NPLOTH7 GIS Database Development Mission (2619), Bryson (2601), Franklin (2603), Dillsboro (2602) Final Report



Similar documents
How To Study The Historic Resources Of The Project

CITY OF SUFFOLK, VIRGINIA GIS DATA DISTRIBUTION AND PRICING POLICY

North Dakota GIS Program Report To Governor Jack Dalrymple. July 1, 2011 June 30, 2012

REGIONAL SEDIMENT MANAGEMENT: A GIS APPROACH TO SPATIAL DATA ANALYSIS. Lynn Copeland Hardegree, Jennifer M. Wozencraft 1, Rose Dopsovic 2 INTRODUCTION

Statement of Purpose: Perfect R.S rights providing public access to public lands while protecting private property rights.

M E M O R A N D U M. SUBJECT: Highlights of Planning Division Activities for September 2012

Appendix E-10. Consultation Record. Cultural Resource Committee

Utah State General Records Retention Schedule SCHEDULE 1 GEOSPATIAL DATA SETS

Jackson Hydroelectric Project (FERC Project No. 2157) Revised Study Plan 12: Northern Spotted Owl Surveys. Final Technical Report

2500 Mandatory Setback from Oil and Gas Development

Natural Resource-Based Planning*

Monitoring Riparian Areas With a Camera

CARLTON COUNTY GIS DATA DISTRIBUTION POLICY June 1, 2010 Revised March 25, 2015

Data Sharing System (DSS) Data Entry Instruction for Archaeological Survey

Using Aerial Photography to Measure Habitat Changes. Method

October 11, Sharon Stohrer State Water Resources Control board P.O. Box 2000 Sacramento, CA

If you require assistance in obtaining access to the presentations or have questions regarding the or Glenn Young at (916)

AERIAL PHOTOGRAPHS. For a map of this information, in paper or digital format, contact the Tompkins County Planning Department.

Town of Chatham Department of Community Development

GIS MAPPING FOR IRRIGATION DISTRICT RAPID APPRAISALS Daniel J. Howes 1, Charles M. Burt 2, Stuart W. Styles 3 ABSTRACT

Conducting a Land Use Inventory

Eagle Mountain Pumped Storage Project No Final License Application Volume 6 of 6. Exhibit G Project Boundary PUBLIC. Palm Desert, California

A GIS helps you answer questions and solve problems by looking at your data in a way that is quickly understood and easily shared.

Development of an Impervious-Surface Database for the Little Blackwater River Watershed, Dorchester County, Maryland

Remote Sensing, GPS and GIS Technique to Produce a Bathymetric Map

Geographic Information System Product Distribution Policies. Preface

December 19, Donna Macalle-Holly Lake Hopatcong Foundation 37 Nolan s Point Park Road Lake Hopatcong, NJ Dear Ms.

Guidelines on Information Deliverables for Research Projects in Grand Canyon National Park

Bowmanville Marsh Habitat Restoration and Public Access Project

CRS 610 Ventura County Flood Warning System Website

Pima Regional Remote Sensing Program

Special Publication SJ2004-SP24 East Central Florida Water Supply Initiative St. Johns River Water Supply Project

FEDERAL ENERGY REGULATORY COMMISSION Washington, DC January 27, 2012

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER. GENERAL SURVEY INSTRUCTIONS EASEMENTS Authority 11 AAC 53

Weed Survey and Mapping

CHAPTER I: INTRODUCTION. Background

DRAFT. Shoreline adaptation alternatives development to determine flood reduction potential and project costs

THE CAGIS CONSORTIUM DATA SERVICES PRICING POLICY

A Web-Based Trail Map for the Pioneer Valley Region

Can GIS Help You Manage Water Resources? Erika Boghici Texas Natural Resources Information Systems

4.03 Vertical Control Surveys: 4-1

2002 URBAN FOREST CANOPY & LAND USE IN PORTLAND S HOLLYWOOD DISTRICT. Final Report. Michael Lackner, B.A. Geography, 2003

APPENDIX K NATURAL GAS PIPELINE STORAGE PERMITTING PROCESSES

Emery, Gary GIS Coordinator, Fisheries Dept, Hoopa Valley Tribe, P.O. Box 417, Hoopa, CA 95546; phone (530) x 22; gis@pcweb.

ART Vulnerability and Risk Assessment Report September 2012 Appendix C. ART GIS Exposure Analysis

How to do it Manual No. 3: ArcMap10 in Remote Desktop mode and Landgate slip files. Jeremy Green

SAWTOOTH NATIONAL RECREATION AREA AND JERRY PEAK WILDERNESS ADDITIONS ACT

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

Applying High-resolution Satellite Imagery and Remotely Sensed Data to Local Government Applications

Sample Pages. Free Newsletter Sign up Today! Learn Through Experience

SITE MONITORING, AFFIRMATIVE CULTURAL RESOURCE MANAGEMENT FOR CACHE CREEK PUBLIC LANDS, LAKE COUNTY, CALIFORNIA

To successfully manage your land, you need to

WHAT IS GIS - AN INRODUCTION

Title 10 DEPARTMENT OF NATURAL RESOURCES Division 35 Land Survey Chapter 1 Cadastral Mapping Standards

SHOALS Toolbox: Software to Support Visualization and Analysis of Large, High-Density Data Sets

Wayne County Implementation Plan Table of Contents

2.0 RESEARCH DESIGN AND PROJECT METHODS

3. The submittal shall include a proposed scope of work to confirm the provided project description;

PEBBLE PROJECT ENVIRONMENTAL BASELINE DOCUMENT 2004 through 2008 APPENDIX C. DATA MANAGEMENT AND GEOGRAPHIC INFORMATION SYSTEM

Chapter 6: Data Acquisition Methods, Procedures, and Issues

CONTENTS ABSTRACT. KEYWORDS:. Forest ownership, forest conversion.

121 FERC 62,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Public Utility District No. 1 of Project No Chelan County

LIDAR and Digital Elevation Data

Range Management Databases on the Web: Two Examples

Mapping Application for Resource Planning

Impacts of Global Warming on North Carolina s Coastal Economy

EXHIBIT A LOCATION MAP AND LAND USE INFORMATION

Appendix E: Stewardship Program

NJDEP GPS Data Collection Standards For GIS Data Development

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

National Network of Reference Watersheds

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan

Vegetation Resources Inventory

Photo by Jeff Thibodeau, Helios Land Design

APPLICATION FOR CLASSIFICATION OF FOREST LAND

TABLE OF CONTENTS CHAPTER 1: CHAPTER 2:

Michigan Tech Research Institute Wetland Mitigation Site Suitability Tool

CHAD R. GOURLEY SPECIALTY EMPLOYMENT

Policy & Procedure Manual

4. Priority Areas of Conservation

Soil Data Warehouse Western Regional NCSS Conference Western Regional NCSS Conference

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

GEOGRAPHIC INFORMATION SYSTEMS

GIS BASED LAND INFORMATION SYSTEM FOR MANDAL SOUM, SELENGE AIMAG OF MONGOLIA

The Boating Infrastructure Grant Program BIG. Additional guidance for developing a competitive BIG Tier II proposal.

REQUEST FOR PROPOSAL FOR THE DEVELOPMENT OF A GIS PARCEL MAPPING FOR VERNON COUNTY, MISSOURI

The Urban Renewal Authority of Pueblo

Funding Connecticut s Statewide GIS Program

MAPPING THE ST. FRANCIS DAM OUTBURST FLOOD WITH GEOGRAPHIC INFORMATION SYSTEMS

OUR PURPOSE CHAPTER 1.

THE OFFERING MANAGEMENT OVERVIEW

Request for Proposals for Topographic Mapping. Issued by: Teton County GIS and Teton County Engineering Teton County, Wyoming

Michigan Department of Natural Resources Oil and Gas Leases Frequently Asked Questions

2016 BES Summer Student Intern Program

Business Plan for Orthoimagery in North Carolina

Metadata for Big River Watershed Geologic and Geomorphic Data

APFO Data Provisioning and Services

Rural Residential Buildable Lands Inventory

APLS GIS Data: Classification, Potential Misuse, and Practical Limitations

GEOGRAPHIC INFORMATION SYSTEMS

Transcription:

NPLOTH7 GIS Database Development Mission (2619), Bryson (2601), Franklin (2603), Dillsboro (2602) Final Report Introduction Duke Power Nantahala Area (Duke) is in the process of relicensing the Mission, Bryson, Dillsboro and Franklin Hydroelectric Projects. The relicensing process requires the applicant to file accurate maps depicting the projects, project features and other geographic features. At the beginning of the relicensing process, Duke had limited electronic maps of the four projects. Accordingly, Duke undertook an effort to develop Geographic Information System (GIS) data for the projects. Duke s objective was to utilize the GIS data in preparing reports and maps for use in the relicensing process. In addition, Duke will utilize the GIS data in the long-term management of the projects. Database Development Duke determined that it would utilize high-resolution, geo-referenced aerial photography of the projects for its base data layer. All other data layers would be built upon this base. The projects were flown in early 2001 during leaf-off conditions. Leaf-off conditions allowed the greatest opportunity to identify individual structures and other features. The data were collected in wide area mosaic 3-foot Ground Sample Distance imagery. See Figure 1 for an example of the aerial images. The firm Orbis GIS, Inc. was selected to develop the GIS database. Orbis obtained GIS data from a number of sources including the United States Forest Service, local counties, the North Figure 1 Dillsboro Hydroelectric Project Aerial Image Carolina Center for Geographic Information and Analysis (NCGIA) and other sources. The data is in GIS projection North Carolina Stateplane NAD 83 in feet. Project boundaries were then digitized from FERC exhibit drawings and overlaid on the aerial photography. Where there were obvious discrepancies between the digitized project boundaries and the aerial photography, the project boundary was adjusted to fit the georeferenced aerial photography. For some projects, Duke has proposed to modify portions of the project boundary; the GIS data have been modified to reflect these changes. Full pond boundaries were developed from the aerial photography by photo interpretation of the full pond elevation around each reservoir at the time of the aerial photography. The locations of project structures including dams and powerhouses were developed based upon photo interpretation of the aerial photography. The GIS data developed as part of this effort is not intended to be survey quality. These data layers were reviewed by Lake Management, Hydro Licensing and others

knowledgeable of the projects prior to being completed. See Figures 2 and 3 for examples of the data that was developed. Project Boundary Full Pond Project Structures Figure 2 Dillsboro Hydroelectric Project Project Information Figure 3 Dillsboro Hydroelectric Project Aerial image with project information overlay These data layers and associated metadata files are currently maintained by the Lake Management organization within Duke Power and will be utilized in administering Duke s Lake Management Policies and Procedures. The data is also being utilized in relicensing reports. Some of the additional data currently available is listed in Table 1. Data National Wetlands Inventory National Register Sites Federal Land Ownership Clay County Tax Parcels Macon County Tax Parcel Indian Lands and Native Entities Natural Heritage Sites Significant Natural Heritage Areas US Forest Service Land Ownership US Forest Service Management Areas Trails Source US Fish & Wildlife Service North Carolina Department of Cultural Resources NCGIA Clay County Macon County US Bureau of Indian Affairs North Carolina Department of Environment and Natural Resources North Carolina Department of Environment and Natural Resources US Forest Service US Forest Service US Forest Services Table 1 Western North Carolina GIS Data and Sources

Appendix 1: Study Plan

Action #: NPLOTH7 Prerequisite Action # s: NPL Action Description: Develop a GIS-based mapping system to support cataloging and data presentation and analysis for several other studies. Applicable Hydro Projects/Developments: Bryson, Dillsboro, East Fork (Wolf Creek, Bear Creek, Tennessee Creek, Cedar Cliff), Franklin, Mission, Nantahala (Nantahala, Diamond Valley, White Oak Creek, Dicks Creek), West Fork (Thorpe, Tuckasegee) I. Objective Develop GIS-based maps of projects and project lands that can be utilized for data presentation, analysis and cataloging. II. Basis FERC requires applicants to provide accurate maps of projects as part of the license application. Duke Power Nantahala Area does not currently have GIS-based maps of the projects. Development of accurate maps will facilitate the presentation of data collected during the relicensing studies and facilitate the analysis of such data. III. Geographic and Temporal Scope GIS data for all Duke Power - Nantahala Area projects referenced above will be compiled. Where data is already existing and available, the GIS database may include data that extends beyond the project boundary. Where data layers must be developed, efforts will focus on developing such data within the project boundaries. IV. Approach and Analysis Geo-referenced aerial photographs of the projects will serve as a backdrop for the GIS-database. The photographs will be obtained from a consultant selected through a competitive bidding process. Duke Power s GIS consultant will develop the GIS database by obtaining existing GIS-data layers from state and federal agencies or developing other data layers. The consultant will be selected through a competitive bidding process. GIS data will be accessible through ArcView software. Duke Power s GIS database will meet or exceed the standards developed by the Federal Geographic Data Committee. The following list includes data layers that will be included in the GIS database:

Project boundaries Project structures Wetlands Natural heritage sites Federal lands Native American lands Hydrologic features FERC-required recreation areas Parks (local, state and federal) Roads, railroads Political boundaries (counties, cities) Relicensing study information like sampling locations, data points, etc. Archaeological sites (Note: access to data will be restricted) Schedules and Required Conditions 1 st quarter, 2001 Obtain aerial photographs of projects. Submit Request for Services (RFS) for GIS database development. 3 rd quarter, 2001 Initiate development of GIS database. Project would continue throughout 2002 with additional data layers added as information becomes available from the various relicensing studies. V. Results The GIS mapping system will be a tool for use in other relicensing studies. Development of the GIS mapping information will provide a way to spatially examine, describe and depict relationships between the projects and adjoining lands. VI. Participants Agency Contacts NP&L Supporting Consultant NCWRC USFS USFWS Orbis GIS, Inc. Chris Goudreau Ray Johns Mark Cantrell 828.652.4360 828.257.4859 828.258.3939 Organization Name Phone # E-Mail NP&L Lead Resource Management Jennifer Huff 704.373.4392 jrhuff@dukeenergy.com Goudrecj@wnclin k.com Rayjohns@fs.fed. us Mark_a_cantrell @fws.gov VII. Expected Benefits Duke Power Nantahala Area does not currently have tools to effectively depict the projects and their locations. The development of the GIS mapping system will provide an effective tool for doing so. The GIS mapping system will also prove useful in lake management activities that take place after the relicensing effort. VIII. List of Attachments Request for Services for aerial photography IX. List of References

GUIDELINES FOR ACQUIRING DIGITAL AERIAL PHOTOGRAPHY FOR THE NANTAHALA HYDROELECTRIC PROJECTS January 9, 2001 INTRODUCTION The purpose of this document is to provide a set of guidelines to acquire a cost proposal to: 1. Collect digital aerial photography for Duke Power s Nantahala Hydroelectric Projects. The projects are distributed across the southwestern area of North Carolina. 2. Process the data to where it is compatible for use as backdrop in development of Geographic Information System (GIS) Data. 3. Certify the data is at a quality suitable to use in performing heads up digitizing of natural features such as lakes, rivers, roads and other aspects of infrastructure in the Nantahala area. The image data will eventually be incorporated as a back drop for the GIS data to a degree sufficient to view all amenities that are along the shorelines of the Nantahala lakes, i.e. private piers, commercial facilities, transmission lines, distribution lines, communication lines, environmental areas, etc. PROJECT NECESSITY Nantahala Power and Light, a division of Duke Energy Corporation is the licensee for the Nantahala Hydroelectric Project. The projects are licensed by the Federal Energy Regulatory Commission (FERC) as Project 2694 (Queens Creek), Project 2692 (Nantahala), 2601 (Bryson), 2602 (Dillsboro), 2603 (Franklin), 2619 (Mission), West Fork (2686), East Fork (2698). This work is being performed to support development of the GIS database to support ongoing activities to meet the FERC requirements at the Nantahala projects. There is an immediate need to gather the aerial data in February 2001 because there is an interest to gather the data with the larger lakes drawn down approximately 20 feet. Historically, the lakes start filling up due to seasonal rains in February. Consultant is requested to arrange schedule with communication from Duke personnel to collect photography in manner to meet the time frame requirements at the optimum depth levels. The data will eventually need to be passed on to a GIS consultant hired by Duke Power to begin the process of developing the full GIS database. SCOPE OF WORK FOR CONSULTANT This section provides a summary of expectations to be completed to acquire the digital aerial photography in preparation to use the data for developing a GIS database for the Nantahala Projects. SCOPE: 1. Utilize the attached USGS 1:24000 North Carolina Quad Maps to locate the area Duke Power is requesting to be flown. The areas are outlined in red ink on the maps. The following North Carolina Quad Maps are included: Peachtree, Topton, Hewitt, Bryson City, Whittier, Greens Creek, Sylva South, Tuckasegee, Glenville, Big Ridge, Lake Toxaway, Franklin, and Corbin Knob. This will cover areas for lake and riverine areas known as Mission, Nantahala, Queens Creek, Bryson, Dillsboro, Franklin, Thorp, Tuckasegee, Cedar Cliff, Bear Cliff, Wolf Creek and Tennessee Creek. Duke Power Lake Management personnel shall be provided opportunity to critique flight lines prior to collection of data to certify the coverage area is accurate.

2. Plans should be coordinated to collect the data near the beginning of February. The primary idea is to collect the data when Lake Nantahala and Lake Glenville are in the 20 foot drawdown range. This criteria is not applicable to the other lakes that are to be flown. Consultant should include in the cost a separate breakout to collect the data a second time for Nantahala Lake and Thorp Lake when they approach the 10 foot drawdown. The time period for these conditions can be predicted but it is difficult to say exactly what day they will occur due to weather conditions. The 20 foot drawdown range at Nantahala Lake is expected to occur near the first of February so that is the time frame Emerge should plan to collect the first pass. 3. GIS Projection shall be North Carolina Stateplane Nad 83 in feet. Data is requested to be wide area mosaic 3'GSD imagery. This is same as that collected for the Duke Power Catawba/Wateree system. 4. After the area is flown and data is processed the data shall be delivered on CDROM in TIFF format to Duke Power or a designated GIS consultant vendor to be determined in the future. 5. Duke Power, plus any other division of Duke Energy reserves the right to share the data in digital or hard copy format between internal divisions in the day to day business of the corporation as deemed necessary. TERMS: 1. Consultant shall assume responsibility for meeting all dates as requested. 2. Project is dependent on approval of quotation of fees and signing of contract between consultant and Duke Energy. 3. In the future it is probable that Duke Power or other parties involved with Duke Power on Nantahala projects may request additional copies of the aerial data. Upon such request it is expected that consultant will make copies of the data as requested in return for a nominal fee.