Program Hazard Analysis



Similar documents
Brigham Young University is fully accredited by the Northwest Association of Schools and Colleges.

Environmental-Related Risk Assessment

BOY SCOUTS OF AMERICA NATIONAL SHOOTING SPORTS MANUAL

Crosswalk CCNE Standards & 2012 NTF Criteria

University of Paderborn Software Engineering Group II-25. Dr. Holger Giese. University of Paderborn Software Engineering Group. External facilities

Designing an Effective Risk Matrix

Master of Science in Nursing. Learning Outcomes

Integrating System Safety and Software Assurance

identify hazards, analyze or evaluate the risk associated with that hazard, and determine appropriate ways to eliminate or control the hazard.

Help Desk Strategic Plan. Goals

Rifle Shooting Merit Badge Workbook

Mississippi Nursing Degree Programs Accreditation Standards Effective June 1, 2015

Massachusetts Model System for Educator Evaluation

CHAPTER 12 TRANSFER POLICY

LSST Hazard Analysis Plan

ISO 14971: Overview of the standard

APPLICATION HANDBOOK for

STANDARDS FOR ACCREDITATION OF BACCALAUREATE AND GRADUATE NURSING PROGRAMS SUPPLEMENTAL RESOURCE AUGUST 2015

On-Site Risk Management Audit Checklist for Program Level 3 Process

Del Mar College Department of Nurse Education RNSG Clinical Level One Clinical Evaluation Tool

Del Mar College Department of Nurse Education RNSG Level Four Clinical Evaluation Tool

UNIVERSITY OF NEVADA, LAS VEGAS SCHOOL OF NURSING GRADUATE PROGRAMS MSN PROGRAM OUTCOMES NURSE PRACTITIONER TRACKS

BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA

PHARMACY TECHNICIAN TRAINING PROGRAM ACCREDITATION SURVEY REPORT ARKANSAS STATE UNIVERSITY - BEEBE BEEBE, AR. SURVEY DATE: August 29, 2008

BUILDING A BUSINESS GAMES AND TOYS

Massachusetts Department of Elementary and Secondary Education. Professional Development Self- Assessment Guidebook

Standards for Accreditation of. Post-Baccalaureate. Programs

Massachusetts Model System for Educator Evaluation

Process Documentation Located Who Has Responsibility Time/

CNEP 6315 Professional Ethical and Legal Issues. CNEP 6316 Research, Writing and. Publishing in a Multicultural Society Individual Development Plan

NPS Formative Assessment Report Form (Counseling, Psychologists, and Social Workers)

Controlling Risks Risk Assessment

DUAL DIAGNOSIS CAPABILITY IN ADDICTION TREATMENT (DDCAT) VERSION 3.2 RATING SCALE COVER SHEET

How To Manage Risk

(1) Extremely high risk CASCOM Commander, Commandants of Quartermaster, Ordnance or Transportation Schools, and DeCA Commander.

USDA Risk Management Approach. Office of Procurement and Property Management (OPPM) Richard C. Holman (202)

DDCAT Rating Scale Cover Sheet

Risk Assessment / Risk Management Protocol

The MSPA Rubric for Evaluation of School Psychologists

Wittenberg Nursing Program Evaluation Committee Meeting Minutes January 13, 2016 Participants

HQMC 20 Aug 04 E R R A T U M. to MCO B OPERATIONAL RISK MANAGEMENT (ORM)

ELECTRICAL SAFETY RISK ASSESSMENT

3.4.4 Description of risk management plan Unofficial Translation Only the Thai version of the text is legally binding.

INTERNATIONAL STANDARDS FOR THE PROFESSIONAL PRACTICE OF INTERNAL AUDITING (STANDARDS)

Title: Basic Principles of Risk Management for Medical Device Design

INTERNATIONAL STANDARDS FOR THE PROFESSIONAL PRACTICE OF INTERNAL AUDITING (STANDARDS)

BOY SCOUT LEADER QUALIFICATIONS AND RESPONSIBILITIES

Policy on Accreditation of Baccalaureate Degrees (New, First Reading January 2016)

Best Practices Defined:

Health and Safety Management Standards

3.0 Risk Assessment and Analysis Techniques and Tools

INSTITUTIONAL POLICY AND PROCEDURE (IPP) Department: Manual: Section:

Resource to Support ESE Model System Rubric for Specialized Instructional Support Personnel (SISP)

Accreditation Standards Graduate & Post-Graduate Marriage and Family Therapy Training Programs

Date: Rater(s): Time Spent (Hours): Agency Name: Program Name: Address: Contact Person: 1) ; 2) Telephone: ; FAX: ;

GRANTS MANUAL. Updated: March Request for Proposals and Other Materials Available Online at

Keynote 2: What is Landslide Hazard? Inventory Maps, Uncertainty, and an Approach to Meeting Insurance Industry Needs

RISK MANAGEMENT POLICY

Ensuring Quality Online Learning

A System-safety process for by-wire automotive systems

Wittenberg Nursing Curriculum Committee Meeting Minutes January 13, 2016 Participants

APPR SUMMARY. Registered Nurse / School Nurse Teacher

Evaluation Instrument for Accreditation January 1, 2016

University of Nottingham Emergency Procedures and Recovery Policy

Board Approved March 25, 2015 FLSA: EXEMPT DEAN, DISABLED STUDENT PROGRAMS & SERVICES

Headquarters, Department of the Army

MOD 25 HATSAN ARMS COMPANY. Instruction manual. Bedienungsanleitung. Manuel d instruction. Manual de instrucciones. Break barrel air pistol

School Improvement Plan Template for Advanc ED Goals Management

GAO. COMBATING TERRORISM Threat and Risk Assessments Can Help Prioritize and Target Program Investments. Report to Congressional Requesters

Conference Proceedings

HATSAN BREAK BARREL AIR RIFLES

DDCAT. The Dual Diagnosis Capability in Addiction Treatment (DDCAT) Index Toolkit. Adapted for use in the

RISK MANAGEMENT FOR INFRASTRUCTURE

15 FAM 960 SAFETY, OCCUPATIONAL HEALTH, AND ENVIRONMENTAL MANAGEMENT (SHEM) PROGRAM REQUIREMENTS

Healthcare Management Service Organization Accreditation Program (MSOAP)

Evaluation Instrument for Accreditation January 1, 2015

Safety Analysis: FMEA Risk analysis. Lecture 8

Hazard/Incident Recording, Reporting and Investigation

SUPPLIER SELF-ASSESSMENT QUESTIONNAIRE (SAQ):

Business Continuity Position Description

Risk Matrix as a Tool for Risk Assessment in the Chemical Process Industry

How To Know If You Can Treat An Addict

HAZARDOUS MATERIALS MANAGEMENT ISSUE 2

Risk Management. Policy

Civil Air Patrol BASIC LEVEL OPERATIONAL RISK MANAGEMENT

The Team Report: Putting Your Findings in Writing

Complaints Policy. Controlled Document Number: Version Number: 6 Controlled Document Sponsor: Controlled Document Lead: Approved By:

Internal Audit Standards

Civil Air Patrol Guide to Operational Risk Management

Risk Assessment for Medical Devices. Linda Braddon, Ph.D. Bring your medical device to market faster 1

Employee Benefit Plans

DRAFT. NLN CNEA Accreditation: A Mark of Quality and Excellence in Nursing Education

CHAPTER 5. GOALS,OBJECTIVES,POLICIES AND PROGRAMS

Creating a Safe Coaching Environment

COMMISSION ON ACCREDITATION 2014 ANNUAL REPORT ONLINE

Elements of an Effective Health and Safety Program. Health and Safety Program Management Guidelines

REQUIREMENTS OF SAFETY MANAGEMENT SYSTEM

SAFETY and HEALTH MANAGEMENT STANDARDS

Standards for Accreditation of. Baccalaureate and. Nursing Programs

Public Notice: Denial of Accreditation Renewal. July 18, 2014

Transcription:

For New, Modified, or Recognized Activities 10/20/2009 Revision and Update This evaluation process is used to systematically identify, assess, and resolve hazards associated with program activities that support the vision, mission, and goals of the Boy Scouts of America. An analysis should be conducted for new program activities, for modifications to or expansions of existing activities, or for existing program activities with newly recognized hazards.

Purpose This evaluation process is used to systematically identify, assess, and resolve hazards associated with program activities that support the vision, mission, and goals of the Boy Scouts of America. An analysis should be conducted for new program activities, for modifications to or expansions of existing activities, or for existing program activities with newly recognized hazards. Process Define the Program Activities The first step in the analysis process is to clearly, completely, and concisely define the physical and functional characteristics of the program activity to be analyzed. These characteristics should be presented in terms of the activity s equipment and materials, procedures, participants, and environment. Knowledge of how these elements interface with each other is essential to identify all potential hazards associated with the activity. Define the scope of the program activity as clearly and concisely as possible. For example, analyzing expanded use of pellet guns in a Webelos resident camp program is both manageable and an efficient use of resources. Defining the program too broadly can lead to numerous tangential paths that are neither efficient nor effective. For example, Cub Scout pellet gun shooting is too broad a topic. The champion for the program is responsible for defining the scope of the program activity. Identify Hazards The second step in the process is to identify the hazards and determine their causes. Hazards can exist in many forms, including physical hazards such as an element of a facility or equipment design, chemical hazards, human error, and procedural hazards such as operating procedures that allow an action that causes an accident, injury, illness, or significant environmental damages. Any of the five basic methods of hazard identification may be employed. Review data from previous accidents or existing operating experience. Develop a scenario and employ the judgment of experts. Use generic hazard checklists. Employ formal hazard analysis techniques. Examples include failure mode and effects analysis (FEMA), preliminary or operational analysis (PHA, OHA), and fault tree analysis (FTA). Review design data and drawings. In this step, the whole universe of potential hazards must be identified and documented. Leadership should direct a cross-functional team or task force within the council to tackle this part of the process. Combinations of groups from program, management, camping, properties, health and safety, etc., tend to provide the best mix of expertise and operational experience for thorough hazard identification. 680-009 10/20/09 2

Assess the Identified Hazards The third step in the process is to assess the identified hazards in terms of both the severity and consequence of each type of hazard and the probability of its occurrence. A classification system based on MIL-STD 882 system safety program requirements will be used as follows. Hazard Severity Hazard severity provides a qualitative measure of the worst credible result of the hazard. The following identifies the hazard severity categories that are used in this analysis and provides a definition for each. Category Catastrophic Critical Marginal Negligible Program Hazard Analysis Hazard Severity Rating Industry Standard Description I II III IV Death, facility, or system loss or severe environmental damage. Severe injury; severe occupational illness; or major facility, system, or environmental damage. Minor injury, minor occupational illness, minor system or environmental damage. Less than minor injury or occupational illness, or less than system or environmental damage. BSA Relevance Fatal or lifetime impairment, loss of sight or limb. Permanent facility loss. Events with multiple critical incidents. > $1 million financial impact. Temporary impairment requiring rehabilitation and/or lifetime partial impairment, loss of use of but not loss of a limb. Facility not a total loss but must be rebuilt or remediated. Events with multiple marginal incidents. < $1 million > $100,000 financial impact. Injury requires physician to treat a temporary impairment, with complete rehabilitation possible. Sutures, clean fractures, injuries requiring transport to offsite medical facilities. Events with multiple negligible incidents. < $100,000 > $1,000 financial impact. First-aid injuries not requiring medical professional intervention. < $1,000 financial impact. 680-009 10/20/09 3

Hazard Frequency The probability that a hazard will be experienced during the planned life expectancy of the program or system can be estimated in potential occurrences per unit of time, events, population or activity. The following identifies the categories used and the definition of each. Descriptive Word Frequent Probable Occasional Remote Improbable Program Hazard Analysis Hazard Frequency Rating Industry Standards Within Level Specific Individual Items, BSA Relevance Fleets, or Inventories Likely to occur frequently. MTBE * is Expected to occur in a unit, A fewer than 1,000 operating hours. district, council, program, Continuously experienced. or activity. B C D E Will occur several times in the life of an item. MTBE is equal to or greater than 1,000 operating hours and fewer than 100,000 operating hours. Will occur frequently. Likely to occur sometime in the life of an item. MTBE is equal to or greater than 100,000 operating hours and fewer than 1 million operating hours. Will occur several times. Unlikely but possible to occur in the life of item. MTBE is greater than 1 million operating hours and fewer than 100 million operating hours. Unlikely, but can reasonably be expected to occur. So unlikely, it can be assumed occurrence may not be experienced. MTBE is greater than 100 million operating hours. Unlikely to occur, but possible. Will occur in the majority of councils conducting the program. Likely to occur in a couple of councils/the program annually. Might happen once a year within the entire organization/program. Might happen once in the lifetime of the BSA. * Mean time between events 680-009 10/20/09 4

Risk Assessment Once severity and frequency are established for a given hazard, a risk matrix can be used to decide whether to accept the risk or to implement hazard elimination or control measures. Frequency of occurrence Catastrophic (I) Critical (II) Marginal (III) Negligible (IV) Frequent (A) IA IIA IIIA IVA Probable (B) IB IIB IIIB IVB Occasional (C) IC IIC IIIC IVC Remote (D) ID IID IIID IVD Improbable (E) IE IIE IIIE IVE Legend Hazard Risk Index Acceptance Criteria IA, IB, IC, IIA, IIB, IIIA Unacceptable ID, IIC, IID, IIIB, IIIC Undesirable (decision required) IE, IIE, IIID, IIIE, IVA, IVB Acceptable with review IVC, IVD, IVE Acceptable without review After the hazards are evaluated, a resolution plan is developed based on an assessment of the risk associated with each hazard. There are essentially four choices in the hazard resolution process. Unacceptable. For the most serious hazards (those with a rating of IA, IB, IC, IIA, IIB, or IIIA), controlling measures will be developed. Undesirable. If the hazard is less serious (rating of ID, IIC, IID, IIIB, or IIIC), the hazard will be evaluated for corrective action and a decision will be made whether to correct or to accept the hazard. Acceptable with review. The hazard resolution is closed based on an evaluation of the final risk, and the re-evaluation of the frequency and severity after the corrective action is included. Acceptable without review. The least serious hazards are accepted as identified, and no corrective action is required. 680-009 10/20/09 5

Acceptance and Resolution of Risk If a program or activity is deemed acceptable, the next step is to resolve identified hazards by implementing elimination and control measures to achieve acceptable risk. Identified unacceptable and undesirable hazards shall be eliminated or controlled using the following hierarchy of hazard resolution. Design for Minimum Risk. Design, redesign, or retrofit to eliminate (i.e., design out) the hazards through design selection. If an identified hazard cannot be eliminated, reduce the severity and/or probability of occurrence to an acceptable level. This may be accomplished, for example, through use of fail-safe devices and principles in design, the incorporation of high-reliability systems and components, and use of redundancy in hardware and software design. Requiring the use of a single-shot bolt-action rifle instead of a semiautomatic magazine-fed rifle is an example of this concept, as is prohibition of an activity in its entirety (i.e., no parachuting as part of the program). Safety Devices Engineering Controls. Hazards that cannot be eliminated through design or controlled through design selection will be controlled to an acceptable level through the use of fixed, automatic, or other protective safety design features or devices. Examples of safety devices include interlock switches and protective enclosures. Care must be taken to ascertain that the operation of the safety device reduces the loss or risk and does not introduce an additional hazard. Safety devices will also permit the system to continue to operate in a limited manner. Provisions will be made for periodic functional checks of safety devices. A ground fault circuit interrupter (GFCI) on an outdoor circuit is an example of this concept. Warning Devices. When neither design nor safety devices can effectively eliminate or control an identified hazard, devices must be used to detect the condition and to generate an adequate warning signal to correct the hazard or provide for personnel remedial action. Warning signals and their application will be designed to minimize the probability of incorrect personnel reaction to the signals and will be standardized within like types of systems. 680-009 10/20/09 6

Procedures and Training. Where it is not possible to eliminate or adequately control a hazard through design selection or use of safety and warning devices, procedures and training will be used to control the hazard. Special equipment operating procedures can be implemented to reduce the probability of a hazardous event, and a training program can be conducted. The level of training required will be based on the complexity of the task and minimum trainee qualifications contained in training requirements specified for the subject system element and element subsystem. Procedures may include the use of personal protective equipment. Precautionary notations in manuals will be standardized. Safety critical tasks, duties, and activities related to the system element/subsystem will require certification of personnel proficiency. However, without specific written approval, no warning, caution, or other form of written advisory will be used as the only risk reduction method for category I and II hazards. Examples of this within the current program include life jacket use during boating activities, the use of qualified trained supervision in shooting or climbing programs, and the initial safety requirements of merit badge pamphlets. Follow-up Once the hazard analysis is completed, it is the responsibility of the champion/originator to fully develop agreed-upon the identified elimination, control, warning, or training and procedures and to implement a system to monitor the measures being used. Should any additional hazards be recognized, it is the responsibility of the champion/originator to update the program hazard analysis to address these hazards. Documentation Keys to successful program hazard analysis include Use of a documented, systematic process for identifying, analyzing, and resolving hazards Integration of key stakeholders early in and throughout the process The ability to bring in subject matter experts as needed Key stakeholders in the process who must always be included are Program Group, Risk Management, Health and Safety, and dependent upon the program, Legal representatives. The champion/originator of the analysis should be the stakeholder who defines the program to be analyzed. Typically, this would be a Program Group representative, but the originator could range from a council volunteer to the Chief Scout Executive. The following forms/guides are offered to document the analysis process. The first is a narrative; the second is a program hazard analysis form. For simple program additions or modifications, abbreviated documentation is acceptable with stakeholder concurrence. 680-009 10/20/09 7

Narrative Example Date: September 23, 2009 Originator / Champion: Representing Program Group: Representing Legal Counsel: Representing Risk Management: Representing Health and Safety: Detailed description of program to be evaluated: Authorization for Boy Scouts to shoot small-bore rimfire.22 caliber repeater-type bolt action rifles with a minimum trigger pull of 3 pounds, and a clip-style magazine. (Tubular magazines are not approved). NEED TO CLARIFY this will not include semi-auto actions as reviewed 9-23-09. This is a new X modified recognized activity. Describe or list advantages of the program. This would permit Boy Scouts to use modern firearms. Councils would have more options for program equipment. Council already have this equipment; this would allow for an optional use of a loaded magazine without the use of a single shot adapter. Describe or list disadvantages or problems associated with the program. Orienting councils, camp staff, and NCS faculty on new procedures. Additional learning curve. Need to manage magazines during clearance drill (add magazine out). Additional wear on rifle / magazine interface, feeding issues. List the hazards associated with the program activities (complete PHA/OHA). Need to manage loaded magazines during ceasefires or clearance drills. List the impact to resources (additional or change). Possible purchase of new firearms. Increased consumption of ammunition. Additional orientation time for staff 680-009 10/20/09 8

Identify publications or policies impacted. Merit badge pamphlets Guide to Safe Scouting NCS lesson plans Shooting Sports manual (pending) Cost impact of proposed change (include council/district/unit costs): Not mandatory, no costs incurred if the council does not purchase new firearms. Scheduled impact of proposed change: None Describe the proposed effective date of change (e.g., When would the change go into effect?): Immediate implementation is acceptable. Update literature during regular revision process. Urgency of change: The majority of shooting sports literature is under review/revision. Approval at this time would streamline the process Program risks: Approved: Rejected: Accepted with controls as follows: Signatures/concurrence: Date: 680-009 10/20/09 9

Narrative Date: Originator / Champion: Representing Program Group: Representing Legal Counsel: Representing Risk Management: Representing Health and Safety: Detailed description of program to be evaluated: This is a new modified recognized activity. Describe or list advantages of the program. Describe or list disadvantages or problems associated with the program. List the hazards associated with the program activities (complete PHA/OHA). List the impact to resources (additional or change). Identify publications or policies impacted. Cost impact of proposed change (include council/district/unit costs): Scheduled impact of proposed change: Describe the proposed effective date of change (e.g., When would the change go into effect?): Urgency of change: Program risks: Approved: Rejected: Accepted with controls as follows: Signatures/concurrence: Date: 680-009 10/20/09 10

Program Hazard Analysis New, Modified, or Recognized Activities Date: 2/25/2008 Program: (EXAMPLE) Cub Scouts Description: (EXAMPLE) Addition of Pellet Gun / Air Rifle Shooting to Cub Scout Resident Camp Programs Hazard Cause / Effect Hazard Description Cause Effect High velocity pellets strike participants and onlookers. Same Same Use of BB gun range or backstop. High velocity and hunting rifles used. Financial pressures or donated air rifles used that don t meet standard Pellets leave safe range area. Pellets leave safe range area. Pellets leave safe range area. Initial Risk Rating * Example Worst Case loss of sight Happening once a year in the organization. ID* ID ID Possible Controlling Measure Conduct the events only at appropriate range or with backstop and pellet trap designed for air rifles. Limit air rifle velocity (500-540 fps) and energy levels (7.5 joules) Clearly define pellet gun as single shot designed for target shooting, trigger pull requirements and accept no substitutes (current examples Daisy 853, 888 (ODCMP) Crossman 2000) Limit air rifle velocity (500-540 fps) and energy levels (7.5 joules) Corrective Actions Closing Comments Accept NRA recommendat ions Accept NRA recommendat ions. Consistent with Boy Scout rifle shooting. Status Final Risk Rating IID 680-009 10/20/09 11

Program Hazard Analysis New, Modified, or Recognized Activities Date: Program: Description: Hazard Cause / Effect Corrective Actions Hazard Description Cause Effect Initial Risk Rating Possible Controlling Measure Closing Comments Status Final Risk Rating 680-009 10/20/09 12