIRE AND LIFE SAFETY INSPECTION CHECKLIST

We hope these Frequently Asked Questions will be of use both to municipal officials and fire inspectors.

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

Commercial Building Valuation Report

Design Development Quality Management Phase Checklist Project Phase Checklist Series

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

The New Life Safety Chapter What It Applies to and How Organizations Can Comply with It

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

FIRE PROTECTION IN THE 2008 NEW YORK CITY BUILDING CODE


COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

Slavic Village Building Condition Review

LOUISVILLE FIRE PROTECTION DISTRICT 895 West Via Appia, Louisville, Colorado

Terms and Definitions In Canada

FIRE LOSS STATISTICAL CONSIDERATIONS IN RELATING FAILURE AND BUILDING DAMAGE TO THE BUILDING CODE OBJECTIVES

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

FIRE RATED WIRING. What the FT4! Paul Latreille, C.E.T. Ottawa Branch Manager

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

Building Code Clarifications - 7. Fire Resistance

CIS Asset Identification and Labelling Standard

2006 IBC BUILDING CODE CHECKLIST FOR COMMERCIAL PROJECTS

- 5 - Table1. Maximum Compartment Volumes

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

Additions and Alterations

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application

LIFE SAFETY UPDATE. FULL SPRINKLERING OF ALL NURSING FACILITIES ADDITIONAL CLARIFICATIONS Prepared by Eric Rosenbaum, P.E. Hughes Associates, Inc.

2012 Changes of the International Building Code Compared to the National Fire Protection Association- 101

Placement of Manufactured Homes on Private Property

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California Prepared By

Fire safety in timber buildings

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS

Measurement Standards for Structures

FIRESTOPPING & SMOKE SEALS

Errata has been identified as follows:

Development Services City of Lawrence, KS

SPECIFIC GUIDANCE FOR A HOUSE IN MULTIPLE OCCUPATION (HMO) CONVERTED ENTIRELY INTO SELF CONTAINED FLATS

Executive Summary Inclusion of Current Firewall Requirements in NBCC

Chapter 3 Pre-Installation, Foundations and Piers

FIRE SAFETY SURVEY REPORT 2000 CODE - HEALTH CARE Medicare Medicaid

* Any required illumination shall be arranged so that the failure of any single lighting unit shall not leave any area in darkness.

PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.)

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

Space and Door Numbering Standards (V1.0) Facilities Planning and Construction

Basic Requirements for Residential Plan Review _

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

Designing for Fire Protection

Fire Alarm Systems Requirements by Occupancy Type

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

Pollution CO CO 2. Carbonaceo us soot H 2 S, NOX, SO2

SWAN POINT YACHT & COUNTRY CLUB

AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Fire Alarm Systems Design. a guide to BS5839

New York City Department of Buildings

Property Inspection. 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT

SECTION 903 AUTOMATIC SPRINKLER SYSTEMS

H-Stud Area Separation Wall System

FIRE-RESISTANCE RATINGS WITH STEEL JOISTS

STATEMENT OF ENVIRONMENTAL EFFECTS AND NOTES IN SUPPORT OF DEVELOPMENT APPLICATION

SOUTHERN NEVADA AMENDMENTS TO THE 2012 INTERNATIONAL BUILDING CODE

CAD Standards Guideline For Facility Documentation and Construction Projects

Transcription:

Cleveland Clinic Drawing Standards Version 2.2

SECTION 1 LIFE SAFETY DRAWINGS 1.1 Layers Layers are required on all drawings to categorize components that create a drawing. Layers are to be strictly followed using the format of the table below, see Fig.1. The width for all polylines shall be 8. The Smoke Barrier (green line) shall remain continuously in the center of the wall assembly, which depicts the perimeter boundary of a smoke compartment as referenced below, see Fig. 2. (Fig.1) Wall Hazardous Area Rated Wall Suite (Fig.2) Suite Rated Wall Smoke Barrier v. 2.2 Section 1 Life Safety Drawings Page 1 of 5

1.2 Example Drawing An example ACAD drawing will be available to download on the Office of Construction s website ccf.org/ocm. All suites and hazardous areas will be shaded with their respective color. I. Suites will have a numeral that will be reflected in the legend. The legend will indicate the area, noting the square footage and whether it s a sleeping or non-sleeping suite, see Fig.3. II. Hazardous areas will have alpha character that will be reflected in the legend. The legend will indicate the area, see Fig.3. III. Smoke compartments will have a numeral that will be reflected in the legend. The legend will indicate area as applicable for new and existing compartments. This drawing is for reference only (rated walls may be inaccurate) (Fig.3) v.2.2 Section 1- Life Safety Drawings Page 2 of 5

1.3 Example Legends Below are legends to be used on the life safety drawings, see Fig. 4. These will be included in the example ACAD drawing on the Office of Construction s website ccf.org/ocm. All applicable legend items shall be graphically represented on the fire and life safety drawings. * (Fig.4) *Use of smoke partition line type is not required for E-SOC life safety drawings v. 2.2 Section 1 Life Safety Drawings Page 3 of 5

1.4 Wall Type Definitions I. Fire Wall A fire-resistance-rated wall having protected openings, which restricts the spread of fire and extends continuously from the foundation to or through the roof, with sufficient structural stability under fire conditions to allow collapse of construction on either side without collapse of the wall. II. Fire resistance rating The time, in minutes or hours, that materials or assemblies have withstood a fire exposure as established in accordance with the test procedures of NFPA 251, Standard Method of Tests of Fire Endurance of Building Construction and Materials. a. 3-HR. FIRE BARRIER Wall or floor assembly that has an established fire resistance rating of 3 hours. b. 2-HR. FIRE BARRIER Wall or floor assembly that has an established fire resistance rating of 2 hours. c. 1-HR FIRE BARRIER - Wall or floor assembly that has an established fire resistance rating of 1 hour. Existing corridor wall in a non-sprinklered building will be no less than 30min fire rating. III. SMOKE BARRIER (from NFPA 101 2000 ed.) denotes a continuous membrane, or a membrane with discontinuities created by protected openings, where such membrane is designed and constructed to restrict the movement of smoke. This required smoke barrier shall be constructed in accordance with Section 8.3 and have a fire resistance rating of not less than one hour in new healthcare as noted in chapter 18 (also OBC 2011) and no less than 30 min. in existing healthcare as noted in chapter 19. IV. SMOKE PARTITION A continuous membrane that limits the transfer of smoke, shall extend from the top of the foundation or floor below to the underside of the floor or roof sheathing, deck or slab above or to the underside of the ceiling above where the ceiling membrane is constructed to limit the transfer of smoke not required to have a fire resistance rating. In general, must be a two-sided partition. V. HAZARDOUS AREA Based on date constructed (NEW=post 2003) a. NEW Is a 1-HR FIRE BARRIER (see definition above) surrounding this area in accordance with NFPA 101 2000 ed. and OBC 2011. b. EXISTING Is a SMOKE PARTITION (see definition above) surrounding this area in accordance with NFPA 101 2000 ed. and OBC 2011. v.2.2 VI. SUITE AREA Is a SMOKE PARTITION (see definition above) surrounding this area in accordance with NFPA 101 2000 ed. and OBC 2011. Section 1- Life Safety Drawings Page 4 of 5

1.5 Barrier Asset Labels The Architect shall assign all barriers a unique (non-repeating) number, unless the barrier jog is less than 18, then the barrier will be considered one continuous fire barrier, see Fig.5. These numbers shall be represented in the ACAD drawings. Numbers shall be assigned in a clockwise motion starting with the Northwest section of the building and ascending. Asset labels that are associated with walls that are removed physically during renovations shall NOT be reassigned. The obsolete numbers shall be retired, along with the asset history associated with said label. All asset numbers shall be reviewed and approved by CC Fire and Life Safety (FLS) team. I. Wall Barrier Assignment Barriers shall be assigned an asset label starting with the building ID, floor number, barrier ID, and unique (non-repeating) number, see example below. a. Building ID s can be found on the Office of Construction website. ccf.org/ocm b. Barrier ID s, see Fig.6 c. Unique (non-repeating) number shall be reviewed and approved by CC Fire and Life Safety (FLS) team. Example: Building ID Floor Number Unique (non- repeating) Number A9-FB2-25 Barrier ID (Fig.5) (Fig.6) v. 2.2 Section 1 Life Safety Drawings Page 5 of 5

September 22, 2009 SECTION 2 ROOM NUMBERING CONVENTION 2.1 General 1. Typical room designations shall consist of (3) specific parts a. Building Code (ID) b. Floor (level) c. Three Digit Room Number Example: J5-001 J=Building Code (ID) for the Miller Pavilion 5=5 th floor of the Miller Pavilion 001=Three digit room number 2. Large building floor plates shall be broken-up into logical zones (100 s, 200 s, 300 s etc.) and keep numbering consistent within that zone, see Fig.1. 3. Numbers shall start at main entry point or main elevator bank, flow in a clockwise motion, and be in sequential order, see Fig.2. 4. There should be a break (i.e. 10 numbers) where large areas are present to allow for additional rooms to be built in the future. (Fig.1) (Fig.2) Section 2 Room Numbering Convention Page 1 of 3

September 22, 2009 2.2 Hospital Units 1. Hospital Units are numbered with building; unit number (which indicates the floor) and room number. Example: J5-3-001 J=Building Code (ID) for the Miller Pavilion 5=5 th floor of the Miller Pavilion 3=Unit number 001=Three digit room number 2. Start numbering the patient rooms first; starting at main entry point or main elevator bank, flow in a clockwise motion, and be in sequential order, see Fig.3. (Fig.3) Note: All patient room numbering shall be first discussed with the nurse manager of the respective department. Section 1- Life Safety Drawings Page 2 of 3

September 22, 2009 2.3 Rooms (within another room)/ Cubicles 1. Numbers for a room within another room shall use the same number with an alpha character at the end, see Fig.4. Example: J5-3-001=Patient Room 1 J5-3-001A=Toilet Room within Patient Room 1 2. Cubicles shall also be numbered, both in corridors and inside rooms, using the same convention as above, see Fig. 5. (Fig.4) (Fig.5) 2.4 Stairs/ Elevators 1. Stairs and elevators shall be numbered as well, starting with an acronym indicating whether the space is a stair or elevator, then building ID, and finally the number. Numbering shall start from North to South. Stair Example: ST J01 ST=Indicating space is a stair J= Miller Pavilion ID 01=Stair Number Elevator Example: EL J01 EL=Indicating space is an elevator J= Miller Pavilion ID 01=Elevator Number Section 2 Room Numbering Convention Page 3 of 3