Project Screening Results

Similar documents
SPP Notification to Construct

Chapter 7 - Appendix A

Substations or Switching Stations

All routes and route segments included in this notice are available for selection and approval by the Public Utility Commission of Texas.

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD

16 West Coast Regional Plan

2015 I n t e g r a t e d T r a n s m i s s i o n P l a n Y e a r A s s e s s m e n t R e p o r t

Western Area Power Administration Rocky Mountain Region (LAPT) Network Integrated Transmission Service. Designated Network Resources

Item 8: Houston Import RPG Project

2013 Ventyx, an ABB company

6. The estimated costs here do not include any applicable ITCC tax

Emera Maine Proposed Potential Transmission Projects. Line Identification Line 75 - KR Sub. Estimated Cost $201,464 $0 $3,200,000

PJM LMP Market Overview

1. Who is CenterPoint Energy Houston Electric, LLC?

Firm Flow Entitlement on M2M Flowgates Readers' Guide. Last Updated: February 01, 2016 Version: 4.0

Transmission Leadership. Teresa Mogensen Vice President, Transmission

345 kv Brazos Valley Connection Project FAQs

The Impact of Transmission Cable System Construction and Design on Commissioning Test Options & Results

PJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement

Houston Region Import Capacity Project

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003

Bristol District Park & Ride Investment Strategy

How To Operate The Williston Uvls

Oncor s Pioneering Transmission Dynamic Line Rating (DLR) Demonstration Lays Foundation for Follow-On Deployments

How To Vote In A Dallas School District Election

Transmission Planning in the ERCOT Interconnection

Rocky Mountain Power Transmission Five Year Study Findings Meeting

South East of Process Main Building / 1F. North East of Process Main Building / 1F. At 14:05 April 16, Sample not collected

FINAL. Alternative Evaluation. for the. Proposed Burlington-Wray 230-kilovolt Transmission Project

REST HOME & ASSISTED LIVING CABARRUS COUNTY

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

Full Network Model Scope for FNM DB2015Q4

REPORT ON EXISTING AND POTENTIAL ELECTRIC SYSTEM CONSTRAINTS AND NEEDS WITHIN THE ERCOT REGION

Updated SYSTEM IMPACT STUDY OF NEW ENGLAND AREA

ICM Project Station Infrastructure and Equipment

Salt River Project Ten Year Plan Projects

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

FACT SHEET. BSES, Delhi - Distribution Network. Power Systems Consultancy from ABB

AGREEMENT FOR PRELIMINARY ENGINEERING DESIGN MISO PROJECT J233

ALPHA ETA SOCIETY CHAPTERS

AT&T Device Support Center Holiday Operating Hours (November/December)

Robust Adaptive Topology Control

Treasure Valley Electrical Plan

KANSAS CITY WATER SERVICES FISCAL YEAR 2016 CAPITAL IMPROVEMENT PROGRAM

N O W A V A I L A B L E

TUCSON ELECTRIC POWER COMPANY TEN YEAR PLAN FOR YEARS

Institution name Admissions office contact information Application fee (See ApplyTX for information on whether application fee can be waived)

Alabama Department of Agriculture and Industries 1445 Federal Drive Montgomery, AL

New York s Transmission Challenges and Opportunities: An Overview

March 14, Subject: Southern California Edison 2014 Annual Progress Report

TRANSMISSION AND SUBSTATION PROJECTS

TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY

WIC VENDOR LIST. Alsalam Market & Deli University City Blvd. #104 NC28213

Federal Funds Obligated in Chittenden County Federal Fiscal Year 2000

Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report

BLUE POOL PARTICIPANTS: Iola-Scandinavia, Bruce, Aquinas RED POOL PARTICIPANTS: Cuba City, Cambria-Friesland, Oakfield

Denomination Church Name Physical Address Mailing Address Phone Website AMC-CME-AME

QUANTA ENERGIZED SERVICES

Enterprise Asset Management

ACCIDENT REPORT BY DRIVER

Logic gates. Chapter. 9.1 Logic gates. MIL symbols. Learning Summary. In this chapter you will learn about: Logic gates

Survey of the Louisiana Purchase in 1815

Public Land Survey System - Definition

Switch Your Account Today!

Q140 Cluster Addendum

REBUILDING THE CTA FORREST CLAYPOOL, PRESIDENT CHRIS BUSHELL, SVP, INFRASTRUCTURE

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION'^^ j E DIRECT TESTIMONY RAJESH GUPTA PROJECT MANAGER, ENTERGY SERVICES, INC.

2016 Site Visits with Dates

Control Number : Item Number : 9. Addendum StartPage: 0

On the Road to. Duke takes the road less traveled and arrives at a new level of distribution automation.

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Northport - Norwalk Harbor Cable (NNC) Tie line

MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV

2012 Program Report. Agricultural Group Drainage Program

D.3 South Minneapolis Electric Distribution Delivery System Long-Term Study

WELCOME. Hillside Village is a 615,000 sf mixed-use open-air. retail destination located less than 20 minutes from

ICHEM AUTOMATED CHEMICAL OPTIMIZATION. Take Control of Your Chemical Program

Southwestern Public Service Company. Description of Company

Transcription:

Project Screening Results

Updated Economic Issues List Issue Id Constraint Name Contingency M-1 Frederick Town AECI - Frederick Town AMMO 161 kv Line Lutesville - St Francois 345kV Line S-2 North East - Charlotte 161 kv Line Iatan Stranger 345 kv Line S-3 Logan - SW Minot 115 kv Line Blaisedell 230/115 kv Transformer S-4 North Platt - Stockville 115 kv Line Gentleman - Red Willow 230 kv Line M-5 Blue Earth - Winnebago 161kV Line Lakefield Junction - Lakefield 345kV Line M-6 Wapello 161/69 kv Transformer T1 Wapello 161/69 kv Transformer T2 S-7 Collins - Stockton 161 kv Line Neosho La Cygne 345kV Line M-9 Prairie 345/230kV Transformer T2 Prairie 345/230kV Transformer T1 M-10 Swartz - Alto 115kV Line Baxter Wilson - Perryville 500 kv Line M-11 Reed - Dumas 115kV Line Sterlington - El Dorado 500kV Line S-12 Essex - Idalia 161 kv Line Essex - New Madrid 345 kv Line M-13 Grimes Mt Zion 138 kv Line Grimes Ponderosa 230 kv Line S-14 South Shreveport Wall Lake 138 kv Line Dolet Hills 345/230 kv Transformer 2

Screening Process SPP performed initial evaluation for projects addressing SPP issues MISO performed initial evaluation for projects addressing MISO issues Projects addressing multiple issues were evaluated by the RTO which has the highest ranked issue being addressed by the project

Screening Criteria Screening Index (SI): One year benefit / (estimated cost in 2024 dollars* Annual fixed charge rate) Screening Index of at least.5 Benefits and cost calculated for 2024 Proposed solution benefits = SPP Benefit + MISO Benefit IS included as a part of SPP Must provide benefit to both SPP and MISO

Updates to Issues List Logan-SW Minot FLO Blaidsdell transformer Logan-SW Minot reconductor North Platt-Stockville FLO Gentlemen-Red Willow Gentlemen-Red Willow rating decrease removed this need Collins-Stockton FLO Neosho-Lacygne Collins-Stockton rating increase significantly lowered needs congestion 5

Updates to Issues List Blue Earth - Winnebago 161 kv constraint This constraint was binding significantly due to incorrect modeling of a Special Protection Scheme (SPS) in PROMOD Congestion reduced significantly Wapello-Ottumwa 161 kv Ckt 2 constraint Rating increase relived congestion on this constraint Congestion shifted to Wapello 161/69 kv Transformer & Jeff Wapello 161 kv 6

SPP s Screening Results

Potential Seams Projects Passing Screening Projects New 28 mile Dolet Hills-Messick 345kv line, new 500/345kV transformer at Messick New 100 mile Elm Creek-Mark Moore 345kV line Replacing 30MVA 161/69kV transformer at Huntley/Winnebago with a 75MVA transformer North East-Charlotte 161kV 2 nd Ckt Needs Addressed S Shreve Port-Wallace Lake 138kV FLO Dolet Hills 345/230kV transformer North East-Charlotte 161kV FLO Iatan-Stranger 345kV North East-Charlotte 161kV FLO Iatan-Stranger 345kV North East-Charlotte 161kV FLO Iatan-Stranger 345kV 8

Dolet Hills-Messick 345kV Line Total Cost: $52M Screening Index: 0.63 Total APC Benefit: $5.5M MISO % Total APC Benefit: 90% 9 SPP % Total APC Benefit: 10%

Elm Creek-Moore 345kV Line Total Cost: $142.7M Screening Index: 0.74 Total APC Benefit: $17.9M MISO % Total APC Benefit: 15% 10 SPP % Total APC Benefit: 85%

Huntley-Winnebago Transformer Total Cost: $3.8M Screening Index: 1.57 Total APC Benefit: $1M MISO % Total APC Benefit: 72% 11 SPP % Total APC Benefit: 27%

North East-Charlotte 2 nd Ckt 161kV Total Cost: $24M Screening Index: 1.75 Total APC Benefit: $14M MISO % Total APC Benefit: 52% 12 SPP % Total APC Benefit: 48%

Additional Projects These projects pass the Screening Index but provide minimal benefits (between 1 and 5%) to one RTO Projects could increase when evaluated over 20 years For a project to qualify for interregional cost allocation each RTO must receive at least 5% of benefits

Additional Projects Projects 345 kv switching station where the parallel circuit from Gentleman seperates and construct a 345 kv line from new switching station Axtel Mark Moore to Elm Creek 345kV Elm Creek to Moore 345 kv Replace current 30 MVA 161/69 kv transformer at Huntley/Winnebago with 75 MVA unit Rebuild the South Shreveport to Wallace Lake 138 kv line with 1533.3 ACSR/TW Rebuild Stranger - Iatan 161 kv at 345 kv 161 kv line from Neast to Montreal 2nd 161 kv line from Neast to Charlot 345kV line from Wolcott to Iatan with 345/161kV Wolcott transformer 345 kv circuit from Dolet HIlls to Messick and a new 500/345 kv transformer at the Messick Substation. Rebuild South Shreveport-Wallace Lake 138 kv line to 246/246 MVA Needs Addressed North Platt - Stockville 115 kv FLO Gentleman - Redwillow 345 kv North East-Charlotte 161kV FLO Iatan- Stranger 345kV S Shreve Port-Wallace Lake 138kV FLO Dolet Hills 345/230kV transformer

MISO s Screening Results

Solution Ideas Screening Phase I Issue ID Issue Description Solution Idea Screening Index Estimated Cost (M$ - 2015) M-10 M-13 Swartz - Alto 115 kv FLO Baxter Wilson - Perryville 500 kv Grimes - Mt Zion 138 kv FLO Grimes - Ponderosa 230 kv Alto Series reactor 2.46 10.4 New Walker Tap-Rivtrin 138 kv line 0.59 47.5 M-1 Frederick Town AECI - Frederick Town AMMO 161 kv FLO Lutesville - St Francis 345 kv New St Francois - Fletcher 345 kv line New St Francois - Fletcher - Taum Sauk 345 kv Line 0.53 107.9 0.50 151.8 MISO Annual Fixed Charge rate of 17.9% Project in-service date was assumed to be 2024 16

Alto Series Reactor Project Details Addition of a series reactor on the Swartz Alto 115kV line at the Alto 115kV Substation Location - Louisiana This project does not fully relive the congestion on the Swartz Alto (M-10) constraint Reduces the congestion by 90%

Walker Tap - Rivtrin 138 kv line Project Details Tap the existing Grimes Crockett 345kV line at Walker Tap Build 345/138kV transformer and build 11 miles of 138kV line from Walker Tap to Rivtrin Location - Texas This project completely relieves the Grimes - Mt Zion 138 kv (M-13) constraint

St Francois - Fletcher 345 kv Line Project Details Build 50 miles of 345kV line from St. Francois to Fletcher Location Missouri This project does not fully relive the Frederick Town AECI - Frederick Town AMMO 161 kv constraint It reduces the congestion by 75 % Increases Congestion on the New Madrid 345/161kV Transformer T2 19

St Francois - Taum Sauk - Fletcher 345 kv Line Project Details 55 miles of 345kV line from Fletcher to new substation close to Taum Sauk and then to St. Francois 2-345/138kv transformers to tie in 138kV lines from Taum Sauk Location Missouri This project does not fully relive the Frederick Town AECI - Frederick Town AMMO 161 kv constraint It reduces the congestion by 71 % Increases Congestion on the New Madrid 345/161kV Transformer T2

Contact Info SPP interregionalrelations@spp.org Brett Hooton: 501-688-1684 MISO jmckay@misoenergy.org Jenell McKay: 504-846-7108