CONSTRUCTION PERMIT SUBMITTAL CHECKLIST

Similar documents
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE


STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

Activity Yes No N/A Notes

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

C. Storm Water Pollution Prevention Plan (SWPPP) Yes No Response / Comment. D. Good Site Management Housekeeping Yes No Response / Comment

City of Shelbyville Site Inspection Checklist

Low Impact Development Checklist

STATEMENT OF ACKNOWLEDGMENT

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

MONTANA Water Quality & Storm Water Management Training Programs For Construction Activities

Exhibit A-7.III. Water Quality Management Plan (WQMP) Checklist

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

TCEQ TPDES CGP EPA NPDES GCP Inspection of Controls Report

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY

Storm Water Management Requirements for Construction Projects Less than One Acre

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

State of Florida. Department of Environmental Protection. Generic Permit. For. Stormwater Discharge from Large and Small Construction Activities

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

SECTION A: LOCAL STORM WATER POLLUTION PREVENTION PLAN

SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

City of Beverly Hills Construction Stormwater Requirement Checklist

Best Management Practices (BMPs) Ideas for School Districts. Presented by: Donald Lussier

MODULE 2 RULES RELATING RULES RELA

III. Relying on another Governmental Entity

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

Storm Drain System Operation and Maintenance

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

GENESEE COUNTY DRAIN COMMISSIONER S OFFICE

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

How To Get A Stormwater Discharge Permit In A City Of Scottsdale

SE-10 STORM DRAIN INLET PROTECTION. Objectives

Standard Operating Procedures Storm Drain System Maintenance

Construction Site Inspection. Inspecting to Keep You in Compliance

Homeowner s Guide to Drainage

Construction Site Monitoring Program Guidance Manual

SAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:

Waste Handling & Disposal

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

Storm Drain Inlet Protection

Storm Drain Inlet Protection

Post Construction Stormwater Management Checklist Program

CHAPTER 10 POLLUTION PREVENTION PLAN

STORMWATER MANAGEMENT CHECKLIST

City of San Diego Urban Runoff Management Program. Appendix XI. Minimum BMPs for Mobile Businesses

Definition of Tower from the Bradley County Zoning Resolution

PRELIMINARY PROJECT REVIEW PROCESS

City of Valdosta Land Development Regulations. Table of Contents

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

Warren County MS4 Stormwater Management Program Plan

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

CHAPTER MUNICIPAL SEPARATE STORM SEWER SYSTEMS

Operations and Maintenance

Annual Standards and Specifications. Erosion and Sediment Control

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Post Construction and Redevelopment Inspection Manual

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

URBAN DRAINAGE CRITERIA

BUSINESS INSPECTION PROGRAM

Appendix G: Model Stormwater Ordinance and Performance Standards

Post Construction Stormwater Management Inspection & Maintenance PROGRAM MANUAL

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STORMWATER MANAGEMENT PLAN PREPARATION GUIDANCE. Revised 4/2011. Contact information

Clear Water Projects in Cooksville Creek Watershed

Outlet stabilization structure

E&SC Training & Certification

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

BEST MANAGEMENT PRACTICES (BMPs)... What are They? GOOD HOUSEKEEPING PRACTICES Your Business Should Employ

APPENDIX I DEVELOPMENT PROCESS CHECKLIST

Table 4.9 Storm Drain Inlet Protetion Applicable for

CHAPTER 15 MUNICIPAL SEPARATE STORM SEWER SYSTEM PROGRAM REQUIREMENTS

Best Management Practices Fats, Oils, & Grease

PLANNED DEVELOPMENT PERMIT

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

SECTION 5 DRAFTING STANDARDS

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL

APPENDIX A: STORMWATER MANAGEMENT CHECKLIST

Developing Your Stormwater Pollution Prevention Plan A Guide for Construction Sites

SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION

Concrete Waste Management

Transcription:

LAS VEGAS VALLEY STORMWATER QUALITY MANAGEMENT PROGRAM CONSTRUCTION PERMIT SUBMITTAL CHECKLIST (Applies to all Grading Site Development Building and Encroachment Permits and plans including Final Parcel Subdivision Site Drainage and Erosion and Sediment Control Plans) Owner / Operator (applicant) Information Name: Phone: Address: City: State: Zip Code: Project Name: Project Address/Location: Signature: Date: Total planned area of land disturbance = permit application). acres (should match grading If the area of land disturbance is one acre or more the applicant must submit a copy of their Notice of Intent (NOI) to Nevada Division of Environmental Protection (NDEP) to be regulated under Stormwater General Permit NVR100000 and submit a copy of the receipt for payment of the annual fee or the letter of authorization from NDEP (address attached). Once payment has been received by NDEP the applicant is immediately covered under the State s permit. 1. Copy of NOI attached 2. Copy of receipt or letter of authorization from NDEP attached By submitting a copy of the NOI and the receipt or authorization from NDEP the applicant acknowledges that they are aware of the requirements set forth in the State s General Permit and have developed and will implement a site specific Stormwater Pollution Prevention Plan (SWPPP). The applicant further acknowledges that they are aware of the Las Vegas Valley Construction Site BMP Guidance Manual and the required performance standards set forth in Section 3.2 of the manual. To ensure compliance with these performance standards the applicant shall submit a completed Performance Standards Compliance Checklist indicating the BMPs that implement standards 1 12. It is recommended that the applicant also attach a copy of the checklist to their SWPPP.

Copy of Performance Standards Compliance Checklist attached Yes No Were calculations required for sizing of diversion channels and/or sediment retention basins? If the answer is yes pursuant to NRS 625.565 a Nevada Registered Professional Engineer must review and stamp plans such as grading plans and reports that require engineering calculations. In addition to the submittal requirements specified above and in the ordinances the following shall be included as a set of standard notes to be depicted on all site plans that disturb one acre or larger. Standard notes from Section 3.5 of the Las Vegas Valley Construction Site BMP Guidance Manual on design plans Nevada Division of Environmental Protection Bureau of Water Pollution Control 901 South Stewart Street Suite 4001 Carson City NV 89701-5249 Phone: (775) 687-9429 Fax: (775) 687-4684 Web: http://ndep.nv.gov/bwpc/index.htm

LAS VEGAS VALLEY STORMWATER QUALITY MANAGEMENT PROGRAM PERFORMANCE STANDARDS COMPLIANCE CHECKLIST The checklist that follows identifies the BMPs that can be used at construction sites to meet each of the Performance Standards of the Las Vegas Valley Construction Site BMP Guidance Manual (BMP Guidance Manual). You must select at least one BMP for each performance standard to meet the minimum requirements. Please refer to the BMP Guidance Manual to assist you in selecting BMPs for your site. It is the responsibility of the person who fills out this checklist to ensure that the BMPs selected are included in the contract bid documents and implemented at the site. If your project or site has characteristics that make meeting a performance standard infeasible or inapplicable (e.g. size of site slope of site) please explain these characteristics at the bottom of the form. Owner / Operator (applicant) and Project Information Name: Address: Phone: City: State: Zip Code: Project Name: Project Address/Location: Signature: Date:! " # $ % ) ) ## # # "! #- #!! # " ##. /. 0 #- #

1 2 2 0 3 #- # $. /. 1. 4! 0 # * 5 + 5!. ) 0 /. 1. -! 0! 4! 0 * " 6 ' ' 71 ' " 6 5 ' #" 5 6 5 % 8 #9 5 : 4 #1 ) # #+ " ) ; # (#; < / 8 +" 2! ( - / 8 < 2 / 8 1! = / 8 #>! >! / 8 < 2 % )! " ) # Explanation why performance standard(s) cannot be met:

LAS VEGAS VALLEY STORMWATER QUALITY MANAGEMENT PROGRAM CONSTRUCTION SITE INSPECTION CHECKLIST The contractor or other responsible party shall inspect the site at a minimum weekly and within 24 hours after a storm event of 0.5 inches or greater. The owner/operator may use their own construction site inspection checklist however it must contain at a minimum the information required by this checklist. Inspection checklists shall be maintained onsite for review by State and local government inspectors. Project Name and File Number: Project Location: Date: Inspected by: (Name and Company) Type of Inspection: Routine Post-Storm Other Yes No N/A 1. Is there evidence of pollutant discharge from the property? 2. Are roadways storm drains watercourses or swales or channels leading offsite free of sedimentation litter wastes and hazardous materials? 3. Are all material and equipment storage and maintenance areas reasonably clean and free of spills leaks or other sources of potentially polluting materials? 4. Are materials and waste managed adequately to minimize potential to impact the environment? 5. Are all the necessary BMPs installed functioning properly and adequately maintained If you answered YES to Question 1 or NO to Questions 2-5 describe any corrective actions that must be taken to remedy the problem and when the corrective action is to be taken. Attach additional sheets as needed. Checklist Item Corrective Action Needed Date to be Completed