Safety Analysis: FMEA Risk analysis. Lecture 8
|
|
|
- Evelyn Payne
- 9 years ago
- Views:
Transcription
1 Safety Analysis: FMEA Risk analysis Lecture 8
2 Failure modes and effect analysis (FMEA) Why: to identify contribution of components failures to system failure How: progressively select the individual components or functions within a system and investigate their possible modes of failure Information analyzed: possible failure modes, possible causes, local and system effect, how to fix (remedial actions)
3 What is the proper level? Depends at which design stage: might be very general might be very detailed Hardware To off-the-shelf components Or field-replaceable assemblies for which failure modes are available Software as a single component Failure modes as worst possible effects Does not include human
4 Example of hardware-oriented FMEA
5 Evaluation of FMEA + Allows to identify redundancy, single-point failure, inspection points and how often the system needs to be serviced Technique is complete - Time consuming Does not consider effect of multiple or common-cause failures
6 Some notes about FMEA Very often hardware-oriented FMEA formulates software requirements very vaguely, e.g., modify software to detect failure. How to do it better? Find a common model, i.e., the model which would be a middle-hand between safety analysis and software requirements
7 Example a conveyor system A conveyor system consists of a feed belt and an elevating rotary table. The feed belt transports objects placed on its left end to the right end and then on the table. The table then elevates and rotates an object to make it available for processing by further machines. The belt has photo-electric cells, which signals when an object has arrived at its ends. The motor of the belt may be switched on and off: it has to be on while waiting for a new object and has to be switched off when an object is at the end of the belt but cannot be delivered onto the table because the table is not in proper position. The table lifts and rotates an object clockwise to a position for further processing. When an object is taken the table moves down and counterclockwise to accept another object. For the brevity we omit the details of table s implementation. We merely observe that the table moves between two positions: one for loading an object from the feed belt and another for unloading an object for further machines. Initially the table is in its loading position and the feed belt is running empty while waiting for an object to be placed.
8 Hazards: Object is jammed between the belt and the table Objects are piled up
9 Safety requirements Safety requirement1: The feed belt may only convey an object through its exit sensor, if the table is in the loading position. Safety requirement2. A new object may only be put on the feed belt after the exit sensor confirms that the last one has arrived at the end of the feed belt
10 Statechart of fault free system
11 Safety requirements in terms of Safety requirement1: statecharts FB is in Delivering implies TAB is in ReadyForLoading Safety requirement2: EntrySen_On arrives only when FB is in VACANT
12 Analysis The model of reality which controller has is actually a statechart model Controller keeps record of state and updates the state upon arrival of every event We introduce variables to model states of components
13 Example of traditional FMEA Unit Failure mode Possible cause Local effects System effects Remedial action Feed belt entry sensor Stuck at zero Primary sensor failure Sensor sends zero signal constantly Arrival of an object is undetected. No control over the distance between arriving objects. Danger to pile up. Ensure that the fault is always detected. Modify software to detect the fault. If fault occurs then switch on alarm and stop the system
14 Formalizing FMEA The main idea is to use statecharts to express how each error should be detected and mitigated Two types of detection: Aberrant event and Timeout
15 Examples of formalized FMEA
16
17 Statechart model of fail-safe conveyor system (see appendix 3)
18 Fail-safe systems A fail-safe system upon detection of an error is shut down.
19 Fail-safe controller Constants /*Maximal time to reload object from feed belt to table */ MaxDeliveringTime /*Maximal time for object to come from beginning to end of feed belt */ MaxTranspDelivTime Procedures /* Halts feed belt */ HaltFB = if FB=VACANT FB_st=VACANT then FB := HALTINGV FB_st := HaltedVac elseif FB=FBLOADED FB_st=StartTransporting then FB := HALTINGL FB_st := HStartTransporting /* Immediately stops feed belt */ StopFB = if (FB=VACANT FB=FBLOADED) then FB := FBSTOPPED FB_ST := FBSTOPPED /* Outputs message to an operator */ Warning (Msg: String) = output(msg)
20 /* Timers are active then ON */ DeliveryTimer, TranspDelivTimer : {ON, OFF} /*Time stamps fix time when timers are activated */ DeliveryTimerStamp, TranspDelivTStamp : INT /*Object arrived at the beginning activate timer TranspDelivTimer */ E=EntrySen_ON FB=VACANT FB_st=VACANT E :=NIL FB := FBLOADED FB_st := StartTransporting TranspDelivTimer := ON TranspDelivTStamp := t
21 /*Object arrived at the end -- deactivate timer TranspDelivTimer */ E=ExitSen_ON FB= FBLOADED FB_st = Transporting TAB=TVACANT TAB_st = ReadyToLoad FB_st := Delivering TranspDelivTimer := OFF [] E=ExitSen_ON FB= FBLOADED FB_st = Transporting (TAB=TVACANT TAB=TLOADED) TAB_st ReadyToLoad E :=NIL FB_st := Waiting TranspDelivTimer := OFF /* Object passed the exit sensor while the motor was supposed to be OFF */ E=ExitSen_OFF FB=FBLOADED FB_st=Waiting E :=NIL FB := FBFAILED FB_ST := FBFAILED call Warning( Feed belt motor fails to stop ) call StopTAB
22 Conclusions on safety analysis Do not be scared by hardware terms in fault trees and FMEA! Your knowledge of simple failure modes of sensors and actuators which we have studied already will be sufficient. But always deduce software requirements from safety analysis: overlooked safety requirements is a greatest threat! Always start safety analysis from identifying hazards, i.e., asking yourself what I would like to avoid happening in this system Draw fault tree to analyse how it can happen Conduct FMEA to see which components in which failure modes are contributing to hazards Derive specifications of error detection procedures, remedial actions and make sure you implement them correctly!
23 Hazard and accident Hazard is a potential for an accident How do we judge whether a hazard is acceptable? The importance of a hazard is related to the accidents that may result from it. Accident is an unintended event or sequence of events that causes death, injury, environmental or material damage 23
24 Risk Two factors are significant for an accident: the potential consequences of any accident that might result from the hazard the frequency (or probability) of such an accident occurring Risk is a combination of the frequency or probability of a specified hazardous event, and its consequence. 24
25 Example Failure of a particular component is likely to result in an explosion that could kill 100 people. It is estimated that this component will fail once in every years. What is the risk associated with that component? Risk= severity x frequency = 100 x = 0.01 deaths per year 25
26 Categories of severity for military Category systems Definition Catastrophic Multiple deaths Critical Marginal Negligible A single death, and/or multiple severe injuries or severe occupational illnesses A single severe injury or occupational illness, and/or multiple minor injuries or minor occupational illnesses At most a single injury or minor occupational illness 26
27 Accident probability ranges for Accident frequency military systems Occurrence during operational life considering all instances of the system Frequent Likely to be continually experienced Probable Likely to occur often Occasional Likely to occur several times Remote Likely to occur some time Improbable Unlikely, but may exceptionally occur Incredible Extremely unlikely that the event will occur at all 27
28 Risk classification Severity of hazardous event Risk classification Frequency of hazardous event 28
29 Why classifying risks? Risks can be expressed qualitatively and quantitatively Calculation of risk results in a risk class (or risk level). Most standards define a number of risk classes and then set out development and design techniques appropriate for each category of risk 29
30 Risk classes and interpretations for military systems 30
31 As Low As is Reasonably Practicable (ALARP) principle 31
32 The process of risk reduction 32
33 Difference between criticality of systems Both an electric toaster and a nuclear reactor protection system should be adequately safe but meaning of adequately would be different for these two cases Hence the importance of safe operation differs widely between applications Different safety requirements for different projects mean different levels of risk reduction required 33
Controlling Risks Risk Assessment
Controlling Risks Risk Assessment Hazard/Risk Assessment Having identified the hazards, one must assess the risks by considering the severity and likelihood of bad outcomes. If the risks are not sufficiently
University of Paderborn Software Engineering Group II-25. Dr. Holger Giese. University of Paderborn Software Engineering Group. External facilities
II.2 Life Cycle and Safety Safety Life Cycle: The necessary activities involving safety-related systems, occurring during a period of time that starts at the concept phase of a project and finishes when
Basic Fundamentals Of Safety Instrumented Systems
September 2005 DVC6000 SIS Training Course 1 Basic Fundamentals Of Safety Instrumented Systems Overview Definitions of basic terms Basics of safety and layers of protection Basics of Safety Instrumented
Safety Requirements Specification Guideline
Safety Requirements Specification Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:[email protected] -1- Summary Safety Requirement
LSST Hazard Analysis Plan
LSST Hazard Analysis Plan Large Synoptic Survey Telescope 950 N. Cherry Avenue Tucson, AZ 85719 www.lsst.org 1. REVISION SUMMARY: Contents 1 Introduction... 5 2 Definition of Terms... 5 2.1 System... 5
Designing an Effective Risk Matrix
Designing an Effective Risk Matrix HENRY OZOG INTRODUCTION Risk assessment is an effective means of identifying process safety risks and determining the most cost-effective means to reduce risk. Many organizations
Accident Investigation
Accident Investigation ACCIDENT INVESTIGATION/adentcvr.cdr/1-95 ThisdiscussionistakenfromtheU.S.Department oflabor,minesafetyandhealthadministration Safety Manual No. 10, Accident Investigation, Revised
Software Safety Hazard Analysis
UCRL-ID-122514 Software Safety Hazard Analysis Version 2.0 Prepared by J. Dennis Lawrence Prepared for U.S. Nuclear Regulatory Commission Disclaimer This document was prepared as an account of work sponsored
Programmable Logic Controllers Definition. Programmable Logic Controllers History
Definition A digitally operated electronic apparatus which uses a programmable memory for the internal storage of instructions for implementing specific functions such as logic, sequencing, timing, counting,
140.01.3 REQUIREMENTS OF SAFETY MANAGEMENT SYSTEM
SA-CATS 140 Safety management system List of technical standards 140.01.3 REQUIREMENTS OF SAFETY MANAGEMENT SYSTEM 1. Minimum standards for the safety management system 140.01.3 REQUIREMENTS OF A SAFETY
Electric Actuator Smart Controller
RCS and ANDCO Electric Actuators Electric Actuator Smart Controller Microprocessor Based Analog Positioner Technical Manual Models: SCC10 24VDC Document EASC DC DICM Revision 1.0 Dresser Flow Control Texsteam
3.4.4 Description of risk management plan Unofficial Translation Only the Thai version of the text is legally binding.
- 1 - Regulation of Department of Industrial Works Re: Criteria for hazard identification, risk assessment, and establishment of risk management plan B.E. 2543 (2000) ---------------------------- Pursuant
ISO 14971: Overview of the standard
FDA Medical Device Industry Coalition ISO 14971: Overview of the standard Risk Management Through Product Life Cycle: An Educational Forum William A. Hyman Department of Biomedical Engineering Texas A&M
3.0 Risk Assessment and Analysis Techniques and Tools
3.0 Risk Assessment and Analysis Techniques and Tools Risks are determined in terms of the likelihood that an uncontrolled event will occur and the consequences of that event occurring. Risk = Likelihood
Nuclear Power Plant Electrical Power Supply System Requirements
1 Nuclear Power Plant Electrical Power Supply System Requirements Željko Jurković, Krško NPP, [email protected] Abstract Various regulations and standards require from electrical power system of the
Understanding Safety Integrity Levels (SIL) and its Effects for Field Instruments
Understanding Safety Integrity Levels (SIL) and its Effects for Field Instruments Introduction The Industrial process industry is experiencing a dynamic growth in Functional Process Safety applications.
11. FLOWCHART BASED DESIGN
plc flowchart - 11.1 Topics: Describing process control using flowcharts Conversion of flowcharts to ladder logic Objectives: Ba able to describe a process with a flowchart. Be able to convert a flowchart
Safety Integrity Levels
Séminaire de Sûreté de Fonctionnement de l X Safety Integrity Levels Antoine Rauzy École Polytechnique Agenda Safety Integrity Levels and related measures as introduced by the Standards How to interpreted
Hazard Identification and Risk Assessment for the Use of Booster Fans in Underground Coal Mines
Hazard Identification and Risk Assessment for the Use of Booster Fans in Underground Coal Mines Felipe Calizaya Michael G. Nelson Mahesh Shriwas Feb 26, 2013 Outline Introduction Booster Fans in U/G Coal
Occupational Health & Safety Policy Injury & Incident Reporting
Occupational Health & Safety Policy Injury & Incident Reporting Policy number 46 Version 1 Approved by board on 6 June 2014 Responsible person President Review date June 2016 Introduction Living Positive
Risk Management and the Impact of EN ISO 14971:2012 Annex Z
Risk Management and the Impact of EN ISO 14971:2012 Annex Z BSI 2014 Medical Device Mini-Roadshow Ibim Tariah Ph.D Technical Director, Healthcare Solutions Copyright 2014 BSI. All rights reserved. 1 Risk
Safety Regulation Group SAFETY MANAGEMENT SYSTEMS GUIDANCE TO ORGANISATIONS. April 2008 1
Safety Regulation Group SAFETY MANAGEMENT SYSTEMS GUIDANCE TO ORGANISATIONS April 2008 1 Contents 1 Introduction 3 2 Management Systems 2.1 Management Systems Introduction 3 2.2 Quality Management System
OCCUPATIONAL HEALTH AND SAFETY POLICY: INCIDENT AND INJURY REPORTING ERJ 6.28.1
OCCUPATIONAL HEALTH AND SAFETY POLICY: INCIDENT AND INJURY REPORTING ERJ 6281 INTRODUCTION The Edmund Rice Justice Aotearoa New Zealand Trust recognises that the health and safety of its employees is a
DANGER indicates that death or severe personal injury will result if proper precautions are not taken.
Multi-User Systems 1 ArchiveServer 2 SIMATIC HMI WinCC V7.0 SP1 File Server 3 WinCC ServiceMode 4 Redundant Systems 5 System Manual Print of the Online Help 11/2008 Legal information Warning notice system
Project Risk Management. Presented by Stephen Smith
Project Risk Management Presented by Stephen Smith Introduction Risk Management Insurance Business Financial Project Risk Management Project A temporary endeavour undertaken to create a unique product
Union College Campus Safety Emergency Action Guide
Union College Campus Safety Emergency Action Guide Emergency Telephone Numbers At Union College, for all campus emergencies dial Campus Safety at ext. 911. (If the line is busy on a second try, dial "6911".)
Technical Bulletin. Understanding Servo Safety Functionality and SIL ratings
Technical Bulletin Understanding Servo Safety Functionality and SIL ratings What is meant by SIL rating and Stop Categories? Why do I need to understand how safety works if none of my current customers
Program Hazard Analysis
For New, Modified, or Recognized Activities 10/20/2009 Revision and Update This evaluation process is used to systematically identify, assess, and resolve hazards associated with program activities that
Risk Assessment / Risk Management Protocol
1 Canadian Pacific Railway Risk Assessment / Risk Management Protocol Overview / Outline At Canadian Pacific Railway, we conduct risk assessments of our activities and operations for a number of different
Risk Assessment for Medical Devices. Linda Braddon, Ph.D. Bring your medical device to market faster 1
Risk Assessment for Medical Devices Linda Braddon, Ph.D. Bring your medical device to market faster 1 My Perspective Work with start up medical device companies Goal: Making great ideas into profitable
RISK MANAGEMENT FOR INFRASTRUCTURE
RISK MANAGEMENT FOR INFRASTRUCTURE CONTENTS 1.0 PURPOSE & SCOPE 2.0 DEFINITIONS 3.0 FLOWCHART 4.0 PROCEDURAL TEXT 5.0 REFERENCES 6.0 ATTACHMENTS This document is the property of Thiess Infraco and all
PROGRAMMABLE LOGIC CONTROLLERS Unit code: A/601/1625 QCF level: 4 Credit value: 15
UNIT 22: PROGRAMMABLE LOGIC CONTROLLERS Unit code: A/601/1625 QCF level: 4 Credit value: 15 ASSIGNMENT 3 DESIGN AND OPERATIONAL CHARACTERISTICS NAME: I agree to the assessment as contained in this assignment.
Digital Systems Based on Principles and Applications of Electrical Engineering/Rizzoni (McGraw Hill
Digital Systems Based on Principles and Applications of Electrical Engineering/Rizzoni (McGraw Hill Objectives: Analyze the operation of sequential logic circuits. Understand the operation of digital counters.
System Specification. Objectives
System Specification cmsc435-1 Objectives To explain how dependability requirements may be identified by analyzing the risks faced by critical systems To explain how safety requirements are generated from
Machine Guarding and Operator Safety. Leader Guide and Quiz
4646 Machine Guarding and Operator Safety Leader Guide and Quiz Leader s Guide MACHINE GUARDING & OPERATOR SAFETY INTRODUCTION: A brief description of the program and the subject that it addresses. This
EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE
1 of 12 DOCUMENT REVISION HISTORY Revision No. Date DESCRIPTION OF CHANGES Pages Affected By 00 01/07/2003 Draft Issued For Comment All HSEQ Dept. 01 01/09/2003 Total Change First Approved Issue All HSEQ
Developing software which should never compromise the overall safety of a system
Safety-critical software Developing software which should never compromise the overall safety of a system Ian Sommerville 1995 Software Engineering, 5th edition. Chapter 21 Slide 1 Objectives To introduce
E4000 SAFETY RELAY BOX
E4000 SAFETY RELAY BOX / OPERATION MANUAL P1 - P7 / English P9 - P15 1. OM-K0597 001 1 2 OFF ON BOX MOTOR-IN MOTOR-OUT EMG 1 Thank you for purchasing E4000 SAFETY RELAY BOX. The E4000 ,
Hazard/Risk Identification and Control Procedure
Hazard/Risk Identification and Control Procedure Introduction Hazard identification and the steps taken to minimize the risks associated with identified hazards are a critical component of working safely.
IMPORTANT SAFETY RULES TO FOLLOW
WARNING FLOOR & CARPET CLEANER Any piece of equipment can be dangerous if not operated properly. YOU are responsible for the safe operation of this equipment. The operator must carefully read and follow
On-Site Risk Management Audit Checklist for Program Level 3 Process
On-Site Risk Management Audit Checklist for Program Level 3 Process Auditor name: Date: I. Facility Information: Facility name: Facility location: County: Contact name: RMP Facility I.D. Phone Number:
ROBOTIC PRINTED CIRCUIT BOARD ASSEMBLY LINE
ROBOTIC PRINTED CIRCUIT BOARD ASSEMBLY LINE MET 415 By Martin Houlroyd 03/29/14 DEPARTMENT MAP 1. BARE PCBS 2. SOLDER PASTE 3. IC ASSEMBLY 4. REFLOW SOLDERING 5. AQUEOUS CLEANING 6. VISUAL INSPECTION 7.
COMPACT LABEL APPLIER
COMPACT LABEL APPLIER MODEL CLAS-1LR CLAS-1RL ML-44227 ML-44228 701 S. RIDGE AVENUE TROY, OHIO 45374-0001 937 332-3000 www.hobartcorp.com FORM 35552 (February 2014) TABLE OF CONTENTS GENERAL... 3 INSTALLATION...
Wipers and washers WINDSCREEN WIPERS. Intermittent variable delay
Wipers and washers WINDSCREEN WIPERS S Do not operate the wipers on a dry screen. The drag on the wiper mechanism may cause damage. Before operating in freezing or very hot conditions, ensure that the
Viewpoint on ISA TR84.0.02 Simplified Methods and Fault Tree Analysis Angela E. Summers, Ph.D., P.E., President
Viewpoint on ISA TR84.0.0 Simplified Methods and Fault Tree Analysis Angela E. Summers, Ph.D., P.E., President Presented at Interkama, Dusseldorf, Germany, October 1999, Published in ISA Transactions,
Motivations. spm - 2014 adolfo villafiorita - introduction to software project management
Risk Management Motivations When we looked at project selection we just took into account financial data In the scope management document we emphasized the importance of making our goals achievable, i.e.
Heat Pump Training System
Refrigeration and HVAC Heat Pump Training System Courseware Sample 85143-F0 Order no.: 85143-00 First Edition Revision level: 02/2015 By the staff of Festo Didactic Festo Didactic Ltée/Ltd, Quebec, Canada
with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions.
B Installation & Maintenance Instructions MM-414 Series 150E and 157E Low Water Cut-Off/Pump Controllers For Steam Boilers and Other Level Control Applications A Typical Applications: Primary or secondary
Predictive Maintenance
PART ONE of a predictive maintenance series Predictive Maintenance Overview Predictive maintenance programs come in all shapes and sizes, depending on a facility s size, equipment, regulations, and productivity
A Quality Requirements Safety Model for Embedded and Real Time Software Product Quality
A Quality Requirements Safety Model for Embedded and Real Time Product Quality KHALID T. AL-SARAYREH Department of Engineering Hashemite University Zarqa 13115, Jordan [email protected] Abstract safety
First Aid Kit The Expert in Lubrication Solutions
Prevent Workplace Accidents! First Aid Kit The Expert in Lubrication Solutions Safety - it s in your hands! Stop unsafe acts before they stop you *About 20% of all accidents are maintenance related: falls
DEVELOPING A PHYSICAL EMULATOR FOR A FLEXIBLE MANUFACTURING SYSTEM
DEVELOPING A PHYSICAL EMULATOR FOR A FLEXIBLE MANUFACTURING SYSTEM Fernando G. Gonzalez Department of Electrical and Computer Engineering University of Central Florida Orlando, Florida 32816 USA (407)823-3987
KELLER S 5-MINUTE WORKPLACE SAFETY TALKS
KELLER S 5-MINUTE WORKPLACE SAFETY TALKS Machine Guarding An Overview Overview Of Topic Machine operators who understand a machine s hazards and how to control them will have a reduced risk of injury.
C3306 LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES. Leader s Guide. 2005, CLMI Training
C3306 LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES Leader s Guide 2005, CLMI Training LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES This easy-to-use Leader s Guide is provided to assist in conducting a successful
WIRELESS SENSOR BATTERY REPLACEMENT INSTRUCTIONS For Safewatch Residential Control Panels
www.adt.ca WIRELESS SENSOR For Safewatch Residential Control Panels Your ADT Safewatch QuickConnect, SafeWatch 3000 or Vista Series residential security system may be installed with wireless sensors, such
Fault Tree Analysis (FTA) and Event Tree Analysis (ETA)
Fault Tree Analysis (FTA) and Event Tree Analysis (ETA) It is easy to get confused between these two techniques. Indeed, the two are in fact complimentary (and are often used together) but focus on opposite
Overview of IEC 61508 - Design of electrical / electronic / programmable electronic safety-related systems
Overview of IEC 61508 - Design of electrical / electronic / programmable electronic safety-related systems Simon Brown The author is with the Health & Safety Executive, Magdalen House, Bootle, Merseyside,
EPM3. Phase Sequence and Motor Rotation Tester. Users Manual
EPM3 Phase Sequence and Motor Rotation Tester Users Manual 1 L1 L2 L3 2 3 A B C CAT 600V 3-PHASE TESTER 5 TEST M1 M2 BATT M3 EPM3 MOTOR ROTATION TESTER EPM3 MOTOR ROTATION DETERMINED WHILE FACING MOTOR
Preventing Overheated Boiler Incidents
Preventing Overheated Boiler Incidents PSE&G Appliance Service October 2012 Runaway Boiler Explosion Review Items Hazard Background Past Incidents PSE&G Emergency Response Future Process Improvements What
Integrating System Safety and Software Assurance
Integrating System Safety and Software Assurance Systems Certification and Integrity Directorate of Aviation Engineering Directorate General Technical Airworthiness 1 Overview Integration of software assurance
Fig 3. PLC Relay Output
1. Function of a PLC PLC Basics A PLC is a microprocessor-based controller with multiple inputs and outputs. It uses a programmable memory to store instructions and carry out functions to control machines
Mauro Calvano. About Aviation Safety Management Systems
Mauro Calvano About Aviation Safety Management Systems January 2003 1 INTRODUCTION In order to be aware of the factors that are driving the accident rate during the last decade, we must identify the hazards
Mobile Equipment Safety
Mobile Equipment Safety PLANNING THE JOB Hazard Assessment DO YOU HAVE THE RIGHT EQUIPMENT? ARE THERE HAZARDS TO BE AVOIDED? IS THE GROUND AREA STRONG ENOUGH TO SUPPORT THE EQUIPMENT? ARE THERE ANY UNUSUAL
Title: Basic Principles of Risk Management for Medical Device Design
Title: Basic Principles of Risk Management for Medical Device Design WHITE PAPER Author: Ganeshkumar Palanichamy Abstract Medical devices developed for human application are used for diagnostic or treatment
Design Verification The Case for Verification, Not Validation
Overview: The FDA requires medical device companies to verify that all the design outputs meet the design inputs. The FDA also requires that the final medical device must be validated to the user needs.
Edwin Lindsay Principal Consultant. Compliance Solutions (Life Sciences) Ltd, Tel: + 44 (0) 7917134922 E-Mail: [email protected].
Edwin Lindsay Principal Consultant, Tel: + 44 (0) 7917134922 E-Mail: [email protected] There were no guidelines/ regulations There was no training No Procedures No Inspectors Inform All staff of
PRODUCT WARRANTY. Page 20
PRODUCT WARRANTY Manufactured equipment is warranted to be free from defects in material and workmanship for a period of twelve (12) months from date of manufacture as indicated by the date stamp and/or
Walk around and identify the area to be assessed and look at what could reasonably be expected to cause harm.
Risk Assessment Introduction The assessment of risk is central to the management of health and safety. The purpose of this is to assist in identifying those measures which are needed to remove or otherwise
Safety and Environmental Information for External Companies
1. Delivery, Notice, Signature After receiving the following information sheets, the team leader from every external company is required to read through them, explain them to their employees, and after
RISK ASSESSMENT POLICY
RISK ASSESSMENT POLICY Post holder responsible for Policy: Directorate / Department responsible for Policy: Contact details: Governance Manager Governance Noy Scott House ext. 3933 Date written: August
Nova Scotia EMO. Hazard Risk Vulnerability Assessment (HRVA) Model. Guidelines for Use. October, 2010
Nova Scotia EMO Hazard Risk Vulnerability Assessment (HRVA) Model Guidelines for Use October, 2010 EMO NS Hazard Risk Vulnerability Assessment Model Page 1 of 10 Table of Contents 1. Background 2. Definitions
Risk Assessment: A Proactive Approach to Minimizing Waste
Risk Assessment: A Proactive Approach to Minimizing Waste Shoji Nakayama Purdue University - Calumet Hammond, Indiana Ugo Mgbike Unilever Olathe, Kansas Introduction Our society is currently facing various
WA Manager Alarming System Management Software Windows 98, NT, XP, 2000 User Guide
WA Manager Alarming System Management Software Windows 98, NT, XP, 2000 User Guide Version 2.1, 4/2010 Disclaimer While every effort has been made to ensure that the information in this guide is accurate
DIAMOND Gear Company, LTD. an ERIKS Company. Installation, Maintenance, & Operation Manual Declutchable Worm Gear
DIAMOND Gear Company, LTD. an ERIKS Company Installation, Maintenance, & Operation Manual Declutchable Worm Gear 2016 DECLUTCHABLE WORM GEAR INSTRUCTIONS This is an instructional manual which provides
Remote Access System Installation
2011-2013 Explorer Remote Access Remote Access System Installation CONTENTS VEHICLE PREPARATION Hood Switch Wire Harness Installation Hood Switch Installation RMST Module Installation RMU Module Installation
University of Nottingham Emergency Procedures and Recovery Policy
University of Nottingham Emergency Procedures and Recovery Policy Guidelines for High Hazard Schools and Departments 1. Introduction The University of Nottingham is committed to the identification and
Safety Management Systems (SMS) guidance for organisations
Safety and Airspace Regulation Group Safety Management Systems (SMS) guidance for organisations CAP 795 Published by the Civil Aviation Authority, 2014 Civil Aviation Authority, CAA House, 45-59 Kingsway,
SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE
SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE Cable Processor Module overview WARNING! When tipping the Cable Processor Module back, (after removing the toggle arm pin), use extreme caution not to drop
Elevator Malfunction Anyone Going Down?
Elevator Malfunction Anyone Going Down? Lessons Learned Volume 04 Issue 41 2004 USW Purpose Elevator Malfunction - Anyone Going Down? To conduct a small group lessons learned activity to share information
Safety Analysis for Nuclear Power Plants
Regulatory Document Safety Analysis for Nuclear Power Plants February 2008 CNSC REGULATORY DOCUMENTS The Canadian Nuclear Safety Commission (CNSC) develops regulatory documents under the authority of paragraphs
A System-safety process for by-wire automotive systems
A System-safety process for by-wire automotive systems Steer-by-wire and other by-wire systems (as defined in this article) offer many passive and active safety advantages. To help ensure these advantages
SEMETS3-70 Performing engineering software safety assessments
Performing engineering software safety assessments Overview This unit identifies the competences you need to perform a software safety assessment as part of the product definition activity, in accordance
Media fills Periodic performance qualification (Re-Validation)
Media fills Periodic performance qualification (Re-Validation) Minimum number of Simulations Number of units Contaminated Units Action a Two per Year (Retrospective & Prospective Validation) < 5000 5000
Workers Compensation and Employers Liability (Lecture 13)
Workers Compensation and Employers Liability (Lecture 13) Overview of Lecture 13 (Chapter 9, CPCU 4) I. Introduction II. III. IV. Employers Liability Under Common Law State Workers Compensation Laws Workers
CIM Computer Integrated Manufacturing
INDEX CIM IN BASIC CONFIGURATION CIM IN ADVANCED CONFIGURATION CIM IN COMPLETE CONFIGURATION DL CIM A DL CIM B DL CIM C DL CIM C DL CIM B DL CIM A Computer Integrated Manufacturing (CIM) is a method of
Brake module AX5021. Documentation. Please read this document carefully before installing and commissioning the brake module!
Documentation Brake module AX5021 Please read this document carefully before installing and commissioning the brake module! Version : 1.2 : 2012.03.05 Date Article-no. : TDmlAX-5021-0000-0200 Page 2/8
DRAFT (Public comments phase August 2006) Date: XX/XX/XX. Initiated by: ANE-110
(Public comments phase August 2006) Advisory Circular Subject: PROPOSED DRAFT Turbine Engine Repairs and Alterations Approval of Technical and Substantiation Data Date: XX/XX/XX Initiated by: ANE-110 AC
SIMATIC. WinCC V7.0. Getting started. Getting started. Welcome 2. Icons 3. Creating a project 4. Configure communication 5
SIMATIC WinCC V7.0 SIMATIC WinCC V7.0 Printout of the Online Help 1 Welcome 2 Icons 3 Creating a project 4 Configure communication 5 Configuring the Process Screens 6 Archiving and displaying values 7
SIMATIC S7-300. Getting Started for First Time Users. Order No.: 6ZB5310-0NC02-0BA0 04/2007 A5E01094750-01
SIMATIC S7-300 Getting Started for First Time Users Order No.: 6ZB5310-0NC02-0BA0 04/2007 A5E01094750-01 Safety Guidelines This manual contains notices you have to observe in order to ensure your personal
Safety and Environmental Information for External Companies
Health and and al Health and at 1. Delivery, Notice, Signature After receiving the following information sheets, the assembly leader from every external company is required to read through them, explain
Statistical Analysis of the Direct Reason of Construction Safety Accidents
Statistical Analysis of the Direct Reason of Construction Safety Accidents ZHANG Jianshe, XU You School of Civil Engineering, Henan Polytechnic University, China, 454003 [email protected] Abstract:
Ethernet/IP Explicit Messaging Using Unity Software
Data Bulletin 8000DB1025 07/2010 Raleigh, NC, USA Ethernet/IP Explicit Messaging Using Unity Software Retain for future use. Overview Presumption Requirements This data bulletin illustrates how to setup
Guidance for Industry: Quality Risk Management
Guidance for Industry: Quality Risk Management Version 1.0 Drug Office Department of Health Contents 1. Introduction... 3 2. Purpose of this document... 3 3. Scope... 3 4. What is risk?... 4 5. Integrating
Policy Guideline 07 Health & Safety (Serious Injury and Incident)
Patron: The Honourable Alex Chernov AC QC Governor of Victoria Policy Guideline 07 Health & Safety (Serious Injury and Incident) Introduction 1. U3A Ringwood Incorporated recognises that the health and
Analyzing the Security Significance of System Requirements
Analyzing the Security Significance of System Requirements Donald G. Firesmith Software Engineering Institute [email protected] Abstract Safety and security are highly related concepts [1] [2] [3]. Both
Module 13: Emergency Preparedness and Response
Module 13: Emergency Preparedness and Response Guidance...13-2 Tools...13-4 Tool 13-1: Emergency Preparedness and Response Worksheet...13-4 Tool 13-2: Emergency Preparedness and Response Requirements Matrix...13-5
Fire Safety Risk Assessment Checklist for Residential Care Premises
Checklist for Residential Care Premises Name of Premises: Address of Premises: Name of Responsible Person: What area / location does the assessment cover? Does the assessment cover the whole site YES or