From RCM to CMMS: How to implement the RCM recommendations in EXP and Maximo. Presented October 14, 2009 Chung Yee Keong



Similar documents
Increase Equipment Uptime Through Robust Enterprise Asset Management. For the Upstream, Midstream & Downstream Sectors of the Oil & Gas Industry

2012 Honeywell Users Group EMEA. Sustain.Ability. Gary Peacock Global Solution Marketing Manager, Asset Management

of The New England Water Works Association

Achieve greater efficiency in asset management by managing all your asset types on a single platform.

Predictive Maintenance

Achieve greater efficiency in asset management by managing all your asset types on a single platform.

ASSET Connect. The next level in Critical Environment Operational Efficiency

IBM Maximo Asset Management solutions for the oil and gas industry

2012 Americas School of Mines

The Leading Reward of Maintenance Management

Asset Management Best Practices

Forklift Fleet and Operator Management: Optimizing Return through Phased Implementation

Asset Management Strategy - Developing the Master Plan

Maximizing return on plant assets

Better-performing Assets Make Companies

BAE Systems streamlines IT services and asset management with IBM Maximo solutions.

XHQ Performance Management. Measure, communicate, evaluate and analyze your operational performance. Answers for energy.

Enterprise Asset Performance Management

Asset Performance Management: Bridging the Gap Between CapEx and OpEx

Asset Management for Green Manufacturing

Achieve greater efficiency in asset management by managing all your asset types on a single platform.

Utilizing Real-Time Information in Enterprise Asset Management Systems

IBM asset management solutions White paper. Using IBM Maximo Asset Management to manage all assets for hospitals and healthcare organizations.

Managing municipal assets for regulatory compliance with PSAB 3150

The Value of Optimization in Asset Management

Overcoming challenges of asset management amid declining federal budgets

SKF Asset Management Services. Your trusted resource for life cycle support and sustainability of physical assets

Changing Metrics and Mindsets in the Warehouse Part Two: Optimizing the ROI of Forklift Fleet Management Through Phased Implementation

2012 Honeywell Users Group Americas. Sustain.Ability. Ron Stallworth Asset Management

Infor Enterprise Asset Management (EAM)

Asset management for local government

The Role of CMMS. A white paper on the selection and implementation of computerized maintenance management systems. Prepared by:

Avantis Enterprise Asset Management Suite

Proactive Asset Management with IIoT and Analytics

Highway Network Management Services State of Qatar Ken Harland, Business Director, Amey Consulting

Real-time asset location visibility improves operational efficiencies

Advansoft ODM PLANT MOBILE DATA MANAGEMENT & DECISION SUPPORT SYSTEM

Advanced Solutions. Uniformance Suite. Real-time Digital Intelligence Through Unified Data, Analytics and Visualization

Industry Solution. Predictive Asset Analytics at Power Utilities

MAINTelligence. Asset Performance Management

Accenture Utilities Podcast Series A perspective on enterprise asset management in the power generation sector

Enabling Data and Analytics. for Enterprise Asset management (EAM) Devang Patel & Arun Narayanan. SEAL Consulting Inc SESSION CODE: EM2098

Over 70,000 RELIABILITY CENTERED MAINTENANCE (RCM2 TM ) TRAINING COURSES

Asset Management Systems Information

SIMATIC IT Historian. Increase your efficiency. SIMATIC IT Historian. Answers for industry.

Overview of EAM Services. A Fully Integrated Global EAM Service Provider

Empowering intelligent utility networks with visibility and control

OpEx Advantages + Asset Optimization

QAD EAM - Maintenance Demonstration Guide. August 4, 2015 EAM 2015

See your business in a new way.

Oracle Enterprise Asset Management

SAP Preventive Maintenance The Core and More. Len Harms - Vesta

ORACLE ENTERPRISE ASSET MANAGEMENT

IBM Software. IBM TRIRIGA: The power of true integration in workplace management solutions

OPTIMIZE ENTERPRISE ASSET MANAGEMENT WITH MOBILE

The Role of Predictive Analytics in Asset Optimization for the Oil and Gas Industry

Smarter Infrastructure Instrumented, Interconnected, Intelligent... Patterns of Innovation

Master big data to optimize the oil and gas lifecycle

CMMS & SCADA. SCADA Intro CMMS Intro. SCADA/CMMS Interfaces Real World Applications

M-Files EAM. Agile Plant Maintenance Solutions

AssetWise Performance Management. APM Installation Prerequisites

ABB Process Automation Service Services that add life to your systems and processes

Balancing Uptime and Working Capital: Maintenance and Inventory Strategies in Mining

The Role of Software in Asset Performance Management

U.S. Department of State, Selects Syclo SMART Mobile Suite For Maximo

Improving production and operation systems with RFID. Taking manufacturing to the next level: RFID Work-in-Process solutions from IBM

PROACTIVE ASSET MANAGEMENT

Getting More from SCADA. Using SCADA software to Enhance Asset Management in an Organization. Presented by B-Scada, Inc.

Collaborative Asset Lifecycle Management and PAM

Maximo Asset Management for the aerospace and defense industry.

Scheduled Maintenance

Steel supply chain transformation challenges Key learnings

Reliability centered maintenance: managing cost and risk

IBM Enterprise Asset Management

USERS CONFERENCE Copyright 2016 OSIsoft, LLC

Delivering operations integrity through better plant safety, availability and compliance across your entire enterprise

MORE THAN DOTS ON A MAP. Optimizing Business Intelligence by Automating Fleet Management MotionLink motionlink.com

Uniformance Asset Sentinel. Advanced Solutions. A real-time sentinel for continuous process performance monitoring and equipment health surveillance

Information Needed for Effective Asset Management

Operations & Maintenance 101 Maintenance Strategies and Work Practices to Reduce Costs

ARMORED TRANSPORT OPTIMIZATION

CENTRALIZED CONTROL CENTERS FOR THE OIL & GAS INDUSTRY A detailed analysis on Business challenges and Technical adoption.

Service Management Foundation

Managing the integrity of pipeline assets

AV-24 Advanced Analytics for Predictive Maintenance

PUB (MPI) 1-62 Reference: Gartner Scorecard

Asset Management 101

Asset Performance Management

Transcription:

From RCM to CMMS: How to implement the RCM recommendations in EXP and Maximo Presented October 14, 2009 Chung Yee Keong

Challenges Today Doing the right minimum work to maximize asset performance Enabling change and sustaining the new processes for continued improvement Enabling the RCM recommendations to be implemented into daily life Capturing and managing all the data You all can add others

Cost of Not Doing the Right Work Type of work Cost Result Reactive/ Deviation Downtime - highest repair $ Too Little Too Late Non-value added Unnecessary parts and labor $ Too Much Too Early Base Work Minimum $ to ensure reliability The Right Work at the Right Time

Cost of Not Doing the Right Work Industry Average Best in Class Reactive / Deviation work Too little, too late 60 % 15 % Non-value added work Too much, too early Base work The Right Work at the Right Time 20 % 20 % 5 % 80 % SMRP: Reactive work takes 3X longer and cost 4 10X more

Traditional View of Failure Assumed most items wear out at about the same age Probability of Failure Age Preventive Maintenance (time based) The PM itself could cause failure

The Reality of Failure There are six failure patterns <20% age related 4% >80% random 7% A - Bathtub 2% D - Rapid increase to random 14% B - Random, ending with wear out zone 5% E - Random Failure 68% C - Slowly increasing to random F - Infant mortality, decreasing to random The majority of failures are random, not age related

Today s Definition of Failure Failure starts here Today s definition of failure Potential Failure Equipment not performing intended function Functionally failed P P-F Interval Equipment Condition F Old definition of failure Equipment broken Time

Today s Definition of Failure Failure starts here Today s definition of failure Potential Failure Functionally failed P P-F Interval The inspection and corrective task must be completed within the P-F P F interval. Equipment Condition F Equipment broken Time

Consolidating Islands of Data CASE STUDIES ABOUT IVARA SOLUTION PROCESS WHY EXP DEMO WORK SMART

Ivara EXP and Asset Performance The Ivara software solution ties it all together Technology Process & Practices People ASSET CONDITION DATA ANY EAM/CMMS Inspection Data Online Data (Data Historian, SCADA) Asset Hierarchy Asset Priority Job Plans Predictive Technologies Work Orders

Strategy Development Set performance targets Prioritize opportunities and risks Analyze assets and develop reliability action plans RCM2 MTA CPR Integration points: Synchronize Ivara asset hierarchy from IBM Maximo (master) Maximo asset priority is updated based on Ivara risk prioritization analysis (consequence priority)

Reliability Program Implementation Rapidly implement Define and manage tasks and data derived from RCM Define alarm points and planned response Collect condition data Integration points Synchronize IBM Maximo Job Plans and Ivara tasks (bi-directional) ASSET CONDITION DATA Inspection Data Online Data (Data Historian, SCADA) Predictive Technologies

Performance Management Shared view of current asset health online in real time Consolidated and automated analysis to make informed decisions, initiate work Manage by exception, priority KPIs ASSET CONDITION DATA Inspection Data Online Data (Data Historian, SCADA) Predictive Technologies

Work Management Make informed decisions in responding to alarms Integration points: Create work orders in IBM Maximo Acknowledgement of an alarm due to a condition being out of normal range Use pre-planned Maximo job plans as the basis for the work triggered. When resulting work is completed (work order is closed in Maximo), the work order is closed in EXP.

EXP / IBM Maximo Integration Maximizes your investment in IBM Maximo by ensuring the right work is executed at the right time to optimize asset performance Standard integration accelerates the deployment of EXP Rapid implementation and value realization through EXP s proactive maintenance process accelerates IBM Maximo time-tovalue Eliminates duplication of effort and inconsistent data through automated synchronization of key data Streamlines IT infrastructures and reduces costly integration efforts

EXP / IBM Maximo Integration Details IBM Maximo is the master for all key asset master data EXP asset risk prioritization (consequence priority number) updates Maximo Asset Priority EXP guides you through the development of RCM and FMEA analyses. The resulting reliability programs reside in EXP. Maximo PM and Job Plans are synchronized with the reliabilty program in EXP Monitor condition in EXP, alarms trigger work orders in Maximo When a maintenance task is initiated, you understand the link back to the cause of failure When resulting work is completed, the close status is returned to EXP to drive important failure statistics

Benefits for IBM Maximo Customers Reduces integration costs, streamlines IT efforts Accelerates the deployment of EXP Enterprise with IBM Maximo Accelerates IBM Maximo time-to-value Ensures informed maintenance decision-making Holistic approach to executing a proactive conditionbased maintenance strategy to optimize asset performance

Details: ArcelorMittal Scottish Power

ArcelorMittal, Dofasco Hamilton DOFASCO HAMILTON METALS STEEL Background / Challenge Globally competitive steel industry Unprecedented growth in China Industry consolidation Rising costs and pricing pressure for steel Fluctuating exchange rates Aging workforce Strategy Implement a proactive equipment reliability process supported by technology (Ivara EXP), new organizational structure, and RCM2 based reliability practices throughout its ten business units Piloted solution on the Galv Line Target of 80 percent asset utilization

ArcelorMittal, Dofasco Hamilton DOFASCO HAMILTON METALS STEEL Results With the Ivara solution, Dofasco s DSG automotive galvanizing line achieved: a 14% improvement in asset utilization resulting in an additional 5600 tons/month Reactive fire-fighter approach to maintenance replaced with a proactive reliability-based maintenance program Now rolling out throughout the Dofasco Hamilton operation, asset by asset. Roles and responsibilities for all positions have been developed and people trained as required

ArcelorMittal: After the Dofasco Acquisition DOFASCO HAMILTON METALS Dofasco Process and Methodology for Asset Manangement adopted by ArcelorMittal Flat Rolled Carbon ArcelorMittal Flat Rolled Carbon USA rolls out Ivara EXP and Dofasco Process and Methodology to 5 integrated steel sites Using RCM, MTA, CPR for Strategy Development Integrated EXP to Tabware (CMMS) Total cost savings to date this year at one site = $2.1 Million + STEEL

Scottish Power ELECTRIC UTILITIES POWER GENERATION Background / Challenge External Factors Energy policy, evolving energy markets, low-carbon economy, security of supply, Process Safety incidents, benchmarking Internal Drivers Strategy Operational excellence, aging assets, plant failures, focus on health and safety, risk management Improve plant performance, reliability & process safety, PAS 55 accreditation Seven work groups containing nineteen projects Leadership of change business leads assigned, governance ensures structured coherent program Adopt Wholesale s award winning project delivery methodology Build on existing core processes /underlying integrated IT platforms Continual cycle of challenge and review

Scottish Power ELECTRIC UTILITIES POWER GENERATION How? CPR / MTA / RCM - to develop the reliability program Ivara EXP to determine actions required Results Identify what information is important Determine collection frequency Implement tools to improve data quality Automatically detect deteriorating performance Integrate processes PAS 55 accreditation (1 st European utility) EXP and handheld devices improved information capture, data quality EXP acts as audit Trail supports Process Safety KPI s Integrated O&M Operator Routes Proactive Maintenance work orders triggered based on asset condition into Maximo Maintenance work planned, scheduled and executed in Maximo

Thank You www.ivara.com

For further information please contact: John Hou, Ph.D. Supply Chain Management EAM Solution Leader Global Business Service, IBM Voice: +886 2 8723-9335 Mobile: +886 912-269-906 Fax: +886 2 2729-1388 Mail: kwhou@tw.ibm.com