MODULE 2 RULES RELATING RULES RELA



Similar documents
Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Stormwater Design Guidelines Frequently Asked Questions:

Storm Water Management Requirements for Construction Projects Less than One Acre

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Costs for Green Infrastructure and Stormwater Retention Practices

10/4/ slide sample of Presentation. Key Principles to Current Stormwater Management

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007

Low Impact Development Checklist

VEHICLE SERVICE FACILITIES. Best Management Practices

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

CONSTRUCTION PERMIT SUBMITTAL CHECKLIST

SE-10 STORM DRAIN INLET PROTECTION. Objectives

Selection of Stormwater Treatment Facilities For Maximum Extent Practicable Treatment Effectiveness in Compliance with NPDES Provision C.

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

Stormwater Credit Open House Q&A

City of Beverly Hills Construction Stormwater Requirement Checklist

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures

DRAINAGE SERVICE CHARGES

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Permeable Paving System with StormAbsorb Technology

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

SECTION A: LOCAL STORM WATER POLLUTION PREVENTION PLAN

CHAPTER 15 MUNICIPAL SEPARATE STORM SEWER SYSTEM PROGRAM REQUIREMENTS

Costs for Green Infrastructure and Stormwater Controls

City of Shelbyville Site Inspection Checklist

Activity Yes No N/A Notes

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Underground Injection Control Storm Water Information

Storm Drain Inlet Protection

CASFM Stormwater Quality Field Trip June 23rd, 2011

How To Amend A Stormwater Ordinance

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS

Guidelines for. Permeable Pavement

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Operation & Maintenance Document Templates

Storm Drainage Systems

BEST MANAGEMENT PRACTICES (BMPs)... What are They? GOOD HOUSEKEEPING PRACTICES Your Business Should Employ

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

12-O-1761 A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE

GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT

Exhibit A-7.III. Water Quality Management Plan (WQMP) Checklist

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

FOOD SERVICE FACILITIES Best Management Practices Stormwater Management Program City of Bluff City P.O. Box 70, Bluff City, TN

URBAN DRAINAGE CRITERIA

Waste Handling & Disposal

Spill Prevention, Control & Cleanup SC-11

Post-Construction Storm Water Management Program: Planning, Design, Construction, and Operation. Presenters:

Post Construction Stormwater Management Checklist Program

Green Infrastructure for Single Family Residences

Good Housekeeping Practices for DPW/Fleet Maintenance Facilities

Computing Stormwater Runoff Rates and Volumes

Storm Drain Inlet Protection

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs. Tom Schueler Chesapeake Stormwater Network

CITY OF ESCONDIDO SUSMP Standard Urban Stormwater Mitigation Plan Requirements for Development Projects

Planning, Health and Environment Division

Appendix A: BMP Fact Sheets

Operations and Maintenance

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A Developer s Guide: Watershed-Wise Development


Updates on Pervious Pavement Design and Construction. Jason T. Peterein, P.E. June 19, 2012

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STORMWATER MANAGEMENT PLAN PREPARATION GUIDANCE. Revised 4/2011. Contact information

Storm Drain System Operation and Maintenance

Storm Water Permanent Best Management Practices Manual

City of West Linn Public Works Design Standards Table of Contents

Table 4.9 Storm Drain Inlet Protetion Applicable for

Suffolk County Department of Health Services. Division of Environmental Quality

STORMWATER MANAGEMENT CHECKLIST

City of Douglas Commercial Building Permit Site Application

User s Manual for the BMPTRAINS Model

Chesapeake Bay Preservation Ordinance Waiver and Exception Process Guidance for Activities in the Resource Protection Area (RPA)

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

BMP #: Dry Wells / French Drains

AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers

Low Impact Development

Recommendations for future developments

COUNTY OF SAN DIEGO STORMWATER STANDARDS MANUAL

Individual Residential Property Credit

PRELIMINARY PROJECT REVIEW PROCESS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

Transcription:

MODULE 2 RULES RELATING TO STORM DRAINAGE STANDARDS

MODULE 2 RULES RELATING TO STORM DRAINAGE STANDARDS 1

RULES RELATING TO STORM DRAINAGE STANDARDS Sections that underwent revision 1-11 PURPOSE 1-2 MODIFICATIONS 1-3 DEFINITIONS 1-4 SECTION I STANDARDS FOR FLOOD CONTROL 1-5 SECTION II STORM WATER QUALITY 1-6 REPEAL 2

1 1, 1, PURPOSE These Rules address requirements for both storm runoff quantities for flood control as well as storm runoff quality and reflect the most recent changes to Federal, State, and County requirements related to the quality of storm water discharges. By establishing criteria to address water quality, the City and County of Honolulul is satisfyinging Federal Regulatory requirements to control the discharge of pollutants in storm water as specified in the Clean Water Act as amended by the Water Quality Act of 1987. These standards are not intended to limit the initiative and resourcefulness fl of the engineer in developing drainage plans, or be viewed as maximum limits in design criteria. More stringent criteria should be used where reasonable. 3

1 2, MODIFICATIONS A. The Director may modify provisions of these rules whenever: 1. The land to be developed is of such asize and shape or is affected by location or geological or topographical conditions, or is devoted to such uses that it is impractical or not economically achievable in the particular case to conform fully to these rules. was changed to: A. The Director may modify provisions of these rules whenever: 1. Full conformance to these rules is not achievable because of the size and shape, location or geological or topographical conditions, i or land uses. 4

1 3, DEFINITIONS Terms Added Biofiltration Disturbed Area Evapotranspiration Impervious Surface Infiltration Low Impact Development New Development Site Design Strategies Source Control BMPs Treatment Control BMPs Terms Revised Redevelopment 5

DISTURBED AREA The area of the project that is expected to undergo any disturbance, including, but not limited to excavation, grading, clearing, demolition, uprooting of vegetation, equipment staging, and storage 6

DISTURBED AREA Areas not considered to be Disturbed Areas which are cleared, graded, and/or excavated for the sole purpose of landscape renovation Areas which are cleared, graded, and/or excavated for the sole purpose of growing gcrops www.hagstromreport.com 7

IMPERVIOUS SURFACE A surface covering or pavement of adeveloped parcel of land that prevents the land s natural ability to absorb and infiltrate rainfall/ storm water, including rooftops; walkways; patios; driveways; parking lots; storage areas; impervious concrete and asphalt; and any other continuous watertight pavement or covering

NEW DEVELOPMENT Land disturbing activities; structural development, including construction or installation of a building or structure, the creation of impervious surfaces; and land subdivision

SOURCE CONTROL Low technology practices designed dto prevent pollutants from contacting storm water runoff and/or prevent discharge of contaminated runoff to the MS4 Stenciling storm drain inlets Grading dumpster, fueling, and storage areas to prevent run on & runoff Using dumpsters with lids Paving high risk areas with concrete instead of asphalt Covering fueling and storage areas Gas station, Kapolei, HI 10

SOURCE CONTROL Approved Source Control BMPs Landscaped areas Auto. irrigation systems Storm drain inlets Loading docks Parking areas Vhil/ Vehicle/equipmenti repair Vehicle/equipment fueling Vehicle/equipment washing/cleaning Outdoor trash storage Outdoor material storage Outdoor work areas Outdoor process equip. operations Details for each are provided in Chapter 2 of the City s Storm Water BMP Guide 11

SOURCE CONTROL Vehicle/Equipment Fueling Cover with a roof or canopy Pave with Portland Cement Concrete Use fuel ldispensing nozzles with automatic shutoffs Post signs warning against "topping off" of fuel tanks 12

SOURCE CONTROL Loading Docks Cover allareas, areas, ordesign them to preclude run on and runoff. Do not allow runoff from depressed loading docks (truck wells) to discharge into storm drains. Grade to a drain that is connected to a dead end. Pave with concrete instead of asphalt. hlt 13

SOURCE CONTROL Outdoor Material Storage Place materialsin in an enclosure to prevent contact with runoff Slope the storage area towards a deadend sump Direct runoff from downspouts/roofs away from storage areas Cover the storage area with an awning 14

SOURCE CONTROL Outdoor Work Areas Create an impermeable surface or use a metal drip pan Cover the area with a roof to prevent run on Berm around the area perimeter to prevent run on from adjacent areas Locate the work area away from storm drains or catch basins 15

REDEVELOPMENT Development that would create or add impervious surface area on an already developed site, including expansion of a building footprint; addition to or replacement of a structure; replacement of an impervious surface that is not part of a routine maintenance activity; it and land disturbing activities iti related to structural t or impervious surfaces

REDEVELOPMENT Activities not considered to be Redevelopment Routine maintenance activities to maintain original hydraulic capacity Routine maintenance activities to maintain original purpose of facility Emergency redevelopment activity required to protect public health and safety Impervious surface replacement, such as parking lot and roadway reconstruction, which does not disturb additional area Repaving of existing roads 17

Revised dsubsections 1 5.1, PART I WATER QUALITY CRITERIA 1 5.1.B.1, Development & Redevelopment Included 1 5.1.B.3,, Project Applicability 1 5.1.B.6, Management Practices to Meet Criteria 1 5.1.B.10, Storm Water Quality Facilities Review 1 5.1.B.11, 51B11 Maintenance Deleted Subsections 1 5.1.C, 51C Detention Based WQ Control 1 5.1.D, Flow Through Based WQ Control 1 5.1.E, Detention Combined with Flow Through Treatment 1 5.1.F, Flow Through Upstream of Detention Treatment New Subsections 1 5.1.B.2, Regulated Projects 18

1 5.1.B.1, DEVELOPMENT AND REDEVELOPMENT INCLUDED What the Rules now specify Rules apply to all projects as defined in 1 5 5.1.B.2 BMP sizing requirements apply to all new development projects that disturb at least 1 acre during construction BMP sizing requirements apply to all redevelopment projects that t disturb at least t1 acre during construction Rules only apply to the addition of the redevelopment 19

1 5.1.B.2, REGULATED PROJECTS Projects are classified as follows: Priority A1 Description Disturb 5 acres of land during construction A2 B Disturb 1 5 acres of land during construction Disturb < 1 acre during construction, create at least 10,000 sq ft of total impervious surface, and is a Retail Gas Station, Auto Repair Shop, Restaurant, or Parking Lot 20

1 5.1.B.3, PROJECT APPLICABILITY What the Rules now specify The Director may exempt projects from the application of these rules if projects are determined to have submitted substantially completed construction drawings and substantially completed site specific drainage reports prior to June 1, 2013. 21

1 5.1.B.6, MANAGEMENT PRACTICES TO MEET CRITERIA What the Rules used to specify Post Construction Treatment Control BMPs BMP at owner s discretion What the Rules now specify Combination of multiple management practices based on the project s Priority BMP at owner s discretion (partially) 22

1 5.1.B.6, MANAGEMENT PRACTICES TO MEET CRITERIA Priority A1 Projects (disturb 5 acres) All applicable Site Design Strategies All applicable Source Control BMPs Unless infeasible, retain with LID Retention BMPs, the Water Quality Volume (WQV) Unless infeasible, biofilter with LID Biofiltration BMPs, any portion of the WQV not retained Alternative Compliance if WQV is not retained or biofiltered 23

1 5.1.B.6, MANAGEMENT PRACTICES TO MEET CRITERIA Priority A2 Projects (disturb 1 5 acres) All applicable Site Design Strategies All applicable Source Control BMPs Unless infeasible, retention or biofiltration of WQV Alternative Compliance if WQV is not retained or biofiltered Priority i B Projects Consider implementing LID Site Design Strategies All applicable Source Control BMPs 24

1 5.1.B.6, MANAGEMENT PRACTICES TO MEET CRITERIA 1 5.1.B.6 references some other new terms: Water Quality Volume Infeasible Alternative Compliance 25

WATER QUALITY VOLUME Water Quality Volume (WQV) Volume of runoff generated by a pre determined precipitation event (the Water Quality Design Storm, or WQDS) that must be managed for water quality The City selected 1 inch as the WQDS WQDS at Oahu Federal Facilities 26

INFEASIBILITY How is Infeasibility Determined? Pre established criteria for all Retention and Biofiltration BMPs Based on a review and analysis of other municipalities and state/federal agencies Exemption from a specific LID BMP may be claimed if at least one criterion for the BMP is met Applicant may propose for City approval a criterion not listed 27

ALTERNATIVE COMPLIANCE Alternative Compliance Options 1. Either Harvest/Reuse or Treat on site with non LID BMPs, any portion of the WQV that is not retained or biofiltered Detention Basin Sand Filter Manufactured Treatment Device 2. Retain or biofilter at an offsite location, the volume of runoff equivalent to the portion of the WQV that was not retained and/or biofiltered on site Proposed location must be approved by City Applicant responsible for all costs, including maintenance 28

1 5.1.B.10, STORM WATER QUALITY FACILITIES REVIEW What the Rules now specify SWQR (Storm Water Quality Report) required for Priority A1 Projects A SWQR presents a project s storm water quality issues and storm water quality management strategy, in a standard report format SWQC (Storm Water Quality Checklist) required for Priority A2 & Priority B Projects A SWQC presents a project s storm water quality management strategy, in a simple checklist format 29

1 5.1.B.10, STORM WATER QUALITY FACILITIES REVIEW SWQR & SWQC Specifics Signed by Owner & Licensed Architect/Engineer Submittal Requirements SWQR (Priority A1) SWQC (Priority A2) Construction Plan Approvals Building Permit Applications SWQC (Priority B) WQ management strategy t must be included din Master Plan, Discretionary Land Use Permit, or EA/EIS More details in Module 3 30

1 5.1.B.11, MAINTENANCE What the Rules now specify Mit Maintenance dtil details specified in SWQR/SWQC, as applicable Treatment Control BMPs must be maintained regularly l and inspected annually prior to rainy season Maintenance Activity Log must be kept for 5 yrs 31

1 5.2, PART II WATER QUALITY DESIGN STANDARDS Subsections A D replaced in their entirety with: 1 5.2.A 2 Volume Based Storm Water Quality Control Facilities i 1 5.2.B Flow Based Storm Water Quality Control Facilities 1 5.2.C Area Based Storm Water Quality Control Facilities 1 5.2.D Demand Based Storm Water Quality Control Facilities 32

1 5.2.A, VOLUME BASED STORM WATER QUALITY CONTROL FACILITIES Vl Volume based dbmps shall hllbe sized dfor the WQV: WQV = PCA x 3630 Where: WQV = water quality volume (cubic feet) P = WQDS runoff depth (inches) = 1 inch C = volumetric runoff coefficient (unitless) A = drainage area (acres) The volumetric runoff coefficient is calculated by: C = 0.05 + 0.009I Where: C = volumetric runoff coefficient I = % impervious io cover, expressed as a percentage Infiltration Basin Infiltration Trench Subsurface Infiltration Dry Well Bioretention Basin Permeable Pavement Green Roof Vegetated Bio Filter Enhanced Swale Tree Box Filter Detention Basin Sand Filter 33

1 5.2.B, FLOW BASED STORM WATER QUALITY CONTROL FACILITIES Flow through h based BMPs shall llbe sized for the WQF: WQF = CiA Where: WQF = water quality flow rate (cubic feet per second) C = runoff coefficient (unitless) i = peak rainfall intensity (inches per hour) A = total drainage area (acres) A Peak rainfall intensity of 0.4 in/hr shall be used For drainage areas containing multiple land uses, a composite weighted runoff coefficient should be used. Vegetated Swale Vegetated Buffer Strip Tree Box Filter Manufactured Treatment Device 34

1 5.2.C, AREA BASED STORM WATER QUALITY CONTROL FACILITIES Area based BMPs shall be sized such that: The size of the vegetated area receiving the roof runoff is at least 10% of the size of the roof area that drains to the downspout or The flow path of the vegetated area receiving the roof runoff is at least as long as the flow path of the roof area that drains to the downspout Downspout Disconnection 35

1 5.2.D, DEMAND BASED STORM WATER QUALITY CONTROL FACILITIES Demand based BMPs shall be sized such that: At least 80% of the total annual runoff is captured and At least 80% of the total annual reuse demand is met Harvesting / Reuse 36

RULES RELATING TO STORM DRAINAGE STANDARDS Module Summary 37

SUMMARY PROJECTS SUBJECT TO RULES Priority A1 Description Disturb 5 acres of land during construction A2 B Disturb 1 5 acres of land during construction Disturb < 1 acre during construction, create at least10 10,000000 sq ft of total impervious surface, and is a Retail Gas Station, Auto Repair Shop, Restaurant, or Parking Lot 38

SUMMARY STORM WATER MANAGEMENT REQUIREMENTS Priority A1 LID SITE DESIGN SOURCE CONTROL Priority A2 LID SITE DESIGN SOURCE CONTROL RETENTION Is WQV retained on site? YES DONE NO NO Is it infeasible to retain WQV? YES BIOFILTRATION RETENTION/BIOFILTRATION Is WQV retained or biofiltered? YES DONE Is WQV retained or biofiltered? YES DONE NO NO NO is it infeasible to retain or biofilter WQV? YES ALTERNATIVE COMPLIANCE NO is it infeasible to retain or biofilter WQV? YES ALTERNATIVE COMPLIANCE 39

SUMMARY STORM WATER MANAGEMENT REQUIREMENTS Priority B CONSIDER LID SITE DESIGN SOURCE CONTROL DONE 40

SUMMARY DOCUMENTATION REQUIREMENTS Submittal Requirements Priority Document Building Const. Plan Permit Apps. Approvals A1 SWQR A2 SWQC B SWQC 41

SUMMARY MAINTENANCE REQUIREMENTS Maintenance activities and responsibility specified in SWQR/SWQC, as applicable Treatment Control BMPs must be maintained regularly and inspected annually prior to rainy season (November 1) Maintenance Activity Log must be kept on file for 5 yrs 42

SUMMARY WATER QUALITY DESIGN STANDARDS BMP Sizing Criteria BMP Type Volume Based Sizing Criteria WQV with rainfall depth of 1 inch Flow Based Area Based Demand Based WQF with rainfall intensity of 0.4 in/hr 10% of contributing area or 100% of contributing flow path 80% of total annual runoff is captured and 80% of total annual reuse demand is met 43

RULES RELATING TO STORM DRAINAGE STANDARDS End of Module 2 44