RULES AND REGULATIONS CONTRACTOR WORK



Similar documents
Core & Shell Construction. Rules and Regulations

STCC Contractor/Vendor Rules and Regulations

WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS

Contractors Rules & Regulations

APPLICATION & RULES FOR OWNERS, CONTRACTORS, MOVERS

Gramercy Place Condo Association, Inc.

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

Colocation Center Policies & Procedures

ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015

FACILITIES MANAGEMENT DEPARTMENT QUICK REFERENCE Guide to Services

ASBESTOS MANAGEMENT PROGRAM

Houston ISD Deadly Middle School RR Renovations- Phase 3 VCS Architects, LLC

City of Fort Smith Building Permit Process Frequently Asked Questions

The schedule is based upon a five (5) day work week (Monday through Friday). Weekend service is only when requested.

FACILITIES PLANT OPERATIONS SERVICES

Responsibility Due/Done Relocation Task Comments

Case Studies. Disaster Recovery Restoration Remediation Decontamination

Terms of Reference Air Handling Unit (HVAC System) Cleaning

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

CARITAS MANAGEMENT CORPORATION CALIFORNIA ADDENDUM GENERAL

Water Leak 1: Intrusion Policy

Service Level Agreement

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Guidelines for. the employment EXTERNAL COMPANIES

Claridge Condominium Association, Inc Pelican Bay Blvd. Naples, FL 34108

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

Asbestos in your home. Information on living with Asbestos

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION

CONTRACTOR INDUCTION HANDBOOK

THIRD LAGUNA HILLS MUTUAL

Janitorial Service. Scope of Work

COMPANY ESTIMATOR BID DAY PHONE NO.

How To Handle An Emergency At A Strata Corporation

Fire Damage Repairs, 2510 Burton Street

GENERAL BUILDING INFORMATION DENVER HIGHLANDS E. HARVARD AVE. DENVER COLORADO 80231

EMBARQ PHONE COMPANY SUDDENLINK CABLE COMPANY ATMOS GAS COMPANY COSERV ELECTRIC

1349 Tenants Corporation. Apartment#: of 13491;enants Corporation and agree. This is to advise that I have read the house to abide by same.

Asbestos

CSC-DIVISION 1-MASTER SECTIONS Description

SECTION 807 PUMP STATION REHABILITATION

Drain Replacement Project Overview

Section Summary of Work Contract Security System, Network Infrastructure and UPS Power

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

Asbestos Work Permit Procedures

KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE

Conference Room Reservation Policy Packet

ADDENDUM No. 2. RFP No /27, Oakland Maintenance Center Facility Management Services

Construction of 86 Dummer Street: Questions and Answers for Trustman Residents

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number:

2015 Chrysalis Awards Entry: Commercial Insurance Restoration. Gallo Center for the Arts. BELFOR Sacramento

Renovations for a New 18 Bed Gero-Psych Nursing Unit August 7, 2014 Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA Addendum No.

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Renovation instructions

General Fire Code Requirements Within Commercial Tenant Spaces

STATEMENT OF WORK (SOW) 2. Contract Title. HEPA Supply/Exhaust fans for Clean room USP 797 Compliance

SWAN POINT YACHT & COUNTRY CLUB

A Self-Audit of Your Current Campus Security Systems

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION SECURITY SYSTEMS

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW

SECTION EXISTING HAZARDOUS MATERIALS CONDITIONS

Data Center Due Diligence List

Commercial Maintenance Services

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Exhibitor General Information

APPENDIX A BUILDING MAINTENANCE MECHANIC D.O.T. CODE O*NET CODE

How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work. Section 2 Types of Methods of Measurements page 4

The Pennsylvania State University Physical Security Office. Intrusion Alarm. Performance Specification

BIDDULPH MANSIONS RESIDENTS GUIDE

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

Asbestos in Your Home

Customer Service Center: One Floor (7391 College Pkwy in Ft. Myers, FL)

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

EVERYONE'S RESPONSIBILITY

Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation

REQUEST FOR PROPOSAL FOR: Fire and Security Alarm Service and Monitoring

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL

Centergy One & Technology Square Research Building Building Rules and Regulations

Sample Outline (courtesy of City of Guelph Museums) Building Conservation Plan

DUKE ENERGY CENTER BUILDING CARD ACCESS SYSTEM POLICY

CLEANING CONTRACT BID SPECIFICATIONS

FULTON HOUSE CONDOMINIUM ASSOCIATION LEASE PACKET

Important Information for Owners of Buildings in Flood Zones

FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011

Crummer Graduate Housing Program

HSE Requirements for Contractors

TEMPLE UNIVERSITY OFFICE OF FACILITIES MANAGEMENT PROJECT DELIVERY GROUP TECHNICAL SPECIFICATIONS

CONTROL METHODS. There are five ways to control the release of asbestos fibers:

Valencia at Pelican Bay

Transcription:

RULES AND REGULATIONS CONTRACTOR WORK CARILLON 227 West Trade Street Suite 330 Charlotte, NC 28202 The following Rules and Regulations shall govern the operation of contractor work in the Building. For purposes of this document Owner shall mean Hines Charlotte Carillon LP, Hines Interests Limited Partnership, or the Building Management Office. RULES AND REGULATIONS Normal business hours are from 8:00 am to 6:00 pm, Monday through Friday and 8:00 am to 1:00 pm on Saturdays. All disruptive work (noisy, odorous, etc.) must be completed afterhours. 1. Certificates of Insurance Prior to Work: All contractors performing work must submit a current Certificate of Insurance ( COI ) prior to commencement of work. The COI shall be in strict compliance with the Owner s requirements. Failure to comply will delay the commencement of work. 2. Contractor Access: All contractors must submit a Contractor Access Form listing the name of the company, company s representatives, after-hours phone numbers for each representative (in the event of an afterhours emergency) and description of work planned. Company name, contact and phone numbers must be included for all subcontractors. a) Access forms should be submitted at least weekly detailing the work to be performed. b) For work planned in core electrical room(s) or for work requiring deactivation of the fire life safety system, contractor must submit access forms a minimum of 48 hours in advance of work. c) Each day, before beginning work, contractor must confirm that the fire life safety system has been taken off line by checking with the Owner or Security. d) For work requiring access to other tenant spaces outside the construction area (above, below, or adjacent), contractor must schedule work a minimum of one week in advance with the Owner. e) General contractor s onsite supervision (project manager or superintendent) must be onsite at all times while work is being performed. Subcontractors will not be provided access to any construction area until the general contractor is present and accounted for. 3. Deliveries: All deliveries must be made afterhours. An access form must be submitted listing the delivery and delivery time. 4. Common Area Protection: Floor protection must be installed on SL2 corridor from the Loading Dock to the Service Elevator. Floor and wall protection must be installed on the Service Elevator Lobby(ies) of the floor(s) under construction. Floor and wall protection must be installed on common area corridors from Service Elevator to work area.

5. All work that affects the mechanical, electrical or structural integrity of the Building must be approved in writing by Owner prior to commencement of the work. 6. Restrooms are available on the SL2 level building restrooms on the construction floor are not to be used. 7. Under no circumstances will the loading dock, common corridors or service elevator lobbies be used for material storage. All construction materials/tools must be stored in the construction space. 8. The door to the Mechanical Room must remain closed at all times. 9. Under no circumstances can the loading dock doors to the building be held /propped open. If doors are found propped open, Owner will require and bill back the GC for the services of a security officer to be stationed at the loading dock during construction. 10. The air handlers will typically be shut down during construction activities. However it is possible to run the air handlers for a $45/hour charge. This must be scheduled in advance and can be included on the Access form. 11. All contractors must abide by all city, county, state and federal laws and building codes. 12. All contractors are required to submit Material Safety Data Sheets (MSDS) before any materials will be allowed into the building(s) - no exceptions. 13. Contractor must provide Pre-filter media over the building AHU filters before construction begins. Filters should be changed as needed during the construction, and contractor should perform a filter change out with MERV 13 filters upon completion of project. Mechanical room is to be thoroughly cleaned at the conclusion of the construction. 14. All contractors and sub-contractors are required to submit written Lock-Out/Tag-Out procedures before any work can begin. Contractor s employees must abide by these procedures at all times. Anytime an electrical panel cover is removed for more than a period of three (3) hours or more than one (1) contractor is working in an area, a sign must be posted warning of any potential hazards (i.e. electrocution, etc.). 15. All contractors and vendor employees, while transporting tools and materials will be required to use the loading area entrance way and the freight elevator. No use of the passenger elevator is allowed by contractors or subcontractors. 16. All on-site inspections will be made both before and after jobs by the contractor s representative and a Building Management representative of the common areas to document contractor damage to these areas. 17. All Contractor employees while in Carillon will refrain from: a. Profanity b. Any loud talking or noise making, which will disturb Carillon tenants. c. Loitering in common areas. d. Entering tenant suites or unauthorized areas without prior approval of Carillon Management Office. e. Playing of radios. f. Use of chewing tobacco or cigarettes anywhere on the property.

18. No parking is provided at the building, all construction parking is to be off-site or by purchasing extended dock ramp parking permit for after-hours dock parking. Extended Dock Parking Pricing Summary M-F 7am 5pm with Hines permission $20/day $200/month M-F after 5pm $20/night $200/month Weekends only $20/day $200/month 19. Thirty minutes time will be given to vehicles needing to load/unload in the loading dock area. 20. All contractors will submit to the management office a list of subcontractors before performing any work in the building. 21. All contractors and sub-contractor employees will sign in and out each day at the security desk using the Carillon Contractor Sign-In Log. Contractors and sub-contractors must present a picture id to security in order to receive a freight elevator access card. 22. All contractors will wear assigned Contractor Badges while performing any work in the building. 23. All contractor employees must be properly clothed, including a shirt with sleeves and a company logo on the shirt to identify them. 24. No construction debris will be allowed in the compactor. If Contractor fails to comply, Contractor will be held responsible for the cost of removing any debris. 25. Any contractor needing to station an open top dumpster or dump truck in the loading area must receive prior permission from the management office. 26. Any work performed after hours in the building must be done only after notifying the management office in writing. 27. Access to electrical rooms, roof and any other unauthorized area must be approved on an individual basis by the management office. 28. Contractor will remove any debris accumulation in work areas as a result of construction work. Otherwise, back charges will be predicated on $55.00 per man hour for cleaning services. 29. All work will be performed complying with local, state and federal safety standards. 30. One complete (1) set of As-Built drawings will be provided by contractor to the building management office at the completion of construction. 31. Existing Materials/Improvements - Existing partitions, lights, electrical receptacles, doors, hardware, millwork, etc. are the property of Carillon and are not to be removed by the tenant or contractor. The return of unused materials is to be coordinated with Building Management. 32. Permits - Contractor to obtain all necessary permits and be responsible for any and all inspections. 33. Structural Modifications - All floor penetrations or modifications to the existing floor slab and/or structural steel must be approved by Building Management. Example: plumbing

lines, electrical conduit, floor cores, etc. Carillon has Post Tension cables and electrical conduit in the slabs. Scanning is required prior to all drilling. Carillon is a post-tension building with cables and conduit running through the floor slabs. Scanning of the floor or deck must be completed prior to any coring. In addition, fasteners to the floor and deck MUST be less than ¾ in length. 34. Asbestos - Materials containing asbestos are not permitted at Carillon. At the request of the building management, contractors shall provide a certificate to the owner stating that no products or construction materials used by contractor contain asbestos. Contractors shall provide manufacturer s Data Sheets on materials used at the request of building management. 35. Copper pipe only will be permitted for sinks or water lines to tenant equipment. 36. Clean-up - The contractor is responsible for cleaning the premises, including the surrounding area adjacent to the construction. This shall also include restoring the mechanical room on the affected floor(s) to broom clean condition, consistent with the condition prior to the construction. This is to include the vacuuming of carpets, sweeping of the floors, cleaning of the windows (interior surfaces), cleaning light fixtures and dusting as required. Contractor will provide the necessary cleaning materials including the vacuum cleaner for this clean up. This will be done at the end of each day. Otherwise, charges will be applied at a rate of $55.00 per man hour for cleaning services. 37. All noise and odor generating work (i.e. - demolition, coring, hammer drilling, tacking of carpet pad, shooting track into deck and painting) shall be performed after normal business hours. 38. The general contractor is responsible to schedule and coordinate the tenant s low voltage work with their ceiling cover-up inspection requirement. 39. The management office must be notified prior to any work being done to the Security Systems, Fire Systems or any other life safety system. 40. It is the contractor s responsibility to notify all of his subcontractors and any subcontract personnel of the Rules and Regulations. 41. Upon completion, the contractor shall provide the Landlord with a copy of the Certificate of Occupancy, if applicable. REQUIREMENTS FOR ENDING CONSTRUCTION Electrical panels are to be inspected by the general contractor and chief building engineer to verify they are properly labeled. The punch-out of every project is to occur three (3) days prior to the schedule completion date of the project. The general contractor is to schedule the day and time of the punch-out with the Property Manager. The general contractor will have 10 business days to complete punch list. General contractor is required to clean any vacant area that was used to stage out of during the course of construction. When electrical meters are installed, general contractor shall provide the Property Manager with the meter number and a list of the items that it is metering.

REQUIREMENTS FOR CLOSE-OUT OF CONSTRUCTION PROJECTS Before the application for final payment will be processed, three (3) sets of the following close-out package must be submitted in its entirety: Certificate of Occupancy Test & Balance Report Signed-off punch list by tenant Lien waivers from general contractors, subcontractors, and material suppliers Certificate of Insurance Building Permit Fire alarm test letter As-built drawings (architectural and MEP drawings) 1 hard copy and 1 electronic Contact list of all contractors Operation and Maintenance Manuals

ACKNOWLEDGMENT OF CONTRACTOR/VENDOR INFORMATION Owner will strictly enforce the rules and guidelines of the Contractor/Vendor Information. Your failure to comply with all of these rules and guidelines will make you subject to being removed as an approved contractor/vendor for the building and the job will be suspended until such time that these requirements are met. With your help in following these rules, we can expect a safe and successful project with as few problems as possible. Please sign and return this page along with the other information requested. You will not be allowed to begin work in Carillon until all information has been received and approved by the Property Management office. I have read the contractor rules and regulations for performing work in Carillon, 227 W. Trade Street and I agree to abide by these rules. Contractor: Site Manager: By: Work Telephone #: Home Telephone #: Building: Job Permit #: