Facility Operations Integration

Similar documents
A Framework for Developing and Evaluating Data Center Maintenance Programs

Denver International Airport Data Center Commissioning Plan

Project Management Plan for

ASSET Connect. The next level in Critical Environment Operational Efficiency

Construction Management Standards of Practice

Energy Design Resources Commissioning Plan Outline Template

Modeling Building Automation and Control Systems Jim Sinopoli, Managing Principal Smart Buildings, LLC

Sample Company SECTION GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES

Commissioning of Mission Critical Facilities

Commissioning of Fire Protection and Life Safety Systems. Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA

Volume II- Project Development Processes

Delivering results with Datacenter Clarity LC TM

CA/NV AWWA SCADA Seminar SCADA Master Planning. Presented by: Philip Gaberdiel Cell: ext

Top 10 Mistakes in Data Center Operations. Eric Gallant Regional Director Lee Technologies

Data Center Commissioning: What you need to know

Safety Plan Reviews in 3D Christopher Santulli, PE. April 23, 2012 Times Square Marriott Marquis

Managing risk in construction projects how to achieve a successful outcome*

4.4 Commissioning, Handover and Warranty

Introducing eco_dc_expert Group to Decathlon TM

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

COMMISSIONING OF FIRE ALARM SYSTEMS

Commissioning Fundamentals and a Practical Approach

Incorporating BIM into Facilities Management

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

Process Plant Construction: A Handbook for Quality Management

Top 10 Mistakes in Data Center Operations: Operating Efficient and Effective Data Centers

WESTERN MICHIGAN UNIVERSITY

Exhibit C: Scope of Work and Schedule of Deliverables

Mecklenburg County. Electronic Plans. Management (EPM) System. Customer User Guide

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

City of Raleigh Public Utilities Department. Wastewater EMS Manual

Understanding Power Usage Effectiveness (PUE) & Data Center Infrastructure Management (DCIM)

The Hitchhikers Guide to Data Center Facility Operations

S c h n e i d e r E l e c t r i c BUSINESS IMPACT. Jack Hack Enterprise System Engineer 19 November 2015

GRAFIK 5000TM/6000 /7000TM System Onsite Startup

The Building Commissioning Association

Guide Specification SECTION COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY

Commissioning Plan Preparation Guide. Version 2.0 (Replaces Project Test Plans Preparation Guide, Version 1.0, September 2012)

Building Commissioning

The Life-Cycle of Commissioning for New Construction

Data center management suite. Providing optimal control and efficiency to data center management.

H.V.A.C. Design Plumbing Design

Design Consultant Project Management Requirements

National Environmental Balancing Bureau 8575 Grovemont Circle Gaithersburg, MD ph: fax:


Revised Work Scope Dated April 23 rd, 2015

How to Monitor Large & Live Data Centers. PI makes data centers Green!

Construction Project Management Software UserView. Lessons from real software users

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT PROFESSIONAL SERVICES. Part I: Qualifications Information

Project Start Up. Start-Up Check List. Why a Project Check List? What is a Project Check List? Initial Release 1.0 Date: January 1997

Solar Home System. User Manual. AEH-SHS01-10W2L Solar Home System 2 Lamps

Asset management it s a simple concept. Know your system s

California Department of Technology, Office of Technology Services WINDOWS SERVER GUIDELINE

Technical Specifications for West Campus Data Center HVAC System

Visualization, Management & Optimization Keys for an efficient Data Center Sergio Uribe - CommScope

BIM and Facilities Management

BIM UNDERSTANDING THE PROCESS The State of the Art Tool in Design and Construction SPONSORED BY SAME, DC POST IN ASSOCIATION WITH ACEC M/W

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE DIVISION PROCEDURES MANUAL PROGRAM AND PROJECT MANAGEMENT

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information

Powerful information management services and software for the oil, gas, and chemical industries

Foreseer Services. Product application guide. Table of contents

Vendor Performance Evaluation Requirements

Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho

Datacenter Infrastructure Management (DCIM) Solution

SECTION INTEGRATED AUTOMATION SOFTWARE FOR CONTROL OF MONITORING NETWORKS

Project Close Out Summary

Florida Power & Light Company. Business Heating Ventilation & Air Conditioning ( HVAC ) Program Standards. Effective: November 9, 2015

Service Catalog. it s Managed Plan Service Catalog

San Antonio Water System Standard Specifications for Construction ITEM NO. 903 CONSTRUCTION QC/QA PROGRAM

The Real Cost of Manual Asset Management

Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK

through DCIM as a Datacenter Clarity LC powered by PI System

HVAC MAINTENANCE SUPERVISOR (Range 121)

Top 10 Mistakes in Data Center operations:

Facility Safety and Emergency Management (FSE)

Optional Lab: Schedule Task Using GUI and at Command in Windows 7

Phased Building Information Management (BIM) and Modeling Implementation Plan. David J. Gutierrez, AIA September, 2014

Equipment Identification Process for PMCS

BlueCielo Meridian Today

By the Citrix Publications Department. Citrix Systems, Inc.

Georgia School Boards Association. Risk Management Fund Claims Manual

Sedgwick White Paper Integrated Disability Management

CalMod Design-Build Electrification Services

The Green Grid, Metrics and DCMM. Presented by: Jay Taylor

T146 Electro Mechanical Engineering Technician MTCU Code Program Learning Outcomes

DTW Works Master Specification Version 2006

Transcription:

Facility Operations Integration James Bartone, Schneider Electric Kevin Dalton, Digital Realty Trust Philip Beatty, Bradford Engineers Jason Schafer, Schneider Electric Michael Jordan, Vantage Data Centers

Program Summary Facility Operations Integration during design, construction, commissioning, and sustained operations Facilitated discussion of industry experts representing the following perspectives: DC Owner/Developer DC Designer DC Commissioning Consultant DC Facilities Operator

Problem Statement Universal DC Industry Problem Inadequate or inaccurate Facility Operations Documentation results in non-optimized data center performance due to uncertainty or lack of information Process Issue Lack of operational focus & required documentation during design and construction Incompatible data collection formats utilized during design, construction, and commissioning Inadequately specified requirements for operational documents turnover at project completion Non-integrated change management system

Recommendation A new TGG white paper provides prescriptive measures for better data collection, integration, and change management practices throughout the entire facility lifecycle Defines required operational documents for turnover to Facility Operations team Recommends employing a commissioning consultant from schematic design phase through Go Live turnover Presents a formulated approach for producing a holistic facility sequence of operations manual that is delivered to the Facility Operations team at turnover

Sequence of Operations Sequence of Operations and the Data Center Lifecycle Planning & Programming Design Construction Commission Turnover & Transition Operations Site Analysis Elec. Coord n Study Project Summary QA/QC Inspections O & M Manuals QA/QC Procedures MOPS, SOPs, EOPs Environmental Reports Arc Flash Study Shop Drawings Functional Test Scripts Vendor Contact List Training Materials (Drills, Classes, etc.) Owner s Project Requirements CFD Air Flow Model Submittals Integrated Systems Test Report Spare Parts List Training Records & Certification Building Program IFC Drawings Equipment List Issue Resolution Log As-Built Drawings Maintenance History (CMMS) Basis of Design Specifications Change Order Log Commissioning Report Control Network Diagrams Project Impact Analysis Cx Plan & Ops Sequences Punch List Update Systems Diagrams Panel Schedules Updated OpDocs & SOO Regulatory Documents Permits Inspection Reports Cert. of Substantial Completion Update Systems Narrative Sequence of Ops Manual Software Back-up Disks Change Control Log Certificate of Occupancy Warranties

Introductions Moderator: Owner: Designer: Commissioner: Operator: James Bartone Schneider Electric Kevin Dalton Digital Realty Trust Philip Beatty Bradford Engineers Jason Schafer Schneider Electric Michael Jordan Vantage Data Centers

FOI Survey Question #1 SEQUENCE OF OPERATIONS Do you have written Sequences of Operations for the Power and Cooling systems in your data center (i.e. documentation beyond electrical oneline drawings, HVAC control diagrams & O&M manuals)? Yes No http://manage.eventmobi.com/en/ars/results/question/59279/eb36460cf 0159cc36d0ad37af8eaa4da

FOI Survey Question # 2 FACILITY INFORMATION MODEL How would you best describe your current Facility Information Model? A. Blueprints and 2D drawing files + O&Ms B. 3D CADD drawing files + O&Ms C. BIM (3D Building Information Model) http://manage.eventmobi.com/en/ars/results/question/59280/c0c55513bab8a4d 7f5f59c6821a13e48

FOI Survey Question # 3 INFRASTRUCTURE MANAGEMENT How would you describe your critical infrastructure management system? A. No formal systems in place. B. Multiple separate systems monitored on separate screens (i.e. EPMS, BMS, etc.) C. DCIM ( single pane monitoring and control of multiple systems) http://manage.eventmobi.com/en/ars/results/question/59281/b7930da5b5bf44ff e5f8660da03116a6

FOI Survey Question # 4 DCIM STANDARDS When do you foresee an industry accepted DCIM standard? A. 2 Years B. 5 Years C. 10 Years http://manage.eventmobi.com/en/ars/results/question/59282/2dd50ff9f9347714 914414689e25d018

Read the New Whitepaper The Green Grid White Paper #52 An Integrated Approach to Operational Efficiency and Reliability at: http://tinyurl.com/ggwp52