Appendix E. Potential Funding Sources



Similar documents
Harlem River Bridges Access Plan

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

DESIGN ASSISTANCE APPLICATION

CITY COUNCIL WORKSHOP MAY 24, 2016

BIKEWAY TYPOLOGIES COMPLETE STREETS WORKSHOP JULY John Cock, Principal/Planner Alta Planning + Design

Lincoln Downtown Master Plan Update

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

Executive Summary. Transportation Needs CHAPTER. Existing Conditions

Maryland Invests $845 Million in New Highway and Bridge Projects

For more information, visit: rethinkingstreets.com

Is Encouraging More Bike Ridership On El Camino Real A Good Idea?

N Street Protected Bikeway

VDOT Project Advertisements from 4/1/13-6/30/14 (by advertisement)

Proposed Program of High Capacity Transit Improvements City of Atlanta DRAFT


Light Rail Transit in Phoenix

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

TABLE 2 FDOT ADOPTED WORK PROGRAM - ORANGE COUNTY PROJECTS FOR FISCAL YEARS 2014/ /19

Pavement Management Program

CITY OF BLOOMINGTON,109 E OLIVE ST BLOOMINGTON IL CITY OF BLOOMINGTON,109 E OLIVE ST BLOOMINGTON IL 61701

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

REST HOME & ASSISTED LIVING CABARRUS COUNTY

VERTICAL SPEED CONTROL DEVICES

Bremerton Non-Motorized Transportation Plan Parametrix

CITY OF BRAMPTON STREET CORRIDOR MASTER PLAN

2015 STATE OF THE URBAN TRAILS. Accomplishments, Active Projects, and Next Steps

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements

June 2013 Multifamily Market Rent Study PREPARED BY:

In 2005, the City of Pasadena, CA, USA, with the support of consultants,

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

Assessing Paved Trails for Compliance with Standards and Best Practices

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

Dallas-Fort Worth Area Major Transportation Projects

Indianapolis SDAT. Neighborhood Restoration

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

Clean, Green, Fun! Cady Way. Trail

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014

STATUS. DESCRIPTION New Road Construction 6 to 8 lanes Flexible Pavement Reconstruction CST 2016/17 CST 2014/15. Resurfacing CST 2014/15

Pavement Management Program

Holyoke Public Schools Bus Routes

28.0 Development Permit Area #2 (Neighbourhood District)

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)

STREETS -- BICYCLES -- PATHS

General Obligation Bond Projects FYE

MID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, TIP Public Review Meeting

TROUP COUNTY. Multi-Modal Transportation Study MULTI-MODAL TRANSPORTATION PLAN REPORT. November 2006 PREPARED FOR

CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND)

DISTRICT LOCATION ADDRESS St Pete Warehouse th St N Davenport Warehouse 220 Dean Still Rd

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program

Chicago Neighborhoods 2015: Assets, Plans and Trends A project of The Chicago Community Trust

REGIONAL NON-MOTORIZED TRANSPORTATION NETWORK

Update on Previous Related Transportation Enhancement Grants

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM

Downtown Tampa Transportation Vision

Needs Analysis. Long Beach Bicycle Master Plan. Bicycle Commuter Needs. LONG BEACH BICYCLE MASTER PLAN Needs Analysis

WELCOME. Hillside Village is a 615,000 sf mixed-use open-air. retail destination located less than 20 minutes from

Florida Avenue Multimodal Transportation Study. June 19, 2013

The Trust for Public Land CREATING PARKS FOR PEOPLE CONNECTING CLEVELAND THROUGH PARKS AND TRAILS

Overview of Transportation Planning

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013

DRAFT. Light Rail Corridor Shared-Use Path Study. September Prepared for: Prepared by:

Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016

Chapter BICYCLES

FY 2009 Economic Stimulus List

S a i n [ t C l o u d M L S A r e a s

New Jersey SRTS Travel Plan Guide

Oregon Health Leadership Council Low Back Pain Pilot Participating Physical Therapy Clinics

REQUEST FOR RESPONSE

Federal Funds Obligated in Chittenden County Federal Fiscal Year 2000

Texarkana Bicycle and Pedestrian Master Plan

SAN ANTONIO CATEGORY 7 RECAP FY 2011

GRAND PRAIRIE INDEPENDENT SCHOOL DISTRICT 504 WORKERS COMPENSATION MEDICAL CARE PROGRAM

Transcription:

Appendix E. Potential Funding Sources Intersection Improvements System Development Charges(3) Street User Fees(3) Kingsley St at Hovey Avenue x x x x x Parkside Rd at Hovey Avenue x x x x x Cottage Avenue at Hovey Avenue x x x x x Veterans Parkway at Shepard Rd x x x x x Veterans Parkway at Fort Jesse Rd x x x x x Veterans Pkwy at Parkway Plaza Dr Veterans Parkway at Juniper Dr x x x x x Veterans Parkway at Vernon Avenue x x x x x Constitution Trail (north/south segment) Rdway crossings x x x x x * Funds shared use path component of project only Normal Bicycle and Pedestrian Master Plan 235

APPENDIX E Pedestrian Priority Corridors Street User Fees Main Street/ Kingsley St - south town limits to Raab Rd x x x College Avenue/ Mulberry St - School St to Hershey Rd x x x Towanda Avenue - Jersey Avenue to Raab Rd Raab Rd - Parkside Rd to Towanda Ave Linden Street S. town limits to Northtown Rd Willow Street/ Fort Jesse Rd - Beech Street to Northpointe Dr Airport Rd - Fort Jesse Rd to Raab Rd Hershey Rd - Fort Jesse Rd to Raab Rd x x x x x Shepard Rd - Hershey Rd to Airport Rd Veterans Parkway Vernon Ave to Shepard Rd * Funds shared use path component of project only 236 Normal Bicycle and Pedestrian Master Plan

POTENTIAL FUNDING SOURCES Community-Wide Walkway Improvements Street User Fees Sidewalk infill ADA improvements in parks x x x Crosswalk marking upgrades x x x x x Damaged sidewalk repair/replacement Drainage grate retrofits x x x x ADA-compliant curb ramp upgrades x x x x At-grade railroad crossing upgrades x x x Transit stop upgrades x x x ** Funds shared use path component of project only Normal Bicycle and Pedestrian Master Plan 237

APPENDIX E Bikeway Improvement s Street User Fe Adelaide St X x x x College Ave/ Mulberry St x Gregory St: Parkside to Normal x x x x Cottage Ave x x x Parkside Rd x x x x Bryan St / Dale St/ University St / Virginia Ave / Belt Dr/ Jersey Ave x x x x Grove St x x x Kerrick Rd x x x Northtown Rd x x x x Raab Rd: Constitution Trail to Linden x x x x x Karin Dr/ Centennial Ave / Spear Dr/ Hammitt Dr/ Keller Rd x x x Hovey Avenue/ Beaufort St x x Orlando Ave/ Aurora Wy/ Warren Av/ Heritage Rd/ Regal Dr/ Basswood Ln x x x x White Oak Rd x x x Pheasant Run Creek Trail x x 238 Normal Bicycle and Pedestrian Master Plan

POTENTIAL FUNDING SOURCES Bikeway Improvement s Street User Fe Oakdale Elem Accessway x x x Main St/ Kingsley St x East-West Connector Trail x x Shepard Rd: Greenbriar to Airport x x x x x Hanson Dr x x x Constitution Trail at Vernon Avenue x x Sugar Creek Elem Connector x x x Parkinson St / Dewey St x x x x Brookwood Dr x x x Normal Ave/ Bakewell Ave x x x Fell Ave / North St / School St x x x x x Linden St: Shelbourne to Raab x x x x Linden St: Raab to Northtown x x x x Grandview Dr/ Karin Dr/ Beech St x Hoose Elem campus/ Blair Dr x x x x Normal Bicycle and Pedestrian Master Plan 239

APPENDIX E Bikeway Improvement s Street User Fe Henry Street x x x Towanda Avenue: Vernon to Raab x x x x Towanda Avenue: Raab to I-55 x x x Towanda Avenue at I-55 (Phase 1) x x x x Towanda Avenue at I-55 (Phase 2) x x x x Towanda Avenue: I-55 to Northtown x x x Watkins Dr/ College Hills Mall Loop/ Landmark Dr x x x Susan Dr/ Taft Dr x x x Hershey Rd x x x Airport Rd x x x x x College Avenue: Mitsubishi Motorway to Parkside Rd Raab Rd: Hershey Rd to Normal Community High Locust St/ Old Fort Jesse Rd/ Harter Ln/ George Dr/ Courtland Ave/ Arborwalk Dr/ Parkway Plaza Dr x x x Sycamore St / Linden St / Pine St x x x x 240 Normal Bicycle and Pedestrian Master Plan

POTENTIAL FUNDING SOURCES Bikeway Improvement s Street User Fe Summit St / Shelbourne Dr x x x McKinley Street/ Clay St / Lincoln St / Lincoln Avenue/ Chippewa St x x x x x Mitsubishi Motorway/Mabel Rd x x x Raab Rd: Mabel Rd to Heartland x x x x x Maxwell Park Trail x x Raab Rd: Henry St to Towanda Avenue x x x x Greenbriar Park Trail x x Const. Trail/ Spear Dr Connector x x Route 66 Trail x x x Main Street/Raab Road to Const. Trail ** Funds shared use path component of project only Normal Bicycle and Pedestrian Master Plan 241

APPENDIX E Community-Wide Bikeway Improvements I llinois Bicycle Path Grant Program Street User Fees Bicycle Wayfinding Signage Plan x x x Shared use path pavement upgrades x x x Uptown Normal Bike Oasis x x ** Funds shared use path component of project only 242 Normal Bicycle and Pedestrian Master Plan

Alta Planning + Design 711 SE Grand Avenue Portland, OR 97214 www.altaplanning.com