Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance
|
|
|
- Randall Adams
- 10 years ago
- Views:
Transcription
1 Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance The Boiler MACT, 40 CFR 63, Subpart DDDDD, was vacated in 2007 by the U.S Court of Appeals and the 2004 rule was remanded. For solid fuel fired existing boilers the vacated rule addressed emissions limits (PM, HCl, and Hg) and there were no continuous emissions monitoring (CEM) requirements. Small solid fuel fired boilers (10 million BTU s per hour or less) had emissions limits for PM only under this vacated rule. The EPA s promulgated schedule is to issue a proposed Boiler MACT rule for public comment in April, 2010 and promulgate a final rule in December, Phoenix Process Engineering, Inc., has 45 years experience in the application of bag houses, including the replacement of ESP s with bag houses. For elevated temperature gas streams we have extensive experience in gas cooling prior to treatment in bag houses and ESP s. This work includes the application of air atomized water sprays, spray towers, quench chambers, and process gas-to-air heat exchangers. Systems have been designed to cool gases from 750 F (and higher) to as low as 250 F using air atomized water spray systems. This work has included gas flow modeling and spray tower sizing to resolve uneven distribution in existing spray tower systems and define the configuration of the new facilities we designed. We have also designed air atomized water spray cooling systems for metallurgical applications in which off gas temperatures varied from 2200 F to 750 F. We are not implying water spray towers or systems are the only solution to elevated temperature gas streams, only that we have experience in these systems. Key project summaries are presented. Our expertise, experience and qualifications allow us to identify project efficiencies and savings. This ability to identify opportunities by looking outside the box is often lost at larger engineering companies. The majority of these summaries focus on bag house and ESP applications. We also have expertise in gas cleaning systems requiring scrubbers and in sulfur dioxide capture, abatement of oxides of nitrogen and the technical needs of the emerging technology of mercury capture. We would be pleased to present our more descriptive PowerPoint presentation of these projects and our qualifications, capabilities and expertise to you and your colleagues. Phoenix Process Engineering, Inc Cave Springs Road, Suite 305, St. Peters, Mo Phone: , Fax:
2 Reference Profile: The client requested engineering services for replacement of a collector duct at the discharge of cyclones and replacement of a gas duct to the bag house manifold. This duct was failing in place with numerous holes. Investigations determined the existing horizontal duct was in danger of failure from years of overload from accumulated dust, which enhanced corrosion and the occurrence of cyclone plugging. Replacement ducts were designed with adequate carrying velocities and installed, providing for a more uniform dust loading to the bag house and eliminating saltation. Total project value: NA
3 Reference 05101/05111 Profile: The client requested an evaluation and performance review of an existing fabric filter due to high filter bag failure rate. This fabric filter handled the off gas streams from two similar processes. Annual bag replacement costs rose from $250,000 to $500,000 in one year and significantly impacted operating up time. All system components were thoroughly inspected internally and externally. Upstream gas quality was assessed. These investigations showed the high bag failure rate was due to a series of events including wet dust coating the bags resulting in concentration of gas flow and cleaning air flow to a reduced cleaning area. This in turn resulted in dust penetrating the weave, higher differential pressure, more frequent cleaning and mechanical deterioration of the bags. The cause of the wet dust was determined to be an inadequately sized gas cooling tower aggravated by high water pressure spray nozzles that did not provide the needed fine water droplet size.
4 Phoenix received a subsequent assignment to design two properly sized gas cooling towers with the correct inlet cone geometry and atomizing nozzles that provide that Sauder Mean Diameter (SMD) water droplets. Although the fabric filter was not the main problem some low pressure transition ducts with straightening vanes were needed in certain elbows and some other inlet manifold modifications were made to get equal gas and dust distribution to each compartment, extending bag life. As the recommendations needed several months to implement interim solutions to reduce fabric filter failures were provided including a reconstituted water system, specific additional maintenance procedures and different spray nozzles. Total project value: $4.4 million. This was the lowest cost solution.
5 Reference Profile: The client planned to re-activate an alkali bypass of a four stage preheater kiln. Phoenix provided engineering services to support the client s purchase of major equipment. This included new quench air fans, a new fabric filter, a new inlet air damper for secondary cooling of bypass gases, and a new ID fan. Phoenix designed modifications to the existing quench chamber to improve performance. Vendor proposals were evaluated through a) generating comparative capital cost estimates inclusive of structural, mechanical and electrical costs, b) providing general conceptual arrangement drawings, c) evaluation of risk factors for each system including buildup of alkali chlorides, periodic removal of buildups and access and safety considerations for the work, and d) a capital cost summary of each option. Vendor submitted approval drawings were modified where needed. Additional project features included: A fresh air damper to control moisture in duct gases. A new duct from the quench chamber to the new bag house. A new bin vent filter for an existing dust storage bin. An ESP had to be removed to accommodate this system. In this case we were able to re-use the removed ESP s structural steel base for the new (smaller footprint) bag house. The existing ID fan s base was reused for the new ID fan with minimal modifications saving time and money. Total project value: ~$1.5 million
6 Reference Profile: The client requested we analyze the flue gas temperature profile and review the performance of the downstream fabric filter due to inadequate bag life. We provided a detailed analysis of the requested items and other items we identified as possible contributors to the high failure rate, including temperature control, bag cleaning cycle frequency, bag characteristics, particulate emissions, and system online time. Recommendations were implemented and bag failures were reduced. Total Project value: NA Reference 05107/05114 Profile: The client was faced with the need to rebuild an ESP. Due to emissions limits issues a bag house would be necessary on the clean side of the ESP in addition to rebuilding the ESP. The upstream process equipment was experiencing corrosion believed to be due to the presence of condensed acid gas in the gas stream. We suggested an alternative to rebuilding the ESP was to install a new fabric filter suitably protected against corrosion by coating the steel components. Mechanical, Process and Electrical Specifications were prepared for the supply and erection of the fabric filters and ID fan. Conceptual plans and Capital cost estimates were developed comparing two bag house vendors. Evaluations of the potential vendors capabilities and equipment were provided. An 800,000 acfm bag house at 425 F was needed. The performance guarantee for the bag house was emissions particulate concentration had to be less than gr/dscf and opacity had to be less than 10%. The ID fan was sized at 2500hp. Total project value: $12.9 million (included new upstream ductwork and insulation. Reference Profile: The client requested engineering services for replacement of a collector at the discharge of cyclones and replacement of a gas duct to the bag house manifold. This scope was similar to reference although for a different client. In addition to the items addressed in reference we determined other items contributed to inadequate bag life. This system required bleed in air regulated to control gas temperature to the bag house and the duct diameter was modified to provide gas velocities to minimize dust settling out. Total Project Value: NA
7 Reference Profile: The client requested a capital cost estimate and preliminary engineering for replacing an ESP with a bag house. Downtime for the switchover had to within the normal maintenance period of days. Project related items that could impact the work required during the switchover period included confirmation of existing gas flow rates, pressures and temperatures and evaluation of the existing gas cooling tower and ID fan to meet the new requirements. Rather than remove the existing ESP we determined it was more cost effective to leave it in place, using it as a combination duct and drop out chamber prior to the new bag house. The new fabric filter s location did not require the existing ESP to be removed. This arrangement helped meet the client s constraint of switchover time. Some modifications were made to the existing gas cooling tower to improve performance. Design requirements for the new bag house were 137,000 acfm at 475 F. Total project value: $4.1 million. Project completed on time and within budget and has been in operation for five years.
8 Reference 06130/07131 Profile: The client requested engineering services to replace an ESP with a bag house to comply with emissions limits at this Canadian facility. Phoenix proposed a two step process with a) preliminary engineering to define the layout, define the flow sheet and preparation of a capital cost estimate and b) the complete engineering services to allow a contractor to install the new bag house and demolish the existing ESP. The preliminary engineering phase examined two alternatives to capture the dust: Use the existing ESP as a drop out chamber. Install cyclones ahead of the bag house and demolish the existing ESP once the new system was on line. The scope of the detailed engineering depended on whether the ESP was left in place or demolished with cyclones installed. Our evaluation and capital cost comparisons indicated re-use of the ESP as a drop out chamber was a cost effective solution. We received a subsequent assignment to provide detailed engineering for this selection. The new bag house design capacity was 227,000 acfm at 450 F with a vendor performance guarantee that emissions would not exceed 0.01 gr/dscf to meet regulatory requirements. Total project value: $7.1 million.
9 Reference Profile: With the success of reference 06130/07131 this same client requested engineering services to replace an ESP with a bag house to comply with emissions limits on another piece of process equipment at this Canadian facility. Phoenix determined a bag house capacity of 450,000 acfm at 500 F was needed. Specifications were prepared and vendor quotes solicited with a performance guarantee for the emissions not to exceed 0.01 gr/dscf. A capital cost estimate was prepared for capital appropriation submittal. Unfortunately, funds were not approved for this $6.2 million project, which remains open to this day. Reference 07124/07136 Profile: The client requested a study to determine the needed process modifications to reduce emissions and improve carbon capture at an activated carbon production facility. Phoenix included evaluating the client s original proposal of adding cyclones, calculating expected operating parameters and providing recommendations regarding the advisability and expected results of the operation. Our evaluation indicated adding cyclones without additional process gas fans would introduce unacceptable pressure drops. An expanded project scope was required. We were awarded a subsequent assignment to develop the project and provide detailed engineering services. Besides reducing emissions an added scope of the expanded project was to develop additional heat recovery. Total project value: $4.5 million. Reference Profile: Due to the high cost of a carbon black material handling system from the vendor, Phoenix Process Engineering was asked to develop a more cost effective system. The process flow stream was Raw Material to Grinding to Bag House to Storage to Pelletized to Dryer to Bagging. Phoenix designed the material handling system and the process and nuisance dust collection systems. Total project value: $1.3 million. The client is currently considering our services for additional production facilities.
10 Reference Profile: The client requested we evaluate their air pollution control system on a proprietary drying process and define a system that will meet stipulated emissions limits. The original designed system did not adequately capture the process emissions and subsequent work by a second engineering company did not result in any further improvement at this Canadian facility. We provided flow diagrams of the recommended system with our report. Additional equipment (a bag house and additional fan) was needed to capture particulate emissions. System gas carrying velocities were excessive and resulted in mechanical damage that can be avoided. We developed a schedule where the system modifications could be made without disrupting production and downtime of less than two days would be needed for the final connections. Total project value: In progress. Total project cost estimated to be less than $0.5 million.
Assessing the Changes Required by the Industrial Boiler MACT Regulations
Technical Paper MS-17 Assessing the Changes Required by the Industrial Boiler MACT Regulations Authors: A.L. LeClair L.M. McDermitt Babcock & Wilcox Power Generation Group, Inc. Barberton, Ohio, U.S.A
Multi-pollutant control solutions for coal based power plants
Multi-pollutant control solutions for coal based power plants By Luca Mancuso and Hans Janssen Content SOx control Wet Scrubbers Open towers Dual Flow Tray Technology Semi-Dry SDA CFB Scrubbers Dust control
Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard
Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Introduction SRU s (Sulfur Recovery Units) are critical pieces of equipment in refineries and gas plants. SRUs remove sulfur compounds from certain
State of the Art (SOTA) Manual for Boilers and Process Heaters
State of the Art (SOTA) Manual for Boilers and Process Heaters Original Date: July 1997 Revision Date: February 22, 2004 State of New Jersey Department of Environmental Protection Air Quality Permitting
IT3 01 Conference, Philadelphia, PA, May 14-18, 2001
IT3 01 Conference, Philadelphia, PA, May 14-18, 2001 BAGHOUSE OPTIMIZATION AT A MEDICAL WASTE INCINERATOR R. D. Montgomery Phoenix Services, Inc. John Kumm EA Engineering, Science, and Technology C. P.
FACT SHEET PROPOSED MERCURY AND AIR TOXICS STANDARDS
FACT SHEET PROPOSED MERCURY AND AIR TOXICS STANDARDS ACTION On March 16, 2011, the Environmental Protection Agency (EPA) issued a proposed rule that would reduce emissions of toxic air pollutants from
Bill Maxwell, U.S. Environmental Protection Agency, OAQPS (C439-01)
TO: Bill Maxwell, U.S. Environmental Protection Agency, OAQPS (C439-01) FROM: Jeffrey Cole, RTI International DATE: December 2003 SUBJECT: Methodology for Estimating Cost and Emissions Impact for Coal-
STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR MANAGEMENT
Page 1 of 7 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Issued pursuant to Title 22a of the Connecticut General Statutes
MILLIKEN CLEAN COAL TECHNOLOGY DEMONSTRATION PROJECT UNIT 2 ELECTROSTATIC PRECIPITATOR PERFORMANCE TEST RESULTS BEFORE AND AFTER MODIFICATION
MILLIKEN CLEAN COAL TECHNOLOGY DEMONSTRATION PROJECT UNIT 2 ELECTROSTATIC PRECIPITATOR PERFORMANCE TEST RESULTS BEFORE AND AFTER MODIFICATION Prepared by: CONSOL Inc. Research & Development 4000 Brownsville
Continuous Emissions Monitoring - Program 77
Program Description Program Overview Coal-fired power plants are in increased need of robust, accurate, and certifiable continuous emissions monitors (CEMs) for mercury, particulate matter (PM), acid gases,
1.0 What Are the Purpose and Applicability of Performance Specification 11?
While we have taken steps to ensure the accuracy of this Internet version of the document, it is not the official version. Please refer to the official version in the FR publication, which appears on the
Hackney Biomass Boiler Information Request Form
Hackney Biomass Boiler Information Request Form In common with other types of combustion appliances, biomass boilers are potentially a source of air pollution. Pollutants associated with biomass combustion
INTRODUCTION. Fact Sheet: Air Pollution Emission Control Devices for Stationary Sources
Fact Sheet: Air Pollution Emission Control Devices for Stationary Sources INTRODUCTION Stationary sources of air pollution emissions, such as power plants, steel mills, smelters, cement plants, refineries,
GUIDELINES FOR SOURCE TESTING
GUIDELINES FOR SOURCE TESTING Created August 12, 2011 Revised October 03, 2013 Source Testing Guidelines Rev. 2 TABLE OF CONTENTS 1.0 INTRODUCTION...6 1.1 Purpose...6 1.2 Application...6 1.3 Revisions...6
Stack Sampling Stack sampling or source sampling
Stack Monitoring Stack Sampling Stack sampling or source sampling may be defined as a method of collecting representative samples of pollutant laden air/gases at the place of origin of pollutants to determine
Description of Thermal Oxidizers
Description of Thermal Oxidizers NESTEC, Inc. is a full service equipment supplier specializing in solutions for plant emission problems. The benefit in working with NESTEC, Inc. is we bring 25+ years
How To Make Calcium Carbide
11.4 Calcium Carbide Manufacturing 11.4.1 General Calcium carbide (CaC 2 ) is manufactured by heating a lime and carbon mixture to 2000 to 2100 C (3632 to 3812 F) in an electric arc furnace. At those temperatures,
RTO UPGRADE PROVIDES COST SAVINGS AND PERFORMANCE IMPROVEMENTS
RTO UPGRADE PROVIDES COST SAVINGS AND PERFORMANCE IMPROVEMENTS Abstract Pollution abatement systems are a standard requirement for the solvent based coating processes, with planning these do not need to
Site Identification No.: 197809AAO Application No.: 15030051
Project Summary for a Construction Permit Application from Midwest Generation for a Natural Gas Conversion Project for the Joliet Electric Generating Station Joliet, Illinois Site Identification No.: 197809AAO
Evaluate, Clean, and Tune Guidance
Evaluate, Clean, and Tune Guidance The Evaluate, Clean and Tune (ECT) process serves three essential purposes in the Weatherization Assistance Program (WAP). The first is to evaluate the existing system
ENVIROENERGY SOLUTIONS. Presentation of APC and Wet Electrostatic Precipitation Technology
ENVIROENERGY SOLUTIONS Presentation of APC and Wet Electrostatic Precipitation Technology Agenda Introduce participants Review WESP technology Review the Applications of WESP Questions & answers People
GEA Niro Pharmaceutical GMP Spray Drying facility. Spray drying process development and contract manufacturing. engineering for a better world
GEA Niro Pharmaceutical GMP Spray Drying facility Spray drying process development and contract manufacturing engineering for a better world GEA Process Engineering 2 GEA Niro PSD-4 Chamber cone in clean
SECTION 23 01 30.51 HVAC AIR-DISTRIBUTION SYSTEM CLEANING
SECTION 23 01 30.51 HVAC AIR-DISTRIBUTION PART 1 - GENERAL 1.1 SUMMARY A. Section includes cleaning of interior surfaces of HVAC equipment. The HVAC equipment cleaning work includes the following: 1. Air
Wolverine Clean Energy Venture
Prepared for: Wolverine Power Supply Cooperative Cadillac, Michigan Supplement to CAA Section 112(g) MACT Auxiliary Boiler Amended Application No. 317-07 Wolverine Clean Energy Venture Rogers City, MI
PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS
January 1997 PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS 1.0 PERMIT 1.1 After receipt of a Building Permit from the City of San Jose Building Department, submit
Roadmap Performance Target Best technology Capability
Sulfur Dioxide Control Technologies In Electric Power Plants CCTR Basic Facts File #5 Brian H. Bowen, Marty W. Irwin The Energy Center at Discovery Park Purdue University CCTR, Potter Center, 500 Central
HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3
HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- BY MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3 SYNOPSIS JP Steel Plantech Co. has developed Hybrid system for EAF off-gas heat recovery, with EAF
EPA Requirements for Diesel Standby Engines In Data Centers. Bob Stelzer / CTO / Safety Power Inc. For 7x24 Fall 2014 Conference. 1.
EPA Requirements for Diesel Standby Engines In Data Centers Bob Stelzer / CTO / Safety Power Inc For 7x24 Fall 2014 Conference 1.0 Introduction In order to get the Air Emissions Permit for facilities that
SLMA Meeting. Boiler MACT and Related Rules. Atlanta, GA March 2, 2011. Martin Rollins, P. E. H. M. Rollins Company, Inc. Gulfport, Mississippi
SLMA Meeting Atlanta, GA March 2, 2011 Boiler MACT and Related Rules Martin Rollins, P. E. H. M. Rollins Company, Inc. Gulfport, Mississippi Boiler MACT and Related Rules EPA Had Requested 15 Month Delay
Guidelines on AIR POLLUTION CONTROL for. Joss Paper Burning at Chinese Temples, Crematoria and Similar Places
Guidelines on AIR POLLUTION CONTROL for Joss Paper Burning at Chinese Temples, Crematoria and Similar Places CONTENTS 1 Introduction 2 Major Considerations 3 Best Available Technology for Control of Air
Biomass Boiler House Best Practices. Irene Coyle & Fernando Preto CanmetENERGY
Biomass Boiler House Best Practices Irene Coyle & Fernando Preto CanmetENERGY Growing the Margins London, Ontario March 2010 The Biomass & Renewables Group of Industrial Innovation Group (IIG) of CanmetENERGY
Element D Services Plumbing
Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.
Condensing Economizers Workshop Enbridge Gas, Toronto. MENEX Boiler Plant Heat Recovery Technologies. Prepared by: Jozo Martinovic, M A Sc, P Eng
Condensing Economizers Workshop Enbridge Gas, Toronto MENEX Boiler Plant Heat Recovery Technologies Prepared by: Jozo Martinovic, M A Sc, P Eng MENEX Innovative Solutions May 15, 2008 MENEX INC. 683 Louis
Energy Efficient Operations and Maintenance Strategies for Boilers
Energy Efficient Operations and Maintenance Strategies for Boilers Large, complex and widely used, industrial boilers are major consumers of fuel. Proper operations and maintenance (O&M) procedures must
SEPARATING DUST PARTICLES USING AN AERODYNAMIC DEDUSTER
SEPARATING DUST PARTICLES USING AN AERODYNAMIC DEDUSTER DEVELOPMENT OF AN AERODYNAMIC DEDUSTER FOR LIVESTOCK BUILDINGS G.A. Zhao, Y. Zhang Summary Dust is among the major pollutants that have a detrimental
Best Available Retrofit Technology Analysis Report
Report Best Available Retrofit Technology Analysis Report Weyerhaeuser Corporation Longview, WA Prepared for Weyerhaeuser Corporation P.O. Box 188 Longview, Washington 98632 December 2007 Revised June
Improving Energy Efficiency through Biomass Drying
Improving Energy Efficiency through Biomass Drying Gilbert McCoy, Senior Energy Systems Engineer Northwest CHP Technical Assistance Partnership International District Energy Association Woody Biomass CHP
Mercury Speciation in Flue Gas from Coal-fired Power Stations
Mercury Speciation in Flue Gas from Coal-fired Power Stations Matthew A Dexter, Warren T Corns and Peter B Stockwell P S Analytical Arthur House Crayfields Industrial Estate Main Road Orpington BR5 3HP
NAWTEC18-3507 COMPARISON OF ACID GAS CONTROL TECHNOLOGIES IN EFW FACILITIES
Proceedings of the 18 th Annual North American Waste-to-Energy Conference NAWTEC18 May 11-13, 2010, Orlando, Florida, USA NAWTEC18-3507 COMPARISON OF ACID GAS CONTROL TECHNOLOGIES IN EFW FACILITIES Craig
Method 202 Dry Impinger Method for Determining Condensable Particulate Emissions from Stationary Sources. By: Paul Ottenstein
Air Quality Issues in the Rocky Mountain Region PM2.5 Source Testing Method 201A Determination PM 10 and PM 2.5 Emissions from Stationary Sources (Constant Sampling Rate Procedure) Method 202 Dry Impinger
QUADRANT SR- Thermal Oxidizer Process Design & Environmental Control Benefits for the Sand Coating Industries
> 99% VOC, HAP & CO Destruction Efficiency Time, temperature and turbulence are the basic design principles required for organic pollutant control. In the QUADRANT-SR SERIES Recuperative Thermal Oxidizers,
Redefining Spray Technology
Redefining Spray Technology Macrospray Single-Point Nozzles Macrospray Spider Nozzles Macrospray nozzle technology Improved performance, lower cost Macrospray nozzle technology from Parker Hannifin s Gas
Comparison of selected plasma technologies
Comparison of selected plasma technologies PREPARED BY PLASTEP PARTNER #11 INSTITUTE OF NUCLEAR CHEMISTRY AND TECHNOLOGY Working group Dr. Andrzej Pawelec Mrs. Sylwia Witman-Zając Mrs. Agnieszka Molenda
Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin
Drying of Woody Biomass BioPro Expo & Marketplace / Atlanta, GA / March 14-16, 2011 Drying of Woody Biomass Conventional Direct Fired Dryer Technology Proprietary work of the Copyright Owner Issues with
Appendix 5A: Natural Gas Use in Industrial Boilers
Appendix 5A: Natural Gas Use in Industrial Boilers Industrial boilers consumed 2.1 Tcf of natural gas in 2006, accounting for 36% of total natural gas in manufacturing. 1 In this appendix, we provide further
presents Cooking With Fire Fixed Fire Suppression & Exhaust Systems for Cooking Environments Monday, 17 June, 13
presents Cooking With Fire Fixed Fire Suppression & Exhaust Systems for Cooking Environments Who is the AFSA? Safe and Secure Alberta Fire Safety Association Fire industry members working together to improve
TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS
TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS Dr. Abhay Kumar Sahay, AGM(CC OS) Bijay Manjul, AGM( Operation) Kahalgaon Boiler has three inputs Steam generator 1. WATER 2. COAL 3. AIR Burner Air preheater
1. Certification: Employ an ASCS certified by NADCA on a full-time basis. 2. Supervisor Qualifications: Certified as an ASCS by NADCA.
PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.3 Properties of Coal
1.3 Properties of Classification is classified into three major types namely anthracite, bituminous, and lignite. However there is no clear demarcation between them and coal is also further classified
NFR: 2.D.3.c Asphalt roofing SNAP: 040610 Asphalt roofing materials ISIC: Version Guidebook 2013
Category Title NFR: 2.D.3.c Asphalt roofing SNAP: 040610 Asphalt roofing materials ISIC: Version Guidebook 2013 Coordinator Jeroen Kuenen Contributing authors (including to earlier versions of this chapter)
NATURAL GAS EXPERIENCE
02 NATURAL GAS EXPERIENCE Linde Process Plants, Inc. (LPP) has constructed NGL Plants since 1969 using traditional processes as well as the more advanced CRYO-PLUS technology. CRYO-PLUS TM Proprietary
1-800-214-7716 www.midwestair.com COMPOSITE MESH PAD (CMP) DRY SCRUBBERS III TM ENFORCER III
1-800-214-7716 www.midwestair.com Bulletin ENF-06 MIDWEST AIR PRODUCTS CO., INC. COMPOSITE MESH PAD (CMP) DRY SCRUBBERS ULTRA-MACTACT TM wet scrubbers chrome (CMP) scrubbers mist eliminators (CMP) exhaust
Self Assessment Exercise
Self Assessment Exercise Read the following extract of supporting documentation for Permit Application for Galvos plc galvanising facility and the accompanying tables. Decide if the proposed control techniques
voestalpine Stahl, Linz, Austria Maximized Emission Reduction Of Sintering SIMETAL CIS MEROS plant Metals Technologies
voestalpine Stahl, Linz, Austria Maximized Emission Reduction Of Sintering SIMETAL CIS MEROS plant Metals Technologies 1 Meeting future environmental demands now! The challenge: Requirements placed on
Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,
4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.
Committed to make a better world
Committed to make a better world 1. Higher Availability & Reliability 2. Highest Plant efficiency 3. Lower Heat Rate 4. Minimum Auxiliary Power Consumption 5. Minimum Emission of Pollutants Committed to
Development and Operating Results of Low SO2 to SO3 Conversion Rate Catalyst for DeNOx Application
Development and Operating Results of Low SO2 to SO3 Conversion Rate Catalyst for DeNOx Application By Isato Morita Yoshinori Nagai Dr. Yasuyoshi Kato Babcock-Hitachi K.K., Japan Dr.Howard N. Franklin Hitachi
Energy Efficiency in Industrial HVAC Systems
Energy Efficiency in Industrial HVAC Systems Heating, ventilation and air conditioning (HVAC) constitutes up to 35 percent of energy used in manufacturing facilities. This fact sheet is geared towards
Well Positioned for the Future
Dominion Generation Virginia City Hybrid Energy Center Well Positioned for the Future The Coal Institute July 13, 2015 Rick Boyd Manager of Fuel Origination & Operations 1 Dominion Profile Operating Segments
Reinhold Environmental APC Round Table and Expo. GE Energy
Reinhold Environmental APC Round Table and Expo GE Energy Typical SDA System Schematic Reheat Section Steam Generator Economizer Stack Silo Baghouse SDA/Slurry Tower Ash/Reagen t Silo Baghouse or Precipitator
Mass Flow Meter Product Guide
Mass Flow Meter Product Guide 2 thermal Mass technology Kurz Instruments manufactures thermal mass flow meters designed to accurately monitor and measure dry air, dry gas, and wet gas environments. Thermal
Rule 1146.2 - EMISSIONS OF OXIDES OF NITROGEN FROM LARGE WATER HEATERS AND SMALL BOILERS
Rule 1146.2 - EMISSIONS OF OXIDES OF NITROGEN FROM LARGE WATER HEATERS AND SMALL BOILERS (a) Purpose and Applicability The purpose of this rule is to reduce NOx emissions from natural gas-fired large (commercial)
Particulate Matter Emissions-Control Options for Wood Boiler Systems
Particulate Matter Emissions-Control Options for Wood Boiler Systems PARTICULATE MATTER EMISSIONS-CONTROL OPTIONS for Wood Boiler Systems Contents Particulate Emissions from Wood Combustion Best Practices
Preventive Maintenance. State Energy Assessment Workshop By: DTE Energy Partnership & Services
Preventive Maintenance State Energy Assessment Workshop By: DTE Energy Partnership & Services Do you know? World wide research has shown that one of the reasons causing 80% of the accidents is deficient
IVISIONS STEAM PLANT DIVISIONS TOTAL TURNKEY SOLUTIONS. INDUSTRIAL BOILER & MECHANICAL
IVISIONS INDUSTRIAL BOILER & MECHANICAL STEAM PLANT DIVISIONS TOTAL TURNKEY SOLUTIONS. FIELD SERVICE & REPAIR DIVISION Rely on IB&M's field service experts for your steam plant. Our Field Service & Repair
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
Arapahoe County Residential Water Heater Installation and Inspection Guide
Arapahoe County Residential Water Heater Installation and Inspection Guide The attached handout is designed to be a general permit submittal and inspection guide covering most installation instances, however
HVAC Checklist - Long Form
HVAC Checklist - Long Form Page 1 of 14 Appendix B discusses HVAC system components in relation to indoor air quality. utside Air Intake Location pen during occupied hours? Unobstructed? Standing water,
SAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE
1 Which tool is used to correct internal hi-low when preparing a 4-in. steel pipe for welding? A. 4-in. grinder with cutting disc. B. Mini-grinder with flapper disc. C. Pencil grinder with cone stone.
IEQ-15 Air Distribution System
AIM OF CREDIT To encourage and recognise the design and maintenance of air distribution systems that minimise the risk of particulate and microbial contamination to the internal air supply. CREDIT CRITERIA
www.inspection-for-industry.com
Quality Control Form (TEST RUNNING RECORD FOR AIR HANDLING UNIT) SUB POWER SUPPLY: MAIN POWER V, Hz, CONTROL V, Blower 1 kw, Blower 2 kw, Compressor: (1) kw (2) kw (3) kw (4) kw Heating Element: kw 1.
STATE OF MISSOURI I~I@I DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT
STATE OF MISSOURI I~I@I DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT Under the authority of RSMo 643 and the Federal Clean Air Act the applicant is authorized
Calculate Available Heat for Natural Gas Fuel For Industrial Heating Equipment and Boilers
For Industrial Heating Equipment and Boilers Prepared for California Energy Commission (CEC) Prepared By: Southern California Gas Company (A Sempra Energy Utility) E3M Inc. May 2012 i Disclaimer The CEC
The Regulatory Impact Analysis (RIA) for the Mercury Air Toxics Standard (MATS)
The Regulatory Impact Analysis (RIA) for the Mercury Air Toxics Standard (MATS) Kevin Culligan U.S. Environmental Protection Agency (EPA) Associate Division Director, Sector Policies and Programs Division
GAS HEATING IN COMMERCIAL PREMISES
ENERGY EFFICIENCY OFFICES GAS HEATING IN COMMERCIAL PREMISES www.energia.ie www.energia.ie Typically, energy reductions of 10% or more can be made easily through maintenance and low cost improvements.
PRINCIPLES OF FLUE GAS WATER RECOVERY SYSTEM
PRINCIPLES OF FLUE GAS WATER RECOVERY SYSTEM John H. Copen - SIEMENS Power Generation, Inc. Terrence B. Sullivan - SIEMENS Power Generation, Inc. Bruce C. Folkedahl - Energy & Environmental Research Center
Presentation Outline. Background
Introduction ENVIRONMENTAL SYSTEMS, INC. Innovative Air Pollution Control Solutions Air Pollution Abatement Technologies for the Oil and Natural Gas Processing Industries. Jeff Kudronowicz / Application
During Various Aluminum Fabricating Operations
Guidelines for Handling Aluminum Fines Generated During Various Aluminum Fabricating Operations F-1 Guidelines for Handling Aluminum Fines Generated During Various Aluminum Fabricating Operations SCOPE
POLLUTED EMISSION TREATMENTS FROM INCINERATOR GASES
POLLUTED EMISSION TREATMENTS FROM INCINERATOR GASES Ecole Nationale Supérieure de Chimie Avenue du Général Leclerc, Campus de Beaulieu 35700 Rennes, France Tel 33 (0)2 23 23 80 02 Fax 33 (0)2 23 23 81
CoalGen 2010 Pre-Air Heater Control of SO3 and Related Condensables
CoalGen 2010 Pre-Air Heater Control of SO3 and Related Condensables Charles A. Lockert, Breen Energy Solutions, 104 Broadway Street, Carnegie, PA 15106 Greg Filippelli, P.E. and Marty Dillon, ADA Environmental
INDEX 9-7-100 GENERAL
REGULATION 9 INORGANIC GASEOUS POLLUTANTS RULE 7 NITROGEN OXIDES AND CARBON MONOXIDE FROM INDUSTRIAL, INSTITUTIONAL AND COMMERCIAL BOILERS, STEAM GENERATORS AND PROCESS HEATERS INDEX 9-7-100 GENERAL 9-7-101
INDUSTRIAL BOILER MACT FACTSHEET
INDUSTRIAL BOILER MACT FACTSHEET The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Industrial/Commercial/Institutional Boilers and Process Heaters (40 CFR Part 63, Subpart DDDDD),
NFPA Combustible Dust Compliance and the Industrial Ventilation System
NFPA Combustible Dust Compliance and the Industrial Ventilation System Presented By: Tom Kroeger PE [email protected] Kirk & Blum, a CECO Environmental Company Marty Schloss PE [email protected]
NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES
NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES 8.1 INTRODUCTION Testing, adjusting, and balancing of HVAC systems can best be accomplished by following a series of systematic procedures. The NEBB TAB
Printing and Publishing Energy Savings Guide
Printing and Publishing Energy Savings Guide Oregon printing and publishing plants face challenges of rising operating costs, environmental and other regulations, outdated equipment and customer demand
C. Burner management system to follow requirements of Industrial Risk Insurers (IRI).
SECTION 23 52 30 PART 1 - GENERAL 1.01 RELATED WORK A. Section 23 05 00: Common Work Results for HVAC B. Section 23 25 00: Chemical Water Treatment C. Section 23 51 23: Flue Piping 1.02 QUALITY ASSURANCE
Notice of Decision: Approval Effective Immediately
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT We Protect Hoosiers and Our Environment. 100 N. Senate Avenue Indianapolis, IN 46204 (800) 451-6027 (317) 232-8603 www.idem.in.gov Michael R. Pence Thomas
TODAY S THERMAL OXIDIZER SOLUTIONS TO MEET TOMORROW S CHALLENGES
Callidus Oxidizers for Waste Destruction TODAY S THERMAL OXIDIZER SOLUTIONS TO MEET TOMORROW S CHALLENGES Thermal oxidizer systems Catalytic oxidizer systems Callidus, experts in Thermal Oxidizers Wide
(a) Method 1 Sample and Velocity Traverses for Stationary Sources.
While we have taken steps to ensure the accuracy of this Internet version of the document, it is not the official version. Please refer to the official version in the FR publication, which appears on the
Arecibo Resource Recovery Project
Arecibo Resource Recovery Project Energy Answers International, Inc., through its subsidiary, Energy Answers Arecibo, LLC, is developing a 77 MW Resource Recovery Project to generate renewable energy and
SMALL ENTITY COMPLIANCE GUIDE FOR MAJOR SOURCE BOILERS AND PROCESS HEATERS
SMALL ENTITY COMPLIANCE GUIDE F MAJ SOURCE BOILERS AND PROCESS HEATERS National Emission Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and