Prequalification Supplement for First Tier Subcontractors under CM at Risk Wake Technical Community College Early Site North Campus Project



Similar documents
State of North Carolina Prequalification for First Tier Subcontractors under CM at Risk

State of North Carolina Prequalification Form for Prime Contractor

Wake County Public School System Rogers Lane Elementary School (E40) Raleigh, North Carolina INSTRUCTIONS TO BIDDERS

Colorado Mesa University CMU 2489 REQUEST FOR QUALIFICATIONS SMALL BUSINESS GENERAL CONTRACTOR PREQUALIFICATION

Clancy & Theys Construction Company/Holt Brothers Construction Prequalification Form for First-Tier Subcontractors under CM at Risk

NOTICE TO CONTRACTORS

The University of North Carolina Plan to Increase Utilization of Historically Underutilized Businesses in Construction Projects

PASADENA AREA COMMUNITY COLLEGE DISTRICT (PACCD) 2015 California Uniform Public Construction Cost Accounting Act (CUPCCAA) Informal Bid List

College of the Siskiyous Insurance Requirements

KIEWIT CM/GC Enabling/Utilities

GUIDELINES FOR RECRUITMENT AND SELECTION OF MINORITY BUSINESSES FOR PARTICIPATION IN STATE CONSTRUCTION CONTRACTS

T34 - PUBLIC WORK IN MASSACHUSETTS, UNDERSTANDING CHAPTER 149 AND CHAPTER 149A

ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED*

PRE BID MEETING AGENDA

INFORMAL BIDDING APPLICATION FOR REGISTRATION November 2015 October 2016

CULVER CITY UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR PROSPECTIVE CONTRACTORS. May 21, 2015

DENVER URBAN RENEWAL AUTHORITY GUIDELINES FOR UTILIZATION OF SMALL BUSINESS ENTERPRISES IN URBAN REDEVELOPMENT PROJECTS.

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

ANNUAL PREQUALIFACTION APPLICATION. Interested Subcontractor:

1. PROJECT DESCRIPTIONS.

NOW, THEREFORE, THE BOARD OF COMMISSIONER FOR THE COUNTY OF ALAMANCE DOTH ORDAIN:

SUBCONTRACTOR PRE-QUALIFICATION APPLICATION

How to do Business. with Charlotte-Mecklenburg Utilities.

Project Name: Project No.: CONTRACTOR BID FORM. BID FROM: Name: Address:

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

TRANSBAY JOINT POWERS AUTHORITY

Subcontractor Prequalification Statement

RICHARD B. HUDGENS ARCHITECT, INC.AIA

July 5, 2016 FAILURE TO RETURN THIS BID ADDENDUM IN ACCORDANCE WITH INSTRUCTIONS MAY SUBJECT YOUR BID TO REJECTION ON THE AFFECTED ITEM(S):

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT S. Marion Avenue, Mail Station 2015 Lake City, Florida

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER

Construction Management and project process

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)

Attachment A. Application for Prequalification. General Contractors, Trade Subcontractors and Related Construction Service Providers.

CITY OF COMMERCE CITY BID BOND

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR)

BOND MEASURE E CONTRACTOR OUTREACH

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES

Oakton Community College Business Services, Room E. Golf Road, Des Plaines, IL 60016

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013

CONSTRUCTION LAW. Mechanical Roofing Contractor. Electrical Class A Air Conditioning. Contractor Class B Air Conditioning

GUILFORD TECHNICAL COMMUNITY COLLEGE COLLEGE PLAN TO INCREASE PARTICIPATION BY

General Contractor Pre-qualification Requirements

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

TD AMERITRADE Park Omaha

NOTICE TO CM/GC Companies

Unity Community Center Metal Roof Installation. Request for Bids

THE TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY Disabled Veteran Business Enterprise (DVBE) Participation Requirement

PITTSBURG UNIFIED SCHOOL DISTRICT

Subguard Benefits and Insights

Getting Connected with the Colorado Department of Transportation (CDOT)

Charlotte-Mecklenburg Schools Capital Program Services. Request for Qualifications Construction Management at Risk Services

Shook Subcontractor Prequalification Form

N O T I C E REQUEST FOR STATEMENT OF QUALIFICATIONS RFQ# POLICE DEPARTMENT PARKING GARAGE

VDOT Prequalification. Suzanne Lucas Construction Division

CONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE

City of Greenville/Greenville Utilities Commission Minority and Women Business Enterprise Program

TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG

Mechanical Contractor Pre-Qualification Packet. SPSC N180 Computer Data Room Phase II. Project No. CP Notice No. Notice

DOCUMENT ADDENDA ADDENDUM NUMBER ONE (1) A. Project Name: BHFC New Single Family Dwelling Unit Dahlia Circle

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Hunt Construction Group, Inc. LEVEL 1 DESIGN BUILD SPECIALTY CONTRACTOR PREQUALIFICATION DOCUMENTS FOR:

SUPPLIER PREQUALIFICATION QUESTIONNAIRE FORM

On behalf of the Sussex Development Team, thank you for your interest in doing business with us. We look forward to learning more about your company.

CERTIFICATION OF COMPLIANCE WITH SMALL, DISADVANTAGED, MINORITY, WOMEN OWNED, AND HISTORICALLY UNDERUTILIZED BUSINESS POLICY

Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS

Outline. Owner Perspective CM Definition Working Relationships Why CM? Project Approach Pre-construction Construction. Iowa League of Cities // 2011

Project Management Division

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

ATTACHMENT B PROPOSAL SUBMITTAL FORMS. For WEB FILTER REPORTING TOOL RFP #

DAKOTA COUNTY TRANSPORTATION DEPARTMENT GUIDE TO BIDDING TRANSPORTATION PROJECTS

REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES. PASSENGER SCREENING CHECKPOINT CONSOLIDATION PROJECT PROJECT No.

Fundamentals of a Construction Audit. August 7, 2014

School Construction Projects

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER-AT-RISK

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER / GENERAL CONTRACTOR (CM/GC SERVICES)

Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property

CITY COLLEGE OF SAN FRANCISCO May 2008 PROJECT INSPECTION SERVICES

OAKLAND UNIFIED SCHOOL DISTRICT FOR LOCAL FIRST TIER SUBCONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS

ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects

Transcription:

NC General Statue 143-128.1.c states, The construction manager at risk shall contract directly with the public entity for all construction; shall publically advertise as prescribed in G.S. 143-129; and shall prequalify and accept bids from first tier subcontractors for all construction work under this section. The construction manager at risk shall use the prequalification process determined by the public entity in accordance with G.S.143-135.8, provided that the public entity and the construction manager at risk shall jointly develop the assessment tool and criteria for that specific project, which must include the prequalification scoring values and minimum required score for prequalification on that project. The public entity shall require the construction manager at risk to submit its plan for compliance with G.S.143.128.2 for approval by the public entity prior to soliciting bids for the project(s) first tier subcontractors. A construction manager at risk and first tier subcontractors shall make a good faith effort to comply with the G.S.143-128.2, G.S.143-128.4, and to recruit and select small business entities. Explanation of Pre-Qualification Selections: Should a subcontractor want an explanation of their submittal s non-prequalified status on an individual project, they should contact the CM at Risk in writing (email is sufficient) for an explanation within 3 business days of notification of the prequalified subcontractor s list. PREQUALIFICATION DUE DATE: November 1, 2014 Submitted to: Patrick McHugh Contact Name Clancy & Theys/Balfour Beatty- Wake Tech, a Joint Venture CM @ R Firm 5420 Wade Park Blvd. Suite 200 Address Raleigh, NC 27607 City/State Zip Code + 4 919-834-3601 Office Phone number 272 Contact Person Ext. patrickmchugh@clancytheys.com Contact Person E-mail address Sub Prequalification_Form_03-08-11 Page 1 of 10

Project: Wake Technical Community College North Wake Campus The Trustees of Wake Technical Community College Project Owner O Brien/Atkins Associates, PA Project Architect Early Site December 20, 2014 Project Phase Project Start Date (Approx.) 22 Months November 20, 2014 Project/Phase Duration Anticipated Bid Date 38.5 Million 4 Million Total Project Budget Phase Budget Insurance Program: OCIP N/A CCIP _ N/A Subcontractor Bonding: Payment/Performance Bond SubGuard X (Bonding Threshold is required for all Bids over $300,000) None Bid Bond Required: All bids $300,000 or higher need a bid bond, or cashier s check Project Description: Early Site Package consists of Earthwork, UG Utilities, Paving, Misc. Metal / Fencing and General Trades. The overall project includes multiple buildings (Central Utility Plant, Gym / Multipurpose Center & Skilled Trades Building) along with a comprehensive site package. The expected start date is November 2014 with an estimated duration time of 26 months. The exterior of the buildings are comprised of metal panels, brick, glass & glazing. The Skilled Trades Building and Multipurpose building are erected from structural steel; the Central Utility Plant is comprised of CMU. Interior finishes including terrazzo, overhead doors, millwork, flooring, paint and tile along with the MEP trades are all required for this project. If your firm is interested in prequalifying for this project/phase, please check the box for your trade(s). This is a preliminary list of Bid Packages and may change based on response and qualified bidders. Preliminary Check Box if Scope of Work Budget Prequalifying Bid Package BP 2A Earthwork Early Site Earthwork, Site Utilities, Paving $ 3,000,000.00 BP 2B UG Electrical Early Site Underground Electrical $ 500,000.00 BP 2C Misc. Metal Early Site Misc. Metal & Fencing $ 50,000.00 BP 2D General Trades Early Site General Trades / Cleanup $ 120,000.00 Sub Prequalification_Form_03-08-11 Page 2 of 10

List three (3) current or completed projects of similar type, size, and duration of proposed project. #1 Similar - Project Name Description of Work Performed Contract Delivery Method (CM/GC)? Owner Name/ Representative Owner Address/Phone #/Email Architect Name/Representative Architect Address/Phone #/Email Contract Dollar Value Percentage Complete Current Anticipated Completion Date #2 Similar - Project Name Description of Work Performed Contract Delivery Method (CM/GC)? Owner Name/ Representative Owner Address/Phone #/Email Architect Name/Representative Architect Address/Phone #/Email Contract Dollar Value Percentage Complete Current Anticipated Completion Date #3 Similar - Project Name Description of Work Performed Contract Delivery Method (CM/GC)? Owner Name/ Representative Owner Address/Phone #/Email Architect Name/Representative Sub Prequalification_Form_03-08-11 Page 3 of 10

Architect Address/Phone #/Email Contract Dollar Value Percentage Complete Current Anticipated Completion Date Section 1. GENERAL REQUIREMENTS 1. a. General Company Information Name of Subcontractor: Contact Person: Contact Person: phone, and email Did you complete the BB/CT online Prequalification Form prior to submitting this form Yes No Are you registered with the State of North Carolina Secretary of State Yes No 1. b. Type of Work Performed on a regular basis Primary Scope of Work: Secondary Scope of Work: Other Scope of Work: Insurance 1. c. Insurance The minimum requirements of coverage are indicated in ATTACHMENT A to prequalification. Firms must indicate that they can provide evidence of insurance coverage, should they be the successful bidder by attaching a copy of their insurance certificate by checking the box: Yes No ; if no, you need to attach your company s insurance certificate highlighting the differences to attachment A for BB/CT approval. 1. d. Minority Information This Project has a minority participation goal of _15_% (i) Indicate your NC HUB Certification: B HA AA AI W SE D See website link for more information: http://www.doa.nc.gov/hub/swuc.htm Sub Prequalification_Form_03-08-11 Page 4 of 10

(ii) Does the company currently have a documented plan for engaging subcontractor participation from Historically Underutilized Businesses? Yes No If yes, please attach your company s HUB plan. (iii) What has been your company s average percentage level of Historically Underutilized Business participation for projects in North Carolina for the past 5 years: % (iv) List the HUB participation you provided in the three similar projects listed above Project Name HUB % Owner s Rep Contact Phone # (v) How can you provide HUB participation on this project? Sub Prequalification_Form_03-08-11 Page 5 of 10

Attachment A Project Specific Insurance Certificate SUBCONTRACT INSURANCE CERTIFICATE HERE Sub Prequalification_Form_03-08-11 Page 6 of 10

Sub Prequalification_Form_03-08-11 Page 7 of 10

Attachment B Prequalification Scoring Sheet (FOR REFERENCE ONLY) Sub Prequalification_Form_03-08-11 Page 8 of 10

Attachment C EMR Safety Report Sub Prequalification_Form_03-08-11 Page 9 of 10

Attachment D List Previous Projects with Design Team (O Brien Atkins/Kimley-Horn) Sub Prequalification_Form_03-08-11 Page 10 of 10