*Note: This document is an electronic (scanned) version of the original paper report and formatting may vary somewhat from the original.



From this document you will learn the answers to the following questions:

What is the temperature of 25 degrees Celsius?

How far should the ports extend outwards from the exterior stack wall?

What are the ports normally installed at?

Similar documents
2010 Residential Water Heater Replacement Check List

One-third of all fatalities in the U.S. construction

Prevention through Design: Eliminating Confined Spaces and Minimizing Hazards

Exhaust Calculation Booklet

Walking and Working Surface Checklist:

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements

CTI TECHNICAL BULLETIN Number 9: A publication of the Cable Tray Institute

SIMULATION PRE-INSTALLATION GUIDELINES CONTRACTOR REQUIREMENTS FOR ROOM PREPARATION

Element D Services Plumbing

WALKING-WORKING SURFACES (SLIPS, TRIPS, AND FALLS)

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

OPTIONAL INFORMATION GUARDING FLOORS, STAIRS, AND OTHER OPENINGS SELF INSPECTION CHECKLIST

Excerpts from the Canadian National Building Code (NBC)

CHAPTER 11 STORM DRAINAGE

Solar Panel Installations

Building Code Clarifications - 7. Fire Resistance

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, , ]

PORT HEDLAND PORT AUTHORITY

Air Quality Performance Test Guidelines. Kansas Department of Health and Environment Bureau of Air and Radiation

Morrison Bros. Co. General Product Specifications

Drew University Ladder Safety Program Policy and Inspection Procedure Draft 0412

Chapter 10 - Scaffolding Systems

Residential Decks. Planning and Development Services Department

COMMONLY USED RESIDENTIAL BUILDING CODES

Modeling Curved Surfaces

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

PUBLIC RESTROOMS, DESIGN INTENT

IBC Tote Containment Sumps

`Fall Protection Guidelines in Construction

FLUID FLOW Introduction General Description

MINNESOTA DEPARTMENT OF PUBLIC SAFETY State Fire Marshal Division STATEMENT OF POLICY. State Fire Marshal

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

Gas-Fired, Residential Storage Type Water Heaters

COMMERCIAL ITEM DESCRIPTION TRUCK, LIFT, FORK, DIESEL-ENGINE-DRIVEN, PNEUMATIC-TIRED, 10,000 POUND CAPACITY 1. SCOPE. This commercial item

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality

Union County Public Schools. Facilities Department. Electrical. Safe Work Practices

EMPLOYEE FALL PROTECTION

15430 SAFETY SHOWERS AND EYEWASHES

SECTION GROUND WATER STORAGE TANKS

Stack Sampling Stack sampling or source sampling

QUESTIONS AND ANSWERS ON NEW FALL PROTECTION LEGISLATION

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

SCOPE This guideline applies to all construction projects on Emory University properties, including renovation projects.

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Fall Protection System: A system put in place to protect workers from falling. (i.e. installation of guardrails, fall arrest, fall restraint, etc.

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

This material was produced under grant number SH F-48 Occupational Safety and Health Administration, U.S. Department of Labor.

Cooling Capacity CFM in. w.c. (125 Pa)

Electrical. This section applies to the design and installation of building power distribution systems.

Arapahoe County Residential Water Heater Installation and Inspection Guide

CHAPTER 11 STORM DRAINAGE

Ladder Inspections. Attachment 1 is a provided as a guideline for portable ladder inspections.

Guideline for Fire Safety Elements of Solar Photovoltaic Systems July 17, 2008 Rev: 1/1/10

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

ASME Packaged Indirect Fired Water Heater

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

FALL PROTECTION WORK PLAN

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

Element D Services Plumbing

(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark

Installation Instructions

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

WINDOW AND DOOR REPLACEMENT REQUIREMENTS


CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS

GYPSUM AREA SEPARATION FIREWALLS GA

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

Wastewater Capital Projects Management Standard Construction Specification

BUILDING PERMIT SPECIFICATIONS

Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance

Services Enclosures and Protected Shafts - Maintaining Compartmentation

Mechanical Installation

High Efficiency Copper Finned Tube Boilers 750,000-2,000,000 BTU/HR

Elkhorn Construction, Inc. Safety Manual Title: Fall Protection Policy Effective Date:

How to secure your property after a disaster

ETL listed for installations within 5 ft. (1.5M) of outer edge of water Rev E Page 1 of 10

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

Practice Problems on Pumps. Answer(s): Q 2 = 1850 gpm H 2 = 41.7 ft W = 24.1 hp. C. Wassgren, Purdue University Page 1 of 16 Last Updated: 2010 Oct 29

The replacement or modification of existing windows shall comply with the following requirements:

Flue gas measurement and control Partial-insertion pitot tubes in CEMS applications

HANDRAIL STANDARDS HANDRAILS AXESS LADDER SYSTEM KICK FLAT SYSTEM OPEN FLOORING

PMA ONLINE TRAINING Venting for Plumbing Systems

CHAPTER 10 BOILERS, WATER HEATERS AND PRESSURE VESSELS

Managing the risk of falls while working on roofs in housing construction

Fiberstars Mini Lighted Laminar Flow Fountains

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

Chapter 6 ROOF-CEILING SYSTEMS

Bath Planning Guidelines With Access Standards

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

4 Installation Requirements

Fabricated Drainage Products

19 DYNAmax Free Standing Server C A B I N E T s

Transcription:

Guideline No. 97-05 January 19, 1998 Version 1.0 Guideline for Stack Sampling Facilities* Prepared By: Kevin Reeve, B. Sc. Air Emission Specialist Environmental Operations Division Art Schultz, C.E.T. Stack Sampling Supervisor Environmental Operations Division 1996 Journey to Excellence "Striving for Excellence" Recipient *Note: This document is an electronic (scanned) version of the original paper report and formatting may vary somewhat from the original.

Page 1- Preamble This guideline is intended to provide general guidance only for the drafting of specifications for stack sampling facilities. As the basic configuration of both stack and method requirements vary considerably, proponents are encouraged to consult with professional stack sampling consultants before any installation occurs. Readers should also note that internal and external specifications of stack sampling equipment varies between manufacturers. Manitoba Environment staff may also be contacted by telephone at (204) 945-7100 or by facsimile at (204) 948-2420. For specific direction in the application of a stack sampling program, a document titled "Stack Sampling Performance Protocol" is available upon request from Manitoba Environment at the above phone/facsimile numbers. 1. Definitions: "CEM" means continuous emission monitor; "monorail" means a supporting device for the probe and sample box; "particulate" means any finely divided liquid or solid matter other than water droplets; "sample port" means a small opening perpendicular to the stack to provide access to the gas stream to be sampled; "snatch block" means a pulley set located in a frame to simplify the lifting of equipment to the working platform; "stack" means a duct, flue, pipe, chimney, vent, opening or other structure through which contaminants are emitted to the atmosphere; "stack sampling survey" means a series of stack sampling tests; "standard conditions" means a temperature of 25 degrees Celsius and a pressure of 760 millimetres of mercury, unless otherwise specified in an Environment Act Licence or Regulation; and "working platform" means scaffolding or permanent walkway required to support personal and equipment at sample location.

Page 2-2. Sampling ports: a) Ports should normally be made from standard industrial pipe but stainless steel or other non corroding material should be used where corrosion problems might exist; b) The inside diameter of all ports should be at least 3 1/2 inches and should extend outwards from the exterior stack wall a distance of 3 inches. Ports should be flush with the interior stack wall. Note that some methods, such as EPA Method 201 or 201A, require a 6 inch diameter port. The proponent should verify the port diameter requirements pursuant to the applicable method before installing ports; c) Ports should be threaded to accommodate screw on caps which should be installed at the time of port installation. The port caps should be installed whenever the ports are not in use. 3. Sample port location: a) Where possible, sample ports should be located at any section of the stack which is eight or more stack diameters (distance) downstream and two or more stack diameters (distance) upstream from any flow disturbance such as a bend, constriction, expansion or stack exit; Under some circumstances, ports may be located at distances less than the 8 and 2 stack diameters mentioned above, but not less than 4 and 1 stack diameters respectively. The proponent should note that all stack sampling methods require laminar flow, i.e., no cyclonic or reverse flow or stratification pattern. Although locating ports at 8 and 2 stack diameters respectively from a flow disturbance does not guarantee laminar flow, decreasing the number of stack diameters increases the chance of flow disturbances that will negatively impact the sampling location, requiring remedial action to either correct the flow pattern or relocate the sampling ports, etc. c) For circular stacks with outside diameters less than 3 metres (10 feet) two ports are normally installed. Ports are installed at identical elevations and 90 degrees or right angles to each other; d) For circular stacks with outside diameters greater than 3 metres (10 feet) four ports are normally required. Ports are installed at identical elevations and 90 degrees or right angles to each other;

Page 3- e) For rectangular stacks all ports should be placed on one side of the stack at identical elevations. f) Ports should be installed at a height which provides clearance for the sample box without interference from the guard rails. 4. Power supply: a) One, 115 volt, 15 amp. circuit with a grounded two duplex receptacle outlet should be provided within 7.5 metres (25 feet) of each working platform; b) No other equipment should be connected to these circuits; c) The proponent should contact their stack sampling consultant to ascertain special electrical requirement for CEMs or other analyzers. 5. Monorail Attachment Requirements: The proponent should contact their stack sampling consultant to ascertain special sampling equipment attachment requirements. Monorail attachments are necessary for each sampling port of a multi-port configuration. Note that standardization of sampling equipment attachment does not exist. 6. Work platform standards: 6.1 Workplace Safety Requirements: a) The working platform and access must conform to applicable Workplace Safety and Health Division Regulations, Building, Electrical and Fire Codes, and all other applicable laws. If a conflict exists between any Regulations or Codes and the general guidance of this guideline, the Regulations, Codes and other applicable laws will take precedence. 6.2 Free standing stacks: a) The work platform should be constructed of angle iron with an iron grate type working surface. This platform should be able to support at least three sampling personnel and 200 pounds of test equipment. A simplified diagram of a typical installation is attached to this document as Figure 1.

Page 4- b) Where a platform does not encircle the stack, the platform should extend 1 metre beyond each sampling port. c) The work platform should serve the entire circumference of a circular stack if sampling requires four ports. d) The work platform for rectangular stacks should be placed on the side of the stack where ports are located. e) The floor of the platform should be approximately 1.2 metres (4 feet) below the ports with a minimum width of 1 metre (3 feet) between stack wall and railing. f) A guard rail, meeting workplace standards, should be secured to the work platform. The guard rail should be designed so that it does not interfere with the sampling train. g) Safe and easy access to the work platform should be provided via a permanent ladder enclosed in a safety cage. No ladder well or other such opening should be located within 1 metre (3 feet) of any port and any opening to the platform should have a hinged cover at the platform. 6.3 Roof top access to stack ports: a) Approved scaffolding can be used for ports located not more than 4.5 metres (15 feet) above roof level. b) If a stack is located near the edge of a building roof a guard rail should be provided on the building roof. c) If ports are located higher than 4.5 metres (15 feet) above roof level, work platform standards for free standing stacks apply. 7. Equipment lifting for free standing stacks: a) An extended overhead beam with a winch or provision for attaching a snatch block and rope should be provided at some point beyond the edge of the platform (above the walkway). Higher sampling platforms are usually equipped with a power winch rather than a manually operated snatch block.

Page 5-