Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series



Similar documents
Design Development Quality Management Phase Checklist Project Phase Checklist Series

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

2.4 Hardcopy submittals shall be provided at adequate size so that all notes are readable.

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

Segreti Design Scope of Interior Design Services

T170 Interior Design Technology MTCU Code Program Learning Outcomes

Construction Technologies Career Field Pathways and Course Structure

June 7, 2010 Page 1 of 5

Exhibit C: Scope of Work and Schedule of Deliverables

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Space Planning. Gretchen Addi, Associate AIA, and Jacqueline Lytle, IIDA, Associate AIA. Summary CLIENT NEEDS

How To Design An Interior Design

Element D Services Heating, Ventilating, and Air Conditioning

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

NAPCS Product List for NAICS 54134: Drafting Services

REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Appendix 1 Project Information. PS-0748-A Page 1 5/4/2016 Appendix 1

ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning

PLAN SUBMITTAL INFORMATION

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

Lincoln Public Schools. 15 Attachments (separately bound) Schematic Design Schematic Design Project Manual

Civil Engineering and Architecture (CEA) Detailed Outline

Olilo's AEC Design Services. SrinSoft Inc, Partners of

Design and Construction Design Phase Deliverables

@hba_sudbury. Buying A New Home. Presented in Partnership with. Greater Sudbury Public Library PHONE SDHBA:

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

Programming, Planning & Practice

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter.

VIRGINIASCAN OFFICE BUILDING DATA SHEET

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

CAD Standards Guideline For Facility Documentation and Construction Projects

BUILDING SAFETY UNIT

GENERAL AND SPECIFIC OBJECTIVES

CAD Standards Guideline For Facility Documentation and Construction Projects

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

NECESSITY OF SCHOOL CONSTRUCTION STAGE III DESIGN REVIEWS

Schedule B to By-law

Single Family Residential Basement Finish

City of Peterborough

EXAM GUIDE. Construction Documents & Services

Methods for Effective Room Air Distribution. Dan Int-Hout Chief Engineer, Krueger Richardson, Texas

Commercial Building Valuation Report

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

PENNSYLVANIA HOUSING FINANCE AGENCY (2015 UNDERWRITING APPLICATION) Tab 34 Physical/Capital Needs Assessment & Energy Audit

Schedule B to By-law Part A Fees Payable for Permits

BIM: FOR PROJECT MANAGERS CSI Southwest Region Conference Program 1B 8:45am 11:00am

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY

Professional CAD System

The use of BIM in plumbing projects creates deeper project knowledge, delivers a more robust product, and can reduce total project costs.

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

KIEWIT CM/GC Enabling/Utilities

Code Requirements for Existing Buildings

BUILDING PERMIT SPECIFICATIONS

State of Connecticut Department of Public Health RADON PROGRAM

PROJECT COST ESTIMATES & FEASIBILITIES

Volume II- Project Development Processes

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5

Seattle Public Schools Building Excellence IV Projects Under Construction

Marketing Coordinator Bootcamp Session 2: ABCs of AEC

Electrical. This section applies to the design and installation of building power distribution systems.

Element Z General Design Requirements Standards and Other Requirements

SWAN POINT YACHT & COUNTRY CLUB

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Gramercy Place Condo Association, Inc.

Learning Objectives for the Interior Design program Department of Design, Textiles, Gerontology, & Family Studies

Chapter 5. Architectural Analysis GENERAL. 5.1 Qualifications, Responsibilities, and Approval of Lender s Representative. A.

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Dienstleistung. Certification as "Quality Approved Passive House" Criteria for Residential-Use Passive Houses

STATE OF MINNESOTA. BIM GUIDELINE State of Minnesota s Facilities Administration Data Capture Plan

Design. Documentation Guidelines

Standard Plan Review - Project Submittal Checklist

Revised Work Scope Dated April 23 rd, 2015

The Integrated Design Process

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

Appendix P-0a: Suggested Implementation for All Performance Management Guidelines

TENANT DESIGN MANUAL UPDATED JULY 2015

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Commercial Building Permit Application & Submittal Guidelines

T109 Architectural Technology MTCU Code Program Learning Outcomes

Page 1 of 6 COMPLIANCE CHECKLIST. > Long Term Care Facility - Nursing Unit

VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY (518) /

aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608

Scope: Communications and Electronic Systems addressed in this section include:

Transcription:

Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement or recommendation. Appropriate use of the information provided is the responsibility of the reader. SUMMARY The attached checklist is offered to AIA members as an aid to quality management. It is intended to assist project teams in meeting their obligations. This checklist is organized in three primary parts; General Objectives of Phase, Phase Task and Deliverables for Phase. The Phase Task is further organized by subgroup tasks. In developing a checklist for general applicability it is necessary to decide upon some frame of reference; this checklist assumes a medium to larger commercial project. This checklist could be trimmed for smaller projects, expanded for large projects and revised to be applicable to particular building types or specific projects. It is, in effect, a general template. GENERAL OBJECTIVES O F PHASE It is critical that project teams establish General Objectives for. The starting point is the contract; refer to AIA B101-2007 for general requirements and to the specifics of the project agreement whether executed or still in negotiation. The General Objectives are intended to be clear, concise and shared with the entire project team including the client. The architect and greater design team needs to be aware of how a client intends to utilize documents. Documents may be part of approval processes such as zoning, local planning commission or other regulatory body. SD Documents are also submitted for owner approval which could extend to parties other than those generally representing the owner in routine communication such as a board of directors, lending institutions and others. A client may be using the documents to confirm programming, issues of building performance, design concerns, addressing project construction costs, project scheduling, project logistics and other issues. PHASE TASK CHECKLIST The body of the checklist is a more extensive tabulation of specific tasks organized under the following headings: Management / Quality Management / Schedules Program / Construction Costs / Regulatory Requirements Performance Criteria Civil / Site Design Design / Architecture Structural MEP / FP Other Consultants These tasks are still somewhat general and focused primarily on tracking the completeness of or status of specific project related tasks. This checklist is not sufficient to address very specific or technical tasks associated with a project. This checklist is a tool primarily designed to assist the Project Manager or Project Architect and associated team members for a project. There are action items within this checklist suggesting a development of that is consistent with AIA B101-2007 but greater specificity is also associated with many action items. There are also action items which suggest a fairly high standard of quality and completeness; and it ought to be noted that perhaps this exceeds the scope of work defined in AIA B101-2007. One example is that the Performance Criteria section suggests that, within the Documents, the design team provide performance criteria for the principal systems of the project; these can be narratives. One of the Design / Architecture action items suggests that some representative portion of a plan be graphically correct and coordinated with structural and MEP. This task item is primarily more a function of a development of the documents in an efficient manner and to address issues of quality management. A firm or project team can easily modify the standards set within this template to be consistent with the firm s standard of practice and to address project specific requirements. These tasks are general and suggestive. DELIVERABLES FOR PHASE It is often the case that clients do not have a sufficiently clear idea of what the Documents shall be until they are delivered. Architects are often in a similar The AIA Knowledge gained from experience immediately applicable to a task at hand. BP 12.03.01

Best Practices position not clearly knowing what they shall receive from their consultants until after they receive the documents. This is not an acceptable situation. To help avoid this, consider developing clearly stated deliverables after the schematic design phase commences that are consistent with the General Objectives of the phase and consistent with the specific Phase Tasks established for the phase. This portion of the checklist should also be shared with the owner and with the appropriate members of the design team so that the expectations are clearly articulated. CONCLUSION This particular is one in a series intended to address typical phases for medium to larger projects. The phase checklists include: RESOURCES More Best Practices The following AIA Best Practices provide additional information related to this topic: 12.03.02 Design Development Phase Quality Management 10.01.01 Project Management Techniques For More Information on This Topic See also the 14th edition of the Handbook, which can be ordered from the AIA Store by calling 800-242-3837 (option 4) or by email at bookstore@aia.org. Pre-Design Services / Site Analysis Design Development Construction Documents Bidding or Negotiation Construction Contract Administration Post Construction Administration Each of these checklists are designed to be easily manageable by controlling the length; this checklist is seven pages in length. This means that these particular checklists are not sufficient to serve as detailed technical task checklists addressing the various details of the documents. ABOUT OUR CONTRIBUTOR Micheal J. Lough, AIA, is a principal of Integral Consulting, a Quality Management and Technical Services consulting practice. The practice focuses on Peer Reviews, exterior envelope services and other technical services designed to assist firms and project teams in improving the successful implementation and execution of architectural projects. Clients include architects, owners, development management companies and contractors. Peer Review & Contributing Commentary This checklist was reviewed with members of the Chicago Practice Management Knowledge Community and specific comments were provided by Randall Kurzman, AIA, Michael Schwindenhammer, AIA, and Robert Abell, AIA. See also s beginning on page 833 of the 15th Edition of the Architect s Handbook of Professional Practice. The Handbook can be ordered from the AIA Store online at www.aia.org/store, by calling 800-242-3837 (option 4), or by email at bookstore@aia.org. Feedback The AIA welcomes member feedback on Best Practice articles. To provide feedback on this article, please contact bestpractices@aia.org. Keywords Practice Business planning Quality control programs Quality management s General Objectives Deliverables October 2011 The AIA Knowledge gained from experience immediately applicable to a task at hand. BP 12.03.01

General Objectives of Phase Drawings and other documents indicating the scale and relationships of Project components in conformance with program Building areas and volumnes demarcated Project images / renderings clearly depicting design intent Representative plan element(s) graphically complete Structural grid and representative exterior modules fixed Small scale building elevations graphically complete for typical areas Representative wall section graphically developed at a larger scale Structural and MEP/FP systems defined Project performance criteria established estimate of the cost of the work Phase Task MANAGEMENT / QUALITY MANAGEMENT / SCHEDULES Update project area and use summaries. Maintain binder and check set of all work prepared during this phase. Conduct brief weekly team meeting with the team. Obtain authorization to proceed with Phase. Confirm Owner's budget. Finalize Owner/Architect agreement if not already done. Finalize selection of consultants. Draft Consultant agreements. Review Owner /Consultant agreements. Confirm compliance with insurance requirements for the project including General Liability, Automobile Liability, Workers' Compensation and Professional Liability B101-2007 - 2.5 Establish and review the role of project team members. Establish communication protocol between team members; who, methods of communication, project meetings and minutes, filing structure, etc. B101-2007 3.1.1 Prepare a preliminary evaluation to the Owner and discuss alternative approaches to the Owner's intended project delivery method B101-2007 3.2.2 Page 1

Develop mock-up set and drawing index for the anticipated Construction Documents drawings. As much as possilbe the drawing scale and a reasonable block-out of referenced details should be provided. Submit for Peer Review. Confirm/update project data and relation to Owner/Architect agreement. Monitor design firm's fees and manpower versus actual progress. Monitor design team's billings Prepare or update the project schedule; review with Owner. B101-2007 - 3.1.3 & B101-2007 - 3.2.2 Confirm peer review schedule for this phase. Submit package for Peer Review. B101-2007 - 3.2.7 Prepare approval letter for phase completion. B101-2007 - 3.2.7 Modify the checklist for the next phase per the project s particular needs. PROGRAM / CONSTRUCTION COSTS / REGULATORY REQUIREMENTS Review program / prepare preliminary evaluation of program / program requirements agreed upon with the Owner. B101-2007- 3.2.1 / 3.2.2 / 3.2.4 Determine and obtain data on any Owner special building equipment and fixtures; distribute to design team Prepare a preliminary evaluation of Owner's budget for the Cost of the Work B101-2007- 3.2.2 Submit an estimate of the Cost of the Work. B101-2007- 3.2.6 Determine applicable zoning, codes and other regulations applicable to the Architect's services. B101-2007- 3.1.5 & 3.2.1 Prepare or update zoning analysis. Follow up as necessary with governing authorities. B101-2007- 3.1.5 / 3.2.1 Prepare preliminary building code review; as complete as possible. Follow up as necessary with governing authorities. B101-2007- 3.1.5 / 3.2.1 Review project drawings for compliance with accessibility codes and regulations. Prepare the Accessibility Plan. B101-2007 - 3.1.5 / 3.2.1 Draft a schedule for code reviews and submissions with the appropriate agencies and assist the Owner in connection with filing documents required for the approval of governmental authorities. B101-2007 - 3.1.6 Page 2

PERFORMANCE CRITERIA Reach an understanding with the Owner regarding the performance requirements of the project B101-2007 - B3.2.3 Define Structural Design Criteria Define MEP/FP Performance Criteria Define Building envelope performance Criteria Define Acoustical performance Criteria Define Building system durability / maintainability performance Criteria Define Sustainability performance Criteria CIVIL / SITE DESIGN Contact entities providing utility services to the project. B101-2007 - 3.1.5 Develop Schematic site plan B101-2007 - 3.2.5 Prepare drawings and outline specification showing technical site engineering and storm water detention. Identify Site features with focus on hardscape. Prepare Preliminary site grading. Start preliminary coordination with MEP/FP consultant Verify site utilities and Prepare Underground utilities plan Verify that survey and existing conditions information provided by the Owner is sufficient and/or determine what additional information is required (ie additional or new surveys). Address the design requirements for site access (tenant, loading, fire, etc.), site landscaping, sidewalks and/or driveways and site utility areas. Review site landscaping with local code officials. Site features and grading should be approximately shown. Determine the need for and if required prepare a request for site soil borings. Review with the Owner, Structural Engineer and Civil Engineer. Page 3

DESIGN / ARCHITECTURE Discuss with the Owner alternative approaches to design and construction of the project B101-2007 - B3.2.3 Discuss with the Owner the feasibility of incorporating environmentally responsible design approaches B101-2007 - B3.2.3 Prepare a geometry plan for the building. Prepare all major plan elements of the building for all floors, with approximate accommodations for structure and MEP. B101-2007 - 3.2.5 Develop Typical project functional components (i.e. a typical office plan, a residentail floor or a function component of a floor such as hotel room types. Components should be graphically correct and coordinated with structural and MEP. Representative dimensions shown and representative partitions tagged. Show schematic furniture layouts to confirm spatial and program requirments of unit types. Develop typical project components and core elements including elevators, stairs and MEP risers, public toilet rooms. Components should be graphically correct and dimensioned. Minor or atypical elements should be reflected in the plans and building sections. Confirm that all circulation elements conform with building and accessibility codes as well as with market requirements. Verify that all program requirements are incorporated in the plans including support areas such as staff break rooms / toilets, building storage areas, janitor closets, and trash rooms and recycling. Develop Building elevations and note exterior materials. Indicate the extent of their use. Confirm alternatives with the Owner. B101-2007 - 3.2.5 Develop Building sections including typical foundation details. Indicate floor to floor dimensions, ceiling heights, major structural elements and major MEP transfer or horizontal distribution zones. B101-2007 - 3.2.5 Prepare Study models, perspective sketches, or digital modeling. B101-2007 - 3.2.5 Develop preliminary selections of major building systems with construction materials noted on the drawings or described in writing. B101-2007 - 3.2.5 Consider Environmentally responsible design alternatvies. B101-2007 - 3.2.5.1 Consider the value of alternative materials, building systems and equipment B101-2007 - 3.2.5.2 Develop typical exterior wall sections, typical exterior details and typical exterior wall types with sufficent detail delineated in the drawings and adequately described in the Basis of Design Project Manual so that initial system pricing can be obtained. Prepare general descrpition of atypical and high finish spaces such as lobbies, public corridors and amenities. Descibe in the form of narratives and/or freehand sketches. Prepare general describe typical toilet room and kitchen in plan and interior room elevations. Page 4

Establish ceiling heights on a preliminary typical or representative reflected ceiling plan(s) as the basis to initiate project coordination. If possible layout a small representative portion to establish design intent. Establish preliminary ceiling heights for all typical and principal spaces; indicate on the floor plans and building sections. Prepare partition type sheet for typical floor only. All types of partitions should be accurately shown, noted, and dimensioned. Prepare an Outline Specification with Project Description, general and regulatory requirements, preliminary building code, preliminary accessibility analysis, structural requirements, acoustical requirements, outline basic interior and exterior construction and materials, include preliminary elevator study, and include MEP outline specification. Issue The Package for preliminary line item pricing to the Owner's Consultant. STRUCTURAL Determine Structural system. Establish major grid lines, columns, shearwalls and other vertical elements. Determine dimensional requirements and size structural components. Address Major slab openings on typical floor(s), size major beams and spandrel beams. Address unique foundation conditions. Prepare Slab loading diagrams. Provide general descriptive information sufficient for Schematic pricing such as estimates of pounds of rebar per square foot, etc. Review pertinent portions of the Outline Specifications. Page 5

MEP / FP Develop design criteria including indoor and outdoor conditions, ventilation, air circulation, minimum exhaust, sound levels, system diversities and building envelope thermal characteristics. Prepare outline specification including detailed system descriptions. For ductwork provide maximum air velocity criteria and duct insulation requirements. Prepare preliminary fixture selections - general space requirements and types of plumbing fixtures, general criteria for light fixture types. Prepare riser diagrams for all mechanical, fire protection and electrical systems including information on number of risers and general sizes. Develop preliminary layout of major mechanical rooms. Develop typical floor space requirements including electrical rooms, any mechanical rooms, major risers, chase requirements, etc., include weights of equipment, major horizontal and vertical penetrations. DetermineTypical floor MEP & FP distribution systems and other mechanical, fire protection and electrical systems that can impact structural, architectural plans and reflected ceiling plans. Examples include: HVAC supply duct loop (office buildings), criteria for typical fan coil units and horizontal ductwork (residential), sprinkler main routing. Prepare Energy code analysis. Coordinate Utility requirements. OTHER CONSULTANTS Coordination with Owner's consultants. B101-2007 3.1.2 For high-rise buildings: Prepare wind analysis for building structure. Prepare elevator study to determine configuration, number of cars, capacities and speeds of elevators. Prepare preliminary acoustical report sufficient to establish typical wall types and to provide general guidelines in the Outline Specification. Prepare concept scheme for building maintenance. Prepare outline specification for security system. Prepare landscape design drawing sufficient for zoning and/or other governing body approvals. Establish LEED level if applicable. Page 6

Deliverables for Phase Drawings In general drawings indicate the scale and relationship of Project components All plans have spaces generally defined Representative area plans generally graphically fixed Full building elevations generally graphically fixed for typical areas Representative wall sections drawn Typical floor elevator and stair plans with preliminary sections Representative area partition types defined Preliminary civil and landscape drawings Structural plans, foundation defined, columns sized and located, lateral design defined MEP/FP systems defined, major mechanical spaces fixed in plans, representative plan area coordinated, initial riser diagrams Outline Specifications General statement of purpose of Package Project description Outline Specifications including general description of systems and finishes sufficient to met the General Objectives of Phase Project performance criteria established Attachments and additional information as project requires Page 7