MONITORING OF THE PERTH BICYCLE NETWORK 2011



Similar documents
new Perth Stadium Transport Project Definition Plan

Perth Central Business District Transport Plan 2012

The Complete CPP Parking Guide

Bike Blackspots on Perth s Bike Network

Santa Maria College. A Ministry of Mercy Education Ltd. Transport & Bus Information as at October 2014

Protected Bicycle Lanes in NYC

Managing Public Use of Freeway Emergency Access Gates and Median Crossovers

Department of Transport. Cycling Rules

Alternatives to Employment/Post School Options

(As amended by By-law ) By-law of The Corporation of the City of Oshawa

UNDERSTANDING CIVIL PROCEEDINGS

VEHICLE / PEDESTRIAN COLLISIONS (HRM: 2013)

TransLink Bus Service Performance Review

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Pilot Staff Bike Share Project. Induction Notes

South Perth Station Precinct Plan

CYCLISTS INVOLVED IN ROAD CRASHES IN SOUTH AUSTRALIA

Traffic Information in NYC

Clean, Green, Fun! Cady Way. Trail

Harlem River Bridges Access Plan

Trends and issues Lake Te Koutu walkway, Cambridge

Lawson Outline Plan External Traffic Analysis Working Paper

Road Safety Authority Provisional Review of Road Crashes 2013

What roundabout design provides the highest possible safety?

Needs Analysis. Long Beach Bicycle Master Plan. Bicycle Commuter Needs. LONG BEACH BICYCLE MASTER PLAN Needs Analysis

Introduction to state and territory based taxes and duties and to Local Government imposts

Weather Briefing for Southeast Texas October 24 th, 2015

Characteristics of High Injury Severity Crashes on km/h Rural Roads in South Australia

AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF

For more information, visit: rethinkingstreets.com


2015 Capital Works Program

A9 Data Monitoring Report

Contributory factors to road accidents

Chapter 1: Background

PATHWEST COLLECTION CENTRES

ATSB RESEARCH AND ANALYSIS REPORT ROAD SAFETY. Characteristics of Fatal Road Crashes During National Holiday Periods

Waco MPO 2040 Socio-Economic Data Forecast Report

EPA Technical Assistance for Sustainable Communities Building Blocks

Improving Cyclist Safety Western Australia. A joint initiative to enable cyclists of every level of ability to cycle safely.

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street

AIDS AND EQUIPMENT. Australian Mobility Equipment 1/40 Resource Way, Malaga Ph: (08)

SAN DIEGO - A BICYCLE FRIENDLY CITY

Executive Summary. Transportation Needs CHAPTER. Existing Conditions

Public Transport Vehicle Management System. Request for Information

Journey to Work Patterns in the Auckland Region

Age-Friendly Communities

The Panel s key findings are set out in section 5 of this report. They are summarised as follows:

The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan

NEW ENGLAND QUARTER, BRIGHTON, BN1 4DJ. 32,000 sq ft of the best office space in Brighton next to the station

The Auto Masters Group Franchise Overview

Amex Site Residential Development, Tarneit

GTA Cordon Count Program

Children and road safety: a guide for parents

Ne w J e r s e y Tr a f f i c Co n g e s t i o n :

FREQUENTLY ASKED QUESTIONS

BICYCLE TRENDS IN CAMBRIDGE

Monitoring and evaluation of walking and cycling (draft)

Fiscal Year Annual Report

CROYDON MAJOR ACTIVITY CENTRE PARKING STUDY

Council of Ambulance Authorities

Metropolitan Setting l

Construction Traffic Management Plan

3 Tappan Zee Bridge Rehabilitation Options

John Holland Boathouse. N Surrey Ave & Calvert Ave Ventnor City, NJ 08406

Now Therefore, The Corporation of the City of Peterborough by the Council thereof hereby enacts as follows:

SOUTH COOGEE TRANSPORT MANAGEMENT PLAN

Belmont Street Bridge Rehabilitation Project

Dallas-Fort Worth Area Major Transportation Projects

SINGLE FUNERAL PERMIT BURIAL

Traffic Volume Counts

Measuring the Street:

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST

HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings

Workshop Schedule October December 2015

Segregation of Shared Use Routes

21.08 ECONOMIC DEVELOPMENT. Retail

Regional Cycling Strategy. May 2004

SYDNEY ACCESSIBILITY INFORMATION SHEET

Evaluation of the Shared-Use Arrow

Melbourne Airport Rail Link Study. Study overview and findings

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

Cycling Activity. ACT Canada - Sustainable Mobility Summit 2010

There are also, as indicated below, scoliosis clinics in some public hospitals and in most children s hospitals throughout the country.

BYLAW OF ALBERTA BEACH IN THE PROVINCE OF ALBERTA

General Obligation Bond Projects FYE

London Greenways. Monitoring Report. September 2013 MAYOR OF LONDON. Transport for London

21.04 LAND USE. Managing amenity through land use strategies

BlipTrack. Case Studies. ANPR vs. Bluetooth. This case describes how data from ANPR cameras match corresponding Bluetooth sensor data.

Construction Traffic Management Plan

3.1 Historical Considerations

If You Build It : The Impact of Street Improvements on Commercial Office Space

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS

Capturing Value Uplift Benefiting from the Private Sector

APPENDIX E TASK 5 TECHNICAL MEMORANDUM: TRAVEL DEMAND FORECASTING PROCESS

Reported Road Casualties Great Britain: 2013 Annual Report

University Arms Hotel, Cambridge

A Bicycle Accident Study Using GIS Mapping and Analysis

Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application)

Monthly Bulletin of Preliminary Traffic Crash Data September 2015

Transcription:

MONITORING OF THE PERTH BICYCLE NETWORK 2011 Prepared for Department of Transport: Bikewest June 2011 Prepared By Painted Dog Research Chris Batini 1 P a g e

CONTENTS EXECUTIVE SUMMARY... 4 Total for All Counts... 4 Group A Spot and Screen Line Counts... 5 Fremantle Cordon Count... 6 Perth Cordon Counts... 7 Group B Spot and Screen Line Counts... 11 INTRODUCTION... 12 Background... 12 Objectives... 14 Methodology... 15 Definition and Coding of Sites and Locations... 15 Data Collection Approach... 15 Observations Dates And Times... 16 Weather Conditions... 16 Count Procedures... 16 Data collection and survey forms... 17 Site selection... 17 Selection and training of research assistants... 17 KEY FINDINGS... 18 Group A... 19 Group A Spot Counts... 19 There were three Group A spot counts conducted on April 5 th, 2011 including:... 19 Site A1 Parliament House PSP;... 19 Site A2 LBR NE 15 Beechboro; and... 19 Site A3 LBR SE 16 & 27 Bentley.... 19 Site A1, Parliament House PSP... 19 Site A2, LBR NE 15 Beechboro... 20 Site A3, LBR SE 16 & 27, Bentley... 20 Group A Spot Count - Summary... 21 Group A Screen Line Counts... 22 There were seven screen line counts conducted in Group A on April 4 th and 5 th, 2011 including:... 22 Site A4 Harold Street East Perth;... 22 Site A5 John/Francis Streets, Northbridge;... 22 Site A6 Murdoch Drive, Winthrop;... 22 Site A7 Sackville Terrace, Doubleview;... 22 Site A8 Surrey Road, Kewdale;... 22 Site A9 Claremont, adjacent Show Grounds; and... 22 Site A10 Welshpool Road, Albany Highway.... 22 Site A4, Local Bicycle Route Ne 26 East Perth... 22 Site A5, LBR NE 4, Northbridge... 24 Site A6, LBR SW 7 & 8, Winthrop... 26 SITE A7, LBR NW 1 DOUBLEVIEW... 28 SITE A8, LBR, SE 21 KEWDALE... 30 Site A9, Claremont Principle Transport Route... 32 Site A10, Spot Improvement Welshpool Rd PSP... 34 Group A Screen Line Count Totals... 36 Fremantle CBD Cordon Count... 38 Fremantle CBD Cordon Count 3 Hour Counts... 39 Fremantle CBD Cordon Count 12 Hour Counts... 41 Perth CBD Cordon Count... 42 Perth CBD Cordon Count 3 hour Counts... 43 Perth CBD Cordon Count 12 hour Counts... 46 2 P a g e

Perth CBD Pedestrian and Spot Counts... 48 Group B Results... 49 Group B Spot Counts... 49 Site B1, Mounts Bay Road... 50 Site B2, McCallum Park paths... 51 Site B3, West Leederville PSP... 53 Site B4, Alfred Cove, Melville... 54 Site B13, RRP/LBR NW9 Salvado Rd & Jersey St Jolimont... 56 Group B Spot Count Totals... 58 Group B Screen Line Counts... 60 Site B5, LBR SW 5 Canning Highway, Applecross... 60 Site B6, LBR SE 26 Hordern St, Vic Park... 62 Site B7, CBD 2 Aberdeen St (at Palmerton St)... 64 Site B8, PSP CBD James, Roe, Wellington... 66 Site B9, PSP Mitchell Freeway / Lake Monger... 68 Site B10, PSP Stirling Road, Claremont... 70 Site B11, LBR SW 38 Rockingham... 72 Site B12, RRP South Perth Foreshore... 74 Group B Screenline Count Totals... 76 APPENDICES... 78 Appendix I: Site and Location Summary Appendix II: Briefing Notes Appendix III: Count Sheet Example 3 P a g e

EXECUTIVE SUMMARY Total for All Counts The 2011 total count shows a modest 1% increase in cyclist numbers compared to 2010. Total cyclist numbers have increased only slightly in 2011 by just 240 across all count sites to 23,147, representing a 1% increase compared to the 2010 results and a 285% increase compared to the baseline results. For both Group A and B (spot and screenline) a total of 8,168 cyclists were observed in 2011 representing an increase of 30% compared to the 2010 results and an increase of 240% compared to the baseline results. Conversely, the Fremantle cordon count recorded a total of 1,253 cyclists in 2011, representing a 30% decrease compared to 2010 results and a 33% increase compared to baseline results. The Perth cordon count also recorded a decrease compared to 2010, with 13,726 cyclists counted, representing a 7% decrease. However, the 2011 result remains 414% above the figures recorded in the baseline count. Table 1. All counts Baselines vs. 2010 and 2011 ALL COUNTS Baseline 2010 2011 GROUP A (SPOT AND SCREEN) GROUP B TOTALS (SPOT AND SCREEN) 1044 1651 2638 1356 4625 5530 TOTAL GROUP A AND B 2400 6276 8168 TOTAL FREMANTLE CORDON 944 1794 1253 TOTAL PERTH CORDON 2672 14837 13726 ALL COUNTS - TOTAL 6016 22907 23147 4 P a g e

Group A Spot and Screen Line Counts Both Group A Spot and Screenline counts have increased quite substantially in 2011. Group A spot counts were conducted on April 5 th, 2011 between 6.30 am and 9.30 am and 3.30 pm and 6.30 pm. Overall, 594 cyclists were observed in total representing a 128% increase for the Group A spot counts from 2010. This is shown in Table 1 below. Group A screenline counts were conducted on April 4 th and 5 th, 2011 between 6.30 am and 9.30 am, 3.30 am and 6.30 pm or 3.00 pm and 6.00 pm. Overall, significant increases compared to 2010 (47%) and the base line (131%) were observed. Across both Group A Spot and Screenline Counts there were 2,638 cyclists observed in 2011. This represents a 60% increase on 2010 results and a 153% increase on the 1998 baseline. Table 2. Group A: Summary of Spot and Screen Line Counts Group A: Summary of Spot Counts 1998 2010 2011 Site A1 Parliament House PSP 66 87 522 Site A2 LBR NE 15 Beechboro 37 68 12 Site A3 - LBR SE16 & 27, Bentley 57 105 60 TOTAL SPOT COUNTS 160 260 594 Group A: Summary of Screen Line Counts Site A4, A LBR NE 26 East Perth 284 588 1033 Site A5, LBR NE 4 Northbridge 137 228 464 Site A6, LBR SW 7 & 8, Winthrop 146 121 139 Site A7, LBR NW 1 Doubleview 35 146 68 Site A8, LBR, SE 21 Welshpool 122 66 100 Site A9, Claremont Principle Transport Route Site A10, Spot Improvement Welshpool Rd PSP 82 167 81 78 75 159 TOTAL SCREEN LINE COUNTS 884 1391 2044 TOTAL ALL GROUP A COUNTS 1044 1651 2638 5 P a g e

Fremantle Cordon Count The total Fremantle Cordon Count has decreased by 30% in 2011. In total, there were 502 cyclists counted entering and exiting the Fremantle CBD in the 3 hour time period of 6.30 am and 9.30 pm on April 7 th, 2011. This represents a 40% decrease on 2010 observations but a 45% increase on the 1998 baseline. Four sites in the Fremantle CBD Cordon were observed for 12 hours between 6.30 am and 6.30 pm on April 7 th, 2011. A total of 751 cyclists were observed in 2011 and this represents a 22% decrease on 2010 results but a 26% increase on the 1998 baseline. The data is summarised in Table 2 below. Table 3. Fremantle CBD Cordon Count 3 and 12 Hour Counts Fremantle CBD Cordon Count 3 Hour Counts 1998 2010 2011 Enter Exit TOTAL Enter Exit TOTAL Enter Exit TOTAL F-A Beach, Cnr James St 42 26 68 15 15 30 62 20 82 F-B Quarry St, cnr James St 10 4 14 65 36 101 12 2 14 F-C Finnerty St, cnr James St 14 8 22 47 7 54 11 16 27 F-D Ellen St, cnr Ord St 15 5 20 42 19 61 30 3 33 F-E High St, cnr Ord 2 2 4 12 5 17 5 4 9 F-F Knutsford St, cnr Hampton Rd 3 0 3 21 28 49 1 1 2 F-G Fothergill St, cnr Hampton Rd 9 2 11 23 22 45 22 0 22 F-H Alma St, cnr Hampton Rd 7 2 9 31 11 42 16 4 20 F-I Attfield St, Cnr Stevens St 14 2 16 45 50 95 12 3 15 F-J Brennan St, cnr Little Howard 5 4 9 7 3 10 11 5 16 F-K South Tce, cnr Wray Ave 53 20 73 65 23 88 81 27 108 F-L Mews Rd 21 16 37 65 22 87 15 31 46 F-M Marine Tce, opposite Howard St 25 9 34 36 35 71 11 37 48 F-N Train Station 10 17 27 66 16 82 13 47 60 TOTAL 230 117 347 540 292 832 302 200 502 Fremantle CBD Cordon Count 12 Hour Counts 1998 2010 2011 Enter Exit TOTAL Enter Exit TOTAL Enter Exit TOTAL F-A Beach, Cnr James St 87 99 186 80 106 186 110 80 190 F-E High St, cnr Ord 18 10 28 38 47 85 12 18 30 F-K South Tce, cnr Wray Ave 149 146 295 190 194 384 201 173 374 F-M Marine Tce, opposite Howard St 45 43 88 128 179 307 94 63 157 TOTAL 299 298 597 436 526 962 417 334 751 TOTAL ALL SITES 529 415 944 976 818 1794 719 534 1253 6 P a g e

Perth Cordon Counts The total Perth Cordon Count has decreased by 7% in 2011. The Perth CBD Cordon Count was conducted on April 6 th, 2011 between 6.30 am and 6.30 pm. The Cordon Count encompassed both 3 hour and 12 hour counts sites. Table 3 below shows the total counts for both 3 and 12 hour counts. Across the 3 hour counts there were a total of 6,586 cyclists spread across the 20 locations. This represents a 24% decrease on 2011 observations, but a 335% increase on the 1998 baseline. For the 12 hour sites, there were a total of 7,140 cyclists spread across the nine 12 hour locations. This represents a 16% increase on 2010 observations and counts are also higher for the three sites which were included in the 12 hour count in 1998. Table 4. Total Perth CBD Counts (3 and 12 hour counts) Total Perth CBD Counts 1996 2010 2011 3 hour counts 1519 8660 6586 12 hour counts 1153 6177 7140 TOTAL SPOT COUNTS 2672 14837 13726 The 3 hour and 12 hour count sites are outlined in further detail in Tables 4 and 5 overleaf. 7 P a g e

Table 5. Perth Cordon Count 3 hour Counts Perth Cordon Count 3 hour Counts 1996 2010 2011 Enter Exit TOTAL Enter Exit TOTAL Enter Exit TOTAL 1 Heirisson Island 204 73 277 296 69 365 395 96 491 2a Windan Bridge South and foreshore path 3 East St, between Freeway and Kensington Sts 4 Claisebrook Rd pedestrian Bridge 28 13 41 174 56 230 180 55 235 31 9 40 351 126 477 21 5 26 6 4 10 949 158 1107 557 87 644 5 Lord St, cnr Royal St 27 14 41 28 3 31 12 4 16 6 McIver Station (entering and exiting station only) 7 Moore / Pier St & 7b Roe / Stirling St 6 1 7 28 17 45 15 5 20 52 15 67 175 360 535 429 90 519 8 Barrack St, cnr Wellington St 45 55 100 418 210 628 182 57 239 9 Station side entrance** 6 4 10 3 4 7 - - - 10 Perth Station main entrance 6 4 10 3 1 4 2 0 2 11 Horseshoe Bridge 78 9 87 1 2 3 64 10 74 12 Lumiere Footbridge, between Ent Cent and Roe St 13a Bike Path at Market, near George St 71 23 94 356 77 433 424 93 517 - - 0 600 270 870 451 116 567 8 P a g e

Perth Cordon Count 3 hour Counts 1996 2010 2011 Enter Exit TOTAL Enter Exit TOTAL Enter Exit TOTAL 13b George St, cnr Wellington St 41 17 58 209 160 369 15 10 25 14 George St, before Hay St 25 40 65 195 257 452 246 332 578 15 George St, near Murray St - - - 183 129 312 24 18 42 16 Malcom St, between Harvest Tce and the freeway 43 12 55 77 17 94 97 48 145 17 Mount St Footbridge 23 7 30 298 317 615 255 53 308 18 Mounts Bay Rd 6 12 18 517 434 951 323 391 714 19 Narrows Bridge West 178 52 230 776 116 892 953 192 1145 20 Narrows Bridge East 170 109 279 157 83 240 201 78 279 TOTAL 1046 473 1519 5794 2866 8660 4846 1740 6586 9 P a g e

Table 6. Perth Cordon Count 12 hour Counts Perth Cordon Count 12 hour Counts 1996 2010 2011 Enter Exit TOTAL Enter Exit TOTAL Enter Exit TOTAL 1 Heirisson Island - - - 490 537 1027 614 621 1235 2a Windan Bridge South, foreshore path - - - 256 251 507 335 146 481 2a Windan Bridge South, bridge - - - 99 65 164 112 74 186 2b Windan Bridge North, bridge - - - 365 381 746 270 423 693 6 McIver Station (entering and exiting station only) 12 Lumiere Footbridge, between Ent Cent and Roe St 16 Malcom St, between Harvest Tce and the freeway - - - 60 35 95 25 32 57 143 148 291 529 340 869 582 603 1185 140 97 237 137 95 232 165 123 288 19 Narrows Bridge West 296 329 625 1043 905 1948 1220 1115 2335 20 Narrows Bridge East - - - 286 303 589 317 363 680 TOTAL 579 574 1153 3625 2912 6177 3640 3500 7140 10 P a g e

Group B Spot and Screen Line Counts The Group B Spot count decreased slightly in 2011 while the Screenline count increased by 39%. The Group B Spot Counts were conducted on the 10 th and 11 th of April, 2011. In total, 1720 cyclists were observed at these counts between the times of 6.30 am and 9.30 pm. This result represents a slight decrease of 8% on 2010 results, but an overall increase of 285% since the baseline. The Group B Screenline Counts were conducted on April 12 th and 13 th. In total there were 3,810 cyclists observed in the Group B screenline which represents an increase of 39% on 2010 results and a 319% increase on the 1999 baseline. Across both Group B Spot and Screenline Counts there were a total of 5,530 cyclists observed. This represents an increase of 20% on 2010 results and a 307% increase on the 1999 baseline. This is outlined in Table 6 below. Table 7. Group B Spot and Screen Line Counts Group B Spot Count Totals 1999 2010 2011 Site B1 Mounts Bay Rd, near Quarry Point (path and road) 110 626 439 Site B2 McCallum Park path, before Taylor St 53 340 304 Site B3 West Leederville PSP (Subiaco Oval Side), near Train 4 186 380 Station Site B4 Alfred Cove path, near Cunningham St 192 463 407 2000 2010 2011 Site B13 Jersey St, cnr of Salvado Rd 88 263 190 TOTAL SPOT COUNTS 447 1878 1720 Group B Screen Line Count Totals B5 LBR SW 5 Canning Highway, Applecross B6 LBR SE 26 Hordern St, Vic Park B7 CBD 2 Aberdeen St (at Palmerton St) B8 PSP CBD James, Roe, Wellington B9 PSP Mitchell Freeway / Lake Monger B10 PSP Stirling Road, Claremont 1999 2010 2011 73 171 138 83 425 229 121 359 958 176 696 629 86 317 904 147 75 521 B11 LBR SW 38 Rockingham 106 76 49 B12 RRP South Perth Foreshore 117 628 382 TOTAL SCREEN LINE COUNTS 909 2747 3810 GROUP B TOTALS 1356 4625 5530 11 P a g e

INTRODUCTION Background Currently only one in four Western Australian adults are getting the minimum of thirty minutes of physical activity they need each day for good health. http://www.beactive.wa.gov.au/whybeactive.asp Bikewest as part of the Department of Transport is responsible for encouraging and facilitating community participation and engagement in cycling-related activities. As a part of this, The Perth Bicycle Network (PBN) plan defines a strategic network of bicycle routes through the Perth metropolitan area, and is being implemented by the Department of Transport (DOT) in conjunction with Main Roads Western Australia (MRWA) and metropolitan local government authorities. The PBN essentially consists of Local Bicycle Routes (LBRs), which are mainly on quiet suburban streets; Principal Shared Paths (PSPs) on railway and freeway reserves; and Recreational Shared Paths, primarily around the Swan and Canning Rivers, along the west coast and a City to Sea Greenway between Perth City and the coast. To assist in monitoring cycling participation and future funding requirements, user surveys have been undertaken annually since 1996 in order to assess the effectiveness of the PBN program on cycle usage. It is proposed to further develop the trend information by undertaking surveys of bicycle traffic numbers during 2011, 2012 and 2013. The Perth Bicycle Network is part of the Bike Ahead: Bicycle Strategy for the 21 st Century which seeks to set out the actions needed to enable the bicycle to play its role in ensuring that the people of Perth continue to have high levels of access to goods, services and activities without sacrificing the clean air and attractive environment which most people value in Perth. Bike Ahead emphasises development of a network of cycle facilities which: is Convenient, accessible and safe; is Comprehensive, providing access to most destinations for most cyclists; establishes Connectivity; and has regional Coverage. In 2011 the Department of Transport appointed Painted Dog Research for a three year contract to conduct this study the Monitoring of the Perth Bicycle Network - as a follow-up to the previous Perth Bicycle Network (PBN) monitoring studies: 1996 Monitoring of the Perth CBD; CBD Bicycle Cordon Count 1998 (Swadling, D.1998); 1998 Monitoring Services for the Perth Bicycle Network (Swadling, D. 1998); Service for Monitoring Usage of PBN Routes 1999 (Mabbott, N. & Swadling, D.1999); 12 P a g e

Monitoring Usage of PBN Routes 2000 CBD Supplement (Cornwell, D. & Mabbott, N. 2000); Monitoring Usage of PBN Routes 2000 (Cornwell, D. & Mabbott, N. 2000); Monitoring Usage of PBN Routes 2000 Supplement (Cornwell, D. & Mabbott, N. 2000); Monitoring Usage of Perth Bicycle Network Routes 2001 (Cornwell, D. 2001) and; Monitoring Usage of Perth Bicycle Network Routes 2001 Supplement (Cornwell, D. 2001); Monitoring Usage of Perth Bicycle Network Routes for 2002 (Cornwell, D. 2002); Usage of Perth Bicycle Network Routes for 2003 (BSD Consultants. 2003); Summary Report on Monitoring Usage of Perth Bicycle Network Routes 2004 (Cornwell, D. 2004); Summary Report on Monitoring Usage of Perth Bicycle Network Routes 2005 (Cornwell, D. & Roberts P. 2005); Monitoring of the Perth Bicycle Network 2006 (Cornwell, D. & Barker, B. 2006); Monitoring of the Perth Bicycle Network 2007 (Roberts, P. 2007); Monitoring of the Perth Bicycle Network 2008 (Roberts, P. 2008); Monitoring of the Perth Bicycle Network 2009 (Roberts, P. 2009); Monitoring of the Perth Bicycle Network 2010 (Roberts, P. & Rodwell, L. 2010). 13 P a g e

Objectives The overall strategic research objective in monitoring the Perth Bicycle Network is: To provide Bikewest with annual bicycle and pedestrian counts across key strategic locations in Perth to assist with the ongoing assessment of the The Perth Bicycle Network (PBN) plan and Bike Ahead: Bicycle Strategy for the 21 st Century targets and key KPI's The specific research and information objectives of this research are to: 1. Collect Cyclist and Pedestrian count information on an annual basis using an established and rigorous methodology. 2. Analyse this data and compare to previous years' data. 3. Provide interpretation, advice and recommendations where relevant based on the outcomes of the data analyses. 14 P a g e

Methodology Definition and Coding of Sites and Locations The project was divided into two parts: Group A and Group B sites. Group A included: Three spot counts; Seven screenline counts; One cordon count of the Fremantle Central Business District (CBD); One cordon count of the Perth CBD. Research assistants were stationed at a total of 72 locations to collect the relevant data for Group A sites. Group B included: Four spot counts; Eight screen line counts. Research assistants were stationed at 36 locations to collect the relevant data for Group B. A spot count consists of a data capture point at one site in isolation, whereas a screen line count consists of a series of data capture points, arranged so as to allow determination of whether the Perth Bicycle Network (PBN) route is being utilised or whether cyclists are using parallel routes. A cordon count consists of data capture points located at major entry and exit points to the CBD so as to allow determination of the total number of cyclists entering and exiting the CBD area. As was the case for the previous surveys, a simple coding system was utilised to identify the different locations at which the research assistants gathered data. Group A spot and screen line counts were prefixed with an A, followed by the site number and relevant letter for specific site locations (e.g. A4-B); Group B spot and screen line count sites were organised in the same way as Group A sites, except that Group B sites were prefixed with a B ; The Fremantle cordon count was prefixed with an F, followed by a letter to discriminate between site locations (e.g. F-G). Perth cordon count sites were given a number from 1 20. A full summary of the sites, locations, dates times and other site specific details can be found in Appendix I. Data Collection Approach Data Collection Approach Manual Bicycle Traffic Spot Counts 3 locations covering 3 count sites x 3 hours Total 9 observational hours Manual Bicycle Traffic Group A Screenlines 7 locations covering 33 count sites x 3 hours Total 99 observational hours Perth Bicycle Cordon Counts 20 locations covering 20 count sites x 3 hours plus 9 locations covering 9 count sites x additional 9 hours Total 141 observational hours Perth CBD Pedestrian Counts 6 locations covering 6 count sites x 3 hours conducted concurrently with the Central Perth Cordon Count sites Total 0 additional observational hours Fremantle Bicycle Cordon Counts 10 locations covering 10 count sites x 3 hours plus 4 locations covering 4 count sites x 12 hours Total 78 observational hours Group B Route Counts 4 locations covering 4 count sites x 3 hours Total 12 observational hours Manual Bicycle Traffic Group B Screenlines 9 locations covering 31 count sites x 3 hours Total 93 observational hours 15 P a g e

Observations Dates And Times This year s count was scheduled between April 4 th and April 14 th, 2011 and was 1 week later than the 2010 dates which brings them back in line with those for 2009. All counts took place outside of school and public holidays. All counts were representative of the normal working weekday. Two sites were rescheduled to account for personnel error and these are detailed within the report where relevant. These sites were re-surveyed on a parallel day the following week at the same time as originally scheduled. Weather Conditions The weather was mostly fine throughout the survey period and did not result in any sites being rescheduled. Weather conditions on each of the days of the survey are described below in Table 8. In accordance with the Bureau of Meteorology, weather for each day is recorded until 3.00 pm in each 24 hour period. Table 8. Weather conditions in the research period Temps Max wind gust Date Rain Day (April) Min Max Dir Spd Time C C mm km/h local 4 Mo 14.8 33.6 0 NNE 35 08:23 5 Tu 13.1 34.7 0 NNE 35 09:20 6 We 15.4 30.5 0 WSW 28 14:34 7 Th 14.7 22.4 2.0 W 46 15:00 8 Fr 9.0 23.5 0.2 SSE 35 13:29 9 Sa 12.3 26.0 0 NE 41 12:55 10 Su 16.6 29.3 0 NE 44 10:06 11 Mo 19.3 24.8 2.2 WSW 37 15:01 12 Tu 19.4 24.6 0 SSW 39 10:13 13 We 13.3 24.8 0 SSW 39 14:12 14 Th 12.8 25.8 0 NE 33 08:58 Count Procedures A team of experienced research assistants were deployed by a professional market research fieldwork service provider, West Coast Field Services, and their tasks included: Recording bicycle traffic and some pedestrian traffic at selected sites throughout the Perth Metropolitan area; Quality control of spot counts, screen line counts and cordon counts; Validation and checking of the collected data to minimise data collection errors; Data entry. The research assistants were deployed and monitored by a supervisor for each site or cordon and were instructed to display identification which explained the reason for their activity. At each site, the research assistants were positioned at the locations as per the map and instructions supplied to them. Each research assistant recorded the number of bicycles and/or pedestrians in fifteen-minute blocks. This 16 P a g e

continued until the research assistant finished the shift or was relieved. Full instructions on how to count the sites were provided in the briefing notes to the research assistants and these notes can be found in Appendix II. Four of the Fremantle CBD cordon count locations and nine of the Perth CBD cordon count locations were 12 hour counts which were divided into 4 x 3 hour shifts. None of the research assistants were permitted to work longer than 3 hours continuously. This was to avoid contamination of data through fatigue and boredom effects. Data collection and survey forms The data recording forms were updated slightly from previous years and were customised to each location s unique characteristics including directions, measurement unit, time and date. Site specific information was also included in the work sheet as well as a photo map of the locations and the directions to be counted. A sample count sheet is provided in Appendix III. Site selection Sites were the same Group A and Group B sites from previous monitoring. All sites were inspected by the Painted Dog Research field team before commencement of counts to ensure that there were no significant changes to the sites that would impact on the survey. As the Raine Square overpass is no longer operational, the count at site 9 in the Perth cordon count was excluded from the study this year. Selection and training of research assistants The research assistants were sourced from Painted Dog Research s field partner West Coast Field Services. All personnel underwent a full face to face briefing prior to the commencement of the survey. The briefing included: Instruction in the definition of bicycles: o Any two or three wheeled cycle which was either ridden or pushed by a person past the observation point; o Cycles that had motors attached or were carried on a vehicle were not to be included. Specific instructions on site location; Directions in which the cyclists should be counted for spot and cordon counts; To arrive at their location early to obtain the best position available for monitoring traffic; Information related to occupational health and safety considerations for this project; The tools required for the researchers included: o Timepieces; o Recording sheets; o Pencils and clipboards. 17 P a g e

KEY FINDINGS 18 P a g e

Group A Group A Sites include: Group A spot counts; Group A screenline counts; Fremantle CBD cordon; Perth CBD cordon. The results of the Group A counts are outlined in the next sections. Group A Spot Counts There were three Group A spot counts conducted on April 5 th, 2011 including: Site A1 Parliament House PSP; Site A2 LBR NE 15 Beechboro; and Site A3 LBR SE 16 & 27 Bentley. Site A1, Parliament House PSP There were 522 cyclists counted using the Parliament House PSP in 2011. This is a significant increase of 500% on 2010, as well as a 691% increase on the 1998 baseline. Table 9 shows the count data for the site below. Table 9. Site A1, Parliament House PSP Site A1, Parliament 1998 2010 2011 House PSP North 41 60 378 South 25 27 144 TOTAL 66 87 522 DATE 5 th April, 2011 TIME PERIOD 0630 0930 Figure 1. Site A1, Parliament House PSP 19 P a g e

Site A2, LBR NE 15 Beechboro In 2011 there were only 12 cyclists counted along the Beechboro LBR which represents an 82% decrease on 2010 observations. It also represents a 68% decrease on the baseline result. Table 10 shows the count data for the site below. Table 10. Site A2, LBR NE 15 Beechboro Site A2 LBR NE 15 1998 2010 2011 Beechboro North 6 27 1 South 14 10 6 East 12 10 4 West 5 21 1 TOTAL 37 68 12 DATE 5 th April, 2011 TIME PERIOD 0630 0930 Figure 2. Site A2, LBR NE 15 Beechboro Site A3, LBR SE 16 & 27, Bentley There were 60 cyclists counted in 2011 at the Bentley LBR. This represents a 43% decrease on the 2010 result, but a 5% increase on the 1998 baseline result. More cyclists were counted traveling in a Westerly direction. Table 11 shows the count data for the site below. Table 11. Site A3, LBR SE16 & 27, Bentley Site A3 - LBR SE16 & 27, 1998 2010 2011 Bentley North 19 25 12 South 16 32 13 East 10 26 14 West 12 22 21 Total 57 105 60 DATE 5 th April, 2011 TIME PERIOD 1530 1830 Figure 3. Site A3, LBR SE16 & 27, Bentley 20 P a g e

Group A Spot Count - Summary Group A spot counts were conducted on the April 5 th, 2011 between 6.30 am and 9.30 am and 3.30 pm and 6.30 pm. Table 12 below summarises the total counts for each site against the 1998 baseline and 2010. While a significant increase in cyclists was observed at Site A1, counts at both Sites A2 and A3 were lower than previous years. Overall, 594 cyclists were observed in total representing a 128% increase for the Group A spot counts from 2010 and a 271% increase compared to baseline. Table 12. Group A Spot Count Summary Group A Spot Count Totals 1998 2010 2011 Site A1 Parliament House PSP 66 87 522 Site A2 LBR NE 15 Beechboro 37 68 12 Site A3 - LBR SE16 & 27, Bentley 57 105 60 TOTAL 160 260 594 Figure 4 below shows the counts for each site and the proportion change against both 2010 and 1998 baseline results. 522 Group A Spot Count 1998 2010 2011 66 87 37 68 12 57 105 60 Site A1 Parliament House PSP Site A2 LBR NE 15 Beechboro Site A3 - LBR SE16 & 27, Bentley 500% 691% % change % change 2011 vs. 2010 % change 2011 vs. 1998 baseline 5% -82% -68% -43% Site A1 Parliament House PSP Site A2 LBR NE 15 Beechboro Site A3 - LBR SE16 & 27, Bentley Figure 4. Group A Spot Count Summary 21 P a g e

Group A Screen Line Counts There were seven screen line counts conducted in Group A on April 4 th and 5 th, 2011 including: Site A4 Harold Street East Perth; Site A5 John/Francis Streets, Northbridge; Site A6 Murdoch Drive, Winthrop; Site A7 Sackville Terrace, Doubleview; Site A8 Surrey Road, Kewdale; Site A9 Claremont, adjacent Show Grounds; and Site A10 Welshpool Road, Albany Highway. Site A4, Local Bicycle Route Ne 26 East Perth Site A4 is a screen line count with 8 locations as shown in Figure 5 below. Figure 5. Site A4, LBR NE 26 East Perth Table 13 on the following page shows the directional and total counts for each location compared with 2010 results and the 1998 baseline. A total of 1033 cyclists were counted along the screenline in 2011 with the majority travelling in a southerly direction (which is consistent with previous years). This total represents a 76% increase on 2010 and a 264% increase on the 1998 baseline. The increase was consistently reflected across all locations. 22 P a g e

Table 13. Site A4, LBR NE 26 East Perth Site A4, A LBR NE 26 East Perth 1998 2010 2011 North South West TOTAL North South West TOTAL North South West TOTAL A4-A William St, Cnr Vincent St 4 29-33 5 26-31 12 62-74 A4-B Beaufort St, Cnr Harold St 7 26-33 11 21-32 19 16-35 A4-C Curtis St, Cnr Harold St 3 24-27 21 1-22 9 43-52 A4-D Lord St, Cnr Harold St 2 17-19 2 8-10 3 7-10 A4-E West Pde, Cnr Harold St 6 1-7 6 3-9 10 16-26 A4-F East Pde, Near Zebinia St 5 15 20 33 333-366 73 539-612 A4-G Joel Tce, cnr Gardiner St 11 57-68 1 3-4 12 3-15 A4-H Cycle Path between Summers St and Banks Reserve 2 60 15 77 17 97-114 49 160-209 TOTAL 40 229 15 284 96 492-588 197 846-1033 DATE 5 th April, 2011 TIME PERIOD 0630 0930 23 P a g e

Site A5, LBR NE 4, Northbridge Site A5 includes 4 locations along John and Francis Streets in Northbridge. Figure 6. Site A5, LBR NE 4 Northbridge Table 14 overleaf outlines the observations for the four locations in this screenline. A total of 464 cyclists were counted in 2011 which represents a 104% increase on 2010 results and a 239% increase on the 1998 baseline. Almost all locations reflected this increase except for A5-C, Parker St, which remained almost the same as the 2010 observation. As with previous years, most cyclists were observed traveling in a northerly direction. 24 P a g e

Table 14. Site A5, LBR NE 4 Northbridge Site A5, LBR NE 4 Northbridge 1998 2010 2011 North South TOTAL North South TOTAL North South TOTAL A5-A Fitzgerald St, Cnr John St 19 12 31 18 8 26 42 18 60 A5-B Shenton St, Cnr John St 32 16 48 133 11 144 269 23 292 A5-C Parker St, opposite Francis St 24 13 37 24 20 44 25 20 45 A5-D Lake St, Cnr Francis St 14 7 21 10 4 14 54 13 67 TOTAL 89 48 137 124 310 228 390 74 464 DATE 4 th April, 2011 TIME PERIOD 1530 1830 25 P a g e

Site A6, LBR SW 7 & 8, Winthrop Site A6 includes 4 locations along Murdoch Drive in Winthrop. Figure 7. Site A6, LBR SW 7 & 8, Winthrop Table 15 overleaf outlines the 2011 observations for east / west and total counts. A total of 139 cyclists were observed in 2011 which represents a small increase of 15% on 2010 results and a 5% decrease on the 1998 baseline. While the total result remained somewhat consistent, two locations, A6-A, Leach Hwy and A6-B, Sutherland St / Marsegno Way, increased compared to 2010 results. Conversely, locations A6-C, South St, and A6-D, Farrington Rd, decreased compared to 2010. 26 P a g e

Table 15. Site A6, LBR SW 7 & 8, Winthrop Site A6, LBR SW 7 & 8, Winthrop 1998 2010 2011 East West TOTAL East West TOTAL East West TOTAL A6-A Leach Hwy, Cnr Murdoch Dve A6-B Sutherland St / Marsegno Way, Cnr Murdoch Dve. 12 6 18 7 11 18 16 27 43 5 25 30 3 2 5 10 21 31 A6-C South St, Cnr Murdoch Dve 47 16 63 54 17 71 33 15 48 A6-D Farrington Road, Cnr Murdoch Dve 20 15 35 14 13 27 12 5 17 TOTAL 84 62 146 78 43 121 71 68 139 DATE 5 th April, 2011 TIME PERIOD 1530 1830 27 P a g e

SITE A7, LBR NW 1 DOUBLEVIEW Site A7 includes 4 locations along Barnes St and Hertha Rd in Doubleview. Figure 8. Site A7, LBR NW 1 Doubleview Table 16 overleaf outlines the 2011 counts in a north/ south direction as well as the total. A total of 68 cyclists were observed in this site which represents a 53% decrease on 2010 results but still an overall increase on the 1998 baseline (94%). The 2011 decreases were mainly observed in the A7-A, Hertha Rd, and A7-D, Huntriss Rd locations. Consistent with previous years, most cyclists were observed travelling in a southerly direction and this was most pronounced in the A7-A Hertha Rd and A7-B, Odin Rd locations. 28 P a g e

Table 16. Site A7, LBR NW 1 Doubleview Site A7, LBR NW 1 Doubleview 1998 2010 2011 North South TOTAL North South TOTAL North South TOTAL A7-A Hertha Rd, Bend 1 13 14 26 69 95 4 20 24 A7-B Odin Rd, Cnr Barnes St 3 4 7 18 14 32 6 20 26 A7-C Shaw Rd, Cnr Barnes St 1 2 3 0 1 1 5 5 10 A7-D Huntriss Rd, cnr of Barnes 4 7 11 8 10 18 3 5 8 TOTAL 9 26 35 52 94 146 18 50 68 DATE 5 th April, 2011 TIME PERIOD 0630 0930 29 P a g e

SITE A8, LBR, SE 21 KEWDALE Site A8 includes 6 locations along Oats St and Gabriel Rd in Kewdale. Figure 9. Site A8, LBR, SE 21 Kewdale Table 17 overleaf outlines the 2011 observations compared with 2010 and the 1998 baseline. In 2011 a total of 100 cyclists were observed and this represents a 52% increase on 2010 results. It does however also represent an 18% decrease on the 1998 baseline result. The increases between 2011 and 2010 were observed in the A8- A, Orrong Rd, A8-B, Surrey Rd, and A8-D, Acton Rd locations. In contrast with 2010, cyclists travelled mostly in a northerly direction in 2011, as was the case for the baseline study. 30 P a g e

Table 17. Site A8, LBR, SE 21 Kewdale 1998 2010 2011 Site A8, LBR, SE 21 Kewdale North South TOTAL North South TOTAL North South TOTAL A8-A Orrong Rd, Cnr Oats St 17 5 22 4 3 7 19 10 29 A8-B Surrey Rd, Cnr Oats St 31 18 49 2 6 8 12 6 18 A8-C Armadale Rd, Cnr Oats St 9 6 15 4 5 9 5 4 9 A8-D Acton Rd, Cnr Oats St 7 1 8 3 4 7 14 9 23 A8-E Knutsford St, Cnr Gabriel Rd A8-F Belmont St, Cnr Gabriel Rd 8 6 14 12 6 18 3 2 5 4 10 14 8 9 17 9 7 16 TOTAL 76 46 122 33 33 66 62 38 100 DATE 4 th April, 2011 TIME PERIOD 1500 1800 31 P a g e

Site A9, Claremont Principle Transport Route Site A9 includes 3 locations which run through Claremont. Figure 10. Site A9, Claremont Principle Transport Route Table 18 overleaf outlines the 2011 cyclist observations compared with 2010 and the 1998 baseline. In 2011, there were a total of 81 cyclists spread across the three locations with a slightly higher count of 33 observed on Stirling Hwy. This represents a 51% decrease on 2010 observations and is on par with observations from the 1998 baseline. Consistent with previous years, there were slightly more cyclists observed travelling in an easterly direction towards the city. 32 P a g e

Table 18. Site A9, Claremont Principle Transport Route Site A9, Claremont Principle Transport Route 1998 2010 2011 East West TOTAL East West TOTAL East West TOTAL A9-A Stirling Hwy, cnr Loch St 20 23 43 10 5 15 11 22 33 A9-B Gugeri St, between Warden and Chancellor Sts (road) A9-C Gugeri St, between Warden and Chancellor Sts (bike path) 14 4 18 6 11 17 14 8 22 15 6 21 81 54 135 19 7 26 TOTAL 49 33 82 97 70 167 44 37 81 DATE 5 th April, 2011 TIME PERIOD 0630 0930 33 P a g e

Site A10, Spot Improvement Welshpool Rd PSP Site A10 in Welshpool includes 4 locations along Welshpool Road. Figure 11. Site A10, Spot Improvement Welshpool Rd PSP Table 19 overleaf outlines the 2011 cyclist observations compared with 2010 and the 1998 baseline. In 2011, there were a total of 159 cyclists with the majority counted in the A10-A, Albany Hwy and A10-D, Rutland Ave and Railway locations. This represents a 112% increase on 2011 observations and a 104% increase on the 1998 baseline. Consistent with previous years, there were more cyclists observed travelling in a northerly direction, with nearly twice as many counted in this direction. 34 P a g e

Table 19. Site A10, Spot Improvement Welshpool Rd PSP Site A10, Spot Improvement Welshpool Rd PSP 1998 2010 2011 North South TOTAL North South TOTAL North South TOTAL A10-A Albany Hwy, Cnr Welshpool Rd A10-B Welshpool Rd, between Normanby and Ellam Sts A10-C Sevenoaks St, cnr Welshpool Rd A10-D Rutland Ave and Railway, cnr Welshpool Rd 29 8 37 14 5 19 27 15 42 6 10 16 0 1 1 13 11 24 5 2 7 5 21 26 7 6 13 10 8 18 25 4 29 55 25 80 TOTAL 50 28 78 44 31 75 102 57 159 DATE 4 th April, 2011 TIME PERIOD 0630 0930 35 P a g e

Group A Screen Line Count Totals Group A screenline counts were conducted on the April 4 th and 5th, 2011 between 6.30 am and 9.30 am, 3.30 am and 6.30 pm or 3.00 pm and 6.00 pm. Table 20 below summarises the total counts for each site against the 1998 baseline and 2010 results. Overall, significant increases compared to 2010 (47%) and the base line (131%) were observed. While increases in cyclist numbers were observed at most sites, two sites (A7 and A9) had fewer numbers than in 2010. Table 20. Group A Screen Line Counts Totals Group A Screen Line Counts 1998 2010 2011 Site A4, LBR NE 26 East Perth 284 588 1033 Site A5, LBR NE 4 Northbridge 137 228 464 Site A6, LBR SW 7 & 8, Winthrop 146 121 139 Site A7, LBR NW 1 Doubleview 35 146 68 Site A8, LBR, SE 21 Welshpool 122 66 100 Site A9, Claremont Principle Transport Route Site A10, Spot Improvement Welshpool Rd PSP 82 167 81 78 75 159 TOTAL 884 1391 2044 36 P a g e

Figure 12 below outlines the counts for each site and the proportion change against both 2010 and 1998 baseline results. 1200 1000 800 1033 Group A Screenline Count Data 1998 2010 2011 600 400 200 0 400% 350% 300% 250% 200% 150% 100% 50% 0% -50% -100% 284 588 464 228 137 146 121 139 146 35 68 167 159 122 66 100 82 81 78 75 Site A4, LBR NE 26 Site A5, LBR NE 4 Site A6, LBR SW 7 & 8 Site A7, LBR NW 1 Site A8, LBR, SE 21 Site A9, Claremont PSP Site A10, Welshpool PSP 76% 264% 104% 239% 15% -5% % change -53% 94% 52% -18% -51% % change 2011 vs. 2010 % change 2011 vs. 1998 baseline -1% 112% 104% Site A4, LBR NE 26 Site A5, LBR NE 4 Site A6, LBR SW 7 & 8 Site A7, LBR NW 1 Site A8, LBR, SE 21 Site A9, Claremont PSP Site A10, Welshpool PSP Figure 12. Group A Screenline Counts 37 P a g e

Fremantle CBD Cordon Count The Fremantle CBD Cordon Count was conducted on April 7 th, 2011 between 6.30 am and 6.30 pm and encompasses both 3 hour and 12 hour counts sites. This is shown below in Figure 13. Figure 13. Fremantle CBD Cordon Count Sites highlighted in green represent 12 hour count sites. 38 P a g e

Fremantle CBD Cordon Count 3 Hour Counts The Fremantle CBD Cordon 3 Hour Count Sites included 14 locations as shown below and in Table 21 overleaf. In total, there were 502 cyclists counted entering and exiting the Fremantle CBD in 2011. This represents a 40% decrease on 2010 observations but a 45% increase on the 1998 baseline. Three sites did display an increase compared to 2010 including F-A, Beach, F-J, Brennan St, and F-K, South Tce, while the rest displayed a decrease in numbers. As with previous years, the number of cyclists entering Fremantle was greater than those exiting the precinct by approximately 50% in 2011. Figure 14 below shows the total counts for all sites and the percentage change between 2001 and 2010 results and 1998 baseline. 28 30 82 14 101 14 61 54 33 22 27 20 Fremantle Cordon 3 hour Count 95 49 45 42 17 22 20 11 16 15 16 4 9 9 9 10 3 2 108 88 87 73 71 46 48 37 34 1998 2010 2011 82 60 27 F-A Beach, Cnr James F-B Quarry St, cnr James F-C Finnerty St, cnr James F-D Ellen St, cnr Ord F-E High St, cnr Ord F-F Knutsford St, cnr Hampton F-G Fothergill St, cnr Hampton F-H Alma St, cnr Hampton F-I Attfield St, Cnr Stevens F-J Brennan St, cnr Little Howard F-K South Tce, cnr Wray F-L Mews F-M Marine Tce, opposite Howard F-N Train Station 193% 173% 0% 23% 65% 125% % change 100% 122% 78% 60% 48% 23% 24% 41% 122% -86% -50% -46% -47% -96% -33% -51% -52% -84% -6% -47% -32% -27% % change 2011 vs. 2010 % change 2011 vs. 1998 baseline Figure 14. Fremantle Cordon 3 hour counts 39 P a g e

Table 21. Fremantle CBD Cordon Count 3 Hour Counts Fremantle CBD Cordon Count 3 Hour Counts 1998 2010 2011 Enter Exit TOTAL Enter Exit TOTAL Enter Exit TOTAL F-A Beach, Cnr James St 42 26 68 15 15 30 62 20 82 F-B Quarry St, cnr James St 10 4 14 65 36 101 12 2 14 F-C Finnerty St, cnr James St 14 8 22 47 7 54 11 16 27 F-D Ellen St, cnr Ord St 15 5 20 42 19 61 30 3 33 F-E High St, cnr Ord 2 2 4 12 5 17 5 4 9 F-F Knutsford St, cnr Hampton Rd* 3 0 3 21 28 49 1 1 2 F-G Fothergill St, cnr Hampton Rd 9 2 11 23 22 45 22 0 22 F-H Alma St, cnr Hampton Rd 7 2 9 31 11 42 16 4 20 F-I Attfield St, Cnr Stevens St 14 2 16 45 50 95 12 3 15 F-J Brennan St, cnr Little Howard 5 4 9 7 3 10 11 5 16 F-K South Tce, cnr Wray Ave 53 20 73 65 23 88 81 27 108 F-L Mews Rd 21 16 37 65 22 87 15 31 46 F-M Marine Tce, opposite Howard St 25 9 34 36 35 71 11 37 48 F-N Train Station 10 17 27 66 16 82 13 47 60 TOTAL 230 117 347 540 292 832 302 200 502 DATE 7 th April, 2011 * 14 th April, 2011 (recounted site) TIME PERIOD 0630 0930 40 P a g e

Fremantle CBD Cordon Count 12 Hour Counts Four sites in the Fremantle CBD Cordon were observed for 12 hours between 6.30 am and 6.30 pm on April 7 th, 2011. A total of 751 cyclists were observed in 2011 and this represents a 22% decrease on 2010 results but a 26% increase on the 1998 baseline. The two sites which recorded the greatest decrease compared to 2010 were F-E, High St and F-M, Marine Tce. Table 22. Fremantle CBD Cordon Count 12 Hour Counts Fremantle CBD Cordon Count 12 Hour Counts 1998 2010 2011 Enter Exit TOTAL Enter Exit TOTAL Enter Exit TOTAL F-A Beach, Cnr James St 87 99 186 80 106 186 110 80 190 F-E High St, cnr Ord 18 10 28 38 47 85 12 18 30 F-K South Tce, cnr Wray Ave 149 146 295 190 194 384 201 173 374 F-M Marine Tce, opposite Howard St 45 43 88 128 179 307 94 63 157 TOTAL 299 298 597 436 526 962 417 334 751 DATE 7 th April, 2011 TIME PERIOD 0630 1830 41 P a g e

Perth CBD Cordon Count The Perth CBD Cordon Count was conducted on April 6 th, 2011 between 6.30 am and 6.30 pm. The Cordon Count encompassed both 3 hour and 12 hour counts sites. This is shown below in Figure 15. This year, Site 9, Station side entrance, was not counted due to construction obstructing the thoroughfare. The results of both the 3 hour counts and 12 hour counts are detailed in the next two sections. 13A 13B 12 2B 15 14 8 7B 6 4 3 2A 16 9 & 11 7A 5 17 10 18 19 20 1 Figure 15. Perth CBD Cordon Count Locations Sites highlighted in green represent 12 hour count sites. 42 P a g e

Perth CBD Cordon Count 3 hour Counts Table 23 below and overleaf outlines the 2011 cyclist observations compared with 2010 and the 1998 baseline. In 2011, there were a total of 6,586 cyclists spread across the 20 locations. This represents a 24% decrease on 2011 observations, but a 335% increase on the 1998 baseline. Sites 3, 5, 6, 8, 13a and b, 15, 17 and 18 displayed the most significant decreases of all the CBD count sites. Consistent with previous years, there were a significantly greater number of cyclists observed travelling into the Perth CBD during the 6.30 am to 9.30 am time period. Table 23. Perth Cordon Count 3 hour Counts Perth Cordon Count 3 hour Counts 1998 2010 2011 Enter Exit TOTAL Enter Exit TOTAL Enter Exit TOTAL 1 Heirisson Island 204 73 277 296 69 365 395 96 491 2a Windan Bridge South and foreshore path 3 East St, between Freeway and Kensington Sts 4 Claisebrook Rd pedestrian Bridge 28 13 41 174 56 230 180 55 235 31 9 40 351 126 477 21 5 26 6 4 10 949 158 1107 557 87 644 5 Lord St, cnr Royal St 27 14 41 28 3 31 12 4 16 6 McIver Station (entering and exiting station only) 7 Moore / Pier St & 7b Roe / Stirling St 6 1 7 28 17 45 15 5 20 52 15 67 175 360 535 429 90 519 8 Barrack St, cnr Wellington St 45 55 100 418 210 628 182 57 239 9 Station side entrance # 6 4 10 3 4 7 * * * 43 P a g e

Perth Cordon Count 3 hour Counts 1998 2010 2011 Enter Exit TOTAL Enter Exit TOTAL Enter Exit TOTAL 10 Perth Station main entrance 6 4 10 3 1 4 2 0 2 11 Horseshoe Bridge 78 9 87 1 2 3 64 10 74 12 Lumiere Footbridge, between Ent Cent and Roe St 13a Bike Path at Market, near George St 13b George St, cnr Wellington St^ 71 23 94 356 77 433 424 93 517 - - 0 600 270 870 451 116 567 41 17 58 209 160 369 15 10 25 14 George St, before Hay St 25 40 65 195 257 452 246 332 578 15 George St, near Murray St^ - - - 183 129 312 24 18 42 16 Malcom St, between Harvest Tce and the freeway 43 12 55 77 17 94 97 48 145 17 Mount St Footbridge 23 7 30 298 317 615 255 53 308 18 Mounts Bay Rd 6 12 18 517 434 951 323 391 714 19 Narrows Bridge West 178 52 230 776 116 892 953 192 1145 20 Narrows Bridge East 170 109 279 157 83 240 201 78 279 TOTAL 1046 473 1519 5794 2866 8660 4846 1740 6586 # Site not counted in 2011 ^Sites have been counted in accordance with the briefing notes (see Appendix II) which may differ from the approach in previous years DATE 6 th April, 2011 * 13 th April, 2011 (recounted site) TIME PERIOD 0630 0930 44 P a g e

Figure 16 below outlines the counts for each site and the proportion change against both 2010 and 1998 baseline results. 1996 2010 2011 1107 Perth CBD 3 hour Counts 1145 870 951 892 714 365 277 491 477 230 235 41 40 26 10 644 4131 45 16 7 20 626 535 519 517 433 239 67 100 87 74 94 10 7 10 4 2 3 567 578 452 369 58 65 25 312 42 615 308 94 145 55 30 18 230 279 279 240 1 Herrisson Island 2 Windan Bridge South (path) 3 East St 4 Claisebrook Rd pedestrian Bridge 5 Lord St, cnr Royal St 6 McIver Station 7 Moore / Pier & 7b Roe / Stirling 8 Barrack St, cnr Wellington 9 Station side entrance** 10 Perth Station main entrance 11 Horseshoe Bridge 12 Lumiere Footbridge 13a Bike Path at Market, near George 13b George St, cnr Wellington 14 George St, before Hay 15 George St, near Murray 16 Malcom St 17 Mount St Footbridge 18 Mounts Bay Rd 19 Narrows Bridge West 20 Narrows Bridge East 6340% % change % change 2011 vs. 2010 % change 2011 vs. 1996 baseline 3867% 2367% 473% 35% 77% 2% 186% 675% 139% 450% 19% 789% 28% 164% 54% 927% 398% 28% 16% 0% -95% -35%-42% -48% -61%-56% -3% -62% -50% -80% -15% -35% -93% -57% -87% -50% -25% Figure 16. Perth CBD Cordon Count 3 hours 45 P a g e

Perth CBD Cordon Count 12 hour Counts Table 24 below outlines the 2011 cyclist observations compared with 2010 and the 1998 baseline. In 2011, there were a total of 7,140 cyclists spread across the nine 12 hour locations. This represents a 16% increase on 2010 observations and counts are also higher for the three sites which were included in the 12 hour count in 1998. This year, the 12 hour counts in and out of the Perth CBD were almost equivalent. Table 24. Perth CBD Cordon Count 12 hour Counts Perth Cordon Count 12 hour Counts 1998 2010 2011 Enter Exit TOTAL Enter Exit TOTAL Enter Exit TOTAL 1 Heirisson Island - - - 490 537 1027 614 621 1235 2a Windan Bridge South, foreshore path - - - 256 251 507 335 146 481 2a Windan Bridge South, bridge - - - 99 65 164 112 74 186 2b Windan Bridge North, bridge - - - 365 381 746 270 423 693 6 McIver Station (entering and exiting station only) - - - 60 35 95 25 32 57 12 Lumiere Footbridge, between Ent Cent and Roe St 143 148 291 529 340 869 582 603 1185 16 Malcom St, between Harvest Tce and the freeway 140 97 237 137 95 232 165 123 288 19 Narrows Bridge West 296 329 625 1043 905 1948 1220 1115 2335 20 Narrows Bridge East - - - 286 303 589 317 363 680 TOTAL 579 574 1153 3625 2912 6177 3640 3500 7140 DATE 6 th April, 2011 TIME PERIOD 0630 1830 46 P a g e

Figure 17 below outlines the counts for each site and the proportion change against both 2010 and 1998 baseline results. 1235 1027 507 481 164 186 Perth CBD 12 hour Counts 1185 746 869 693 291 237 232 288 95 57 625 2335 1948 1996 2010 2011 589 680 1 Herrisson Island 2a Windan Bridge South (path) 2a Windan Bridge South (bridge) 2b Windan Bridge North (bridge) 6 McIver Station 12 Lumiere Footbridge 16 Malcom St 19 Narrows Bridge West 20 Narrows Bridge East % change 307% % change 2011 vs. 2010 % change 2011 vs. 1996 baseline 274% 20% 13% 36% 24% 22% 20% 15% -5% -7% -40% Figure 17. Perth CBD Cordon Count 12 hour sites 47 P a g e

Perth CBD Pedestrian and Spot Counts As part of the Perth CBD cordon count, pedestrian counts were undertaken at six sites. Table 25 shows the pedestrian counts at these sites for 2011. The 2010 and 2003 counts are included for comparison purposes. A total of 1,486 pedestrians were observed over the 12 hour period. This represents a 31% decrease on 2010 numbers and a 25% decrease on 2003 numbers. All sites counted in 2011 displayed a downward trend in the number of pedestrians except for Site 2b, Windan Bridge North, which remained the same as 2010 results. Table 25. Perth CBD Pedestrian and Spot Counts Perth CBD Pedestrian and Spot Counts TIME 2003 2010 2011 North South TOTAL North South East West TOTAL North South East West TOTAL 1 Heirisson Island 0630-1830 372 365 737 554 490 - - 1044 384 421 - - 805 2a Windan Bridge South, foreshore path 2a Windan Bridge South, bridge 2b Windan Bridge North, bridge 3 East St, between Freeway and Kensington Sts 0630-1830 341 287 628 191 293 - - 484 213 167 - - 380 0630-1830 - - - - - 164 273 437 - - 89 104 193 0630-1830 - - - - - 28 50 78 - - 31 47 78 0630-0930 2 12 14 80 29 - - 109 29 1 - - 30 19 Narrows Bridge West 0630-1830 51 77 128 - - - - - - - - - 0 20 Narrows Bridge East 0630-1830 205 269 474 - - - - - - - - - 0 TOTAL 1981 2152 1486 DATE 6 th April, 2011 48 P a g e

Group B Results Group B counts included both spot and screenline counts. The results of both are outlined in the next sections. Group B Spot Counts Five spot counts were conducted in Group B. Four were conducted on April 11 th, 2011 and one on April 10 th. Group B spot counts are located at: B1 Mounts Bay Road; B2 McCallum Park; B3 West Leederville PSP; B4 Alfred Cove, Melville; and B13 Salvado Road Jolimont. Full results for the Group B Spot Counts are outlined overleaf. 49 P a g e

Site B1, Mounts Bay Road Figure 18 below, shows the location of Site B1, Mounts Bay Road. Figure 18. Site B1, Mounts Bay Road Table 28 below outlines the 2011 cyclist observations compared with 2010 and the 1999 baseline. In 2011, there were a total of 439 cyclists travelling on both the road and PSP. This represents a 30% decrease compared to 2010 observations but a 299% increase on the 1999 baseline results. Table 26. Site B1 Mounts Bay Road Site B1, Mounts Bay Road 1999 2010 2011 East West TOTAL East West TOTAL East West TOTAL Road 4 1 5 6 5 11 3 0 3 PSP 56 49 105 314 301 615 220 216 436 TOTAL 60 50 110 320 306 626 223 216 439 DATE 11 th April, 2011 TIME PERIOD 0630 0930 50 P a g e

Site B2, McCallum Park paths Figure 19 below shows the location of Site B2, McCallum Park. Figure 19. Site B2, McCallum Park Table 27 overleaf outlines the 2011 pedestrian and cyclist observations compared with 2010 and the 1999 baseline. In 2011, there were a total of 304 cyclists travelling along both the bike path and pedestrian path. This represents a slight decrease of 11% on 2010 observations but a 473% increase on the 1999 baseline results. Pedestrians were also counted at this site. There were a total of 280 pedestrians using both the bike path and pedestrian path. This represents an increase of 31% on 2010 observations and a 522% increase on the 1999 baseline results. 51 P a g e

Table 27. Site B2, McCallum Park paths Site B2, McCallum Park paths 1999 2010 2011 East West TOTAL East West TOTAL East West TOTAL Bikes on bike path 29 23 52 147 180 327 150 152 302 Bikes on pedestrian path 0 1 1 7 6 13 1 1 2 TOTAL CYCLISTS 29 24 53 154 186 340 151 153 304 Pedestrians on bike path 2 6 8 11 16 27 8 3 11 Pedestrians on pedestrian path 22 15 37 109 78 187 167 102 269 TOTAL PEDESTRIANS 24 21 45 120 94 214 175 105 280 DATE 11 th April, 2011 TIME PERIOD 0630 0930 52 P a g e

Site B3, West Leederville PSP Figure 20 below shows the location of Site B3, West Leederville. Figure 20. Site B3, West Leederville PSP Table 28 below outlines the 2011 cyclist observations compared with 2010 and the 1999 baseline. In 2011, there were a total of 380 cyclists travelling in both easterly and westerly directions. This represents a 104% increase on 2010 observations and a massive, 9400% increase on the 1999 baseline results. Table 28. Site B3, West Leederville PSP Site B3, West Leederville PSP 1999 2010 2011 East 0 106 280 West 4 80 100 TOTAL CYCLISTS 4 186 380 DATE 11 th April, 2011 TIME PERIOD 0630 0930 53 P a g e

Site B4, Alfred Cove, Melville Figure 21 below shows the location of Site B4, Alfred Cove. Figure 21. Site B4, Alfred Cove, Melville Table 29 overleaf outlines the 2011 cyclist observations compared with 2010 and the 1999 baseline. In 2011, there were a total of 407 cyclists travelling in both easterly and westerly directions on both bike and pedestrian paths. This represents a 12% decrease on 2010 observations but a 112% increase on the 1999 baseline results. Pedestrians were also counted at this site. There were a total of 234 pedestrians using bike path and pedestrian path. This represents an increase of 30% on 2010 observations but a 25% decrease on the 1999 baseline results. 54 P a g e

Table 29. Site B4, Alfred Cove, Melville Site B4, Alfred Cove, Melville 1999 2010 2011 East West TOTAL East West TOTAL East West TOTAL Bikes on bike path 100 90 190 296 150 446 260 142 402 Bikes on pedestrian path 2 0 2 12 5 17 3 2 5 TOTAL CYCLISTS 102 90 192 308 155 463 263 144 407 Pedestrians on bike path 28 66 94 48 59 107 102 103 205 Pedestrians on pedestrian path 119 97 216 39 34 73 19 10 29 TOTAL PEDESTRIANS 147 163 310 87 93 180 121 113 234 DATE 10 th April, 2011 TIME PERIOD 0630 0930 55 P a g e

Site B13, RRP/LBR NW9 Salvado Rd & Jersey St Jolimont Figure 22 below shows the location of Site B13 in Jolimont. Both cyclists and pedestrians were counted at this site on both the road and the path. Figure 22. Site B13, RRP/LBR NW9 Salvado Rd & Jersey St Jolimont In total, there were 190 cyclists observed in 2011, as shown in Table 30 overleaf. This represents a decrease of 28% on 2010 results and a 116% increase on the 2000 baseline. Of those cyclists, the majority were travelling in an easterly direction. There were a total of 122 pedestrians counted at this site, with the majority travelling in a southerly direction. This result is on par with the 2010 result, but still represents a significant increase (107%) on the 1999 baseline. 56 P a g e

Table 30. Site B13, RRP/LBR NW9 Salvado Rd & Jersey St Jolimont Site B13, RRP/LBR NW9 Salvado Rd & Jersey St Jolimont 2000 2010 2011 North South East West TOTAL North South East West TOTAL North South East West TOTAL Road (cyclists) 7 31 30 10 78 Path (cyclists) 1 5 0 4 10 13 123 113 14 263 10 46 120 14 190 TOTAL CYCLISTS 8 36 30 14 88 13 123 113 14 263 10 46 120 14 190 Road (pedestrians) 0 0 0 0 0 Path (pedestrians) 15 20 13 11 59 36 29 39 23 127 27 45 21 29 122 TOTAL PEDESTRIANS 15 20 13 11 59 36 29 39 23 127 27 45 21 29 122 DATE 11 th April, 2011 TIME PERIOD 0630 0930 57 P a g e

Group B Spot Count Totals The Group B Spot Counts were conducted on the 10 th and 11 th of April, 2011. In total, 1,720 cyclists were observed at these counts between the times of 6.30 am and 9.30 am. This result represents a slight decrease of 8% on 2010 results, but an overall increase of 285% since the baseline. Table 31. Group B Spot Count Totals (Cyclists) Group B Spot Count Totals 1999 2010 2011 Site B1 110 626 439 Site B2 53 340 304 Site B3 4 186 380 Site B4 192 463 407 2000 2010 2011 Site B13 88 263 190 TOTAL 447 1878 1720 58 P a g e

Figure 23 below displays the Group B Spot Counts compared with 2010 and the baseline, as well as the percentage change compared with these years. 110 626 439 53 340 304 Group B Spot Counts 380 186 4 192 463 407 88 263 Baseline 2010 2011 190 Site B1 Mounts Bay Road Site B2 McCallum Park Site B3 West Leederville PSP Site B4 Alfred Cove, Melville Site B13 RRP / LBR NW 9 Jolimont % change % change 2011 vs. 2010 % change 2011 vs. baseline 9400% 299% 474% -30% -11% 104% 112% 116% -12% -28% Figure 23. Group B Spot Count 59 P a g e